SlideShare a Scribd company logo
SKYBUS AN EMERGING
TECHNOLOGY
Presented By :
AMIYA KUMAR SAMAL
MECHANICAL ENGINEERING
PARALA MAHARAJA ENGINEERING COLLEGE
7TH SEMESTAR
1301109115
CONTENTS :
 INTRODUCTION
 THE SKYBUS COMPONENTS
 IT’S WORKING PRINCIPLE
 WHY SKYBUS ???????
 SALIENT FEATURES
 SAFETY MEASURES
 ADVANTAGES
 DISADVANTAGES
 SKYBUS IN NEAR FEATURES
 CONCLUSIONS
 WHAT IS SKYBUS ?
 Sky bus is a suspended railway system, can never capsize nor collide
due to its design and construction technique .
 A unique mass transit system which than can be put up within any two
years in any crowded and congested city for safe transportation without
loss of time.”
 The sky bus technology offered by Konkani railway corporation .
 It redefines the thinking and planning for urban transport being eco-friendly.
 Pre-fabricated latest construction technologies, which save time and money
resulting in easy execution of the project in busy urban areas without
disturbing the existing traffic pattern
 COMPONENTS OF SKYBUS :
I. Sky Way
II. Sky Bogies
III. Sky Coaches
IV. Sky Stations
V. Traverse Arrangements
I . SKY WAY
 Path in which Sky Bus travels
 Includes concrete box carried over a series of piers at a height
of about 10m above existing road level
 Two rails are appropriately fixed to guide the bus
II . SKY BOGIES
 Two Standard axle bogies provide the drive mechanism
 Each bogie is driven by 3-phase alternating current (AC) motor.
 Speed of 100 kmph (max. 160 kmph)
 Disc & Emergency brakes is used
 Power is delivered using brushes or by current carrying wheels
III . SKY COACHES
 Double walled lightweight shells with wide large windows and suspended
below rails
 Air conditioned coaches and have 4m wide
and automatic doors
 Audio visual information to passengers
 2m x 2m space for easy entry & exit
 Each coach carries 150 passengers
 Each coach is 9.25m long and 3.2 m wide
 Consist of two coaches, with total length of
18.5m.
IV . SKY STATIONS
 Sky Stations where sky buses halt
 Have automatic doors and Lift
 Smaller area consumption
 Fully computerized
 Entry only by electronic swiping cards
 Lifted 5.5 – 6m above Ground Level
V . TRAVERSE ARRANGEMENTS
 There are no points and crossings
 Automatically shifts the skybus units for balancing loads or change of
roots
 The traverser acts like a station.
 WORKING PRINCIPLE :
 As long as the wheels are on the
rails, the coach runs.
 But failure of rails / obstruction by
a heavy wind force may create
dangerous situations
 When the wheels climb 25 to 30 mm
flange , then derailment occurs
 If derailment occurs, then there is
nothing to hold the coach, then the
coach just topples.
 Such falling of coach can kill people inside
the coach and also people on the road,
if any
 WHY SKYBUS ????
 Conventional railway provides
for heavy steel coaches to
protect people .
 So carry more steel and dead
weight instead of people.
 With total weight of 48T, a
railway can carry only 70
persons in 20mLength
 But for metro it costs about 230
corers and for underground
metro it costs about 398-400
cores
 Sky Bus has no such problem,
no derailment nor capsizing;
hence uses very light weight
coaches and carries more
people.
 It uses much less dead weight
 Sky Bus with the same weight
& length carries 300 persons
comfortably
 The approximate construction
cost for skybus is about 45-50
corers/km
 SAILENT FEATURES :
i. Pollution free
ii. Noise free
iii. Economical
iv. Air Conditioned Travel
v. Can carry 36000 persons per hour (pph)
vi. Can be extended to 72000 pph
vii. Can shift 20ft containers for corner to corner.
 SAFETY MEASURES :
 Safety airbags are provided with each coach
 Compared to conventional railway systems, the centre of gravity of the
mass being carried on the wheels is brought down to be closer to the
wheel support. Hence dynamic safety is many times improved
 In conventional railway wind can topple the trains. In Sky Bus wind
cannot topple- there is positive link between the rail guidance system
and the Bus Coaches- with 400%.
 Sky Bus- eliminating the problems of existing metro rail systems
like derailments, collisions, capsizing and crushing people.
 ADVANTAGES :
 Fast transportation
 Mass Transport
 No land acquisition problem
 No demolition
 No vandalism
 No capsizing
 Tourism
 Low capital and running cost
 Luxury
 No deaths due to trespassing
 Low maintainance cost
 No interference with normal
traffic
 Can be built on existing flyover
 No pollution
 Comfort to passengers
 No derailment problem
 Fire Protection
 DISADVANTAGES :
 Consume High Electricity
 High Initial Cost
But instead of thermal power plant use of hydraulic power plant can
produce more electricity .
 SKYBUS IN NEAR FUTURE :
 As it saves 50% - 70% of the cost it is seen as the future of metro.
 The authorities in Mumbai set up with the idea to consider setting up a
sky bus system on a 9.8 km sketch between Andheri and Ghatkopur .
 To the Tamil Nadu Government, has presented a possible route network
between Muthialpet in North Chennai to Athipet in the west — via
Koyambedu — and Mahabalipuram 45 km South
 The sky bus is proposed by Indian railways in India in following cities
Hyderabad , Pune , Mumbai, Bangalore ,Chennai , Delhi, etc.
 CONCLUSION :
 Research confirms that advantages of sky bus technology are
tremendous. For overpopulated Indian urban areas, sky bus seems to be
the best solution for safe, quality, and inexpensive mass public
transportation.
 Indian state governments and metro city corporations are waiting for
final approval from experts. If sky bus project receives approval by
experts for its track tests, sky bus will become the solution for urban
public transportation in 21st century, at least for India.
 Ultimately life is more precious than any other thing hence we need to
give safer transportation facility along with it economy also play
important role.
Sky bus an emerging technology

More Related Content

What's hot

Sky bus technology
Sky bus technologySky bus technology
Sky bus technology
Praniti Panda
 
Sky bus
Sky busSky bus
Sky bus
JNTU
 
Ppt monorail
Ppt monorailPpt monorail
Ppt monorail
ASHISHKUMARSAROJ1
 
INTELLIGENT TRANSPORT SYSTEM (ITS)
INTELLIGENT TRANSPORT SYSTEM (ITS)INTELLIGENT TRANSPORT SYSTEM (ITS)
INTELLIGENT TRANSPORT SYSTEM (ITS)
Chaitanya Sasetti
 
SKYBUS TECHNOLOGY
SKYBUS TECHNOLOGYSKYBUS TECHNOLOGY
SKYBUS TECHNOLOGY
INDUSTRIAL ENGINEERING
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
srinivas2036
 
Automated Highway System Report
Automated Highway System ReportAutomated Highway System Report
Automated Highway System Report
Samir8880
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
Malyar Talash
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
Bhaskar Kumar Dan
 
Automated highway systems
Automated highway systemsAutomated highway systems
Automated highway systems
Aglaia Connect
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control system
Bathla Tuition Centre
 
Chapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingChapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlocking
dhara dattani
 
Signals on Railway
Signals on RailwaySignals on Railway
Signals on Railway
Satyapal Singh
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
gayathrysatheesan1
 
turnouts in railways
 turnouts in railways turnouts in railways
turnouts in railways
Srinivasulu Srinu
 
seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
mechanical Singh
 
Intelligent Transportation System (ITS)
Intelligent Transportation System (ITS)Intelligent Transportation System (ITS)
Intelligent Transportation System (ITS)
Jonathan D'Cruz
 
A Review on
A Review onA Review on
A Review on
ijsrd.com
 
PPT on MONORAIL TECHNOLOGY
PPT on  MONORAIL TECHNOLOGYPPT on  MONORAIL TECHNOLOGY
PPT on MONORAIL TECHNOLOGY
Yahya K
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
RAMPRASAD KUMAWAT
 

What's hot (20)

Sky bus technology
Sky bus technologySky bus technology
Sky bus technology
 
Sky bus
Sky busSky bus
Sky bus
 
Ppt monorail
Ppt monorailPpt monorail
Ppt monorail
 
INTELLIGENT TRANSPORT SYSTEM (ITS)
INTELLIGENT TRANSPORT SYSTEM (ITS)INTELLIGENT TRANSPORT SYSTEM (ITS)
INTELLIGENT TRANSPORT SYSTEM (ITS)
 
SKYBUS TECHNOLOGY
SKYBUS TECHNOLOGYSKYBUS TECHNOLOGY
SKYBUS TECHNOLOGY
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
Automated Highway System Report
Automated Highway System ReportAutomated Highway System Report
Automated Highway System Report
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
 
Automated highway systems
Automated highway systemsAutomated highway systems
Automated highway systems
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control system
 
Chapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingChapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlocking
 
Signals on Railway
Signals on RailwaySignals on Railway
Signals on Railway
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
 
turnouts in railways
 turnouts in railways turnouts in railways
turnouts in railways
 
seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
 
Intelligent Transportation System (ITS)
Intelligent Transportation System (ITS)Intelligent Transportation System (ITS)
Intelligent Transportation System (ITS)
 
A Review on
A Review onA Review on
A Review on
 
PPT on MONORAIL TECHNOLOGY
PPT on  MONORAIL TECHNOLOGYPPT on  MONORAIL TECHNOLOGY
PPT on MONORAIL TECHNOLOGY
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 

Viewers also liked

Skybus an emerging technology
Skybus   an emerging technologySkybus   an emerging technology
Skybus an emerging technology
pavan bathani
 
Seminar
SeminarSeminar
SeminarJNTU
 
Skybus an emerging technology
Skybus   an emerging technologySkybus   an emerging technology
Skybus an emerging technology
Sourav Das
 
Boilers
BoilersBoilers
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsAhmad Rashwan
 
Monorail
MonorailMonorail
Monorail
Shivang Mehta
 
Bamboo Construction
Bamboo Construction Bamboo Construction
Bamboo Construction
BINITA RAMI
 
Ppt on mono rail by rahul
Ppt on mono rail by rahulPpt on mono rail by rahul
Ppt on mono rail by rahulVikas Gupta
 
demolition of building
demolition of buildingdemolition of building
demolition of buildingtushar garg
 
Six sense technology
Six sense technologySix sense technology
Six sense technology
Rahul Bhagat
 
5 Pen PC Technology
5 Pen PC Technology5 Pen PC Technology
5 Pen PC Technology
Sanunath Gopalakrishnan
 
Boiler final
Boiler finalBoiler final
Boiler final
Het Patel
 
Sonification
SonificationSonification
Sonification
divya kanakam
 
Presentation on Six Sense Technology
Presentation on Six Sense TechnologyPresentation on Six Sense Technology
Presentation on Six Sense Technology
Deepshikha1Maurya1
 
High pressure boilers (1)
High pressure boilers (1)High pressure boilers (1)
High pressure boilers (1)
sneh patel
 
Monorail Presentation
Monorail PresentationMonorail Presentation
Monorail Presentation
Eshu Kumar
 
Wireless charging of mobile phones using microwaves ppt
Wireless charging of mobile phones using microwaves pptWireless charging of mobile phones using microwaves ppt
Wireless charging of mobile phones using microwaves pptHarish N Nayak
 

Viewers also liked (19)

Skybus an emerging technology
Skybus   an emerging technologySkybus   an emerging technology
Skybus an emerging technology
 
Seminar
SeminarSeminar
Seminar
 
Skybus an emerging technology
Skybus   an emerging technologySkybus   an emerging technology
Skybus an emerging technology
 
S_Andriulli_resume
S_Andriulli_resumeS_Andriulli_resume
S_Andriulli_resume
 
Boilers
BoilersBoilers
Boilers
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
Monorail
MonorailMonorail
Monorail
 
Nanotechnology
NanotechnologyNanotechnology
Nanotechnology
 
Bamboo Construction
Bamboo Construction Bamboo Construction
Bamboo Construction
 
Ppt on mono rail by rahul
Ppt on mono rail by rahulPpt on mono rail by rahul
Ppt on mono rail by rahul
 
demolition of building
demolition of buildingdemolition of building
demolition of building
 
Six sense technology
Six sense technologySix sense technology
Six sense technology
 
5 Pen PC Technology
5 Pen PC Technology5 Pen PC Technology
5 Pen PC Technology
 
Boiler final
Boiler finalBoiler final
Boiler final
 
Sonification
SonificationSonification
Sonification
 
Presentation on Six Sense Technology
Presentation on Six Sense TechnologyPresentation on Six Sense Technology
Presentation on Six Sense Technology
 
High pressure boilers (1)
High pressure boilers (1)High pressure boilers (1)
High pressure boilers (1)
 
Monorail Presentation
Monorail PresentationMonorail Presentation
Monorail Presentation
 
Wireless charging of mobile phones using microwaves ppt
Wireless charging of mobile phones using microwaves pptWireless charging of mobile phones using microwaves ppt
Wireless charging of mobile phones using microwaves ppt
 

Similar to Sky bus an emerging technology

Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportationPramod Chinchansur
 
Piyush
PiyushPiyush
Kolkata underwater metro project VISHAL PPT.pptx
Kolkata underwater metro project VISHAL PPT.pptxKolkata underwater metro project VISHAL PPT.pptx
Kolkata underwater metro project VISHAL PPT.pptx
imsuraj2309
 
TRANSIT ELEVATED BUS (straddle bus)
TRANSIT ELEVATED BUS (straddle bus)TRANSIT ELEVATED BUS (straddle bus)
TRANSIT ELEVATED BUS (straddle bus)
Akshay P B
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
IJSRD
 
Driverless metro
Driverless metroDriverless metro
Driverless metro
bbdit
 
Hyperloop
HyperloopHyperloop
Hyperloop
venkatraam
 
Super Capacitor Buses in Shanghai
Super Capacitor Buses in ShanghaiSuper Capacitor Buses in Shanghai
Super Capacitor Buses in Shanghai
Research India Pvt. Ltd
 
Maglev - Inter-City Travel in India by 2030
Maglev - Inter-City Travel in India by 2030Maglev - Inter-City Travel in India by 2030
Maglev - Inter-City Travel in India by 2030
Prateek Biswas
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
TURENDARSAHU
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
poongodiprabha
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
Nishanth H A
 
Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains
VishalSharma109227
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
Jasper Jasper
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET Journal
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
libin paul
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250
Shadina Shah
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
SolidWorks Freelance
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
Nishant Mittal
 
Indian railways ppt
Indian railways pptIndian railways ppt
Indian railways ppt
MohitSaini181
 

Similar to Sky bus an emerging technology (20)

Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportation
 
Piyush
PiyushPiyush
Piyush
 
Kolkata underwater metro project VISHAL PPT.pptx
Kolkata underwater metro project VISHAL PPT.pptxKolkata underwater metro project VISHAL PPT.pptx
Kolkata underwater metro project VISHAL PPT.pptx
 
TRANSIT ELEVATED BUS (straddle bus)
TRANSIT ELEVATED BUS (straddle bus)TRANSIT ELEVATED BUS (straddle bus)
TRANSIT ELEVATED BUS (straddle bus)
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
 
Driverless metro
Driverless metroDriverless metro
Driverless metro
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
Super Capacitor Buses in Shanghai
Super Capacitor Buses in ShanghaiSuper Capacitor Buses in Shanghai
Super Capacitor Buses in Shanghai
 
Maglev - Inter-City Travel in India by 2030
Maglev - Inter-City Travel in India by 2030Maglev - Inter-City Travel in India by 2030
Maglev - Inter-City Travel in India by 2030
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains Smart Railway infrastructure and High speed trains
Smart Railway infrastructure and High speed trains
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Indian railways ppt
Indian railways pptIndian railways ppt
Indian railways ppt
 

More from Amiya Kumar Samal

Basics Overview of Vapour Absorption Machine.pptx
Basics Overview of Vapour Absorption Machine.pptxBasics Overview of Vapour Absorption Machine.pptx
Basics Overview of Vapour Absorption Machine.pptx
Amiya Kumar Samal
 
Training on Electrical Starter & Switch Gear.ppt
Training on Electrical Starter & Switch Gear.pptTraining on Electrical Starter & Switch Gear.ppt
Training on Electrical Starter & Switch Gear.ppt
Amiya Kumar Samal
 
Electrical Safety.ppt
Electrical Safety.pptElectrical Safety.ppt
Electrical Safety.ppt
Amiya Kumar Samal
 
Doc
DocDoc
Flow analysis
Flow analysisFlow analysis
Flow analysis
Amiya Kumar Samal
 
FLOW ANALYSIS OVER NACA AIRFOILS USING FLUENT
FLOW ANALYSIS OVER NACA AIRFOILS USING FLUENTFLOW ANALYSIS OVER NACA AIRFOILS USING FLUENT
FLOW ANALYSIS OVER NACA AIRFOILS USING FLUENT
Amiya Kumar Samal
 
SOLAR AC
SOLAR ACSOLAR AC
GROWTH AND DEVELOPMENT OF SME VIA SALESMANSHIP
GROWTH AND DEVELOPMENT OF SME VIA SALESMANSHIPGROWTH AND DEVELOPMENT OF SME VIA SALESMANSHIP
GROWTH AND DEVELOPMENT OF SME VIA SALESMANSHIP
Amiya Kumar Samal
 
Space Elevator-The Final Frontier
Space Elevator-The Final FrontierSpace Elevator-The Final Frontier
Space Elevator-The Final Frontier
Amiya Kumar Samal
 

More from Amiya Kumar Samal (9)

Basics Overview of Vapour Absorption Machine.pptx
Basics Overview of Vapour Absorption Machine.pptxBasics Overview of Vapour Absorption Machine.pptx
Basics Overview of Vapour Absorption Machine.pptx
 
Training on Electrical Starter & Switch Gear.ppt
Training on Electrical Starter & Switch Gear.pptTraining on Electrical Starter & Switch Gear.ppt
Training on Electrical Starter & Switch Gear.ppt
 
Electrical Safety.ppt
Electrical Safety.pptElectrical Safety.ppt
Electrical Safety.ppt
 
Doc
DocDoc
Doc
 
Flow analysis
Flow analysisFlow analysis
Flow analysis
 
FLOW ANALYSIS OVER NACA AIRFOILS USING FLUENT
FLOW ANALYSIS OVER NACA AIRFOILS USING FLUENTFLOW ANALYSIS OVER NACA AIRFOILS USING FLUENT
FLOW ANALYSIS OVER NACA AIRFOILS USING FLUENT
 
SOLAR AC
SOLAR ACSOLAR AC
SOLAR AC
 
GROWTH AND DEVELOPMENT OF SME VIA SALESMANSHIP
GROWTH AND DEVELOPMENT OF SME VIA SALESMANSHIPGROWTH AND DEVELOPMENT OF SME VIA SALESMANSHIP
GROWTH AND DEVELOPMENT OF SME VIA SALESMANSHIP
 
Space Elevator-The Final Frontier
Space Elevator-The Final FrontierSpace Elevator-The Final Frontier
Space Elevator-The Final Frontier
 

Recently uploaded

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 

Recently uploaded (20)

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 

Sky bus an emerging technology

  • 1. SKYBUS AN EMERGING TECHNOLOGY Presented By : AMIYA KUMAR SAMAL MECHANICAL ENGINEERING PARALA MAHARAJA ENGINEERING COLLEGE 7TH SEMESTAR 1301109115
  • 2. CONTENTS :  INTRODUCTION  THE SKYBUS COMPONENTS  IT’S WORKING PRINCIPLE  WHY SKYBUS ???????  SALIENT FEATURES  SAFETY MEASURES  ADVANTAGES  DISADVANTAGES  SKYBUS IN NEAR FEATURES  CONCLUSIONS
  • 3.  WHAT IS SKYBUS ?  Sky bus is a suspended railway system, can never capsize nor collide due to its design and construction technique .  A unique mass transit system which than can be put up within any two years in any crowded and congested city for safe transportation without loss of time.”  The sky bus technology offered by Konkani railway corporation .  It redefines the thinking and planning for urban transport being eco-friendly.  Pre-fabricated latest construction technologies, which save time and money resulting in easy execution of the project in busy urban areas without disturbing the existing traffic pattern
  • 4.
  • 5.  COMPONENTS OF SKYBUS : I. Sky Way II. Sky Bogies III. Sky Coaches IV. Sky Stations V. Traverse Arrangements
  • 6. I . SKY WAY  Path in which Sky Bus travels  Includes concrete box carried over a series of piers at a height of about 10m above existing road level  Two rails are appropriately fixed to guide the bus
  • 7. II . SKY BOGIES  Two Standard axle bogies provide the drive mechanism  Each bogie is driven by 3-phase alternating current (AC) motor.  Speed of 100 kmph (max. 160 kmph)  Disc & Emergency brakes is used  Power is delivered using brushes or by current carrying wheels
  • 8. III . SKY COACHES  Double walled lightweight shells with wide large windows and suspended below rails  Air conditioned coaches and have 4m wide and automatic doors  Audio visual information to passengers  2m x 2m space for easy entry & exit  Each coach carries 150 passengers  Each coach is 9.25m long and 3.2 m wide  Consist of two coaches, with total length of 18.5m.
  • 9. IV . SKY STATIONS  Sky Stations where sky buses halt  Have automatic doors and Lift  Smaller area consumption  Fully computerized  Entry only by electronic swiping cards  Lifted 5.5 – 6m above Ground Level
  • 10. V . TRAVERSE ARRANGEMENTS  There are no points and crossings  Automatically shifts the skybus units for balancing loads or change of roots  The traverser acts like a station.
  • 11.  WORKING PRINCIPLE :  As long as the wheels are on the rails, the coach runs.  But failure of rails / obstruction by a heavy wind force may create dangerous situations  When the wheels climb 25 to 30 mm flange , then derailment occurs
  • 12.  If derailment occurs, then there is nothing to hold the coach, then the coach just topples.  Such falling of coach can kill people inside the coach and also people on the road, if any
  • 13.  WHY SKYBUS ????  Conventional railway provides for heavy steel coaches to protect people .  So carry more steel and dead weight instead of people.  With total weight of 48T, a railway can carry only 70 persons in 20mLength  But for metro it costs about 230 corers and for underground metro it costs about 398-400 cores  Sky Bus has no such problem, no derailment nor capsizing; hence uses very light weight coaches and carries more people.  It uses much less dead weight  Sky Bus with the same weight & length carries 300 persons comfortably  The approximate construction cost for skybus is about 45-50 corers/km
  • 14.  SAILENT FEATURES : i. Pollution free ii. Noise free iii. Economical iv. Air Conditioned Travel v. Can carry 36000 persons per hour (pph) vi. Can be extended to 72000 pph vii. Can shift 20ft containers for corner to corner.
  • 15.  SAFETY MEASURES :  Safety airbags are provided with each coach  Compared to conventional railway systems, the centre of gravity of the mass being carried on the wheels is brought down to be closer to the wheel support. Hence dynamic safety is many times improved  In conventional railway wind can topple the trains. In Sky Bus wind cannot topple- there is positive link between the rail guidance system and the Bus Coaches- with 400%.  Sky Bus- eliminating the problems of existing metro rail systems like derailments, collisions, capsizing and crushing people.
  • 16.  ADVANTAGES :  Fast transportation  Mass Transport  No land acquisition problem  No demolition  No vandalism  No capsizing  Tourism  Low capital and running cost  Luxury  No deaths due to trespassing  Low maintainance cost  No interference with normal traffic  Can be built on existing flyover  No pollution  Comfort to passengers  No derailment problem  Fire Protection
  • 17.  DISADVANTAGES :  Consume High Electricity  High Initial Cost But instead of thermal power plant use of hydraulic power plant can produce more electricity .
  • 18.  SKYBUS IN NEAR FUTURE :  As it saves 50% - 70% of the cost it is seen as the future of metro.  The authorities in Mumbai set up with the idea to consider setting up a sky bus system on a 9.8 km sketch between Andheri and Ghatkopur .  To the Tamil Nadu Government, has presented a possible route network between Muthialpet in North Chennai to Athipet in the west — via Koyambedu — and Mahabalipuram 45 km South  The sky bus is proposed by Indian railways in India in following cities Hyderabad , Pune , Mumbai, Bangalore ,Chennai , Delhi, etc.
  • 19.  CONCLUSION :  Research confirms that advantages of sky bus technology are tremendous. For overpopulated Indian urban areas, sky bus seems to be the best solution for safe, quality, and inexpensive mass public transportation.  Indian state governments and metro city corporations are waiting for final approval from experts. If sky bus project receives approval by experts for its track tests, sky bus will become the solution for urban public transportation in 21st century, at least for India.  Ultimately life is more precious than any other thing hence we need to give safer transportation facility along with it economy also play important role.