• Definition
• Waste identification and reduction
• 5S
• Cellular Manufacturing
• JIT
• Design with Lean in mind
• Value Stream Mapping
3
Lean Manufacturing Definition
“A philosophy of production that
emphasizes the minimization of the
amount of all the resources (including
time) used in the various activities of the
enterprise. It involves identifying and
eliminating non­value­adding activities in
design, production, supply chain
management, and dealing with the
customers. . .”
–– APICSAPICS
4
Lean Enterprise Definition
“An enterprise with a focus on waste
elimination and the customer’s needs in
all parts of its operations,
manufacturing, and administration.
Emphasis is given to lean structures
and processes, flexibility of response,
and methods and techniques to
continually seize new opportunities as
they arise.”
– APICS
5
Lean Thinking Principles
1. Accurately specify the value of the products
or services (applies to both factory and office
areas, not just to manufacturing).
2. Identify the value stream for each product or
service and remove wasted actions (muda).
3. Make the product or service value flow
without interruptions.
4. Let customers pull products or services from
the producer.
5. Pursue perfection and continuously improve.
6
Lean Manufacturing, Supply
Chain, and the Lean Enterprise
Supply Chain – the Lean Enterprise
Raw
Material
Suppliers
Tier 2
Suppliers
Tier 1
Suppliers
Company
XYZ Customers
Lean
Manufacturing
7
Lean Manufacturing Characteristics
• Focus is on the improvement of
resource utilization:
– Equipment setup time reduced
– Scheduled machine maintenance
– Orderly, clean workplace
– Pull production being used
– JIT inventory control
– Factory layout in workcell
arrangement by products
– Active error elimination
– Improved quality, etc.
8
Set big, hairy audacious
goals (BHAG)
• 50% reduction in defects every year
• 100% on­time delivery
• Reduce order­to­ship time to less
than a day
• Increase Inventory turns per year
• Reduce time­to­market by 75%
• Reduce costs (hours/widget)
9
The Importance of Waste Elimination
Lean deals with the elimination or
reduction of many types of non value­
added activities, often referred to as
waste (Muda).
The driving force for waste elimination is
improved value in the products and
services customers buy.
10
The Seven Popular Wastes from TPS
1. Defects
2. Overproduction
3. Transportation
4. Waiting
5. Inventories
6. Motion
7. Processing
11
The Nature of Wastes
Defects
– Low material yields
– Excessive process variability
12
The Nature of Wastes
Overproduction
– Target and achievement unclear
– Excessive lead time and storage times
Transportation
– Widely spaced equipment
– Forklifts not available when needed
Waiting
– Operators waiting
– Operators slower than production line
13
The Nature of Wastes
Inventory
– Large safety stocks
– Variable procurement lead times
Motion
– Double handling
– Equipment widely spaced from each other
Inappropriate Processing
– Variability in operator’s performance
– Processes not statistically capable
14
Correcting Wastes
Defects
– Develop the production process to prevent
defects from being made and eliminate the need
for inspection. At each process, produce no
defects. Design processes to be failsafe to
assure this. From a quality process comes a
quality product—automatically.
15
Correcting Wastes
Overproduction
– Eliminate by reducing setup
times, synchronizing quantities
and timing between processes,
compacting layouts, etc. Make
only what is needed now.
Transportation
– Establish layouts and locations
to make transport and handling
unnecessary, if possible.
16
Correcting Wastes
Waiting
– Eliminate through synchronizing
work flow as much as possible and
balancing uneven loads with
flexible workers and equipment.
Inventory
– Reduce by shortening setup times
and lead times by synchronizing
work flows and improving work
skills, even by smoothing
fluctuations in demand for the
product. Reducing all the other
wastes reduces the waste of
stocks.
17
Correcting Wastes
Motion
– Study motion for economy and consistency.
Economy improves productivity, and consistency
improves quality. First improve the motions, then
mechanize or automate. Otherwise, there is a
danger of automating waste.
Processing
– First questions to ask are why should this item be
made at all, then why is each process necessary.
Extend thinking beyond economy of scale or speed.
18
Seven Additional
Wastes within Manufacturing
1. Wasted power and energy
2. Wasted human potential
3. Environmental pollution
4. Unnecessary overhead
5. Inappropriate design
6. Departmental culture
7. Inappropriate information
19
The 5 Ss
• To eliminate waste, you must first find it.
• Visual order makes waste evident and is
a starting point for managing resources.
• Good housekeeping uses the Toyota
Production System’s 5 Ss as the method
for improvement by exposing waste and
poor utilization of resources.
20
The 5 Ss
1.Seiri: Organization
2.Seiton: Tidiness
3.Seiso: Purity
4.Seiketsu: Cleanliness
5.Shitsuke: Discipline
Japanese American
Sort
Set in order
Shine
Standardize
Sustain
Cleanup
Arranging
Neatness
Discipline
Ongoing
Improvement
CANDO
Sifting
Sweeping
Sorting
Sanitizing
Sustaining
American
21
The 5S’s with Safety
Sort: Classify tools, parts, instructions into
necessary and unnecessary. Get rid of the later.
Sustain: Make a habit of properly maintaining and
following standard practices.
Safety: Identify and eliminate dangerous and
hazardous conditions.
Standardize: Put a system in place to readily
identify abnormal conditions.
Shine: Conduct cleanup to identify abnormalities.
Set in Order: Make it visible and easy to use:
3 Es = easy to see, easy to get, and easy to return.
22
Shadow Boarding
Correct Incorrect
23
Andon Warning Lights
• Andon lights are visual tools
that enable operators to signal
the need for immediate
assistance whenever
production flow is affected.
– When an abnormality is detected,
a supervisor and support
personnel rapidly respond.
24
What Are Processes?
• A particular method of doing something, generally
involving a number of steps, activities, or operations.
Grind Turn Mill Drill
Manufacturing
Type
contract
Obtain
signature
Type
envelope
Mail
Office
Grind Turn Mill Drill
Manufacturing
Grind Turn Mill DrillGrind Turn Mill Drill
Manufacturing
Type
contract
Obtain
signature
Type
envelope
Mail
Office Type
contract
Obtain
signature
Type
envelope
Mail
Type
contract
Obtain
signature
Type
envelope
Mail
Office
• Processes are found in manufacturing and service
industries.
• Example:
25
What Are Value­Added Activities?
• Value­added activities are those that add value
to products and services that customers are
willing to pay for.
– Improvements that change a product’s or service’s form,
fit, or function.
• Other activities use resources but add no value.
– Some non­value­added activities may be necessary if they
cannot be eliminated based on current knowledge or
technology. Eliminate long term.
– Remaining non­value­added activities should be eliminated
currently.
26
A Value­Added Step
• A value­added step in a process is one
that physically changes the work passing
through the process or the work output
produced to make it more valuable to the
customer.
• A step requested by the customer that he
or she is willing to pay for.
• A legally required mandate.
27
Value­ Versus Non­Value­Added
• Entering order
• Ordering
materials/supplies
• Preparing drawings
• Assembling
• Shipping to customers
• Processing customer
deposits
• Examining patients
• Filing insurance claims
• Dispensing event tickets
• Fueling airplane
• Waiting/sorting
• Moving
• Kitting/staging
• Counting
• Inspecting
• Checking
• Recording
• Obtaining approvals
• Testing
• Reviewing
• Copying
• Filing
• Revising/reworking
• Tracking work
Value­Added Activities Non­Value­Added Activities
– Charlene B. Adair and Bruce A. Murray,
Breakthrough Process Redesign
28
• Lean maximizes efficiency by analyzing and
streamlining process flow before trying to
improve discrete operations.
Emphasis Is on Process Flow
• Five separate activities take place: storage,
transport, waiting, processing, and inspection.
Manufacturing Cycle
(Queue, Setup, Run, Wait, and Move)
Parts
Storage
Transport Waiting Processing Waiting Inspection
Product
Storage
Processes
29
Continuous Flow
• In flow layouts, operations are
sequential
– Operators understand the total process.
– Products move singularly.
– Buffer stocks are not required because
lines are balanced.
– The flow path is predefined.
– Equipment is right­sized.
– Emphasis is on faster flows.
30
Production Systems
Batch
Not a flow system
Consider converting to flow
F
B
D
H
I
C E G
A
Functional Layout
C D EA B Batch
or flow
Load balancing important
Line balancing important
Mixed­model schedulingProduction Line
E
B AD C
H IF G
Flow ­
build in
lots
of one
Line balancing necessary
Can use takt time
Should use pull/kanban
Cellular
31
Batch Manufacturing





 
 


 


Stock
Room
Shapers Mills
Tool
Room
Drills Lathes Heat Treat
Inspection
FinishedGoods
Taps
Weld
Grinder
A
B C
32
Using Production Lines
Inspection
FinishedGoods
Stockroom
A Weld Lath Shaper Heat Treat
B
Grinder
Drill Tap Mill
Tool
room
C Weld
Grinder
Shaper Heat Treat
33
Loads Not LeveledLoads Not Leveled
Max Authorized Capacity
Available Capacity
Product A Lot 3
Load
Product B Lot 3
LoadProduct D Lot 12
Load
Product A Lot 4
Load
48
40
HRS
WEEKS
Work Loads Not Distributed Evenly
34
Loads LeveledLoads Leveled
Product
A
Product
B
Product
A
Product
C
Product
B
Product
C
Weeks
Available Capacity
Loads Distributed Fairly Evenly
Hours
Per
Week
35
Cellular Manufacturing
• An approach to producing a family of
parts or products on a dedicated line
with dedicated operators
– Functional layouts are rearranged into
process oriented cells.
– Machines and workstations are linked.
– Layouts are designed for efficient flow.
– All operator requirements are close by.
36
Production Cell Varieties
I­Shaped Line
6
5
4
3
2
1
IN
OUT
Walk only
Walk and transfer part
L­Shaped Line
6
5
4
3 2 1 IN
OUT
U­Shaped Line
IN OUT
2
1 6
5
43
37
Lean must be Designed into the system
• A lean company ideally starts with
the lean design of its products.
– Products should be designed by taking
into consideration their manufacturing
and assembly requirements at the same
time they are being designed.
– Use concurrent or simultaneous
engineering.
38
Design for One-Piece Flow
Stop producing big batches of product and start producing
one piece at a time
In a hospital you would follow a patient from admission to discharge.
In a printing company, you'd follow a job from start to delivery.
In a manufacturing plant, you'd follow the product from order to delivery.
1. Focus on the part, product or service itself.
Follow the product through its entire production
cycle looking for opportunities to reduce delay,
inventory, waste, and rework.
39
Design for One-Piece Flow
2. Ignore traditional boundaries, layouts, etc. In other words, forget what you
know.
3. Realign the work flow into production "cells" to eliminate delay, rework, and
scrap.
4. "Right size" the machines and technology to support smaller batches, quick
changeover, and one­piece flow. This often means using simpler, slower, and
less automated machines that may actually be more accurate and reliable.
The goal of flow is to eliminate all delays, interruptions and stoppages, and not
to rest until you succeed.
Focus the improvement effort to avoid wasting valuable time and money.
Focus on mission­ and profit­critical processes and issues first!
40
Just-in-Time—Process of
producing only what is needed,
when it is needed, and only at
the quantity needed.
Definition
41
Pull System
1. In manufacturing: the production of items
only as demanded to replace those taken.
2. In material control: withdrawal of inventory as
demanded by a user. Material is not issued
until a signal is received from the user.
3. In distribution: a system for replenishing field
warehouse inventories where replenishment
decisions are made at the field warehouse
itself and not at the central warehouse or
plant.
– APICS Dictionary, 10th
edition
42
Load Leveling Material/Labor
Monday Friday
Batch
A
B
A
B
Wk.
1
Wk.
2
Monday Friday
Leveled
Material and labor
leveled
Assume A is three times
more complex than B
43
Batch Flow
Finished
GoodsAA DD
Raw
Material BB CC
0
5
10
15
20
Minutes
0
5
10
15
20
Minutes
20 Minutes
Total Lead
Time for
5 Units
Processing time
= 1 minute per unit
448 minutes total lead time for five units
Single-Piece Flow
Finished
GoodsA D
Raw
Material B C
0
1
2
3
4
5
6
7
8
Finished
GoodsAA DD
Raw
Material BB CC
0
1
2
3
4
5
6
7
8
45
Self-Verification Benefits
Own
Process
(Self­
Verification)
Next
Process
End of
Line
Final
Inspection
End
User
Defects
Found At:
Cost to the
Company:
• Very
Minor
• Minor
Delay
• Rework
• Reschedule
of Work
• Significant
Rework
• Delay in
Delivery
• Additional
Inspection
• Warranty
Cost
• Administration
Cost
• Reputation
• Loss of
Market
Impact to the
Company:
46
Continuous ImprovementContinuous Improvement
Sources of Process VariabilitySources of Process Variability
Operator
Machine
Tooling
Setup
Material
Total
Operator
Machine
Tooling
Setup
Material
Total
After
I mprovement
Tolerance
Limits +6σ-6σ
After
I mprovement
Tolerance
Limits +6σ-6σ
Tolerance
Limits +6σ-6σ
Before
I mprovement
Tolerance
Limits +3σ-3σ
Before
I mprovement
Tolerance
Limits +3σ-3σ
Tolerance
Limits +3σ-3σ
47
Value­Stream Mapping (VSM)Value­Stream Mapping (VSM)
• Start by observing and recording theStart by observing and recording the
flows of orders, materials, goods, andflows of orders, materials, goods, and
information for a product family.information for a product family.
– Product family: A group of product variants passingProduct family: A group of product variants passing
through similar processing steps that use commonthrough similar processing steps that use common
equipment.equipment.
• One objective of mapping is to elevateOne objective of mapping is to elevate
waste situations for later improvements.waste situations for later improvements.
48
Value­Stream Mapping Process
1. Map customer requirements (orders)
Ask questions at each step to help determine
waste or non-value-added areas.
6. Summarize current state
5. Add a process time line
4. Map plant information flows
3. Map physical product/material flows
2. Map order information flows
49
1. Map Customer Requirements
Daily
CustomerCustomerCustomer
1
50
Supplier
Daily
Production
Control
CustomerCustomerCustomer
1
2
Weekly
orders
Weekly
Orders
2. Map Order Information Flows
51
Supplier
Stamping Weld Assembly Paint
Staging
Shipping
I I I I
Daily
Production
Control
Daily
CustomerCustomerCustomer
1
2
3
Weekly
orders
Weekly
Orders
3. Map Physical Product Flows
52
Supplier
Weekly Schedule
Stamping Weld Assembly Paint
Staging
Shipping
I I I I
Daily
Production
Control
Daily
CustomerCustomerCustomer
1
2
3
4
Weekly
orders
Weekly
Orders
4. Map Plant Information Flows
53
Supplier
Weekly Schedule
Stamping Weld Assembly Paint
Staging
Shipping
I I I I
Daily
Production
Control
Total Time = 10 Days
Value-Added Time = 6 minutes
Daily
CustomerCustomerCustomer
1day1 Day 1 Days 2 days 2 days 3 days
60 sec120 sec90 sec40 sec50 sec
Process Time Line
1
2
3
4
5
Weekly
orders
Weekly
Orders
5. Add a Process Time Line
54
Getting Started
• Reorganize your company by product and
value stream. Topple the silos and
implement flow.
• Move machines and people into product
cells.
• Help your remaining suppliers implement
“Lean."
• Improve each value stream multiple times.
• Right-size your machines and tools.
55
“It’s not necessary to change. Survival is not mandatory.”
– W. Edwards Deming
“It’s not necessary to change. Survival is not mandatory.”
– W. Edwards Deming
Why Lean?
56
The end.
Thank you!
57
Definitions
Cell A close arrangement of people and machines in a processing
sequence to facilitate flow
Kanban Japanese word for card, ticket, or sign. It's a key tool for managing
flow in a pull system. In a grocery store, it's the card at the back of
the shelf indicating the product is sold out or back ordered.
Andon Visual signal that alerts workers to problems.
Andon is like a dashboard with warning lights to alert
you to problems.
Heijunka Level out the work load.
Jidoka Automation with the human touch.
Takt Time In lean, takt is the rate of customer demand. It's like a
speedometer. Takt Time = Available hours worked
per day/Required production to meet demand.
Poka-Yoke Mistake-proofing a process so that a
person cannot make an error.

Lean manufacturing overview

  • 1.
  • 2.
    2 Lean Manufacturing Overview •Definition • Waste identification and reduction • 5S • Cellular Manufacturing • JIT • Design with Lean in mind • Value Stream Mapping
  • 3.
    3 Lean Manufacturing Definition “Aphilosophy of production that emphasizes the minimization of the amount of all the resources (including time) used in the various activities of the enterprise. It involves identifying and eliminating non­value­adding activities in design, production, supply chain management, and dealing with the customers. . .” –– APICSAPICS
  • 4.
    4 Lean Enterprise Definition “Anenterprise with a focus on waste elimination and the customer’s needs in all parts of its operations, manufacturing, and administration. Emphasis is given to lean structures and processes, flexibility of response, and methods and techniques to continually seize new opportunities as they arise.” – APICS
  • 5.
    5 Lean Thinking Principles 1.Accurately specify the value of the products or services (applies to both factory and office areas, not just to manufacturing). 2. Identify the value stream for each product or service and remove wasted actions (muda). 3. Make the product or service value flow without interruptions. 4. Let customers pull products or services from the producer. 5. Pursue perfection and continuously improve.
  • 6.
    6 Lean Manufacturing, Supply Chain,and the Lean Enterprise Supply Chain – the Lean Enterprise Raw Material Suppliers Tier 2 Suppliers Tier 1 Suppliers Company XYZ Customers Lean Manufacturing
  • 7.
    7 Lean Manufacturing Characteristics •Focus is on the improvement of resource utilization: – Equipment setup time reduced – Scheduled machine maintenance – Orderly, clean workplace – Pull production being used – JIT inventory control – Factory layout in workcell arrangement by products – Active error elimination – Improved quality, etc.
  • 8.
    8 Set big, hairyaudacious goals (BHAG) • 50% reduction in defects every year • 100% on­time delivery • Reduce order­to­ship time to less than a day • Increase Inventory turns per year • Reduce time­to­market by 75% • Reduce costs (hours/widget)
  • 9.
    9 The Importance ofWaste Elimination Lean deals with the elimination or reduction of many types of non value­ added activities, often referred to as waste (Muda). The driving force for waste elimination is improved value in the products and services customers buy.
  • 10.
    10 The Seven PopularWastes from TPS 1. Defects 2. Overproduction 3. Transportation 4. Waiting 5. Inventories 6. Motion 7. Processing
  • 11.
    11 The Nature ofWastes Defects – Low material yields – Excessive process variability
  • 12.
    12 The Nature ofWastes Overproduction – Target and achievement unclear – Excessive lead time and storage times Transportation – Widely spaced equipment – Forklifts not available when needed Waiting – Operators waiting – Operators slower than production line
  • 13.
    13 The Nature ofWastes Inventory – Large safety stocks – Variable procurement lead times Motion – Double handling – Equipment widely spaced from each other Inappropriate Processing – Variability in operator’s performance – Processes not statistically capable
  • 14.
    14 Correcting Wastes Defects – Developthe production process to prevent defects from being made and eliminate the need for inspection. At each process, produce no defects. Design processes to be failsafe to assure this. From a quality process comes a quality product—automatically.
  • 15.
    15 Correcting Wastes Overproduction – Eliminateby reducing setup times, synchronizing quantities and timing between processes, compacting layouts, etc. Make only what is needed now. Transportation – Establish layouts and locations to make transport and handling unnecessary, if possible.
  • 16.
    16 Correcting Wastes Waiting – Eliminatethrough synchronizing work flow as much as possible and balancing uneven loads with flexible workers and equipment. Inventory – Reduce by shortening setup times and lead times by synchronizing work flows and improving work skills, even by smoothing fluctuations in demand for the product. Reducing all the other wastes reduces the waste of stocks.
  • 17.
    17 Correcting Wastes Motion – Studymotion for economy and consistency. Economy improves productivity, and consistency improves quality. First improve the motions, then mechanize or automate. Otherwise, there is a danger of automating waste. Processing – First questions to ask are why should this item be made at all, then why is each process necessary. Extend thinking beyond economy of scale or speed.
  • 18.
    18 Seven Additional Wastes withinManufacturing 1. Wasted power and energy 2. Wasted human potential 3. Environmental pollution 4. Unnecessary overhead 5. Inappropriate design 6. Departmental culture 7. Inappropriate information
  • 19.
    19 The 5 Ss •To eliminate waste, you must first find it. • Visual order makes waste evident and is a starting point for managing resources. • Good housekeeping uses the Toyota Production System’s 5 Ss as the method for improvement by exposing waste and poor utilization of resources.
  • 20.
    20 The 5 Ss 1.Seiri:Organization 2.Seiton: Tidiness 3.Seiso: Purity 4.Seiketsu: Cleanliness 5.Shitsuke: Discipline Japanese American Sort Set in order Shine Standardize Sustain Cleanup Arranging Neatness Discipline Ongoing Improvement CANDO Sifting Sweeping Sorting Sanitizing Sustaining American
  • 21.
    21 The 5S’s withSafety Sort: Classify tools, parts, instructions into necessary and unnecessary. Get rid of the later. Sustain: Make a habit of properly maintaining and following standard practices. Safety: Identify and eliminate dangerous and hazardous conditions. Standardize: Put a system in place to readily identify abnormal conditions. Shine: Conduct cleanup to identify abnormalities. Set in Order: Make it visible and easy to use: 3 Es = easy to see, easy to get, and easy to return.
  • 22.
  • 23.
    23 Andon Warning Lights •Andon lights are visual tools that enable operators to signal the need for immediate assistance whenever production flow is affected. – When an abnormality is detected, a supervisor and support personnel rapidly respond.
  • 24.
    24 What Are Processes? •A particular method of doing something, generally involving a number of steps, activities, or operations. Grind Turn Mill Drill Manufacturing Type contract Obtain signature Type envelope Mail Office Grind Turn Mill Drill Manufacturing Grind Turn Mill DrillGrind Turn Mill Drill Manufacturing Type contract Obtain signature Type envelope Mail Office Type contract Obtain signature Type envelope Mail Type contract Obtain signature Type envelope Mail Office • Processes are found in manufacturing and service industries. • Example:
  • 25.
    25 What Are Value­AddedActivities? • Value­added activities are those that add value to products and services that customers are willing to pay for. – Improvements that change a product’s or service’s form, fit, or function. • Other activities use resources but add no value. – Some non­value­added activities may be necessary if they cannot be eliminated based on current knowledge or technology. Eliminate long term. – Remaining non­value­added activities should be eliminated currently.
  • 26.
    26 A Value­Added Step •A value­added step in a process is one that physically changes the work passing through the process or the work output produced to make it more valuable to the customer. • A step requested by the customer that he or she is willing to pay for. • A legally required mandate.
  • 27.
    27 Value­ Versus Non­Value­Added •Entering order • Ordering materials/supplies • Preparing drawings • Assembling • Shipping to customers • Processing customer deposits • Examining patients • Filing insurance claims • Dispensing event tickets • Fueling airplane • Waiting/sorting • Moving • Kitting/staging • Counting • Inspecting • Checking • Recording • Obtaining approvals • Testing • Reviewing • Copying • Filing • Revising/reworking • Tracking work Value­Added Activities Non­Value­Added Activities – Charlene B. Adair and Bruce A. Murray, Breakthrough Process Redesign
  • 28.
    28 • Lean maximizesefficiency by analyzing and streamlining process flow before trying to improve discrete operations. Emphasis Is on Process Flow • Five separate activities take place: storage, transport, waiting, processing, and inspection. Manufacturing Cycle (Queue, Setup, Run, Wait, and Move) Parts Storage Transport Waiting Processing Waiting Inspection Product Storage Processes
  • 29.
    29 Continuous Flow • Inflow layouts, operations are sequential – Operators understand the total process. – Products move singularly. – Buffer stocks are not required because lines are balanced. – The flow path is predefined. – Equipment is right­sized. – Emphasis is on faster flows.
  • 30.
    30 Production Systems Batch Not aflow system Consider converting to flow F B D H I C E G A Functional Layout C D EA B Batch or flow Load balancing important Line balancing important Mixed­model schedulingProduction Line E B AD C H IF G Flow ­ build in lots of one Line balancing necessary Can use takt time Should use pull/kanban Cellular
  • 31.
    31 Batch Manufacturing               Stock Room Shapers Mills Tool Room Drills Lathes Heat Treat Inspection FinishedGoods Taps Weld Grinder A B C
  • 32.
    32 Using Production Lines Inspection FinishedGoods Stockroom AWeld Lath Shaper Heat Treat B Grinder Drill Tap Mill Tool room C Weld Grinder Shaper Heat Treat
  • 33.
    33 Loads Not LeveledLoadsNot Leveled Max Authorized Capacity Available Capacity Product A Lot 3 Load Product B Lot 3 LoadProduct D Lot 12 Load Product A Lot 4 Load 48 40 HRS WEEKS Work Loads Not Distributed Evenly
  • 34.
  • 35.
    35 Cellular Manufacturing • Anapproach to producing a family of parts or products on a dedicated line with dedicated operators – Functional layouts are rearranged into process oriented cells. – Machines and workstations are linked. – Layouts are designed for efficient flow. – All operator requirements are close by.
  • 36.
    36 Production Cell Varieties I­ShapedLine 6 5 4 3 2 1 IN OUT Walk only Walk and transfer part L­Shaped Line 6 5 4 3 2 1 IN OUT U­Shaped Line IN OUT 2 1 6 5 43
  • 37.
    37 Lean must beDesigned into the system • A lean company ideally starts with the lean design of its products. – Products should be designed by taking into consideration their manufacturing and assembly requirements at the same time they are being designed. – Use concurrent or simultaneous engineering.
  • 38.
    38 Design for One-PieceFlow Stop producing big batches of product and start producing one piece at a time In a hospital you would follow a patient from admission to discharge. In a printing company, you'd follow a job from start to delivery. In a manufacturing plant, you'd follow the product from order to delivery. 1. Focus on the part, product or service itself. Follow the product through its entire production cycle looking for opportunities to reduce delay, inventory, waste, and rework.
  • 39.
    39 Design for One-PieceFlow 2. Ignore traditional boundaries, layouts, etc. In other words, forget what you know. 3. Realign the work flow into production "cells" to eliminate delay, rework, and scrap. 4. "Right size" the machines and technology to support smaller batches, quick changeover, and one­piece flow. This often means using simpler, slower, and less automated machines that may actually be more accurate and reliable. The goal of flow is to eliminate all delays, interruptions and stoppages, and not to rest until you succeed. Focus the improvement effort to avoid wasting valuable time and money. Focus on mission­ and profit­critical processes and issues first!
  • 40.
    40 Just-in-Time—Process of producing onlywhat is needed, when it is needed, and only at the quantity needed. Definition
  • 41.
    41 Pull System 1. Inmanufacturing: the production of items only as demanded to replace those taken. 2. In material control: withdrawal of inventory as demanded by a user. Material is not issued until a signal is received from the user. 3. In distribution: a system for replenishing field warehouse inventories where replenishment decisions are made at the field warehouse itself and not at the central warehouse or plant. – APICS Dictionary, 10th edition
  • 42.
    42 Load Leveling Material/Labor MondayFriday Batch A B A B Wk. 1 Wk. 2 Monday Friday Leveled Material and labor leveled Assume A is three times more complex than B
  • 43.
    43 Batch Flow Finished GoodsAA DD Raw MaterialBB CC 0 5 10 15 20 Minutes 0 5 10 15 20 Minutes 20 Minutes Total Lead Time for 5 Units Processing time = 1 minute per unit
  • 44.
    448 minutes totallead time for five units Single-Piece Flow Finished GoodsA D Raw Material B C 0 1 2 3 4 5 6 7 8 Finished GoodsAA DD Raw Material BB CC 0 1 2 3 4 5 6 7 8
  • 45.
    45 Self-Verification Benefits Own Process (Self­ Verification) Next Process End of Line Final Inspection End User Defects FoundAt: Cost to the Company: • Very Minor • Minor Delay • Rework • Reschedule of Work • Significant Rework • Delay in Delivery • Additional Inspection • Warranty Cost • Administration Cost • Reputation • Loss of Market Impact to the Company:
  • 46.
    46 Continuous ImprovementContinuous Improvement Sourcesof Process VariabilitySources of Process Variability Operator Machine Tooling Setup Material Total Operator Machine Tooling Setup Material Total After I mprovement Tolerance Limits +6σ-6σ After I mprovement Tolerance Limits +6σ-6σ Tolerance Limits +6σ-6σ Before I mprovement Tolerance Limits +3σ-3σ Before I mprovement Tolerance Limits +3σ-3σ Tolerance Limits +3σ-3σ
  • 47.
    47 Value­Stream Mapping (VSM)Value­StreamMapping (VSM) • Start by observing and recording theStart by observing and recording the flows of orders, materials, goods, andflows of orders, materials, goods, and information for a product family.information for a product family. – Product family: A group of product variants passingProduct family: A group of product variants passing through similar processing steps that use commonthrough similar processing steps that use common equipment.equipment. • One objective of mapping is to elevateOne objective of mapping is to elevate waste situations for later improvements.waste situations for later improvements.
  • 48.
    48 Value­Stream Mapping Process 1.Map customer requirements (orders) Ask questions at each step to help determine waste or non-value-added areas. 6. Summarize current state 5. Add a process time line 4. Map plant information flows 3. Map physical product/material flows 2. Map order information flows
  • 49.
    49 1. Map CustomerRequirements Daily CustomerCustomerCustomer 1
  • 50.
  • 51.
    51 Supplier Stamping Weld AssemblyPaint Staging Shipping I I I I Daily Production Control Daily CustomerCustomerCustomer 1 2 3 Weekly orders Weekly Orders 3. Map Physical Product Flows
  • 52.
    52 Supplier Weekly Schedule Stamping WeldAssembly Paint Staging Shipping I I I I Daily Production Control Daily CustomerCustomerCustomer 1 2 3 4 Weekly orders Weekly Orders 4. Map Plant Information Flows
  • 53.
    53 Supplier Weekly Schedule Stamping WeldAssembly Paint Staging Shipping I I I I Daily Production Control Total Time = 10 Days Value-Added Time = 6 minutes Daily CustomerCustomerCustomer 1day1 Day 1 Days 2 days 2 days 3 days 60 sec120 sec90 sec40 sec50 sec Process Time Line 1 2 3 4 5 Weekly orders Weekly Orders 5. Add a Process Time Line
  • 54.
    54 Getting Started • Reorganizeyour company by product and value stream. Topple the silos and implement flow. • Move machines and people into product cells. • Help your remaining suppliers implement “Lean." • Improve each value stream multiple times. • Right-size your machines and tools.
  • 55.
    55 “It’s not necessaryto change. Survival is not mandatory.” – W. Edwards Deming “It’s not necessary to change. Survival is not mandatory.” – W. Edwards Deming Why Lean?
  • 56.
  • 57.
    57 Definitions Cell A closearrangement of people and machines in a processing sequence to facilitate flow Kanban Japanese word for card, ticket, or sign. It's a key tool for managing flow in a pull system. In a grocery store, it's the card at the back of the shelf indicating the product is sold out or back ordered. Andon Visual signal that alerts workers to problems. Andon is like a dashboard with warning lights to alert you to problems. Heijunka Level out the work load. Jidoka Automation with the human touch. Takt Time In lean, takt is the rate of customer demand. It's like a speedometer. Takt Time = Available hours worked per day/Required production to meet demand. Poka-Yoke Mistake-proofing a process so that a person cannot make an error.