 The seven wastes are categories of unproductive manufacturing practices
identified by Taiichi Ohno, the father of the Toyota Production System.
 The categories are an integral part of the TPS / Lean production.
 Simply we can remember the Seven Wastes by using the below acronym.
https://www.linkedin.com/in/balamuruganm21
 Transportation
 Inventory
 Motion
 Waiting
 Over Production
 Over Processing
 Defects
https://www.slideshare.net/BalaMurugan272
 Unnecessary movement of people or parts between processes.
 Moving a product between manufacturing processes adds no value, is
expensive and can cause damage or product deterioration.
Example :
 Moving hospital patients from department to department
 Sending overstocked inventory back to a warehouse or an outlet store location
 In software, it may mean moving code from one server or repository to another
 Transportation of products from one functional area to another
Transport Inventory Motion Waiting
Over
production
Over
processing
Defects
© Sholavandan BALAMURUGAN
 Excess products / materials (raw material, work in progress) not being
processed.
 It leads costs of storage and maintenance.
Example :
 Excess production of promotional materials or printed forms
 Produce or food that goes to waste in our kitchen
 Kitchen gadgets that are accumulated and not used
 Unused or rarely used equipment
Transport Inventory Motion Waiting
Over
production
Over
processing
Defects
© 5S BALAMURUGAN
 Unnecessary movement of people, parts or machine within a process.
Example :
 People searching for materials, tools or equipment
 Handoffs in software development
 Poorly structured or disorganized work spaces
 Having to make too many clicks in a website or software to accomplish a small
task
Transport Inventory Motion Waiting
Over
production
Over
processing
Defects
https://www.linkedin.com/in/balamuruganm21
 Parts or people waiting for processing to be completed.
Example :
 Patients in waiting rooms
 Waiting for responses from other departments
 Manufacturing processes waiting for component delivery
 Waiting for a flight that's been delayed due to maintenance being done wrong
Transport Inventory Motion Waiting
Over
production
Over
processing
Defects
https://www.slideshare.net/BalaMurugan272
 Manufacture of products in advance or in excess of demand wastes money,
time and space.
Example :
 Production of components before the next stage in the process is ready to
receive them
 Printing and filing of unnecessary documents
 Creation of meals that are not eaten or partially eaten
 Cars that sit unsold in a car dealer lot
Transport Inventory Motion Waiting
Over
production
Over
processing
Defects
© Sholavandan BALAMURUGAN
 Processing that exceeds the level required to meet specification.
Example :
 Entering the same data in more than one place on a form or in a
software application
 Multiple approval levels for a small spending request
 Ordering unnecessary tests for patients
 Extra report information
Transport Inventory Motion Waiting
Over
production
Over
processing
Defects
© 5S BALAMURUGAN
 Efforts caused by rework, scrap and incorrect information.
Example :
 Scrap produced by poorly maintained fixtures
 Parts assembled with the incorrect orientation
 Incorrect components used due to incorrect, or missing instructions
 Poorly made components that continued to be made as the employees
wanted to reach their performance bonus
 Faulty parts that have reached the customer
Transport Inventory Motion Waiting
Over
production
Over
processing
Defects
https://www.linkedin.com/in/balamuruganm21
Some people have added an eighth waste to Ohno's original list. As a
result, the 8 wastes are commonly referred to as ‘TIMWOODS’.
 The 8th waste is – Non-utilized Human Resources / Talent – The waste of not
using people to the best of their unique abilities.
Example :
 Employees spend time on tasks that do not add value
 Career development and planning is absent
 People with advanced skills do routine work
 Employee ideas for improvement are ignored
Transport Inventory Motion Waiting
Over
production
Over
processing
Skills
DefectsDefects
© 5S BALAMURUGAN
5S Tamil - Basic https://www.slideshare.net/BalaMurugan272/5s-tamil
Quality Circle
Tamil
(jutl;lk; jkpopy;)
https://www.slideshare.net/BalaMurugan272/quality-
circle-tamil
Kaizen Tamil
(nfa;rd;)
https://www.slideshare.net/BalaMurugan272/kaizen-
96728468
Workplace
Safety
https://www.slideshare.net/BalaMurugan272/workpla
ce-safety-93453644
PDCA /
Deming Wheel
https://www.slideshare.net/BalaMurugan272/pdca-
tamil-119387518
Click the picture, To access the filehttps://www.slideshare.net/BalaMurugan272
Thank You.
Sholavandan BALAMURUGAN
B.Sc(CS).,MBA.,M.A(IR).,M.Sc(Psy).,PHRM.,
9043365658 | balamuruganm21@gmail.com
https://www.linkedin.com/in/balamuruganm21/
Please feel free to contact me.. If you have any queries or comments…
7
Wastes

More Related Content

What's hot

Lean ppt
Lean pptLean ppt
Lean ppt
shoban44
 
8 Wastes
8 Wastes8 Wastes
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
Pramod A
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Heda
krishnaheda
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
Mohamed EL-Sayed
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
Timothy Wooi
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
manijayjay
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
Operational Excellence Consulting
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
Frank-G. Adler
 
Muri-Mura-Muda
Muri-Mura-MudaMuri-Mura-Muda
Muri-Mura-Muda
Quality Steps Info
 
Kaizen
KaizenKaizen
Kaizen
Rajiv Mehra
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
Marico Ltd.
 
Downtime 8 Wastes
Downtime 8 WastesDowntime 8 Wastes
Downtime 8 Wastes
Nigel Thurlow
 
Kaizen
Kaizen Kaizen
Kaizen
saiju1706
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
sarah bridge
 
Lean basics
Lean basicsLean basics
Lean basics
Aryan Viswakarma
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
Anand Subramaniam
 
OEE
OEEOEE
The 8 hidden wastes
The 8 hidden wastesThe 8 hidden wastes
The 8 hidden wastes
HIMANSHU TIWARI
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
bwu.nl
 

What's hot (20)

Lean ppt
Lean pptLean ppt
Lean ppt
 
8 Wastes
8 Wastes8 Wastes
8 Wastes
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Heda
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Muri-Mura-Muda
Muri-Mura-MudaMuri-Mura-Muda
Muri-Mura-Muda
 
Kaizen
KaizenKaizen
Kaizen
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Downtime 8 Wastes
Downtime 8 WastesDowntime 8 Wastes
Downtime 8 Wastes
 
Kaizen
Kaizen Kaizen
Kaizen
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Lean basics
Lean basicsLean basics
Lean basics
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
OEE
OEEOEE
OEE
 
The 8 hidden wastes
The 8 hidden wastesThe 8 hidden wastes
The 8 hidden wastes
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 

Similar to 7 Wastes

LEAN Digital Assignment
LEAN Digital AssignmentLEAN Digital Assignment
LEAN Digital Assignment
Santhosh Aang
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
SN Panigrahi, PMP
 
Muda
MudaMuda
Muda
kushal56
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
Gagan Pareek, PMP
 
Module 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementModule 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations Management
AnushreeSingh49
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
Jagriti Prasad
 
Dmytro Lukianov: Lean-Agile (for) Loss Management (UA)
Dmytro Lukianov: Lean-Agile (for) Loss Management (UA)Dmytro Lukianov: Lean-Agile (for) Loss Management (UA)
Dmytro Lukianov: Lean-Agile (for) Loss Management (UA)
Lviv Startup Club
 
Lean Kanban Systems Training Module
Lean Kanban Systems Training ModuleLean Kanban Systems Training Module
Lean Kanban Systems Training Module
Frank-G. Adler
 
Value Chain Analysis, MUDA, Poke Yoke and Kaizen
Value Chain Analysis, MUDA, Poke Yoke and KaizenValue Chain Analysis, MUDA, Poke Yoke and Kaizen
Value Chain Analysis, MUDA, Poke Yoke and Kaizen
Hriday Bora
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
Ankit Sharma
 
Perceiving Muda
Perceiving MudaPerceiving Muda
Perceiving Muda
Elvie Badajos
 
Muda - Waste reduction
Muda - Waste reductionMuda - Waste reduction
Muda - Waste reduction
Jayeshchouhan010
 
Lean Waste
Lean WasteLean Waste
Lean Waste
Sumon Kumar Kundu
 
M U D A Ellimination
M U D A  ElliminationM U D A  Ellimination
M U D A Ellimination
DMR Panda
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
Anuj Kulkarni
 
Waste in production
Waste in productionWaste in production
Waste in production
Prosenjit Banerjee
 
Lean means eliminating wasting
Lean means eliminating wastingLean means eliminating wasting
Lean means eliminating wasting
Jo Padilha
 
DOWNTIME: The Eight Types of Waste
DOWNTIME: The Eight Types of WasteDOWNTIME: The Eight Types of Waste
DOWNTIME: The Eight Types of Waste
Mohammed Barakat
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
venky venkatesh
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
mengist4
 

Similar to 7 Wastes (20)

LEAN Digital Assignment
LEAN Digital AssignmentLEAN Digital Assignment
LEAN Digital Assignment
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
 
Muda
MudaMuda
Muda
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
 
Module 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementModule 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations Management
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Dmytro Lukianov: Lean-Agile (for) Loss Management (UA)
Dmytro Lukianov: Lean-Agile (for) Loss Management (UA)Dmytro Lukianov: Lean-Agile (for) Loss Management (UA)
Dmytro Lukianov: Lean-Agile (for) Loss Management (UA)
 
Lean Kanban Systems Training Module
Lean Kanban Systems Training ModuleLean Kanban Systems Training Module
Lean Kanban Systems Training Module
 
Value Chain Analysis, MUDA, Poke Yoke and Kaizen
Value Chain Analysis, MUDA, Poke Yoke and KaizenValue Chain Analysis, MUDA, Poke Yoke and Kaizen
Value Chain Analysis, MUDA, Poke Yoke and Kaizen
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
Perceiving Muda
Perceiving MudaPerceiving Muda
Perceiving Muda
 
Muda - Waste reduction
Muda - Waste reductionMuda - Waste reduction
Muda - Waste reduction
 
Lean Waste
Lean WasteLean Waste
Lean Waste
 
M U D A Ellimination
M U D A  ElliminationM U D A  Ellimination
M U D A Ellimination
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Waste in production
Waste in productionWaste in production
Waste in production
 
Lean means eliminating wasting
Lean means eliminating wastingLean means eliminating wasting
Lean means eliminating wasting
 
DOWNTIME: The Eight Types of Waste
DOWNTIME: The Eight Types of WasteDOWNTIME: The Eight Types of Waste
DOWNTIME: The Eight Types of Waste
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
 

More from 5S BALAMURUGAN

TPM Basics
TPM BasicsTPM Basics
TPM Basics
5S BALAMURUGAN
 
5S Tamil 3.0
5S Tamil 3.05S Tamil 3.0
5S Tamil 3.0
5S BALAMURUGAN
 
7 QC Tools - Tamil
7 QC Tools - Tamil7 QC Tools - Tamil
7 QC Tools - Tamil
5S BALAMURUGAN
 
Cost of Quality (COQ) In Tamil
Cost of Quality (COQ) In TamilCost of Quality (COQ) In Tamil
Cost of Quality (COQ) In Tamil
5S BALAMURUGAN
 
Kaizen Vs Kairyo
Kaizen Vs KairyoKaizen Vs Kairyo
Kaizen Vs Kairyo
5S BALAMURUGAN
 
Quality Gurus and their key Contributions
Quality Gurus and their key ContributionsQuality Gurus and their key Contributions
Quality Gurus and their key Contributions
5S BALAMURUGAN
 
Industrial Revolution 1.0 - 4.0 in Tamil
Industrial Revolution 1.0 - 4.0 in TamilIndustrial Revolution 1.0 - 4.0 in Tamil
Industrial Revolution 1.0 - 4.0 in Tamil
5S BALAMURUGAN
 
PQCDSM in Tamil
PQCDSM in TamilPQCDSM in Tamil
PQCDSM in Tamil
5S BALAMURUGAN
 
Takt Time, Cycle Time & Lead Time
Takt Time, Cycle Time & Lead TimeTakt Time, Cycle Time & Lead Time
Takt Time, Cycle Time & Lead Time
5S BALAMURUGAN
 
Six Sigma Basics - Tamil
Six Sigma Basics - TamilSix Sigma Basics - Tamil
Six Sigma Basics - Tamil
5S BALAMURUGAN
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean
5S BALAMURUGAN
 
5S Implementation Process - Tamil 2.0
5S Implementation Process - Tamil 2.05S Implementation Process - Tamil 2.0
5S Implementation Process - Tamil 2.0
5S BALAMURUGAN
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
5S BALAMURUGAN
 
5S,Safety Slogans in Tamil & English
5S,Safety Slogans in Tamil & English5S,Safety Slogans in Tamil & English
5S,Safety Slogans in Tamil & English
5S BALAMURUGAN
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
5S BALAMURUGAN
 
PDCA Tamil - Plan Do Check Act / Deming Wheel
PDCA Tamil - Plan Do Check Act / Deming WheelPDCA Tamil - Plan Do Check Act / Deming Wheel
PDCA Tamil - Plan Do Check Act / Deming Wheel
5S BALAMURUGAN
 
Quality Circle - TAMIL
Quality Circle - TAMILQuality Circle - TAMIL
Quality Circle - TAMIL
5S BALAMURUGAN
 
Workplace safety
Workplace safetyWorkplace safety
Workplace safety
5S BALAMURUGAN
 
5S TAMIL
5S TAMIL5S TAMIL
5S TAMIL
5S BALAMURUGAN
 

More from 5S BALAMURUGAN (19)

TPM Basics
TPM BasicsTPM Basics
TPM Basics
 
5S Tamil 3.0
5S Tamil 3.05S Tamil 3.0
5S Tamil 3.0
 
7 QC Tools - Tamil
7 QC Tools - Tamil7 QC Tools - Tamil
7 QC Tools - Tamil
 
Cost of Quality (COQ) In Tamil
Cost of Quality (COQ) In TamilCost of Quality (COQ) In Tamil
Cost of Quality (COQ) In Tamil
 
Kaizen Vs Kairyo
Kaizen Vs KairyoKaizen Vs Kairyo
Kaizen Vs Kairyo
 
Quality Gurus and their key Contributions
Quality Gurus and their key ContributionsQuality Gurus and their key Contributions
Quality Gurus and their key Contributions
 
Industrial Revolution 1.0 - 4.0 in Tamil
Industrial Revolution 1.0 - 4.0 in TamilIndustrial Revolution 1.0 - 4.0 in Tamil
Industrial Revolution 1.0 - 4.0 in Tamil
 
PQCDSM in Tamil
PQCDSM in TamilPQCDSM in Tamil
PQCDSM in Tamil
 
Takt Time, Cycle Time & Lead Time
Takt Time, Cycle Time & Lead TimeTakt Time, Cycle Time & Lead Time
Takt Time, Cycle Time & Lead Time
 
Six Sigma Basics - Tamil
Six Sigma Basics - TamilSix Sigma Basics - Tamil
Six Sigma Basics - Tamil
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean
 
5S Implementation Process - Tamil 2.0
5S Implementation Process - Tamil 2.05S Implementation Process - Tamil 2.0
5S Implementation Process - Tamil 2.0
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
 
5S,Safety Slogans in Tamil & English
5S,Safety Slogans in Tamil & English5S,Safety Slogans in Tamil & English
5S,Safety Slogans in Tamil & English
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
 
PDCA Tamil - Plan Do Check Act / Deming Wheel
PDCA Tamil - Plan Do Check Act / Deming WheelPDCA Tamil - Plan Do Check Act / Deming Wheel
PDCA Tamil - Plan Do Check Act / Deming Wheel
 
Quality Circle - TAMIL
Quality Circle - TAMILQuality Circle - TAMIL
Quality Circle - TAMIL
 
Workplace safety
Workplace safetyWorkplace safety
Workplace safety
 
5S TAMIL
5S TAMIL5S TAMIL
5S TAMIL
 

Recently uploaded

How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Assessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptxAssessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptx
Kavitha Krishnan
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 

Recently uploaded (20)

How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Assessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptxAssessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptx
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 

7 Wastes

  • 2.  The seven wastes are categories of unproductive manufacturing practices identified by Taiichi Ohno, the father of the Toyota Production System.  The categories are an integral part of the TPS / Lean production.  Simply we can remember the Seven Wastes by using the below acronym. https://www.linkedin.com/in/balamuruganm21
  • 3.  Transportation  Inventory  Motion  Waiting  Over Production  Over Processing  Defects https://www.slideshare.net/BalaMurugan272
  • 4.  Unnecessary movement of people or parts between processes.  Moving a product between manufacturing processes adds no value, is expensive and can cause damage or product deterioration. Example :  Moving hospital patients from department to department  Sending overstocked inventory back to a warehouse or an outlet store location  In software, it may mean moving code from one server or repository to another  Transportation of products from one functional area to another Transport Inventory Motion Waiting Over production Over processing Defects © Sholavandan BALAMURUGAN
  • 5.  Excess products / materials (raw material, work in progress) not being processed.  It leads costs of storage and maintenance. Example :  Excess production of promotional materials or printed forms  Produce or food that goes to waste in our kitchen  Kitchen gadgets that are accumulated and not used  Unused or rarely used equipment Transport Inventory Motion Waiting Over production Over processing Defects © 5S BALAMURUGAN
  • 6.  Unnecessary movement of people, parts or machine within a process. Example :  People searching for materials, tools or equipment  Handoffs in software development  Poorly structured or disorganized work spaces  Having to make too many clicks in a website or software to accomplish a small task Transport Inventory Motion Waiting Over production Over processing Defects https://www.linkedin.com/in/balamuruganm21
  • 7.  Parts or people waiting for processing to be completed. Example :  Patients in waiting rooms  Waiting for responses from other departments  Manufacturing processes waiting for component delivery  Waiting for a flight that's been delayed due to maintenance being done wrong Transport Inventory Motion Waiting Over production Over processing Defects https://www.slideshare.net/BalaMurugan272
  • 8.  Manufacture of products in advance or in excess of demand wastes money, time and space. Example :  Production of components before the next stage in the process is ready to receive them  Printing and filing of unnecessary documents  Creation of meals that are not eaten or partially eaten  Cars that sit unsold in a car dealer lot Transport Inventory Motion Waiting Over production Over processing Defects © Sholavandan BALAMURUGAN
  • 9.  Processing that exceeds the level required to meet specification. Example :  Entering the same data in more than one place on a form or in a software application  Multiple approval levels for a small spending request  Ordering unnecessary tests for patients  Extra report information Transport Inventory Motion Waiting Over production Over processing Defects © 5S BALAMURUGAN
  • 10.  Efforts caused by rework, scrap and incorrect information. Example :  Scrap produced by poorly maintained fixtures  Parts assembled with the incorrect orientation  Incorrect components used due to incorrect, or missing instructions  Poorly made components that continued to be made as the employees wanted to reach their performance bonus  Faulty parts that have reached the customer Transport Inventory Motion Waiting Over production Over processing Defects https://www.linkedin.com/in/balamuruganm21
  • 11. Some people have added an eighth waste to Ohno's original list. As a result, the 8 wastes are commonly referred to as ‘TIMWOODS’.  The 8th waste is – Non-utilized Human Resources / Talent – The waste of not using people to the best of their unique abilities. Example :  Employees spend time on tasks that do not add value  Career development and planning is absent  People with advanced skills do routine work  Employee ideas for improvement are ignored Transport Inventory Motion Waiting Over production Over processing Skills DefectsDefects © 5S BALAMURUGAN
  • 12. 5S Tamil - Basic https://www.slideshare.net/BalaMurugan272/5s-tamil Quality Circle Tamil (jutl;lk; jkpopy;) https://www.slideshare.net/BalaMurugan272/quality- circle-tamil Kaizen Tamil (nfa;rd;) https://www.slideshare.net/BalaMurugan272/kaizen- 96728468 Workplace Safety https://www.slideshare.net/BalaMurugan272/workpla ce-safety-93453644 PDCA / Deming Wheel https://www.slideshare.net/BalaMurugan272/pdca- tamil-119387518 Click the picture, To access the filehttps://www.slideshare.net/BalaMurugan272
  • 13. Thank You. Sholavandan BALAMURUGAN B.Sc(CS).,MBA.,M.A(IR).,M.Sc(Psy).,PHRM., 9043365658 | balamuruganm21@gmail.com https://www.linkedin.com/in/balamuruganm21/ Please feel free to contact me.. If you have any queries or comments… 7 Wastes