BOB SIGHT COLLISION CENTER
 What is lean?
 Why lean?
 Principles of lean
 Goals of lean
 Types of waste
 Lean tools
 Steps to achieve lean systems
 Lean is a systematic approach of eliminating
waste so every step adds value for the
Customer
 To make Bob Sight strong, unbeatable
 To be able to achieve cycle times and touch times.
 To be able to exceed customer expectations
 (Build trust)
 Lean can help the entire shop from the office to
the wash bay.
Not reaching the requirements for USAA for last
quarter.
Fell short on customer service and cycle time days.
This resulted in 1.5% discount for the next quarter.
We are required to put a bottom line discount on
every USAA job we sell.
For last quarter that would have been 1008.83.
Value - A capability provided to a customer at
the right time at an appropriate price, as defined
by the customer.
• Cost
• Quality
• Delivery
 Waste is any activity that consumes time,
resources, or space but does not add any value
to the product or service.
Lack of funds, resources, time and personnel are the top four
constraints that companies experience in achieving
measurable improvements in business performance.
Lack of Funds 43%
Limited Resources 42%
Lack of Time 40%
Lack of Qualified Personnel 32%
• Define value from the customer perspective
• Identify the value stream
• Make the process flow
• Pull from the customer
• Head toward perfection
 Specify value :
Specify value from the standpoint of the end
customer by product family.
 Identify the value stream :
Identify all the steps in the value stream for
each product family, eliminating whenever
possible those steps that do not create value.
 Create flow :
Make the value-creating steps occur in tight
sequence so the product will flow smoothly
toward the customer.
 Let the customer pull product through the
value stream:
Make only what the customer has ordered.
 Seek perfection :
As value is specified, value streams are
identified, wasted steps are removed, and flow
and pull are introduced, begin the process
again and continue it until a state of perfection is
reached in which perfect value is created with no
waste.
 Improve quality:
In order to stay competitive in today’s
marketplace, a company must understand its
customers' wants and needs and design
processes to meet their expectations and
requirements.
 Eliminate waste:
Waste is any activity that consumes time,
resources, or space but does not add any
value to the product or service.
 Reduce time:
Reducing the time it takes to finish an activity
from start to finish is one of the most effective
ways to eliminate waste and lower costs.
 Reduce total costs:
To minimize cost, a company must produce
only to customer demand. Overproduction
increases a company’s inventory costs due to
storage needs.
 overproduction (occurs when production should
have stopped)
 Waiting (periods of inactivity)
 Transport (unnecessary movement of materials)
 Extra Processing (rework and reprocessing)
 Inventory (excess inventory not directly required
for current orders)
 Motion (extra steps taken by employees due to
inefficient layout)
 Defects (do not conform to specifications or
expectations)
 Overproduction : Producing more/sooner than
the Internal or External customer needs.
 Waiting :Long periods of inactivity for people,
information, machinery or materials.
 Transportation :Excessive movement of
people, information or materials.
 In appropriate processing:
Using the wrong set of tools, procedures or
systems.
 Unnecessary Inventory:
Excessive storage and delay of information
or products.
 Motion :
people or equipment moving or walking more
than is required to perform the processing.
 Defects :
Frequent errors in paper work,product quality
problems etc..
 waste elimination
 standardized work
 poka yoke
 5s visual workplace
 just in time
 continuous improvement
 material management
 work in process
 POKA-YOKE- means “Mistake proofing”.
 And it also provides visual or other signals to
indicate characteristic state and referred as
error proofing .
 It is a Japanese word .
 5s visual work place provide a clean
environment .
 It is well organized and efficient .
 It provides the organization for preparing a
rapid work force .
 It can lead to huge improvements in quality
and efficiency .
 This method was adopted by Japanese
manufacturing company.
 JIT means making what the market wants,
when it want it.
 Continuous improvement ,in regards to quality
and performance .
 And it also improves customers satisfaction
through continuous and incremental approach.
 And there by removing unnecessary activities
and variation .
 It aims to minimize the work .
 It needs to store the inventory .
 It take time to look above and below work
areas for needed storage .
 It is a branch of logistics and deals with
tangible components of supply chain.
 It can consolidate and efficiently handle core
service .
 The parts and materials used in supply chain
meets the minimum requirements by
performing quality assurance .
 Lean Thinking diagnostic tool that allows you to:
◦ Visualize work
◦ “See the waste” (barriers to flow)
◦ Focus on improvements
 Value Stream = steps (value added and non-value
added) that are required to complete a service
from beginning to end
Value Added vs. Non-Value
Added
Value added activities
 The customer is willing to pay money for the
process
 Work that changes the market form, fit or
function
Non-value added activities
 Should be eliminated, simplified, reduced, or
integrated whenever possible
 Two types of non-value added activities:
◦ Required for business
◦ Not required for business
Non-Value Added
Value Added
Value Added vs. Non-Value
Added
• Continuous focus on increasing
value added activities
• If value added activities are
increased by 10% = gain of only
2%!
• Focus on reducing non-value
added activities by 10% = gain of
8% value added!
20%
80%
The following steps should be implemented in
order to create the ideal lean
manufacturing system:
 Design a simple manufacturing system
 Recognize that there is always room for
improvement
 Continuously improve the lean manufacturing
system design
Steps to achieve lean
systems
Design a simple manufacturing system
A fundamental principle of lean manufacturing is demand-based flow
manufacturing. In this type of production setting, inventory is only pulled through
each production centre when it is needed to meet a customer’s order.
 The benefits of this goal include
 decreased cycle time
 less inventory
 increased productivity
 increased capital equipment utilization
There is always room for improvement
The core of lean is founded on the concept of continuous product and process
improvement and the elimination of non-value added activities. “The Value
adding activities are simply only those things the customer is willing to pay for,
everything else is waste, and should be eliminated, simplified, reduced, or
integrated”. Improving the flow of material through new ideal system layouts at
the customer's required rate would reduce waste in material movement and
inventory.
Continuously improve
A continuous improvement mindset is essential to reach a company's goals.
The term "continuous improvement" means incremental improvement of
products, processes, or services over time, with the goal of reducing waste to
improve workplace functionality, customer service, or product performance.
SUMMARY
Thank you

More Related Content

What's hot

Lean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassLean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassSam Bishop
 
Introduction to lean manufacturing
Introduction to lean manufacturingIntroduction to lean manufacturing
Introduction to lean manufacturingleangeekcanada
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing pptHeli Patel
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...sanobar77
 
Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations managementHriday Bora
 
Presentation on Lean Manufacturing by Irfan Sahito
Presentation on Lean Manufacturing by Irfan SahitoPresentation on Lean Manufacturing by Irfan Sahito
Presentation on Lean Manufacturing by Irfan SahitoEngr. Irfan Ali
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing toolsIshmam Ahmed
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingskchawla4
 
FREE DOWNLOAD - INTRODUCTION TO LEAN PRESENTATION
FREE DOWNLOAD - INTRODUCTION TO LEAN PRESENTATIONFREE DOWNLOAD - INTRODUCTION TO LEAN PRESENTATION
FREE DOWNLOAD - INTRODUCTION TO LEAN PRESENTATIONTXM Lean Solutions
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
Performance objectives
Performance objectivesPerformance objectives
Performance objectivesLee Morley
 

What's hot (20)

Lean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting ClassLean Manufacturing Overview - MBA Consulting Class
Lean Manufacturing Overview - MBA Consulting Class
 
Introduction to lean manufacturing
Introduction to lean manufacturingIntroduction to lean manufacturing
Introduction to lean manufacturing
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
 
Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations management
 
Waste
WasteWaste
Waste
 
Lean Managment
Lean ManagmentLean Managment
Lean Managment
 
Basics of lean
Basics of leanBasics of lean
Basics of lean
 
Presentation on Lean Manufacturing by Irfan Sahito
Presentation on Lean Manufacturing by Irfan SahitoPresentation on Lean Manufacturing by Irfan Sahito
Presentation on Lean Manufacturing by Irfan Sahito
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
FREE DOWNLOAD - INTRODUCTION TO LEAN PRESENTATION
FREE DOWNLOAD - INTRODUCTION TO LEAN PRESENTATIONFREE DOWNLOAD - INTRODUCTION TO LEAN PRESENTATION
FREE DOWNLOAD - INTRODUCTION TO LEAN PRESENTATION
 
This is lean
This is lean This is lean
This is lean
 
Lean Production
Lean ProductionLean Production
Lean Production
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
0201B Lean Production
0201B Lean Production0201B Lean Production
0201B Lean Production
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
Performance objectives
Performance objectivesPerformance objectives
Performance objectives
 

Viewers also liked (14)

Küme ve bölgesel çalışmalarda TTGV Deneyimleri
Küme ve bölgesel çalışmalarda TTGV DeneyimleriKüme ve bölgesel çalışmalarda TTGV Deneyimleri
Küme ve bölgesel çalışmalarda TTGV Deneyimleri
 
Poseta sajmu-ekologije-2015
Poseta sajmu-ekologije-2015Poseta sajmu-ekologije-2015
Poseta sajmu-ekologije-2015
 
звантаження (1)
звантаження (1)звантаження (1)
звантаження (1)
 
Ankara: Bir Teknoloji Öyküsü
Ankara: Bir Teknoloji ÖyküsüAnkara: Bir Teknoloji Öyküsü
Ankara: Bir Teknoloji Öyküsü
 
XII. Teknoloji Ödülleri
XII. Teknoloji ÖdülleriXII. Teknoloji Ödülleri
XII. Teknoloji Ödülleri
 
Pelaksanaan
PelaksanaanPelaksanaan
Pelaksanaan
 
TTGV İzmir Faaliyetleri
TTGV İzmir FaaliyetleriTTGV İzmir Faaliyetleri
TTGV İzmir Faaliyetleri
 
Cyber Crime
Cyber CrimeCyber Crime
Cyber Crime
 
Медицина Средневековья
Медицина СредневековьяМедицина Средневековья
Медицина Средневековья
 
Endüstriyel Simbiyoz ve Uygulama Örnekleri
Endüstriyel Simbiyoz ve Uygulama ÖrnekleriEndüstriyel Simbiyoz ve Uygulama Örnekleri
Endüstriyel Simbiyoz ve Uygulama Örnekleri
 
Dr. T. Fikret Yücel Ödül Programı
Dr. T. Fikret Yücel Ödül ProgramıDr. T. Fikret Yücel Ödül Programı
Dr. T. Fikret Yücel Ödül Programı
 
World bank by Ajay Pal
World bank by Ajay PalWorld bank by Ajay Pal
World bank by Ajay Pal
 
percents
percentspercents
percents
 
Bursa, Eskişehir ve Bilecik Endüstriyel Simbiyoz Programı
Bursa, Eskişehir ve Bilecik Endüstriyel Simbiyoz ProgramıBursa, Eskişehir ve Bilecik Endüstriyel Simbiyoz Programı
Bursa, Eskişehir ve Bilecik Endüstriyel Simbiyoz Programı
 

Similar to Revised lean

lean accounting , abc accounting , cvp analysis
lean accounting , abc accounting , cvp analysislean accounting , abc accounting , cvp analysis
lean accounting , abc accounting , cvp analysisPOOJA GOYAL
 
Lean Fundamentals And Line Design 06 04 01
Lean  Fundamentals And  Line  Design 06 04 01Lean  Fundamentals And  Line  Design 06 04 01
Lean Fundamentals And Line Design 06 04 01Dan Junkins
 
operation Performance & Operation stategy
operation Performance & Operation stategyoperation Performance & Operation stategy
operation Performance & Operation stategyQamar Farooq
 
Lean and agile manufacturing system
Lean and agile manufacturing systemLean and agile manufacturing system
Lean and agile manufacturing systemAnas CK
 
The power of lean manufacturing
The power of lean manufacturingThe power of lean manufacturing
The power of lean manufacturingMileyJames
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)adnanqayum
 
Lean management in textile processing
Lean management in textile processingLean management in textile processing
Lean management in textile processingIEI GSC
 
Understanding and concept Lean cheat sheet.pdf
Understanding and concept Lean cheat sheet.pdfUnderstanding and concept Lean cheat sheet.pdf
Understanding and concept Lean cheat sheet.pdfpriyaagrawalpefn20
 
Productivity enhancement using lean
Productivity enhancement using leanProductivity enhancement using lean
Productivity enhancement using leanSherin El-Rashied
 
Module 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptxModule 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptxArunJyothi19
 
Awareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsAwareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsNilesh Sawant
 

Similar to Revised lean (20)

lean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptxlean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptx
 
lean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptxlean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptx
 
Lean Production
Lean ProductionLean Production
Lean Production
 
value added manufacturing
value added manufacturing value added manufacturing
value added manufacturing
 
Lean mangement
Lean mangementLean mangement
Lean mangement
 
lean accounting , abc accounting , cvp analysis
lean accounting , abc accounting , cvp analysislean accounting , abc accounting , cvp analysis
lean accounting , abc accounting , cvp analysis
 
Lean startup
Lean startupLean startup
Lean startup
 
Lean Fundamentals And Line Design 06 04 01
Lean  Fundamentals And  Line  Design 06 04 01Lean  Fundamentals And  Line  Design 06 04 01
Lean Fundamentals And Line Design 06 04 01
 
operation Performance & Operation stategy
operation Performance & Operation stategyoperation Performance & Operation stategy
operation Performance & Operation stategy
 
Lean and agile manufacturing system
Lean and agile manufacturing systemLean and agile manufacturing system
Lean and agile manufacturing system
 
The power of lean manufacturing
The power of lean manufacturingThe power of lean manufacturing
The power of lean manufacturing
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Lean management in textile processing
Lean management in textile processingLean management in textile processing
Lean management in textile processing
 
Lean basics
Lean basicsLean basics
Lean basics
 
Understanding and concept Lean cheat sheet.pdf
Understanding and concept Lean cheat sheet.pdfUnderstanding and concept Lean cheat sheet.pdf
Understanding and concept Lean cheat sheet.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
Productivity enhancement using lean
Productivity enhancement using leanProductivity enhancement using lean
Productivity enhancement using lean
 
Module 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptxModule 5 - Just in Time and Kaizen costing.pptx
Module 5 - Just in Time and Kaizen costing.pptx
 
Awareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsAwareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc Tools
 

Revised lean

  • 2.  What is lean?  Why lean?  Principles of lean  Goals of lean  Types of waste  Lean tools  Steps to achieve lean systems
  • 3.  Lean is a systematic approach of eliminating waste so every step adds value for the Customer
  • 4.  To make Bob Sight strong, unbeatable  To be able to achieve cycle times and touch times.  To be able to exceed customer expectations  (Build trust)  Lean can help the entire shop from the office to the wash bay.
  • 5. Not reaching the requirements for USAA for last quarter. Fell short on customer service and cycle time days. This resulted in 1.5% discount for the next quarter. We are required to put a bottom line discount on every USAA job we sell. For last quarter that would have been 1008.83.
  • 6. Value - A capability provided to a customer at the right time at an appropriate price, as defined by the customer. • Cost • Quality • Delivery
  • 7.  Waste is any activity that consumes time, resources, or space but does not add any value to the product or service.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. Lack of funds, resources, time and personnel are the top four constraints that companies experience in achieving measurable improvements in business performance. Lack of Funds 43% Limited Resources 42% Lack of Time 40% Lack of Qualified Personnel 32%
  • 14. • Define value from the customer perspective • Identify the value stream • Make the process flow • Pull from the customer • Head toward perfection
  • 15.  Specify value : Specify value from the standpoint of the end customer by product family.  Identify the value stream : Identify all the steps in the value stream for each product family, eliminating whenever possible those steps that do not create value.
  • 16.  Create flow : Make the value-creating steps occur in tight sequence so the product will flow smoothly toward the customer.  Let the customer pull product through the value stream: Make only what the customer has ordered.
  • 17.  Seek perfection : As value is specified, value streams are identified, wasted steps are removed, and flow and pull are introduced, begin the process again and continue it until a state of perfection is reached in which perfect value is created with no waste.
  • 18.  Improve quality: In order to stay competitive in today’s marketplace, a company must understand its customers' wants and needs and design processes to meet their expectations and requirements.  Eliminate waste: Waste is any activity that consumes time, resources, or space but does not add any value to the product or service.
  • 19.  Reduce time: Reducing the time it takes to finish an activity from start to finish is one of the most effective ways to eliminate waste and lower costs.  Reduce total costs: To minimize cost, a company must produce only to customer demand. Overproduction increases a company’s inventory costs due to storage needs.
  • 20.  overproduction (occurs when production should have stopped)  Waiting (periods of inactivity)  Transport (unnecessary movement of materials)  Extra Processing (rework and reprocessing)  Inventory (excess inventory not directly required for current orders)  Motion (extra steps taken by employees due to inefficient layout)  Defects (do not conform to specifications or expectations)
  • 21.  Overproduction : Producing more/sooner than the Internal or External customer needs.  Waiting :Long periods of inactivity for people, information, machinery or materials.  Transportation :Excessive movement of people, information or materials.
  • 22.  In appropriate processing: Using the wrong set of tools, procedures or systems.  Unnecessary Inventory: Excessive storage and delay of information or products.
  • 23.  Motion : people or equipment moving or walking more than is required to perform the processing.  Defects : Frequent errors in paper work,product quality problems etc..
  • 24.  waste elimination  standardized work  poka yoke  5s visual workplace  just in time  continuous improvement  material management  work in process
  • 25.  POKA-YOKE- means “Mistake proofing”.  And it also provides visual or other signals to indicate characteristic state and referred as error proofing .  It is a Japanese word .
  • 26.  5s visual work place provide a clean environment .  It is well organized and efficient .  It provides the organization for preparing a rapid work force .
  • 27.  It can lead to huge improvements in quality and efficiency .  This method was adopted by Japanese manufacturing company.  JIT means making what the market wants, when it want it.
  • 28.  Continuous improvement ,in regards to quality and performance .  And it also improves customers satisfaction through continuous and incremental approach.  And there by removing unnecessary activities and variation .
  • 29.  It aims to minimize the work .  It needs to store the inventory .  It take time to look above and below work areas for needed storage .
  • 30.  It is a branch of logistics and deals with tangible components of supply chain.  It can consolidate and efficiently handle core service .  The parts and materials used in supply chain meets the minimum requirements by performing quality assurance .
  • 31.  Lean Thinking diagnostic tool that allows you to: ◦ Visualize work ◦ “See the waste” (barriers to flow) ◦ Focus on improvements  Value Stream = steps (value added and non-value added) that are required to complete a service from beginning to end
  • 32. Value Added vs. Non-Value Added Value added activities  The customer is willing to pay money for the process  Work that changes the market form, fit or function Non-value added activities  Should be eliminated, simplified, reduced, or integrated whenever possible  Two types of non-value added activities: ◦ Required for business ◦ Not required for business
  • 33. Non-Value Added Value Added Value Added vs. Non-Value Added • Continuous focus on increasing value added activities • If value added activities are increased by 10% = gain of only 2%! • Focus on reducing non-value added activities by 10% = gain of 8% value added! 20% 80%
  • 34. The following steps should be implemented in order to create the ideal lean manufacturing system:  Design a simple manufacturing system  Recognize that there is always room for improvement  Continuously improve the lean manufacturing system design Steps to achieve lean systems
  • 35. Design a simple manufacturing system A fundamental principle of lean manufacturing is demand-based flow manufacturing. In this type of production setting, inventory is only pulled through each production centre when it is needed to meet a customer’s order.  The benefits of this goal include  decreased cycle time  less inventory  increased productivity  increased capital equipment utilization There is always room for improvement The core of lean is founded on the concept of continuous product and process improvement and the elimination of non-value added activities. “The Value adding activities are simply only those things the customer is willing to pay for, everything else is waste, and should be eliminated, simplified, reduced, or integrated”. Improving the flow of material through new ideal system layouts at the customer's required rate would reduce waste in material movement and inventory. Continuously improve A continuous improvement mindset is essential to reach a company's goals. The term "continuous improvement" means incremental improvement of products, processes, or services over time, with the goal of reducing waste to improve workplace functionality, customer service, or product performance.

Editor's Notes