SlideShare a Scribd company logo
Tahapan perencanaan
terminal agribisnis
Sumber:
Wholesale markets, Planning and design manual
by J. D. Tracey-White
FAO 1991
(diolah)

Kawi Boedisetio
Telebiro.bandung0@clubmember.org
Wieke Irawati Kodri
fe_bandung@yahoo.com
Pengantar
• Dokumen ini berisi diagram proses untuk
melakukan perancangan dan perencanaan
pembangunan Pasar Sayur atau “Sub-Terminal
Agribisnis”
Untuk memudahkan pembacaan, 9 slide berikut
perlu di-print dan hasilnya disambung-sambung,
sesuai dengan “connector” yang ada.

A1

B1

A2

B2

A3

B3

A4

B4
Figure 4 – A Design Methodology
STAGE I

ACTIVITIES

Management
and Operations

Location and
Planning

Construction
and Implementation

STAGE II

STAGE III

STAGE IV

Project Identification and
pre-feasibility

Detailed
Design
Development

Project
formulation
and feasibility

Project
Implementation

National
Policy &
Goals, Institutional
Structure

Context,
review of
Facilities &
Site Selection

Operation
Plan &
Management
Procedures

Plan options
& Land Use Traffic
Master Plan

Building
options,
Structure,
Materials &
Costs

Staffing,
Training,
and Initiate
Operations

Plan
Evaluation &
Financial
Analysis

FUNCTIONS

Administrators
and
Policy Maker

Planners
and
Economists

Tender
Documents,
Construction
&
Procurement

Engineers
And
Architects
A1

Data
Collection

Surveys

National
Agricultural Policy

Existing Marketing
Studies
Existing Market
Records
Agricultural
Production Data
National
Consumption Data

Data
Analysis

Preliminary
Physical Survey of
Market

Tabulate Existing
Market Facilities

Reconnaissance
Survey of Market
Operations

Define Market
Functionaries

Identify Existing
Shortcomings

Appraisal of Market
Facilities

Analysis of Existing
Marketing System

Define Marketing
Channels
Tabulate Catchment Production

Demographic Data

Tabulate
Population Data

Legislation &
Ordinance

Extract Relevant
Laws

Synthesis
Definition of Project
Goals

Tabulate Relevant
Development
Policies

Regional Planning
Studies
Existing Sector
Programme

Data
Processing

Estimate Market
Turnover

Estimate Design
Population

Review Suitability
of Site Size &
Location

Definition of Project
Risks
Project Future
Needs

Identify Project
Beneficiaries
Identify Management Options
A2

Data
Collection

Stage 1 Context
data & Studies:
• Existing
Marketing Studies
• Existing Market
records
• Agricultural
Production
• National
Consumption
• Demography
• Management
Proposals

Detailed Survey of
Market Operations

Data
Analysis
Define End-of
Project Status

Review Design
Population

Stage 1 definition
of Project Goals

Data
Processing
Review Development Policies

Surveys

Quantify Project
Beneficiaries

Review Market
Functionaries

Review Marketing
Channels
Detailed Field
Suirvey of Traders
& Turnover

Review Catchment
Production
Manual/Computer
Spreadsheet

Stage 2 Final
Master Plan

Stage 2 Civil Works
Budget

Appraisal of
Operations &
Management
Options
Analysis of Existing
Marketing System
Project Market
Turnover

Synthesis

Define Project’s
Immediate
Objectives &
Outputs

Define Project’s
Inputs

Formulate Market
Procedures &
Agree Staffing
Establishment

Estimate Utilization
of Market Facilities

Phasing of Design
Options
Agree Equipment
Needs
A3

Data
Collection

Surveys

Data
Processing

Check Stage 1
Findings on
Existing
Shortcomings,
Project Risks,
Issues &
Beneficiaries

Stage 1 Review
Proposals/Issues
Local Planning
Studies

Maps and Aerial
Photographs
Climatic / Hydrogeology Studies
Existing Geotechnical Studies

Survey of Traders
& Turnover
Engineering
Survey of Markets:
• Historic
• Topographic
• Geodetic
• Site Features
• Services
• Soils

Survey of Traffic
Modes & Volumes

Manual / Computer
Spreadsheets
Tabulate existing
market facilities
Base Map
Preparation

Official Rates &
Cost data
Stage 1 Draft
Project Budget

Construction
Materials
Availability

Further analysis of
existing market
facilities

Tabulate suitable
materials

Collate cost Data
Local Construction
Cost Review

Revise estimate of
Demand & Trade
Volumes

Constraints &
Opportunities
Mapping

Planning / Building
Regulations
Construction
Materials Studies

Data
Analysis

Synthesis
Revision of Project
Goals

Refine Stage 1
Estimate of Phisical
needs
Define
Accomodation Brief

Review Site
Planning Options
Review Building
Design Options:
• Modules
• Facilities
• Overall Form
• Climatic Design

Prepare Unit Rates
Review Stage 1
Draft Budget
A4

Data
Collection
List of Monitoring &
Evaluation
Indicators
Stage 3
Management
Structure &
Institutions Report

Surveys

Studies/Survey:
• Training
• MIS System
• Regulations
• Facilities

Technical
Assistance Needs

Data
Processing

Stage 2 Phasing
Programme

Stage 2 Final
Master Plan &
Development Brief
Stage 2 Building
Design Drawings

Agreed M & E
Programme

Review training
proposals

Agreed Scope of
Training
Programme

Review issues to
be resolved

Finalize Staffing
Establishment

Review Work Plan
& Phasing
Programme

Stage 3 Project
Work Plan

Detailed Stage 3 &
Stage 2 Civil Works
Budgets

Synthesis

Review M & E
Requirements

Establishment of
Market
management
Board &
Appointment of
Core Management
& Operations Staff

Data
Analysis

Detailed Engineering Surveys:
• Geotechnic
• Geodetic
• Materials

Selection and
Appointment of
Design &
Supervision
Consultants

Survey SubContractors reports

Review budget
allocations
Review Design
Changes

Agreed Phasing of
Development

Confirm Availability
of Finance
Agreed Design
Drawing
Programme
B1

RecommendatIons
Outline
Consultation
Procedure

Client Policy
Making Body &
Donors

Budget Request
Form

Final

Output
User

Project Identification & PreFeasibility report

Detailed

Output
Form

Finance Ministry &
Donors

Land Purchase
Form

Lands / Survey
Ministry

Terms of reference
for Initial Surveys:
•Engineering
•Social
•Marketing

Public Works Dept.
/ Engineering
Consultans

Preliminary Estimate of Phisical
requirements
Define Issues to be
resolved
Adjustment of
Development
Programme,
Budget Estimate &
Preliminary
Financial Analysis

Draft Budget
Requirements
Land Acquisition
Requirements
Further Survey
Requirements

Marketing Dept. or
Authority

Institutional
Proposals

Draft management
Structure &
Institutions Report

Law Ministry /
Client Body
B2

Figure 6 Stage II - detailed design development
RecommendatIons
Output
Output
Form
User
Outline
Detailed
Final
Consultation &
Agree Parameters
to be used in
Analysis
Review of Design
Options & Project
Risks
Estimate recurrent
Costs:
•Salaries
•Qverheads
•Depreciation
•Repairs &
Maintenance
Estimate Annual
Revenues:
•Levies
•Rents
•Parking Fees
Estimate Capital
Costs:
•Land Purchase
•Surveys
•Civil Works
•Equipment

Justification of
Project Benefits &
Risks

Overall Project
Design, Financial &
Economic Analysis,
including Sensitivity
testing

Final Institutional
Strategy
Further Issues to
be Resolved
Agreed Coordination
Arrangements
Further Survey
Requirements

Technical
Assistance
Requirements
Prepare Cash
Flows for Basic
Options
Final Budget
Requirements

Project Feasibility
Report

Final Management
Structure &
Institutions Report

Client Policy
Making Body &
Donors
Law Ministry

Project Work Plan /
Bar Chart
List of Monitoring &
Evaluation
Indicators
Terms of reference
for further Studies /
Surveys:
•Training
•MIS System
•Market
Regulations
•Facilities
•EIA
Detailed Budget
Form

Marketing Dept. or
Authority

Management /
Engineering
Consultant

Finance Ministry &
Donors
B3

RecommendatIons
Outline

Detailed

Final

Consultation
Procedure: staffing,
costs, demand,
phasing & Facilities

Adjustments from
Consultation &
Stage 3 Feasibility
Study

Output
Form

Further Issues to
be Resolved

Draft Master Plan

Sketch Design of
Buildings &
Facilities

Detailed Site
Planning and
Engineering
Studies:
•Earthworks
•Reclamation
•Conservation
•Land Drainage
•Roads/Parking
•Site Services
•Urban Design
•Landscaping
Detailed Building
Design:
•Circulation
•Space Needs
•Services
•Expansion
•Evaluation of
Structure &
Materials

Client Policy
Making Body &
Donors

Final Land Use &
Traffic Master Plan
Phasing
Programme
Defined Off Site
Infrastructure
Requirements

Further Survey
Requirements

Project Master Plan
report
&
Detailed
Development Brief

Terms of reference
for Detailed
Surveys:
•Geotechnic
•Geodetic
•Materials

Final Building
Designs
Outline
Specification Notes
& Final Cost
Estimate

Output
User

Building Design
Drawings

Final Civil Works
Budget

Marketing Dept. or
Authority
Local Planning
Authority
Public Works Dept.
/ Engineering
Consultants
Survey
Subcontractors
Lands/Survey
Ministry
Construction
Consultants
Finance Ministry &
Donors
B4

RecommendatIons
Outline
Preparation of
Overall Training
programme
Define Training
Recipients
Define Salary
Scales
Define Context:
•Cost Plan
•Materials Supply
•Contract Types
•Phasing Targets
•Pre-qualification

Detailed
Prepare Training
Material & Pilot
Test Training
Programme
Initiate Staff
Recruitment
Trader/Public
Participation
Design Accounting
System
Agreed Financial
Management
System

Preparation of
Working Drawings,
Specifications &
Bills of Quantities
for Civil Works

Tendering
Procedure:
•Analysis
•Award

Review Equipment
Needs

Final Equipment
List/Specification

Final
Finalize M & E
System

Staff Training
Initiated
Agreed Rents,
Tolls, Levies &
Parking Fees
Selection of
Applicants/
Stallholders
Finalize Market
Procedures
Selection of
Contractors &
Contract Start

Output
Form

Output
User

M & E Guidelines

Client Policy
Making Body &
Donors

Trained Staff
Schedule of Tolls &
Levies
Register of
Traders/Leases
Management
Manual:
•Procedures
•Training
•Accounts

Finalize Working
Details

Contract
Documents:
•Drawings/Spec.
•Signed Contract
•Materials Testing
Programme

Equipment
Procurement

Procurement
Scedules

Training Body TA
Consultants

Private Sector
Investors/Traders
Marketing
Authority/Board
Management
Consultants
Finance Ministry &
Donors
Appointed
Contractors
Design & Supervision Consultants
Materials/Equipment Suppliers
Mulai dibuat

Fonts tambahan

Jumlah halaman

07/09/2002

Comic Sans MS

32
Kawi Boedisetio

+62 817 219 755
telebiro.bandung0@clubmember.org

kawi.4shared.com

More Related Content

What's hot

Parking Initiatives Update: May 11, 2017
Parking Initiatives Update: May 11, 2017Parking Initiatives Update: May 11, 2017
Parking Initiatives Update: May 11, 2017
Fairfax County
 
Rural Economic Development Program Application Tips 2018
Rural Economic Development Program Application Tips 2018 Rural Economic Development Program Application Tips 2018
Rural Economic Development Program Application Tips 2018
Stephen Morris Ec.D.
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
D.Pawan Kumar
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
Dagný Gísladóttir
 
Non-technological Aspects of Service-Orien Map Production
Non-technological Aspects of Service-Orien Map ProductionNon-technological Aspects of Service-Orien Map Production
Non-technological Aspects of Service-Orien Map Production
indogpr
 
I1495 tac1
I1495 tac1I1495 tac1
I1495 tac1
Omni-Means
 
NVBIA NAIOP GOAL 3 Update
NVBIA NAIOP GOAL 3 UpdateNVBIA NAIOP GOAL 3 Update
NVBIA NAIOP GOAL 3 Update
Fairfax County
 
Northgate Study and Operations Plan
Northgate Study and Operations PlanNorthgate Study and Operations Plan
Northgate Study and Operations Plan
City of College Station
 
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
Fairfax County
 
Project Monitoring System (PMIS)
Project Monitoring System (PMIS)Project Monitoring System (PMIS)
Project Monitoring System (PMIS)
Niharendra Choudhury
 
Urbanistic Equalization and Compensatory Mechanism - From Legislation to GIS
Urbanistic Equalization and Compensatory Mechanism - From Legislation to GISUrbanistic Equalization and Compensatory Mechanism - From Legislation to GIS
Urbanistic Equalization and Compensatory Mechanism - From Legislation to GIS
Rui Menezes
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
Galala University
 
CV - SimonV7
CV - SimonV7CV - SimonV7
CV - SimonV7
Simon Ersser
 
Benchmark Historic Tax Credit Presentation
Benchmark Historic Tax Credit PresentationBenchmark Historic Tax Credit Presentation
Benchmark Historic Tax Credit Presentation
Christopher_Fields
 
Generic rlresume
Generic rlresumeGeneric rlresume
Generic rlresume
Ronda Lovell
 
Baseline Condition Assessment
Baseline Condition AssessmentBaseline Condition Assessment
Baseline Condition Assessment
GrantWhittle
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and scheduling
Subash Bhattarai
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
VISHNU VIJAYAN
 
PROJECT MANAGEMENT
PROJECT MANAGEMENT PROJECT MANAGEMENT
PROJECT MANAGEMENT
VISHNU VIJAYAN
 
CV Prakash Mistry
CV Prakash MistryCV Prakash Mistry
CV Prakash Mistry
Prakash Mistry
 

What's hot (20)

Parking Initiatives Update: May 11, 2017
Parking Initiatives Update: May 11, 2017Parking Initiatives Update: May 11, 2017
Parking Initiatives Update: May 11, 2017
 
Rural Economic Development Program Application Tips 2018
Rural Economic Development Program Application Tips 2018 Rural Economic Development Program Application Tips 2018
Rural Economic Development Program Application Tips 2018
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
Non-technological Aspects of Service-Orien Map Production
Non-technological Aspects of Service-Orien Map ProductionNon-technological Aspects of Service-Orien Map Production
Non-technological Aspects of Service-Orien Map Production
 
I1495 tac1
I1495 tac1I1495 tac1
I1495 tac1
 
NVBIA NAIOP GOAL 3 Update
NVBIA NAIOP GOAL 3 UpdateNVBIA NAIOP GOAL 3 Update
NVBIA NAIOP GOAL 3 Update
 
Northgate Study and Operations Plan
Northgate Study and Operations PlanNorthgate Study and Operations Plan
Northgate Study and Operations Plan
 
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
 
Project Monitoring System (PMIS)
Project Monitoring System (PMIS)Project Monitoring System (PMIS)
Project Monitoring System (PMIS)
 
Urbanistic Equalization and Compensatory Mechanism - From Legislation to GIS
Urbanistic Equalization and Compensatory Mechanism - From Legislation to GISUrbanistic Equalization and Compensatory Mechanism - From Legislation to GIS
Urbanistic Equalization and Compensatory Mechanism - From Legislation to GIS
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
 
CV - SimonV7
CV - SimonV7CV - SimonV7
CV - SimonV7
 
Benchmark Historic Tax Credit Presentation
Benchmark Historic Tax Credit PresentationBenchmark Historic Tax Credit Presentation
Benchmark Historic Tax Credit Presentation
 
Generic rlresume
Generic rlresumeGeneric rlresume
Generic rlresume
 
Baseline Condition Assessment
Baseline Condition AssessmentBaseline Condition Assessment
Baseline Condition Assessment
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and scheduling
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
PROJECT MANAGEMENT
PROJECT MANAGEMENT PROJECT MANAGEMENT
PROJECT MANAGEMENT
 
CV Prakash Mistry
CV Prakash MistryCV Prakash Mistry
CV Prakash Mistry
 

Viewers also liked

KB oyama &-yufuin-02
KB oyama &-yufuin-02KB oyama &-yufuin-02
KB oyama &-yufuin-02PUPUK
 
KB FGD-3-r05
KB FGD-3-r05KB FGD-3-r05
KB FGD-3-r05
PUPUK
 
KB pelatihan basis-data-02
KB pelatihan basis-data-02KB pelatihan basis-data-02
KB pelatihan basis-data-02
PUPUK
 
KB mitos dan realitas-03
KB mitos dan realitas-03KB mitos dan realitas-03
KB mitos dan realitas-03PUPUK
 
Kb sistem inovasi- daerah-21
Kb sistem inovasi- daerah-21Kb sistem inovasi- daerah-21
Kb sistem inovasi- daerah-21PUPUK
 
KB Diamond-01
KB Diamond-01KB Diamond-01
KB Diamond-01
PUPUK
 
Kb ovop-01
Kb ovop-01Kb ovop-01
Kb ovop-01
PUPUK
 
KB survai-14
KB survai-14KB survai-14
KB survai-14
PUPUK
 
KB campaign-05
KB campaign-05KB campaign-05
KB campaign-05PUPUK
 
Kb sistem inovasi daerah-23
Kb sistem inovasi daerah-23Kb sistem inovasi daerah-23
Kb sistem inovasi daerah-23PUPUK
 
KB jamurklaster-03
KB jamurklaster-03KB jamurklaster-03
KB jamurklaster-03PUPUK
 
KB techno pemuda-04
KB techno pemuda-04KB techno pemuda-04
KB techno pemuda-04PUPUK
 
KB migrasi-03
KB migrasi-03KB migrasi-03
KB migrasi-03
PUPUK
 
Kb layanan kemasan-02
Kb layanan kemasan-02Kb layanan kemasan-02
Kb layanan kemasan-02PUPUK
 
Kb sengatan sengata-12
Kb sengatan sengata-12Kb sengatan sengata-12
Kb sengatan sengata-12
PUPUK
 
KB whitebook-03
KB whitebook-03KB whitebook-03
KB whitebook-03PUPUK
 
KB contoh klaster-31
KB contoh klaster-31KB contoh klaster-31
KB contoh klaster-31
PUPUK
 
KB innovative financing-02
KB innovative financing-02KB innovative financing-02
KB innovative financing-02
PUPUK
 
Kb pohon industri-11
Kb pohon industri-11Kb pohon industri-11
Kb pohon industri-11
PUPUK
 

Viewers also liked (19)

KB oyama &-yufuin-02
KB oyama &-yufuin-02KB oyama &-yufuin-02
KB oyama &-yufuin-02
 
KB FGD-3-r05
KB FGD-3-r05KB FGD-3-r05
KB FGD-3-r05
 
KB pelatihan basis-data-02
KB pelatihan basis-data-02KB pelatihan basis-data-02
KB pelatihan basis-data-02
 
KB mitos dan realitas-03
KB mitos dan realitas-03KB mitos dan realitas-03
KB mitos dan realitas-03
 
Kb sistem inovasi- daerah-21
Kb sistem inovasi- daerah-21Kb sistem inovasi- daerah-21
Kb sistem inovasi- daerah-21
 
KB Diamond-01
KB Diamond-01KB Diamond-01
KB Diamond-01
 
Kb ovop-01
Kb ovop-01Kb ovop-01
Kb ovop-01
 
KB survai-14
KB survai-14KB survai-14
KB survai-14
 
KB campaign-05
KB campaign-05KB campaign-05
KB campaign-05
 
Kb sistem inovasi daerah-23
Kb sistem inovasi daerah-23Kb sistem inovasi daerah-23
Kb sistem inovasi daerah-23
 
KB jamurklaster-03
KB jamurklaster-03KB jamurklaster-03
KB jamurklaster-03
 
KB techno pemuda-04
KB techno pemuda-04KB techno pemuda-04
KB techno pemuda-04
 
KB migrasi-03
KB migrasi-03KB migrasi-03
KB migrasi-03
 
Kb layanan kemasan-02
Kb layanan kemasan-02Kb layanan kemasan-02
Kb layanan kemasan-02
 
Kb sengatan sengata-12
Kb sengatan sengata-12Kb sengatan sengata-12
Kb sengatan sengata-12
 
KB whitebook-03
KB whitebook-03KB whitebook-03
KB whitebook-03
 
KB contoh klaster-31
KB contoh klaster-31KB contoh klaster-31
KB contoh klaster-31
 
KB innovative financing-02
KB innovative financing-02KB innovative financing-02
KB innovative financing-02
 
Kb pohon industri-11
Kb pohon industri-11Kb pohon industri-11
Kb pohon industri-11
 

Similar to KB design methodology-02

CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
sombat nirund
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
AbdulrahmanAfabafal
 
Epm dimensys introductie gvk
Epm dimensys introductie gvkEpm dimensys introductie gvk
Epm dimensys introductie gvk
Glenn Van_kooijk
 
3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptx3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptx
DoctorOkelloBen
 
Best practices for reconciling Architecture roadmaps across domains
Best practices for reconciling Architecture roadmaps across domainsBest practices for reconciling Architecture roadmaps across domains
Best practices for reconciling Architecture roadmaps across domains
Mohan K.
 
RFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-BuilderRFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-Builder
Water Design-Build Council
 
Presentation construction management profiles
Presentation construction management profilesPresentation construction management profiles
Presentation construction management profiles
PriyankaKale53
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
Dagný Gísladóttir
 
KIAT - ARUP - Capacity Building Plan.pdf
KIAT - ARUP - Capacity Building Plan.pdfKIAT - ARUP - Capacity Building Plan.pdf
KIAT - ARUP - Capacity Building Plan.pdf
DianHutami1
 
KIAT - ARUP - Capacity Building Plan.pdf
KIAT - ARUP - Capacity Building Plan.pdfKIAT - ARUP - Capacity Building Plan.pdf
KIAT - ARUP - Capacity Building Plan.pdf
DianHutami1
 
FBC Advisory Committee Kickoff Meeting 091912
FBC Advisory Committee Kickoff Meeting 091912FBC Advisory Committee Kickoff Meeting 091912
FBC Advisory Committee Kickoff Meeting 091912
City of Beaufort Planning Department
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
juwes
 
eBUILD ERP - Software for Builders & Contractors
eBUILD ERP - Software for Builders & ContractorseBUILD ERP - Software for Builders & Contractors
eBUILD ERP - Software for Builders & Contractors
Packt Publishing
 
07 It Application01 Intro
07 It Application01 Intro07 It Application01 Intro
07 It Application01 Intro
Fazie70
 
solicitation presentation
solicitation presentationsolicitation presentation
solicitation presentation
Patrick Ryan
 
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
Black & Veatch
 
Chapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptxChapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptx
AlwanYusuf
 
Project Management
Project ManagementProject Management
Project Management
Murugeswari Ravi
 
Civil Solutions Consulting Group - Program Management
Civil Solutions Consulting Group - Program Management Civil Solutions Consulting Group - Program Management
Civil Solutions Consulting Group - Program Management
Eric Dexter
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
rinkumandaljis
 

Similar to KB design methodology-02 (20)

CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
Epm dimensys introductie gvk
Epm dimensys introductie gvkEpm dimensys introductie gvk
Epm dimensys introductie gvk
 
3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptx3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptx
 
Best practices for reconciling Architecture roadmaps across domains
Best practices for reconciling Architecture roadmaps across domainsBest practices for reconciling Architecture roadmaps across domains
Best practices for reconciling Architecture roadmaps across domains
 
RFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-BuilderRFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-Builder
 
Presentation construction management profiles
Presentation construction management profilesPresentation construction management profiles
Presentation construction management profiles
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
 
KIAT - ARUP - Capacity Building Plan.pdf
KIAT - ARUP - Capacity Building Plan.pdfKIAT - ARUP - Capacity Building Plan.pdf
KIAT - ARUP - Capacity Building Plan.pdf
 
KIAT - ARUP - Capacity Building Plan.pdf
KIAT - ARUP - Capacity Building Plan.pdfKIAT - ARUP - Capacity Building Plan.pdf
KIAT - ARUP - Capacity Building Plan.pdf
 
FBC Advisory Committee Kickoff Meeting 091912
FBC Advisory Committee Kickoff Meeting 091912FBC Advisory Committee Kickoff Meeting 091912
FBC Advisory Committee Kickoff Meeting 091912
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
eBUILD ERP - Software for Builders & Contractors
eBUILD ERP - Software for Builders & ContractorseBUILD ERP - Software for Builders & Contractors
eBUILD ERP - Software for Builders & Contractors
 
07 It Application01 Intro
07 It Application01 Intro07 It Application01 Intro
07 It Application01 Intro
 
solicitation presentation
solicitation presentationsolicitation presentation
solicitation presentation
 
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
How to Obtain the Best Consulting Support for your Radio System Upgrade or Re...
 
Chapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptxChapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
Civil Solutions Consulting Group - Program Management
Civil Solutions Consulting Group - Program Management Civil Solutions Consulting Group - Program Management
Civil Solutions Consulting Group - Program Management
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
 

More from PUPUK

KB inclusive business-02
KB inclusive business-02KB inclusive business-02
KB inclusive business-02
PUPUK
 
KB Pohon Industri-20
KB Pohon Industri-20KB Pohon Industri-20
KB Pohon Industri-20
PUPUK
 
KB pohon industri-19
KB pohon industri-19KB pohon industri-19
KB pohon industri-19
PUPUK
 
KB Bahan Bacaan-36
KB Bahan Bacaan-36KB Bahan Bacaan-36
KB Bahan Bacaan-36
PUPUK
 
KB state_of_the_arts-03
KB state_of_the_arts-03KB state_of_the_arts-03
KB state_of_the_arts-03PUPUK
 
KB FGD-7-r04
KB FGD-7-r04KB FGD-7-r04
KB FGD-7-r04PUPUK
 
KB FGD-6-r05
KB FGD-6-r05KB FGD-6-r05
KB FGD-6-r05
PUPUK
 
KB FGD-5-r02
KB FGD-5-r02KB FGD-5-r02
KB FGD-5-r02
PUPUK
 
KB FGD-4-r03
KB FGD-4-r03KB FGD-4-r03
KB FGD-4-r03PUPUK
 
KB FGD-2-r19
KB FGD-2-r19KB FGD-2-r19
KB FGD-2-r19
PUPUK
 
KB FGD-1-r25
KB FGD-1-r25KB FGD-1-r25
KB FGD-1-r25PUPUK
 
KB greenbook-3-ind-06
KB greenbook-3-ind-06KB greenbook-3-ind-06
KB greenbook-3-ind-06PUPUK
 
KB CSR 02
KB CSR 02KB CSR 02
KB CSR 02PUPUK
 
KB studipasar-04
KB studipasar-04KB studipasar-04
KB studipasar-04PUPUK
 
KB san ojego-07
KB san ojego-07KB san ojego-07
KB san ojego-07PUPUK
 
KB lembar kerja_CSR-02
KB lembar kerja_CSR-02KB lembar kerja_CSR-02
KB lembar kerja_CSR-02PUPUK
 
KB lokabiz-03
KB lokabiz-03KB lokabiz-03
KB lokabiz-03
PUPUK
 
KB Cluster Game-08
KB Cluster Game-08KB Cluster Game-08
KB Cluster Game-08PUPUK
 
KB input-output table-r05
KB input-output table-r05KB input-output table-r05
KB input-output table-r05
PUPUK
 
KB Komponen Teknologi-04
KB Komponen Teknologi-04KB Komponen Teknologi-04
KB Komponen Teknologi-04
PUPUK
 

More from PUPUK (20)

KB inclusive business-02
KB inclusive business-02KB inclusive business-02
KB inclusive business-02
 
KB Pohon Industri-20
KB Pohon Industri-20KB Pohon Industri-20
KB Pohon Industri-20
 
KB pohon industri-19
KB pohon industri-19KB pohon industri-19
KB pohon industri-19
 
KB Bahan Bacaan-36
KB Bahan Bacaan-36KB Bahan Bacaan-36
KB Bahan Bacaan-36
 
KB state_of_the_arts-03
KB state_of_the_arts-03KB state_of_the_arts-03
KB state_of_the_arts-03
 
KB FGD-7-r04
KB FGD-7-r04KB FGD-7-r04
KB FGD-7-r04
 
KB FGD-6-r05
KB FGD-6-r05KB FGD-6-r05
KB FGD-6-r05
 
KB FGD-5-r02
KB FGD-5-r02KB FGD-5-r02
KB FGD-5-r02
 
KB FGD-4-r03
KB FGD-4-r03KB FGD-4-r03
KB FGD-4-r03
 
KB FGD-2-r19
KB FGD-2-r19KB FGD-2-r19
KB FGD-2-r19
 
KB FGD-1-r25
KB FGD-1-r25KB FGD-1-r25
KB FGD-1-r25
 
KB greenbook-3-ind-06
KB greenbook-3-ind-06KB greenbook-3-ind-06
KB greenbook-3-ind-06
 
KB CSR 02
KB CSR 02KB CSR 02
KB CSR 02
 
KB studipasar-04
KB studipasar-04KB studipasar-04
KB studipasar-04
 
KB san ojego-07
KB san ojego-07KB san ojego-07
KB san ojego-07
 
KB lembar kerja_CSR-02
KB lembar kerja_CSR-02KB lembar kerja_CSR-02
KB lembar kerja_CSR-02
 
KB lokabiz-03
KB lokabiz-03KB lokabiz-03
KB lokabiz-03
 
KB Cluster Game-08
KB Cluster Game-08KB Cluster Game-08
KB Cluster Game-08
 
KB input-output table-r05
KB input-output table-r05KB input-output table-r05
KB input-output table-r05
 
KB Komponen Teknologi-04
KB Komponen Teknologi-04KB Komponen Teknologi-04
KB Komponen Teknologi-04
 

Recently uploaded

ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 

Recently uploaded (20)

ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 

KB design methodology-02

  • 1. Tahapan perencanaan terminal agribisnis Sumber: Wholesale markets, Planning and design manual by J. D. Tracey-White FAO 1991 (diolah) Kawi Boedisetio Telebiro.bandung0@clubmember.org Wieke Irawati Kodri fe_bandung@yahoo.com
  • 2. Pengantar • Dokumen ini berisi diagram proses untuk melakukan perancangan dan perencanaan pembangunan Pasar Sayur atau “Sub-Terminal Agribisnis”
  • 3. Untuk memudahkan pembacaan, 9 slide berikut perlu di-print dan hasilnya disambung-sambung, sesuai dengan “connector” yang ada. A1 B1 A2 B2 A3 B3 A4 B4
  • 4. Figure 4 – A Design Methodology STAGE I ACTIVITIES Management and Operations Location and Planning Construction and Implementation STAGE II STAGE III STAGE IV Project Identification and pre-feasibility Detailed Design Development Project formulation and feasibility Project Implementation National Policy & Goals, Institutional Structure Context, review of Facilities & Site Selection Operation Plan & Management Procedures Plan options & Land Use Traffic Master Plan Building options, Structure, Materials & Costs Staffing, Training, and Initiate Operations Plan Evaluation & Financial Analysis FUNCTIONS Administrators and Policy Maker Planners and Economists Tender Documents, Construction & Procurement Engineers And Architects
  • 5. A1 Data Collection Surveys National Agricultural Policy Existing Marketing Studies Existing Market Records Agricultural Production Data National Consumption Data Data Analysis Preliminary Physical Survey of Market Tabulate Existing Market Facilities Reconnaissance Survey of Market Operations Define Market Functionaries Identify Existing Shortcomings Appraisal of Market Facilities Analysis of Existing Marketing System Define Marketing Channels Tabulate Catchment Production Demographic Data Tabulate Population Data Legislation & Ordinance Extract Relevant Laws Synthesis Definition of Project Goals Tabulate Relevant Development Policies Regional Planning Studies Existing Sector Programme Data Processing Estimate Market Turnover Estimate Design Population Review Suitability of Site Size & Location Definition of Project Risks Project Future Needs Identify Project Beneficiaries Identify Management Options
  • 6. A2 Data Collection Stage 1 Context data & Studies: • Existing Marketing Studies • Existing Market records • Agricultural Production • National Consumption • Demography • Management Proposals Detailed Survey of Market Operations Data Analysis Define End-of Project Status Review Design Population Stage 1 definition of Project Goals Data Processing Review Development Policies Surveys Quantify Project Beneficiaries Review Market Functionaries Review Marketing Channels Detailed Field Suirvey of Traders & Turnover Review Catchment Production Manual/Computer Spreadsheet Stage 2 Final Master Plan Stage 2 Civil Works Budget Appraisal of Operations & Management Options Analysis of Existing Marketing System Project Market Turnover Synthesis Define Project’s Immediate Objectives & Outputs Define Project’s Inputs Formulate Market Procedures & Agree Staffing Establishment Estimate Utilization of Market Facilities Phasing of Design Options Agree Equipment Needs
  • 7. A3 Data Collection Surveys Data Processing Check Stage 1 Findings on Existing Shortcomings, Project Risks, Issues & Beneficiaries Stage 1 Review Proposals/Issues Local Planning Studies Maps and Aerial Photographs Climatic / Hydrogeology Studies Existing Geotechnical Studies Survey of Traders & Turnover Engineering Survey of Markets: • Historic • Topographic • Geodetic • Site Features • Services • Soils Survey of Traffic Modes & Volumes Manual / Computer Spreadsheets Tabulate existing market facilities Base Map Preparation Official Rates & Cost data Stage 1 Draft Project Budget Construction Materials Availability Further analysis of existing market facilities Tabulate suitable materials Collate cost Data Local Construction Cost Review Revise estimate of Demand & Trade Volumes Constraints & Opportunities Mapping Planning / Building Regulations Construction Materials Studies Data Analysis Synthesis Revision of Project Goals Refine Stage 1 Estimate of Phisical needs Define Accomodation Brief Review Site Planning Options Review Building Design Options: • Modules • Facilities • Overall Form • Climatic Design Prepare Unit Rates Review Stage 1 Draft Budget
  • 8. A4 Data Collection List of Monitoring & Evaluation Indicators Stage 3 Management Structure & Institutions Report Surveys Studies/Survey: • Training • MIS System • Regulations • Facilities Technical Assistance Needs Data Processing Stage 2 Phasing Programme Stage 2 Final Master Plan & Development Brief Stage 2 Building Design Drawings Agreed M & E Programme Review training proposals Agreed Scope of Training Programme Review issues to be resolved Finalize Staffing Establishment Review Work Plan & Phasing Programme Stage 3 Project Work Plan Detailed Stage 3 & Stage 2 Civil Works Budgets Synthesis Review M & E Requirements Establishment of Market management Board & Appointment of Core Management & Operations Staff Data Analysis Detailed Engineering Surveys: • Geotechnic • Geodetic • Materials Selection and Appointment of Design & Supervision Consultants Survey SubContractors reports Review budget allocations Review Design Changes Agreed Phasing of Development Confirm Availability of Finance Agreed Design Drawing Programme
  • 9. B1 RecommendatIons Outline Consultation Procedure Client Policy Making Body & Donors Budget Request Form Final Output User Project Identification & PreFeasibility report Detailed Output Form Finance Ministry & Donors Land Purchase Form Lands / Survey Ministry Terms of reference for Initial Surveys: •Engineering •Social •Marketing Public Works Dept. / Engineering Consultans Preliminary Estimate of Phisical requirements Define Issues to be resolved Adjustment of Development Programme, Budget Estimate & Preliminary Financial Analysis Draft Budget Requirements Land Acquisition Requirements Further Survey Requirements Marketing Dept. or Authority Institutional Proposals Draft management Structure & Institutions Report Law Ministry / Client Body
  • 10. B2 Figure 6 Stage II - detailed design development RecommendatIons Output Output Form User Outline Detailed Final Consultation & Agree Parameters to be used in Analysis Review of Design Options & Project Risks Estimate recurrent Costs: •Salaries •Qverheads •Depreciation •Repairs & Maintenance Estimate Annual Revenues: •Levies •Rents •Parking Fees Estimate Capital Costs: •Land Purchase •Surveys •Civil Works •Equipment Justification of Project Benefits & Risks Overall Project Design, Financial & Economic Analysis, including Sensitivity testing Final Institutional Strategy Further Issues to be Resolved Agreed Coordination Arrangements Further Survey Requirements Technical Assistance Requirements Prepare Cash Flows for Basic Options Final Budget Requirements Project Feasibility Report Final Management Structure & Institutions Report Client Policy Making Body & Donors Law Ministry Project Work Plan / Bar Chart List of Monitoring & Evaluation Indicators Terms of reference for further Studies / Surveys: •Training •MIS System •Market Regulations •Facilities •EIA Detailed Budget Form Marketing Dept. or Authority Management / Engineering Consultant Finance Ministry & Donors
  • 11. B3 RecommendatIons Outline Detailed Final Consultation Procedure: staffing, costs, demand, phasing & Facilities Adjustments from Consultation & Stage 3 Feasibility Study Output Form Further Issues to be Resolved Draft Master Plan Sketch Design of Buildings & Facilities Detailed Site Planning and Engineering Studies: •Earthworks •Reclamation •Conservation •Land Drainage •Roads/Parking •Site Services •Urban Design •Landscaping Detailed Building Design: •Circulation •Space Needs •Services •Expansion •Evaluation of Structure & Materials Client Policy Making Body & Donors Final Land Use & Traffic Master Plan Phasing Programme Defined Off Site Infrastructure Requirements Further Survey Requirements Project Master Plan report & Detailed Development Brief Terms of reference for Detailed Surveys: •Geotechnic •Geodetic •Materials Final Building Designs Outline Specification Notes & Final Cost Estimate Output User Building Design Drawings Final Civil Works Budget Marketing Dept. or Authority Local Planning Authority Public Works Dept. / Engineering Consultants Survey Subcontractors Lands/Survey Ministry Construction Consultants Finance Ministry & Donors
  • 12. B4 RecommendatIons Outline Preparation of Overall Training programme Define Training Recipients Define Salary Scales Define Context: •Cost Plan •Materials Supply •Contract Types •Phasing Targets •Pre-qualification Detailed Prepare Training Material & Pilot Test Training Programme Initiate Staff Recruitment Trader/Public Participation Design Accounting System Agreed Financial Management System Preparation of Working Drawings, Specifications & Bills of Quantities for Civil Works Tendering Procedure: •Analysis •Award Review Equipment Needs Final Equipment List/Specification Final Finalize M & E System Staff Training Initiated Agreed Rents, Tolls, Levies & Parking Fees Selection of Applicants/ Stallholders Finalize Market Procedures Selection of Contractors & Contract Start Output Form Output User M & E Guidelines Client Policy Making Body & Donors Trained Staff Schedule of Tolls & Levies Register of Traders/Leases Management Manual: •Procedures •Training •Accounts Finalize Working Details Contract Documents: •Drawings/Spec. •Signed Contract •Materials Testing Programme Equipment Procurement Procurement Scedules Training Body TA Consultants Private Sector Investors/Traders Marketing Authority/Board Management Consultants Finance Ministry & Donors Appointed Contractors Design & Supervision Consultants Materials/Equipment Suppliers
  • 13. Mulai dibuat Fonts tambahan Jumlah halaman 07/09/2002 Comic Sans MS 32
  • 14. Kawi Boedisetio +62 817 219 755 telebiro.bandung0@clubmember.org kawi.4shared.com