SlideShare a Scribd company logo
PROJECT
MANAGEMENT
VISHNU VIJAYAN
HOD-Department Of Civil Engineering
Baselios Mathews II College Of Engineering
Sasthamcotta, Kollam,Kerala,INDIA
What is Project ?
Project
•A project is a temporary endeavour
undertaken to create a unique product,
service, or result.
•It has a beginning and an end
•Create a unique product ,service or
result
25March2020
ProjectManagement-VISHNU
VIJAYAN
3
Then..
What is Project Management?
Project Management
• Project management is the application of knowledge ,skills,
tools and techniques to the project activities to meet project
requirements .In order to achieve a specified goal or Target
with in the cost, with in the stipulated time and without
compromise the quality and safety.
(or)
• Project management is the process, activity of planning,
organizing, motivating, and controlling resources to achieve
specific goals.
• The term construction project management means that It
is an overall planning of construction project, it requires
proper co-ordination and control of the construction project
from the conception to completion of the project.
25March2020
ProjectManagement-VISHNU
VIJAYAN
5
TYPES OF CONSTRUCTION
PROJECTS:
The Construction project can be classified into three.
(i) Private construction.
(ii) State construction.
(iii) Federal Construction.
25March2020
ProjectManagement-VISHNU
VIJAYAN
6
Project Life Cycle
25March2020
ProjectManagement-VISHNU
VIJAYAN
8
CONSTRUCTION
ECONOMICS
CONSTRUCTION ECONOMICS
• Construction Economics is the process of
economising the construction work from
initiation to completion of the Project
work.
• This will be ensure the practical and
sustainable financial decisions over the
project.
25March2020
ProjectManagement-VISHNU
VIJAYAN
10
TIME VALUE OF MONEY
• The time value of money(TVM) is the idea
that money available at the present time is
worth more than the same amount in the
future due to potential earning capacity.
This core principle of finance holds that
,provided money can earn interest ,any
amount of money is worth more sooner it
received.
25March2020
ProjectManagement-VISHNU
VIJAYAN
11
TECHNO-ECONOMICANALYSIS
• The analyse of technical aspects as well as
economic aspects are equally important for the
success of a project.
• A good project must be Technically feasible and
economically viable.
25March2020
ProjectManagement-VISHNU
VIJAYAN
12
Technical analysis:
The technical analysis of a construction projects
must be consider the following factors in the
technical analysis stage.
1. Location of site, availability of raw materials,
sufficient land should be easily approachable by
rails and road, availability of electricity, water,
communication facility, availability of man power
around the area etc.
2. Soil characteristics
3.Selection of suitable technologies:
4. Specification:
25March2020
ProjectManagement-VISHNU
VIJAYAN
13
Financial analysis:
• No project can begin without capital (money), so the proper
allocation and budgeting of money will leads the life of a
project.
• The capital cost can be classified into 2 categories
• Working cost: cost of equipment and raw materials etc.
• Operating cost: cost after the completion of project.
• Source of funding
• financial analysis find out the source of money to role the
project smoothly without affect any delay in the work .there
are two types of source for funding namely Internal source
and external source .
• Internal source:
• External source:
25March2020
ProjectManagement-VISHNU
VIJAYAN
14
ECOLOGICALANALYSIS
• At the time of construction needs to identify the major hazards
present at the construction site or hazards will come in the
future by the constriction activity.
• Also find out the Situation and condition that leads to impact
the environment.
• Try to avoid such impact to the environment make the
construction by sustainably as soon as possible.
25March2020
ProjectManagement-VISHNU
VIJAYAN
15
Economic analysis:
• The ultimate aim of economic analysis is to check the
proposed project is economically viable or not. So comparison
of cost and return (benefits) of the project are important. There
are different economic methods are adapted to analysis the
economy of the project. The following are the main methods
are adopted for the analysis of economy of a project.
• Payback Period method
• Net Present Value (NPV)
• Internal Rate of Return method (IRR)
• Benefit cost ratio method (BCR)
25March2020
ProjectManagement-VISHNU
VIJAYAN
16
Payback Period method
• This method finds how long will be take to get the invested
money back from the project.
A project with shorter payback period is desirable.
• Cash out flow: expenditure /investment
• Cash inflow income from the project
25March2020
ProjectManagement-VISHNU
VIJAYAN
17
CONTD..
• Net present value:
• It is based on the concept that the money has some time value.
A project with positive net present value is preferable.
• Internal rate of return
• In this method NPV is assumed to be zero and the rate of
return is find out .a project with larger rate of return is
accepted.
• Benefit cost ratio:
• Benefit cost ratio method the value of different projects are
evaluated and if the project getting less than 1 (B/C < 1)
benefit cost ratio is rejected and one with larger benefit cost
ratio is accepted.
25March2020
ProjectManagement-VISHNU
VIJAYAN
18
COMPUTER CAPABILITIES
IN MANAGEMENT
• GENERAL:
computer and modern packages can provide the
necessary IPMI, required for the successful completion of
project management.
Computers are the effective tools for project managers
Decision making process is expedited by
computerisation .
25March2020
ProjectManagement-VISHNU
VIJAYAN
19
Advantages in management
• Project activities easily sorted out and list outing...
• Project schedule arrangement (depends on the progress )
• Better analysis in time cost trade offs, resource allocation ,cost
control ETC.......
25March2020
ProjectManagement-VISHNU
VIJAYAN
20
IPMI USES
• Features are,
• Payroll accounting
• Records management ,
• Job cards
• Risk analysis
• Graphics & spreadsheet analysis,
• Material management
• Estimating Tender analysis
• BOQ analysis
25March2020
ProjectManagement-VISHNU
VIJAYAN
21
COMPUTERISED SYSTEMS
In construction industry grouped into 3:
1.Planning and Design systems
2.Commercial Application systems
3.Site oriented Operational systems
Computer use by key functionaries:
OWNER
CONSULATANT
CONTRACTORS
25March2020
ProjectManagement-VISHNU
VIJAYAN
22
SOFTWARE TOOLS &
APPLICATIONS
• MS Excel: create spread sheet of documents
• LOTUS : developing database functions, value engineering et.
• PRIMAVERA : scheduling applications
• MS Projects : scheduling applications
• MS Word :creating letters ,documents, memorandum
• MS Perfect : creating letters ,documents, memorandum
• Auto Cad :prepare drawings & details
• Timberline : estimation
• MS Power point : dynamic tool for presentation
25March2020
ProjectManagement-VISHNU
VIJAYAN
23
Thank You …..

More Related Content

What's hot

Ways to mitigate construction risks using bim workflow management
Ways to mitigate construction risks using bim workflow managementWays to mitigate construction risks using bim workflow management
Ways to mitigate construction risks using bim workflow management
nibtedu
 
1528 project management process groups
1528 project management process groups1528 project management process groups
1528 project management process groups
Teresa Jurgens-Kowal, NPDP, PMP
 
Cash flow report using ms project
Cash flow report  using ms projectCash flow report  using ms project
Cash flow report using ms project
Kundan Sanap
 
Project Execution
Project ExecutionProject Execution
Project Execution
Martin Sillaots
 
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
IJSRD
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...
Galala University
 
Planning for Field Information for a project
Planning for Field Information for a projectPlanning for Field Information for a project
Planning for Field Information for a project
John Sushil Packiaraj
 
Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & Monitoring
Jawad Ahmad
 
Scope management_Infrastructure Engineering and Management (2170611) (Semeste...
Scope management_Infrastructure Engineering and Management (2170611) (Semeste...Scope management_Infrastructure Engineering and Management (2170611) (Semeste...
Scope management_Infrastructure Engineering and Management (2170611) (Semeste...
A Makwana
 

What's hot (11)

Ways to mitigate construction risks using bim workflow management
Ways to mitigate construction risks using bim workflow managementWays to mitigate construction risks using bim workflow management
Ways to mitigate construction risks using bim workflow management
 
1528 project management process groups
1528 project management process groups1528 project management process groups
1528 project management process groups
 
Cost management
Cost managementCost management
Cost management
 
Qto
QtoQto
Qto
 
Cash flow report using ms project
Cash flow report  using ms projectCash flow report  using ms project
Cash flow report using ms project
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...
 
Planning for Field Information for a project
Planning for Field Information for a projectPlanning for Field Information for a project
Planning for Field Information for a project
 
Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & Monitoring
 
Scope management_Infrastructure Engineering and Management (2170611) (Semeste...
Scope management_Infrastructure Engineering and Management (2170611) (Semeste...Scope management_Infrastructure Engineering and Management (2170611) (Semeste...
Scope management_Infrastructure Engineering and Management (2170611) (Semeste...
 

Similar to PROJECT MANAGEMENT

Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdf
TanzeelShahid5
 
2. Mr B Morton
2. Mr B Morton2. Mr B Morton
2. Mr B Morton
SeniorITSupport
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE
S. Sathishkumar
 
Role of project management in construction industry
Role of project management in construction industryRole of project management in construction industry
Role of project management in construction industry
Rubnawaz Bhatti
 
1.1 Lecture - SPM.ppt
1.1 Lecture - SPM.ppt1.1 Lecture - SPM.ppt
1.1 Lecture - SPM.ppt
uthiramoorthyarumuga1
 
A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...
ramsey20
 
Planning & Scheduling 222030008.pptx
Planning & Scheduling 222030008.pptxPlanning & Scheduling 222030008.pptx
Planning & Scheduling 222030008.pptx
Aditya Mane
 
chapter 1 edited.pdf
chapter 1 edited.pdfchapter 1 edited.pdf
chapter 1 edited.pdf
kena6
 
Project management-professional-free-sample
Project management-professional-free-sampleProject management-professional-free-sample
Project management-professional-free-sample
ReadytoTrain .
 
Pm only
Pm onlyPm only
Pm only
Yong Sy
 
Pm only
Pm onlyPm only
Pm only
Lwj Welson
 
Environmental Engineering.pptx
Environmental Engineering.pptxEnvironmental Engineering.pptx
Environmental Engineering.pptx
BonnelAlos1
 
Za project &amp; project cycle management
Za   project &amp; project cycle managementZa   project &amp; project cycle management
Za project &amp; project cycle management
hamza khwaja
 
Guidelines for field development plan
Guidelines for field development planGuidelines for field development plan
Guidelines for field development plan
Giuseppe Moricca
 
Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revised
Fiker Love
 
CEM unit -I ppt.pptx
CEM unit -I ppt.pptxCEM unit -I ppt.pptx
CEM unit -I ppt.pptx
latestnewsnews
 
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET Journal
 
PART- 2: Engineering Project Management
PART- 2: Engineering Project Management PART- 2: Engineering Project Management
sample456.pptx
sample456.pptxsample456.pptx
sample456.pptx
JasmineMichael1
 
project introduction.pdf
project introduction.pdfproject introduction.pdf
project introduction.pdf
RajeevRanjan959412
 

Similar to PROJECT MANAGEMENT (20)

Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdf
 
2. Mr B Morton
2. Mr B Morton2. Mr B Morton
2. Mr B Morton
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE
 
Role of project management in construction industry
Role of project management in construction industryRole of project management in construction industry
Role of project management in construction industry
 
1.1 Lecture - SPM.ppt
1.1 Lecture - SPM.ppt1.1 Lecture - SPM.ppt
1.1 Lecture - SPM.ppt
 
A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...
 
Planning & Scheduling 222030008.pptx
Planning & Scheduling 222030008.pptxPlanning & Scheduling 222030008.pptx
Planning & Scheduling 222030008.pptx
 
chapter 1 edited.pdf
chapter 1 edited.pdfchapter 1 edited.pdf
chapter 1 edited.pdf
 
Project management-professional-free-sample
Project management-professional-free-sampleProject management-professional-free-sample
Project management-professional-free-sample
 
Pm only
Pm onlyPm only
Pm only
 
Pm only
Pm onlyPm only
Pm only
 
Environmental Engineering.pptx
Environmental Engineering.pptxEnvironmental Engineering.pptx
Environmental Engineering.pptx
 
Za project &amp; project cycle management
Za   project &amp; project cycle managementZa   project &amp; project cycle management
Za project &amp; project cycle management
 
Guidelines for field development plan
Guidelines for field development planGuidelines for field development plan
Guidelines for field development plan
 
Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revised
 
CEM unit -I ppt.pptx
CEM unit -I ppt.pptxCEM unit -I ppt.pptx
CEM unit -I ppt.pptx
 
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
 
PART- 2: Engineering Project Management
PART- 2: Engineering Project Management PART- 2: Engineering Project Management
PART- 2: Engineering Project Management
 
sample456.pptx
sample456.pptxsample456.pptx
sample456.pptx
 
project introduction.pdf
project introduction.pdfproject introduction.pdf
project introduction.pdf
 

More from VISHNU VIJAYAN

RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTERECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
VISHNU VIJAYAN
 
A study on the analysis and modeling of multipurpose concert center by the in...
A study on the analysis and modeling of multipurpose concert center by the in...A study on the analysis and modeling of multipurpose concert center by the in...
A study on the analysis and modeling of multipurpose concert center by the in...
VISHNU VIJAYAN
 
HARBOUR ENGINEERING
HARBOUR ENGINEERING HARBOUR ENGINEERING
HARBOUR ENGINEERING
VISHNU VIJAYAN
 
Foundation Engineering
Foundation Engineering Foundation Engineering
Foundation Engineering
VISHNU VIJAYAN
 
FORM WORK & SLIPFORM
FORM WORK & SLIPFORMFORM WORK & SLIPFORM
FORM WORK & SLIPFORM
VISHNU VIJAYAN
 
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTORSTUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
VISHNU VIJAYAN
 
An Experimental Study on Chitosan for Water Treatment
An Experimental Study on Chitosan for Water TreatmentAn Experimental Study on Chitosan for Water Treatment
An Experimental Study on Chitosan for Water Treatment
VISHNU VIJAYAN
 
Mechanical Strength of Concrete using Bottom Ash as Fine Aggregate
Mechanical Strength of Concrete using Bottom Ash as Fine AggregateMechanical Strength of Concrete using Bottom Ash as Fine Aggregate
Mechanical Strength of Concrete using Bottom Ash as Fine Aggregate
VISHNU VIJAYAN
 
A comparative study on sustainable building construction with conventional re...
A comparative study on sustainable building construction with conventional re...A comparative study on sustainable building construction with conventional re...
A comparative study on sustainable building construction with conventional re...
VISHNU VIJAYAN
 
A study about the status of implementation on safety standards and legal requ...
A study about the status of implementation on safety standards and legal requ...A study about the status of implementation on safety standards and legal requ...
A study about the status of implementation on safety standards and legal requ...
VISHNU VIJAYAN
 
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
VISHNU VIJAYAN
 
Time-cost-risk optimization in construction work by using ant colony algorithm
Time-cost-risk optimization in construction work by using ant colony algorithmTime-cost-risk optimization in construction work by using ant colony algorithm
Time-cost-risk optimization in construction work by using ant colony algorithm
VISHNU VIJAYAN
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
VISHNU VIJAYAN
 
ADVANCED CONCRETE TECHNOLOGY (CE361)
ADVANCED CONCRETE TECHNOLOGY  (CE361)ADVANCED CONCRETE TECHNOLOGY  (CE361)
ADVANCED CONCRETE TECHNOLOGY (CE361)
VISHNU VIJAYAN
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
VISHNU VIJAYAN
 
SCIENTIFIC MANAGEMENT
SCIENTIFIC MANAGEMENTSCIENTIFIC MANAGEMENT
SCIENTIFIC MANAGEMENT
VISHNU VIJAYAN
 
SCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGSCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNING
VISHNU VIJAYAN
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE
VISHNU VIJAYAN
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)
VISHNU VIJAYAN
 
MASONRY- STONE AND BRICK
MASONRY- STONE AND BRICKMASONRY- STONE AND BRICK
MASONRY- STONE AND BRICK
VISHNU VIJAYAN
 

More from VISHNU VIJAYAN (20)

RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTERECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
RECYCLING OF CONCRETE FROM DEMOLISHED CONSTRUCTION WASTE
 
A study on the analysis and modeling of multipurpose concert center by the in...
A study on the analysis and modeling of multipurpose concert center by the in...A study on the analysis and modeling of multipurpose concert center by the in...
A study on the analysis and modeling of multipurpose concert center by the in...
 
HARBOUR ENGINEERING
HARBOUR ENGINEERING HARBOUR ENGINEERING
HARBOUR ENGINEERING
 
Foundation Engineering
Foundation Engineering Foundation Engineering
Foundation Engineering
 
FORM WORK & SLIPFORM
FORM WORK & SLIPFORMFORM WORK & SLIPFORM
FORM WORK & SLIPFORM
 
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTORSTUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
STUDY ON SUSTAINABLE AND COST EFFECTIVE BUILDING CONSTRUCTION IN HOUSING SECTOR
 
An Experimental Study on Chitosan for Water Treatment
An Experimental Study on Chitosan for Water TreatmentAn Experimental Study on Chitosan for Water Treatment
An Experimental Study on Chitosan for Water Treatment
 
Mechanical Strength of Concrete using Bottom Ash as Fine Aggregate
Mechanical Strength of Concrete using Bottom Ash as Fine AggregateMechanical Strength of Concrete using Bottom Ash as Fine Aggregate
Mechanical Strength of Concrete using Bottom Ash as Fine Aggregate
 
A comparative study on sustainable building construction with conventional re...
A comparative study on sustainable building construction with conventional re...A comparative study on sustainable building construction with conventional re...
A comparative study on sustainable building construction with conventional re...
 
A study about the status of implementation on safety standards and legal requ...
A study about the status of implementation on safety standards and legal requ...A study about the status of implementation on safety standards and legal requ...
A study about the status of implementation on safety standards and legal requ...
 
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
A Study on Strengthening of Bubble Deck Slab with Elliptical Balls by using G...
 
Time-cost-risk optimization in construction work by using ant colony algorithm
Time-cost-risk optimization in construction work by using ant colony algorithmTime-cost-risk optimization in construction work by using ant colony algorithm
Time-cost-risk optimization in construction work by using ant colony algorithm
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
 
ADVANCED CONCRETE TECHNOLOGY (CE361)
ADVANCED CONCRETE TECHNOLOGY  (CE361)ADVANCED CONCRETE TECHNOLOGY  (CE361)
ADVANCED CONCRETE TECHNOLOGY (CE361)
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 
SCIENTIFIC MANAGEMENT
SCIENTIFIC MANAGEMENTSCIENTIFIC MANAGEMENT
SCIENTIFIC MANAGEMENT
 
SCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGSCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNING
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)
 
MASONRY- STONE AND BRICK
MASONRY- STONE AND BRICKMASONRY- STONE AND BRICK
MASONRY- STONE AND BRICK
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 

PROJECT MANAGEMENT

  • 1. PROJECT MANAGEMENT VISHNU VIJAYAN HOD-Department Of Civil Engineering Baselios Mathews II College Of Engineering Sasthamcotta, Kollam,Kerala,INDIA
  • 3. Project •A project is a temporary endeavour undertaken to create a unique product, service, or result. •It has a beginning and an end •Create a unique product ,service or result 25March2020 ProjectManagement-VISHNU VIJAYAN 3
  • 5. Project Management • Project management is the application of knowledge ,skills, tools and techniques to the project activities to meet project requirements .In order to achieve a specified goal or Target with in the cost, with in the stipulated time and without compromise the quality and safety. (or) • Project management is the process, activity of planning, organizing, motivating, and controlling resources to achieve specific goals. • The term construction project management means that It is an overall planning of construction project, it requires proper co-ordination and control of the construction project from the conception to completion of the project. 25March2020 ProjectManagement-VISHNU VIJAYAN 5
  • 6. TYPES OF CONSTRUCTION PROJECTS: The Construction project can be classified into three. (i) Private construction. (ii) State construction. (iii) Federal Construction. 25March2020 ProjectManagement-VISHNU VIJAYAN 6
  • 10. CONSTRUCTION ECONOMICS • Construction Economics is the process of economising the construction work from initiation to completion of the Project work. • This will be ensure the practical and sustainable financial decisions over the project. 25March2020 ProjectManagement-VISHNU VIJAYAN 10
  • 11. TIME VALUE OF MONEY • The time value of money(TVM) is the idea that money available at the present time is worth more than the same amount in the future due to potential earning capacity. This core principle of finance holds that ,provided money can earn interest ,any amount of money is worth more sooner it received. 25March2020 ProjectManagement-VISHNU VIJAYAN 11
  • 12. TECHNO-ECONOMICANALYSIS • The analyse of technical aspects as well as economic aspects are equally important for the success of a project. • A good project must be Technically feasible and economically viable. 25March2020 ProjectManagement-VISHNU VIJAYAN 12
  • 13. Technical analysis: The technical analysis of a construction projects must be consider the following factors in the technical analysis stage. 1. Location of site, availability of raw materials, sufficient land should be easily approachable by rails and road, availability of electricity, water, communication facility, availability of man power around the area etc. 2. Soil characteristics 3.Selection of suitable technologies: 4. Specification: 25March2020 ProjectManagement-VISHNU VIJAYAN 13
  • 14. Financial analysis: • No project can begin without capital (money), so the proper allocation and budgeting of money will leads the life of a project. • The capital cost can be classified into 2 categories • Working cost: cost of equipment and raw materials etc. • Operating cost: cost after the completion of project. • Source of funding • financial analysis find out the source of money to role the project smoothly without affect any delay in the work .there are two types of source for funding namely Internal source and external source . • Internal source: • External source: 25March2020 ProjectManagement-VISHNU VIJAYAN 14
  • 15. ECOLOGICALANALYSIS • At the time of construction needs to identify the major hazards present at the construction site or hazards will come in the future by the constriction activity. • Also find out the Situation and condition that leads to impact the environment. • Try to avoid such impact to the environment make the construction by sustainably as soon as possible. 25March2020 ProjectManagement-VISHNU VIJAYAN 15
  • 16. Economic analysis: • The ultimate aim of economic analysis is to check the proposed project is economically viable or not. So comparison of cost and return (benefits) of the project are important. There are different economic methods are adapted to analysis the economy of the project. The following are the main methods are adopted for the analysis of economy of a project. • Payback Period method • Net Present Value (NPV) • Internal Rate of Return method (IRR) • Benefit cost ratio method (BCR) 25March2020 ProjectManagement-VISHNU VIJAYAN 16
  • 17. Payback Period method • This method finds how long will be take to get the invested money back from the project. A project with shorter payback period is desirable. • Cash out flow: expenditure /investment • Cash inflow income from the project 25March2020 ProjectManagement-VISHNU VIJAYAN 17
  • 18. CONTD.. • Net present value: • It is based on the concept that the money has some time value. A project with positive net present value is preferable. • Internal rate of return • In this method NPV is assumed to be zero and the rate of return is find out .a project with larger rate of return is accepted. • Benefit cost ratio: • Benefit cost ratio method the value of different projects are evaluated and if the project getting less than 1 (B/C < 1) benefit cost ratio is rejected and one with larger benefit cost ratio is accepted. 25March2020 ProjectManagement-VISHNU VIJAYAN 18
  • 19. COMPUTER CAPABILITIES IN MANAGEMENT • GENERAL: computer and modern packages can provide the necessary IPMI, required for the successful completion of project management. Computers are the effective tools for project managers Decision making process is expedited by computerisation . 25March2020 ProjectManagement-VISHNU VIJAYAN 19
  • 20. Advantages in management • Project activities easily sorted out and list outing... • Project schedule arrangement (depends on the progress ) • Better analysis in time cost trade offs, resource allocation ,cost control ETC....... 25March2020 ProjectManagement-VISHNU VIJAYAN 20
  • 21. IPMI USES • Features are, • Payroll accounting • Records management , • Job cards • Risk analysis • Graphics & spreadsheet analysis, • Material management • Estimating Tender analysis • BOQ analysis 25March2020 ProjectManagement-VISHNU VIJAYAN 21
  • 22. COMPUTERISED SYSTEMS In construction industry grouped into 3: 1.Planning and Design systems 2.Commercial Application systems 3.Site oriented Operational systems Computer use by key functionaries: OWNER CONSULATANT CONTRACTORS 25March2020 ProjectManagement-VISHNU VIJAYAN 22
  • 23. SOFTWARE TOOLS & APPLICATIONS • MS Excel: create spread sheet of documents • LOTUS : developing database functions, value engineering et. • PRIMAVERA : scheduling applications • MS Projects : scheduling applications • MS Word :creating letters ,documents, memorandum • MS Perfect : creating letters ,documents, memorandum • Auto Cad :prepare drawings & details • Timberline : estimation • MS Power point : dynamic tool for presentation 25March2020 ProjectManagement-VISHNU VIJAYAN 23