VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021)
ISSN(Online): 2581-7280 Article No. X
PP XX-XX
VIVA Institute of Technology
9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021)
www.viva-technology.org/New/IJRI
Material Management – Using Barcode System
Vrushali Gawale1, Himani Barapatre2, Prathamesh Dhoke3, Ritul Gavand4
1,2,3,4 (Bachelor of engineering, Department of civil engineering Mumbai University/ VIVA Institute of
technology mumbai-401305)
Abstract : Construction materials management plays a Significant role in the success and profitability of
construction Projects. Some of the problems relating to materials Management are materials shortages, delays in
supply, price Fluctuations, damage and wastage, and lack of storage space. To Overcome the problem, the advent
of ICT has been largely Exercised in developed countries to aid and improve construction Materials management.
Overall, there are five processes involved within the materials management, namely planning, Procurement,
logistics, handling, stock and waste control Processes. Studies have shown that the use of ICT in managing The
materials on site has not fully utilised by many construction Firms despite of the potential benefits. This is due to
some Barriers faced by the construction firms in adopting the ICT. Through some qualitative approaches like
questionnaire survey and face to face semi-structure interviews data is collected. The findings showed that There
were high numbers of common ICT tools involved at the Planning and procurement stage of materials
management Processes while handling and waste and stock control stage have The lowest adoption of ICT tools. It
was also found that modern Tracking technologies such as RFID and bar coding system used In developed
countries has not been utilized and can be Considered as non-existence in construction firms’ materials
Management. According to the respondents, this was due to the Requirements needed to purchase the ICT tools
such as high Investment on the hardware, staffs training and qualified ICT Specialist on specific software
knowledge and technology testing on automation or wireless technologies Keywords : Construction Materials,
ICT, Materials management Process.
I. Introduction
Generally material management is based on traditional method. In traditional method inventory management is
utilized in most of the projects. As per traditional method construction materials are not managed properly. It
seems that use of traditional method cause wastage of material with time and more manpower is to be employed
and that result in increase the cost of project. The traditional method is carried out manually which is paper based,
labour intensive, inaccurate and error prone. Applications of
information communication technology in materials management are as follow: 1. Inventory
tracking. 2. Material status and inventory. In this area of interest, survey is to be carried out for material
management in various construction industries and find out the problems and benefits regarding use of ICT. The
application of ICT would automatically reduce the cost of material management and indirectly reduces the time
which involves managing construction materials. This is beneficial to the construction industry
The construction industry has been slow in the adoption and embracing of ICT tools and techniques as compared
to Other sectors (Ahuja et al., 2009). Despite the advancement of Technologies designed to facilitate materials
management Processes, the existing barrier towards effective use of ICT is still found in the recent construction
industry. Consequently, It has hindered the construction industry from moving rapidly Forward (Ang and Kasim,
VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021)
ISSN(Online): 2581-7280 Article No. X
PP XX-XX
VIVA Institute of Technology
9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021)
www.viva-technology.org/New/IJRI
2009). The research reported by Kasim (2011), on recent tracking Technologies such as bar-coding and RFID
stated that these are Tools that are hardly adopted in the materials management. Kasim (2011) has also conducted
research among the Construction firms in identifying the current materials Management practices and problems in
construction projects As well as the ICT applications used to manage it. Her Findings revealed that the inefficient
use of ICT could result in Increase of problematic use of paper-based reports for Exchanging information relating
to materials component within the supply chain. In addition, the range for human Errors will also increased due to
manual operations of Materials tracking during delivery times and at the storage Area. Based from the problems
pertaining in ICT usage in materials Management, this research was designed to identify the Different types of ICT
applications used among construction Firms at different process of materials management which was not
emphasised in similar previous research. This research also focused on the requirements needed to increase the
usage Of ICT application in materials management among the Construction firms.
II. Barcode technology
Basically barcode technology is an automatic identification Technology. Bar code is a predefined format
of dark bars And white spaces .It is structured to contain a specific Piece of information which allows real-time
data to be Collected accurately and rapidly. It consists of a series of parallel, adjacent bars and spaces. More
precisely, it is simply a series of stripes on a very Light background that can be scanned and read directly Into a
computer. They are interpreted virtually Instantaneously and unerringly by a bar code reading System. The
elements (bars and spaces) in a bar code Symbol must be of a consistent, proportional thickness and Thinness.
The widest element could be as thick as a pencil Or as thin as a business card, as long as the corresponding Thin
bars and spaces in the bar code remain proportionally Thin. To read information contained in a Barcode
symbol, A scanning device, such as a light pen is moved across the Symbol from one side to the other. As a
scanning device is Moved across the symbol, the Barcode width pattern of Bars and spaces is analysed by the
Barcode decoder, and The original data is recovered. The typical tasks associated with a material management
System are:
 Procurement and purchasing
 Expediting.
 Materials planning.
 Materials handling.
 Distribution Cost control.
 Inventory management / Receiving.
 Warehousing.
 Transportation
List of Software that can be used:
 SAP Software.
 ERP Software.
 Primavera.
METHODOLOGY
Action Plans
 Survey of different construction industries
 Categorize the site on A,B,C as per turn over
 Selection of site and analyse the current material management process
 Apply ICT technique on site and analyse the performance
VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021)
ISSN(Online): 2581-7280 Article No. X
PP XX-XX
VIVA Institute of Technology
9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021)
www.viva-technology.org/New/IJRI
 Apply ICT technique on site and analyse the performance
 Conclusion
plan of proposed work:
Phase – I
 Carry out survey to analyse current material management process in various construction industries.
 7 sites were surveyed near Andheri, Santacruz, Dadar most of them having old/ Traditional/ Mustard
method for maintaining materials detail.
Phase – II
 Selection of case feasible to apply ICT technique.
 Study the current material management process on site and preparation of ICT technique.
 Some construction firms were surveyed in which small scale, medium scale, large scale were classified as
per there investment in project and data is collected regarding their current material management
process.
 After the survey was done, it is found that large scale company used softwares like ERP, SAP for
material management and medium or small scale companies prefer manual material management
process.
Table No. 1:Table for analysis of surveyed construction firms
Type of Company
(Based on investment)
Type-A
(Large scale)
Type-B
(Medium Scale)
Type-C
(Small scale)
Present method of
material management
ERP Muster method Muster method
Problems faced in
present material
management
No problem More paper/ registered
work
Manual Error
More paper/ registered
work
Barcode Technique
(Yes/ No)
No No No
Conclusion Initial cost of the
project is high
therefore, it requires
precisely skilled as well
as technical man force
for this project.
It is advisable to use
when project cost is
high.
If the initial cost is high,
there is requirement of
skilled and technical
man force.
It is advisable to use
Barcode system or any
other suitable software
when project cost is
high.
There is no initial
investment and this
system requires less
man power and it has
less cost.
It is advisable to use
Barcode system for
material management
Phase – III
After surveying above sites, one of the surveyed sites was selected. It consisted of two buildings, one of
the building had material management by traditional muster maintained by store keeper for other building
barcode system was used. Materials like cement bricks, cement bags, steel bars, paints, plumbing
materials, etc were labelled and material management is done.
VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021)
ISSN(Online): 2581-7280 Article No. X
PP XX-XX
VIVA Institute of Technology
9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021)
www.viva-technology.org/New/IJRI
Following steps were followed for the barcode technique:-
1. Details of each item are entered in simple computer software systems when it received on site
2. Inward entry of that material is done.
3. Barcode label is stick on the material.
4. Material is kept in store in at entered location.
5. When is needed on sit it is just to be scan by barcode scanner then automatically stock is
updated and inventory report can be printed.
Phase – IV
Barcode system was successfully implement on the site. For the application of barcode system two
persons are required out on which at least one should be technically skilled person. Initial cost of system
in this method may be a cause for higher cost. But when we compare the mayerial management by
traditional method and barcode application, bar code application saves a particular amount and hence we
calculate for the whole project these cost comes up to be a large amount.
Result
Benefits of using barcode technique in construction
 Represent unique identity of a product.
 Accuracy of data input (error free).
 Aid effective management of resources and
 Inventories.
 Labour savings by avoiding manual system.
 Real time data collection.
 Rapid access to total production costs.
 More accurate dispatch.
 Work can get easy.
Barriers of barcode technique in construction
 Materials like sand, crush sand, bricks cannot manage by using bar code.
 Need to train workers.
 High initial cost.
III. Conclusion
Based on the findings of this research, it can be concluded that construction firms do practices construction
materials management through partially computerized method. Hence, they could not fully validate on the feas0
ibility of the technology-aided approaches such as RFID and bar coding system in materials management.
However, they did practices all the materials management processes through the planning, Procurement, logistics,
handling and waste and stock control Stage using basic ICT tools that are not that expensive to be Purchased.
In addition, findings have also demonstrated that computer, printer, fax machine, internet, Microsoft Excel and
Microsoft Word were the most common ICT tools in the current Industry’s practice. There was also some special
software such as IFCA used by the construction firms during the materials procurement stage. Subsequently,
planning and procurement stage in materials management were the stage considered to involve the highest
investment of ICT tools. Low usage of ICT were found at the logistics, handling and waste and stock control
process as majority of the respondents practice those processes manually using ISO standard form.
It was found that tracking technologies such as RFID and bar coding system were highly recommended at the
logistics, handling and waste and stock control stage as it enable more convenient tracking and identification of
material flow, lower operation expenses, higher productivity and better space utilization, thus making the follow
VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021)
ISSN(Online): 2581-7280 Article No. X
PP XX-XX
VIVA Institute of Technology
9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021)
www.viva-technology.org/New/IJRI
up on material quantity an easy task.
It can also be concluded that the utilization of ICT for materials management was considered to involve high
hardware investment. Especially when other processes such as materials logistics and handlings required a greater
investment in ICT tools such as bar-coding tools for tracking materials. Besides, the requirements for staffs
training and qualified ICT specialist on specific software knowledge was needed that made the process even more
expensive. Lastly, technology testing for automation or wireless technologies was also required to ensure security
for future implementation and good return on investment that once again contribute to high investments costs.
Indeed, overcoming the previous barriers could eventually lead to the industry-wide implementation of technology
-supported tracking processes. With the availability of bar-coding and RFID, the monitoring of materials
management will be effective, thus improving the materials flow and tracking.
Acknowledgement
We are using this opportunity to express our gratitude to everyone who has supported us throughout the
completion of this project. We are thankful for their guidance, constructive criticism and friendly advice, during
the project work. We express our gratitude to Prof. ASHISH VISHWANATH SHETTY for giving us an
opportunity to carry out project on MATERIAL MANAGEMENT – USING BAR CODE SYSTEM. We would
also like to thank Prof. Lissy Jose, Head of Civil Department and Dr. Arun Kumar, the Principal for their whole
hearted support. Lastly, we express our gratitude towards all those who directly or indirectly helped us in the
completion of our studies
References
1. Khyomesh V. Patel, Prof. Chetna M. Vyas “Construction materials Management on Project Sites” National
Conference on Recent Trends in Engineering & Technology, 13-14 May 2011.
2. N. B. Kasim, Peniel Ang Soon Ern “The Awareness of ICT Implementation for Materials Management in
Construction Projects” Vol-2, No. 1, 2010, pp 1-10.
3. Narimah Kasim “ICT Implementation for Materials Management in Construction Projects: Case Study”
KICEM Journal of Construction Engineering and Project Management, 2011, pp 31-36.
4. Narimah Kasim, Rozlin Zainal, Alina Shamsuddin, Naadira Che Kamarudin “Implementation on RFID
Technology for Real-Time Materials Tracking Process in Construction Projects” IEEE Colloquium on
Humanities, Science & Engineering Research, 3-4 December 2012, pp 472-476.
5. Sohrab donyavi and roger Flanagan “The impact of effective material Management on construction site
Performance for small and medium sized Construction enterprises” Vol. 1, pp. 11-19.2010
6. Elijah E.O.,“Profitability through effective management of material”, school of Engineering,UK.Vol. 1,
2010.
7. Vaid,K.N. , “ Waste control of building materials in construction of mass housing projects” , NICMAR
journal of Construction Management, Vol 2, No.3 , 1997
8. Ahuja, Vanita & Yang, Jay & Shankar, Ravi (2009), “Study of ICT Adoption for building project
management in the Indian Construction industry”, Automation in Constuction, Volume 18(4), 415-423.
9. Torrent, D. G., Caldas, C. H., O’Connor, J. T., Crews, K. A., Fowler, D. W. and Borcherding, J. D. (2008),
‘Development of a Methodology for Automating the Identification and Localization of Engineered
Components and Assessment of its Impact on Construction Craft Productivity’, published PhD, University of
Texas at Austin, United States of America.
10. Chandani, Kansara. , “ Identification of material Wastage in residential buildings” , NICMAR journal of
Construction Management, Vol 13, No.1, January 2007

More Related Content

What's hot

Img s position-paper_for_h2020
Img s position-paper_for_h2020Img s position-paper_for_h2020
Img s position-paper_for_h2020Marco Manso
 
Industry 4.0 Assessment Overview
Industry 4.0 Assessment OverviewIndustry 4.0 Assessment Overview
Industry 4.0 Assessment OverviewEd Morrison
 
Digital Transformation, Industry 4.0 and the Internet of Things: attempt of a...
Digital Transformation, Industry 4.0 and the Internet of Things: attempt of a...Digital Transformation, Industry 4.0 and the Internet of Things: attempt of a...
Digital Transformation, Industry 4.0 and the Internet of Things: attempt of a...Prof. Dr. Manfred Leisenberg
 
Industry 4.0: Technology Mapping and the importance of Cognitive Ergonomics
Industry 4.0: Technology Mapping and the importance of Cognitive ErgonomicsIndustry 4.0: Technology Mapping and the importance of Cognitive Ergonomics
Industry 4.0: Technology Mapping and the importance of Cognitive ErgonomicsIJAEMSJORNAL
 
Industry 4.0 trg 2014
Industry 4.0 trg 2014Industry 4.0 trg 2014
Industry 4.0 trg 2014Jayesh Pai
 
Meetup #3 - Cyber-physical view of the Internet of Everything
Meetup #3 - Cyber-physical view of the Internet of EverythingMeetup #3 - Cyber-physical view of the Internet of Everything
Meetup #3 - Cyber-physical view of the Internet of EverythingFrancesco Rago
 
Recent DEA Applications to Industry: A Literature Review From 2010 To 2014
Recent DEA Applications to Industry: A Literature Review From 2010 To 2014Recent DEA Applications to Industry: A Literature Review From 2010 To 2014
Recent DEA Applications to Industry: A Literature Review From 2010 To 2014inventionjournals
 
IT Applications in Apparel Industry
IT Applications in Apparel IndustryIT Applications in Apparel Industry
IT Applications in Apparel IndustryEnquzer Getachew
 
Manufacturing Analytics at Scale
Manufacturing Analytics at ScaleManufacturing Analytics at Scale
Manufacturing Analytics at ScaleTuri, Inc.
 
The case for 3D printing in the Always-On supply chain
The case for 3D printing in the Always-On supply chainThe case for 3D printing in the Always-On supply chain
The case for 3D printing in the Always-On supply chainMarc-Andre Leger
 
Industry 4.0
Industry 4.0Industry 4.0
Industry 4.0Intetics
 
Industry 4.0 A Great Future
Industry 4.0 A Great FutureIndustry 4.0 A Great Future
Industry 4.0 A Great FutureSuraj Biswas
 
15 03-25-wallom-cloudwatch-wp2
15 03-25-wallom-cloudwatch-wp215 03-25-wallom-cloudwatch-wp2
15 03-25-wallom-cloudwatch-wp2David Wallom
 

What's hot (18)

The factory of the future
The factory of the futureThe factory of the future
The factory of the future
 
Industrial Transfer Learning
Industrial Transfer LearningIndustrial Transfer Learning
Industrial Transfer Learning
 
Img s position-paper_for_h2020
Img s position-paper_for_h2020Img s position-paper_for_h2020
Img s position-paper_for_h2020
 
Industry 4.0 Assessment Overview
Industry 4.0 Assessment OverviewIndustry 4.0 Assessment Overview
Industry 4.0 Assessment Overview
 
Paperpresentationon i4.0
Paperpresentationon i4.0Paperpresentationon i4.0
Paperpresentationon i4.0
 
Digital Transformation, Industry 4.0 and the Internet of Things: attempt of a...
Digital Transformation, Industry 4.0 and the Internet of Things: attempt of a...Digital Transformation, Industry 4.0 and the Internet of Things: attempt of a...
Digital Transformation, Industry 4.0 and the Internet of Things: attempt of a...
 
Industry 4.0: Technology Mapping and the importance of Cognitive Ergonomics
Industry 4.0: Technology Mapping and the importance of Cognitive ErgonomicsIndustry 4.0: Technology Mapping and the importance of Cognitive Ergonomics
Industry 4.0: Technology Mapping and the importance of Cognitive Ergonomics
 
Industry 4.0 trg 2014
Industry 4.0 trg 2014Industry 4.0 trg 2014
Industry 4.0 trg 2014
 
Industrial Natural Language Processing and Information Extraction
Industrial Natural Language Processing and Information ExtractionIndustrial Natural Language Processing and Information Extraction
Industrial Natural Language Processing and Information Extraction
 
Meetup #3 - Cyber-physical view of the Internet of Everything
Meetup #3 - Cyber-physical view of the Internet of EverythingMeetup #3 - Cyber-physical view of the Internet of Everything
Meetup #3 - Cyber-physical view of the Internet of Everything
 
Recent DEA Applications to Industry: A Literature Review From 2010 To 2014
Recent DEA Applications to Industry: A Literature Review From 2010 To 2014Recent DEA Applications to Industry: A Literature Review From 2010 To 2014
Recent DEA Applications to Industry: A Literature Review From 2010 To 2014
 
IT Applications in Apparel Industry
IT Applications in Apparel IndustryIT Applications in Apparel Industry
IT Applications in Apparel Industry
 
Industrial Sensory Data Analytics
Industrial Sensory Data AnalyticsIndustrial Sensory Data Analytics
Industrial Sensory Data Analytics
 
Manufacturing Analytics at Scale
Manufacturing Analytics at ScaleManufacturing Analytics at Scale
Manufacturing Analytics at Scale
 
The case for 3D printing in the Always-On supply chain
The case for 3D printing in the Always-On supply chainThe case for 3D printing in the Always-On supply chain
The case for 3D printing in the Always-On supply chain
 
Industry 4.0
Industry 4.0Industry 4.0
Industry 4.0
 
Industry 4.0 A Great Future
Industry 4.0 A Great FutureIndustry 4.0 A Great Future
Industry 4.0 A Great Future
 
15 03-25-wallom-cloudwatch-wp2
15 03-25-wallom-cloudwatch-wp215 03-25-wallom-cloudwatch-wp2
15 03-25-wallom-cloudwatch-wp2
 

Similar to Material management – using barcode system

IRJET- Review on Study and Analysis of Various Automated Construction Mat...
IRJET-  	  Review on Study and Analysis of Various Automated Construction Mat...IRJET-  	  Review on Study and Analysis of Various Automated Construction Mat...
IRJET- Review on Study and Analysis of Various Automated Construction Mat...IRJET Journal
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...IJECEIAES
 
An overview of big data analysis
An overview of big data analysisAn overview of big data analysis
An overview of big data analysisjournalBEEI
 
IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...IRJET Journal
 
Productivity improvement by using value stream mapping in stainless steel ut...
Productivity improvement by using value stream mapping in  stainless steel ut...Productivity improvement by using value stream mapping in  stainless steel ut...
Productivity improvement by using value stream mapping in stainless steel ut...vivatechijri
 
IRJET- Role and Scope of Information and Communication Technology (ICT) in Co...
IRJET- Role and Scope of Information and Communication Technology (ICT) in Co...IRJET- Role and Scope of Information and Communication Technology (ICT) in Co...
IRJET- Role and Scope of Information and Communication Technology (ICT) in Co...IRJET Journal
 
Envision of an Integrated Information System for Projectdriven Production in ...
Envision of an Integrated Information System for Projectdriven Production in ...Envision of an Integrated Information System for Projectdriven Production in ...
Envision of an Integrated Information System for Projectdriven Production in ...Ricardo Magno Antunes
 
The future of software engineering: Visions of 2025 and beyond
The future of software engineering: Visions of 2025 and beyond The future of software engineering: Visions of 2025 and beyond
The future of software engineering: Visions of 2025 and beyond IJECEIAES
 
ArchiInspection Project: Integrated Non Destructive Testing, A Building Infor...
ArchiInspection Project: Integrated Non Destructive Testing, A Building Infor...ArchiInspection Project: Integrated Non Destructive Testing, A Building Infor...
ArchiInspection Project: Integrated Non Destructive Testing, A Building Infor...Farid Mokhtar Noriega
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Publishing House
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Journals
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Journals
 
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTIONA REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTIONIJMIT JOURNAL
 
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTIONA REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTIONIJMIT JOURNAL
 
Introduction In recent there has been a shift.pdf
Introduction In recent there has been a shift.pdfIntroduction In recent there has been a shift.pdf
Introduction In recent there has been a shift.pdfbkbk37
 
To Development Manufacturing and Education using Data Mining A Review
To Development Manufacturing and Education using Data Mining A ReviewTo Development Manufacturing and Education using Data Mining A Review
To Development Manufacturing and Education using Data Mining A Reviewijtsrd
 
Impacts of internet of things on supply chains
Impacts of internet of things on supply chainsImpacts of internet of things on supply chains
Impacts of internet of things on supply chainsRezgar Mohammad
 

Similar to Material management – using barcode system (20)

IRJET- Review on Study and Analysis of Various Automated Construction Mat...
IRJET-  	  Review on Study and Analysis of Various Automated Construction Mat...IRJET-  	  Review on Study and Analysis of Various Automated Construction Mat...
IRJET- Review on Study and Analysis of Various Automated Construction Mat...
 
matecconf_iconbee2019_05001.pdf
matecconf_iconbee2019_05001.pdfmatecconf_iconbee2019_05001.pdf
matecconf_iconbee2019_05001.pdf
 
Radio frequency identification based materials tracking system for construct...
Radio frequency identification based materials tracking system  for construct...Radio frequency identification based materials tracking system  for construct...
Radio frequency identification based materials tracking system for construct...
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...
 
An overview of big data analysis
An overview of big data analysisAn overview of big data analysis
An overview of big data analysis
 
IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...
 
Productivity improvement by using value stream mapping in stainless steel ut...
Productivity improvement by using value stream mapping in  stainless steel ut...Productivity improvement by using value stream mapping in  stainless steel ut...
Productivity improvement by using value stream mapping in stainless steel ut...
 
IRJET- Role and Scope of Information and Communication Technology (ICT) in Co...
IRJET- Role and Scope of Information and Communication Technology (ICT) in Co...IRJET- Role and Scope of Information and Communication Technology (ICT) in Co...
IRJET- Role and Scope of Information and Communication Technology (ICT) in Co...
 
Envision of an Integrated Information System for Projectdriven Production in ...
Envision of an Integrated Information System for Projectdriven Production in ...Envision of an Integrated Information System for Projectdriven Production in ...
Envision of an Integrated Information System for Projectdriven Production in ...
 
The future of software engineering: Visions of 2025 and beyond
The future of software engineering: Visions of 2025 and beyond The future of software engineering: Visions of 2025 and beyond
The future of software engineering: Visions of 2025 and beyond
 
ArchiInspection Project: Integrated Non Destructive Testing, A Building Infor...
ArchiInspection Project: Integrated Non Destructive Testing, A Building Infor...ArchiInspection Project: Integrated Non Destructive Testing, A Building Infor...
ArchiInspection Project: Integrated Non Destructive Testing, A Building Infor...
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTIONA REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
 
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTIONA REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
A REVIEW OF ICT TECHNOLOGY IN CONSTRUCTION
 
Introduction In recent there has been a shift.pdf
Introduction In recent there has been a shift.pdfIntroduction In recent there has been a shift.pdf
Introduction In recent there has been a shift.pdf
 
To Development Manufacturing and Education using Data Mining A Review
To Development Manufacturing and Education using Data Mining A ReviewTo Development Manufacturing and Education using Data Mining A Review
To Development Manufacturing and Education using Data Mining A Review
 
Impacts of internet of things on supply chains
Impacts of internet of things on supply chainsImpacts of internet of things on supply chains
Impacts of internet of things on supply chains
 
Ijmet 10 01_190
Ijmet 10 01_190Ijmet 10 01_190
Ijmet 10 01_190
 

More from vivatechijri

Understanding the Impact and Challenges of Corona Crisis on Education Sector...
Understanding the Impact and Challenges of Corona Crisis on  Education Sector...Understanding the Impact and Challenges of Corona Crisis on  Education Sector...
Understanding the Impact and Challenges of Corona Crisis on Education Sector...vivatechijri
 
LEADERSHIP ONLY CAN LEAD THE ORGANIZATION TOWARDS IMPROVEMENT AND DEVELOPMENT
LEADERSHIP ONLY CAN LEAD THE ORGANIZATION  TOWARDS IMPROVEMENT AND DEVELOPMENT  LEADERSHIP ONLY CAN LEAD THE ORGANIZATION  TOWARDS IMPROVEMENT AND DEVELOPMENT
LEADERSHIP ONLY CAN LEAD THE ORGANIZATION TOWARDS IMPROVEMENT AND DEVELOPMENT vivatechijri
 
A study on solving Assignment Problem
A study on solving Assignment ProblemA study on solving Assignment Problem
A study on solving Assignment Problemvivatechijri
 
Structural and Morphological Studies of Nano Composite Polymer Gel Electroly...
Structural and Morphological Studies of Nano Composite  Polymer Gel Electroly...Structural and Morphological Studies of Nano Composite  Polymer Gel Electroly...
Structural and Morphological Studies of Nano Composite Polymer Gel Electroly...vivatechijri
 
Theoretical study of two dimensional Nano sheet for gas sensing application
Theoretical study of two dimensional Nano sheet for gas sensing  applicationTheoretical study of two dimensional Nano sheet for gas sensing  application
Theoretical study of two dimensional Nano sheet for gas sensing applicationvivatechijri
 
METHODS FOR DETECTION OF COMMON ADULTERANTS IN FOOD
METHODS FOR DETECTION OF COMMON  ADULTERANTS IN FOODMETHODS FOR DETECTION OF COMMON  ADULTERANTS IN FOOD
METHODS FOR DETECTION OF COMMON ADULTERANTS IN FOODvivatechijri
 
The Business Development Ethics
The Business Development EthicsThe Business Development Ethics
The Business Development Ethicsvivatechijri
 
An Alternative to Hard Drives in the Coming Future:DNA-BASED DATA STORAGE
An Alternative to Hard Drives in the Coming Future:DNA-BASED DATA STORAGEAn Alternative to Hard Drives in the Coming Future:DNA-BASED DATA STORAGE
An Alternative to Hard Drives in the Coming Future:DNA-BASED DATA STORAGEvivatechijri
 
Enhancing The Capability of Chatbots
Enhancing The Capability of ChatbotsEnhancing The Capability of Chatbots
Enhancing The Capability of Chatbotsvivatechijri
 
Smart Glasses Technology
Smart Glasses TechnologySmart Glasses Technology
Smart Glasses Technologyvivatechijri
 
Future Applications of Smart Iot Devices
Future Applications of Smart Iot DevicesFuture Applications of Smart Iot Devices
Future Applications of Smart Iot Devicesvivatechijri
 
Cross Platform Development Using Flutter
Cross Platform Development Using FlutterCross Platform Development Using Flutter
Cross Platform Development Using Fluttervivatechijri
 
Recommender Systems
Recommender SystemsRecommender Systems
Recommender Systemsvivatechijri
 
Light Fidelity(LiFi)- Wireless Optical Networking Technology
Light Fidelity(LiFi)- Wireless Optical Networking TechnologyLight Fidelity(LiFi)- Wireless Optical Networking Technology
Light Fidelity(LiFi)- Wireless Optical Networking Technologyvivatechijri
 
Social media platform and Our right to privacy
Social media platform and Our right to privacySocial media platform and Our right to privacy
Social media platform and Our right to privacyvivatechijri
 
THE USABILITY METRICS FOR USER EXPERIENCE
THE USABILITY METRICS FOR USER EXPERIENCETHE USABILITY METRICS FOR USER EXPERIENCE
THE USABILITY METRICS FOR USER EXPERIENCEvivatechijri
 
Google File System
Google File SystemGoogle File System
Google File Systemvivatechijri
 
A Study of Tokenization of Real Estate Using Blockchain Technology
A Study of Tokenization of Real Estate Using Blockchain TechnologyA Study of Tokenization of Real Estate Using Blockchain Technology
A Study of Tokenization of Real Estate Using Blockchain Technologyvivatechijri
 

More from vivatechijri (20)

Understanding the Impact and Challenges of Corona Crisis on Education Sector...
Understanding the Impact and Challenges of Corona Crisis on  Education Sector...Understanding the Impact and Challenges of Corona Crisis on  Education Sector...
Understanding the Impact and Challenges of Corona Crisis on Education Sector...
 
LEADERSHIP ONLY CAN LEAD THE ORGANIZATION TOWARDS IMPROVEMENT AND DEVELOPMENT
LEADERSHIP ONLY CAN LEAD THE ORGANIZATION  TOWARDS IMPROVEMENT AND DEVELOPMENT  LEADERSHIP ONLY CAN LEAD THE ORGANIZATION  TOWARDS IMPROVEMENT AND DEVELOPMENT
LEADERSHIP ONLY CAN LEAD THE ORGANIZATION TOWARDS IMPROVEMENT AND DEVELOPMENT
 
A study on solving Assignment Problem
A study on solving Assignment ProblemA study on solving Assignment Problem
A study on solving Assignment Problem
 
Structural and Morphological Studies of Nano Composite Polymer Gel Electroly...
Structural and Morphological Studies of Nano Composite  Polymer Gel Electroly...Structural and Morphological Studies of Nano Composite  Polymer Gel Electroly...
Structural and Morphological Studies of Nano Composite Polymer Gel Electroly...
 
Theoretical study of two dimensional Nano sheet for gas sensing application
Theoretical study of two dimensional Nano sheet for gas sensing  applicationTheoretical study of two dimensional Nano sheet for gas sensing  application
Theoretical study of two dimensional Nano sheet for gas sensing application
 
METHODS FOR DETECTION OF COMMON ADULTERANTS IN FOOD
METHODS FOR DETECTION OF COMMON  ADULTERANTS IN FOODMETHODS FOR DETECTION OF COMMON  ADULTERANTS IN FOOD
METHODS FOR DETECTION OF COMMON ADULTERANTS IN FOOD
 
The Business Development Ethics
The Business Development EthicsThe Business Development Ethics
The Business Development Ethics
 
Digital Wellbeing
Digital WellbeingDigital Wellbeing
Digital Wellbeing
 
An Alternative to Hard Drives in the Coming Future:DNA-BASED DATA STORAGE
An Alternative to Hard Drives in the Coming Future:DNA-BASED DATA STORAGEAn Alternative to Hard Drives in the Coming Future:DNA-BASED DATA STORAGE
An Alternative to Hard Drives in the Coming Future:DNA-BASED DATA STORAGE
 
Enhancing The Capability of Chatbots
Enhancing The Capability of ChatbotsEnhancing The Capability of Chatbots
Enhancing The Capability of Chatbots
 
Smart Glasses Technology
Smart Glasses TechnologySmart Glasses Technology
Smart Glasses Technology
 
Future Applications of Smart Iot Devices
Future Applications of Smart Iot DevicesFuture Applications of Smart Iot Devices
Future Applications of Smart Iot Devices
 
Cross Platform Development Using Flutter
Cross Platform Development Using FlutterCross Platform Development Using Flutter
Cross Platform Development Using Flutter
 
3D INTERNET
3D INTERNET3D INTERNET
3D INTERNET
 
Recommender Systems
Recommender SystemsRecommender Systems
Recommender Systems
 
Light Fidelity(LiFi)- Wireless Optical Networking Technology
Light Fidelity(LiFi)- Wireless Optical Networking TechnologyLight Fidelity(LiFi)- Wireless Optical Networking Technology
Light Fidelity(LiFi)- Wireless Optical Networking Technology
 
Social media platform and Our right to privacy
Social media platform and Our right to privacySocial media platform and Our right to privacy
Social media platform and Our right to privacy
 
THE USABILITY METRICS FOR USER EXPERIENCE
THE USABILITY METRICS FOR USER EXPERIENCETHE USABILITY METRICS FOR USER EXPERIENCE
THE USABILITY METRICS FOR USER EXPERIENCE
 
Google File System
Google File SystemGoogle File System
Google File System
 
A Study of Tokenization of Real Estate Using Blockchain Technology
A Study of Tokenization of Real Estate Using Blockchain TechnologyA Study of Tokenization of Real Estate Using Blockchain Technology
A Study of Tokenization of Real Estate Using Blockchain Technology
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

Material management – using barcode system

  • 1. VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021) ISSN(Online): 2581-7280 Article No. X PP XX-XX VIVA Institute of Technology 9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021) www.viva-technology.org/New/IJRI Material Management – Using Barcode System Vrushali Gawale1, Himani Barapatre2, Prathamesh Dhoke3, Ritul Gavand4 1,2,3,4 (Bachelor of engineering, Department of civil engineering Mumbai University/ VIVA Institute of technology mumbai-401305) Abstract : Construction materials management plays a Significant role in the success and profitability of construction Projects. Some of the problems relating to materials Management are materials shortages, delays in supply, price Fluctuations, damage and wastage, and lack of storage space. To Overcome the problem, the advent of ICT has been largely Exercised in developed countries to aid and improve construction Materials management. Overall, there are five processes involved within the materials management, namely planning, Procurement, logistics, handling, stock and waste control Processes. Studies have shown that the use of ICT in managing The materials on site has not fully utilised by many construction Firms despite of the potential benefits. This is due to some Barriers faced by the construction firms in adopting the ICT. Through some qualitative approaches like questionnaire survey and face to face semi-structure interviews data is collected. The findings showed that There were high numbers of common ICT tools involved at the Planning and procurement stage of materials management Processes while handling and waste and stock control stage have The lowest adoption of ICT tools. It was also found that modern Tracking technologies such as RFID and bar coding system used In developed countries has not been utilized and can be Considered as non-existence in construction firms’ materials Management. According to the respondents, this was due to the Requirements needed to purchase the ICT tools such as high Investment on the hardware, staffs training and qualified ICT Specialist on specific software knowledge and technology testing on automation or wireless technologies Keywords : Construction Materials, ICT, Materials management Process. I. Introduction Generally material management is based on traditional method. In traditional method inventory management is utilized in most of the projects. As per traditional method construction materials are not managed properly. It seems that use of traditional method cause wastage of material with time and more manpower is to be employed and that result in increase the cost of project. The traditional method is carried out manually which is paper based, labour intensive, inaccurate and error prone. Applications of information communication technology in materials management are as follow: 1. Inventory tracking. 2. Material status and inventory. In this area of interest, survey is to be carried out for material management in various construction industries and find out the problems and benefits regarding use of ICT. The application of ICT would automatically reduce the cost of material management and indirectly reduces the time which involves managing construction materials. This is beneficial to the construction industry The construction industry has been slow in the adoption and embracing of ICT tools and techniques as compared to Other sectors (Ahuja et al., 2009). Despite the advancement of Technologies designed to facilitate materials management Processes, the existing barrier towards effective use of ICT is still found in the recent construction industry. Consequently, It has hindered the construction industry from moving rapidly Forward (Ang and Kasim,
  • 2. VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021) ISSN(Online): 2581-7280 Article No. X PP XX-XX VIVA Institute of Technology 9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021) www.viva-technology.org/New/IJRI 2009). The research reported by Kasim (2011), on recent tracking Technologies such as bar-coding and RFID stated that these are Tools that are hardly adopted in the materials management. Kasim (2011) has also conducted research among the Construction firms in identifying the current materials Management practices and problems in construction projects As well as the ICT applications used to manage it. Her Findings revealed that the inefficient use of ICT could result in Increase of problematic use of paper-based reports for Exchanging information relating to materials component within the supply chain. In addition, the range for human Errors will also increased due to manual operations of Materials tracking during delivery times and at the storage Area. Based from the problems pertaining in ICT usage in materials Management, this research was designed to identify the Different types of ICT applications used among construction Firms at different process of materials management which was not emphasised in similar previous research. This research also focused on the requirements needed to increase the usage Of ICT application in materials management among the Construction firms. II. Barcode technology Basically barcode technology is an automatic identification Technology. Bar code is a predefined format of dark bars And white spaces .It is structured to contain a specific Piece of information which allows real-time data to be Collected accurately and rapidly. It consists of a series of parallel, adjacent bars and spaces. More precisely, it is simply a series of stripes on a very Light background that can be scanned and read directly Into a computer. They are interpreted virtually Instantaneously and unerringly by a bar code reading System. The elements (bars and spaces) in a bar code Symbol must be of a consistent, proportional thickness and Thinness. The widest element could be as thick as a pencil Or as thin as a business card, as long as the corresponding Thin bars and spaces in the bar code remain proportionally Thin. To read information contained in a Barcode symbol, A scanning device, such as a light pen is moved across the Symbol from one side to the other. As a scanning device is Moved across the symbol, the Barcode width pattern of Bars and spaces is analysed by the Barcode decoder, and The original data is recovered. The typical tasks associated with a material management System are:  Procurement and purchasing  Expediting.  Materials planning.  Materials handling.  Distribution Cost control.  Inventory management / Receiving.  Warehousing.  Transportation List of Software that can be used:  SAP Software.  ERP Software.  Primavera. METHODOLOGY Action Plans  Survey of different construction industries  Categorize the site on A,B,C as per turn over  Selection of site and analyse the current material management process  Apply ICT technique on site and analyse the performance
  • 3. VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021) ISSN(Online): 2581-7280 Article No. X PP XX-XX VIVA Institute of Technology 9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021) www.viva-technology.org/New/IJRI  Apply ICT technique on site and analyse the performance  Conclusion plan of proposed work: Phase – I  Carry out survey to analyse current material management process in various construction industries.  7 sites were surveyed near Andheri, Santacruz, Dadar most of them having old/ Traditional/ Mustard method for maintaining materials detail. Phase – II  Selection of case feasible to apply ICT technique.  Study the current material management process on site and preparation of ICT technique.  Some construction firms were surveyed in which small scale, medium scale, large scale were classified as per there investment in project and data is collected regarding their current material management process.  After the survey was done, it is found that large scale company used softwares like ERP, SAP for material management and medium or small scale companies prefer manual material management process. Table No. 1:Table for analysis of surveyed construction firms Type of Company (Based on investment) Type-A (Large scale) Type-B (Medium Scale) Type-C (Small scale) Present method of material management ERP Muster method Muster method Problems faced in present material management No problem More paper/ registered work Manual Error More paper/ registered work Barcode Technique (Yes/ No) No No No Conclusion Initial cost of the project is high therefore, it requires precisely skilled as well as technical man force for this project. It is advisable to use when project cost is high. If the initial cost is high, there is requirement of skilled and technical man force. It is advisable to use Barcode system or any other suitable software when project cost is high. There is no initial investment and this system requires less man power and it has less cost. It is advisable to use Barcode system for material management Phase – III After surveying above sites, one of the surveyed sites was selected. It consisted of two buildings, one of the building had material management by traditional muster maintained by store keeper for other building barcode system was used. Materials like cement bricks, cement bags, steel bars, paints, plumbing materials, etc were labelled and material management is done.
  • 4. VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021) ISSN(Online): 2581-7280 Article No. X PP XX-XX VIVA Institute of Technology 9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021) www.viva-technology.org/New/IJRI Following steps were followed for the barcode technique:- 1. Details of each item are entered in simple computer software systems when it received on site 2. Inward entry of that material is done. 3. Barcode label is stick on the material. 4. Material is kept in store in at entered location. 5. When is needed on sit it is just to be scan by barcode scanner then automatically stock is updated and inventory report can be printed. Phase – IV Barcode system was successfully implement on the site. For the application of barcode system two persons are required out on which at least one should be technically skilled person. Initial cost of system in this method may be a cause for higher cost. But when we compare the mayerial management by traditional method and barcode application, bar code application saves a particular amount and hence we calculate for the whole project these cost comes up to be a large amount. Result Benefits of using barcode technique in construction  Represent unique identity of a product.  Accuracy of data input (error free).  Aid effective management of resources and  Inventories.  Labour savings by avoiding manual system.  Real time data collection.  Rapid access to total production costs.  More accurate dispatch.  Work can get easy. Barriers of barcode technique in construction  Materials like sand, crush sand, bricks cannot manage by using bar code.  Need to train workers.  High initial cost. III. Conclusion Based on the findings of this research, it can be concluded that construction firms do practices construction materials management through partially computerized method. Hence, they could not fully validate on the feas0 ibility of the technology-aided approaches such as RFID and bar coding system in materials management. However, they did practices all the materials management processes through the planning, Procurement, logistics, handling and waste and stock control Stage using basic ICT tools that are not that expensive to be Purchased. In addition, findings have also demonstrated that computer, printer, fax machine, internet, Microsoft Excel and Microsoft Word were the most common ICT tools in the current Industry’s practice. There was also some special software such as IFCA used by the construction firms during the materials procurement stage. Subsequently, planning and procurement stage in materials management were the stage considered to involve the highest investment of ICT tools. Low usage of ICT were found at the logistics, handling and waste and stock control process as majority of the respondents practice those processes manually using ISO standard form. It was found that tracking technologies such as RFID and bar coding system were highly recommended at the logistics, handling and waste and stock control stage as it enable more convenient tracking and identification of material flow, lower operation expenses, higher productivity and better space utilization, thus making the follow
  • 5. VIVA-Tech International Journal for Research and Innovation Volume 1, Issue 4 (2021) ISSN(Online): 2581-7280 Article No. X PP XX-XX VIVA Institute of Technology 9th National Conference on Role of Engineers in Nation Building – 2021 (NCRENB-2021) www.viva-technology.org/New/IJRI up on material quantity an easy task. It can also be concluded that the utilization of ICT for materials management was considered to involve high hardware investment. Especially when other processes such as materials logistics and handlings required a greater investment in ICT tools such as bar-coding tools for tracking materials. Besides, the requirements for staffs training and qualified ICT specialist on specific software knowledge was needed that made the process even more expensive. Lastly, technology testing for automation or wireless technologies was also required to ensure security for future implementation and good return on investment that once again contribute to high investments costs. Indeed, overcoming the previous barriers could eventually lead to the industry-wide implementation of technology -supported tracking processes. With the availability of bar-coding and RFID, the monitoring of materials management will be effective, thus improving the materials flow and tracking. Acknowledgement We are using this opportunity to express our gratitude to everyone who has supported us throughout the completion of this project. We are thankful for their guidance, constructive criticism and friendly advice, during the project work. We express our gratitude to Prof. ASHISH VISHWANATH SHETTY for giving us an opportunity to carry out project on MATERIAL MANAGEMENT – USING BAR CODE SYSTEM. We would also like to thank Prof. Lissy Jose, Head of Civil Department and Dr. Arun Kumar, the Principal for their whole hearted support. Lastly, we express our gratitude towards all those who directly or indirectly helped us in the completion of our studies References 1. Khyomesh V. Patel, Prof. Chetna M. Vyas “Construction materials Management on Project Sites” National Conference on Recent Trends in Engineering & Technology, 13-14 May 2011. 2. N. B. Kasim, Peniel Ang Soon Ern “The Awareness of ICT Implementation for Materials Management in Construction Projects” Vol-2, No. 1, 2010, pp 1-10. 3. Narimah Kasim “ICT Implementation for Materials Management in Construction Projects: Case Study” KICEM Journal of Construction Engineering and Project Management, 2011, pp 31-36. 4. Narimah Kasim, Rozlin Zainal, Alina Shamsuddin, Naadira Che Kamarudin “Implementation on RFID Technology for Real-Time Materials Tracking Process in Construction Projects” IEEE Colloquium on Humanities, Science & Engineering Research, 3-4 December 2012, pp 472-476. 5. Sohrab donyavi and roger Flanagan “The impact of effective material Management on construction site Performance for small and medium sized Construction enterprises” Vol. 1, pp. 11-19.2010 6. Elijah E.O.,“Profitability through effective management of material”, school of Engineering,UK.Vol. 1, 2010. 7. Vaid,K.N. , “ Waste control of building materials in construction of mass housing projects” , NICMAR journal of Construction Management, Vol 2, No.3 , 1997 8. Ahuja, Vanita & Yang, Jay & Shankar, Ravi (2009), “Study of ICT Adoption for building project management in the Indian Construction industry”, Automation in Constuction, Volume 18(4), 415-423. 9. Torrent, D. G., Caldas, C. H., O’Connor, J. T., Crews, K. A., Fowler, D. W. and Borcherding, J. D. (2008), ‘Development of a Methodology for Automating the Identification and Localization of Engineered Components and Assessment of its Impact on Construction Craft Productivity’, published PhD, University of Texas at Austin, United States of America. 10. Chandani, Kansara. , “ Identification of material Wastage in residential buildings” , NICMAR journal of Construction Management, Vol 13, No.1, January 2007