SlideShare a Scribd company logo
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 343
Optimal Generation Scheduling For Thermal Units
Nitish R. Patel1, Nilesh K. Patel2
1PG student, Department of Electrical Engineering, Sankalchand Patel College of Engineering, Gujarat, India
2Associate professor, Department of Electrical Engineering, Sankalchand Patel College of Engineering,
Gujarat, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - The main aim of this paper is to develop short-
term generation scheduling. The scheduling problem is
formulated by considering productioncostandstart-upcostof
generating units and satisfying all equality and inequality
constraint. A PSO techniques is used to obtain optimal
scheduling of ten generating unit. Results generated are
compared with other techniques. It was found that PSO
technique are very effective and efficient to solved short term
generation scheduling problem andprovideeconomic benefits
to the system operator to developed optimal scheduling.
Key Words: short-term scheduling,PSO,Economic Dispatch
1. INTRODUCTION
In deregulated power system, all the generating company
are independently and separately operated. The system
operator plan day ahead scheduling, that how many
generating units are carried out to satisfy load demand. A
short-term scheduling also known as day ahead scheduling.
In power system, consumer demand changes continuously,
its varied according to day-time, evening and morning
time[1]. Thus, system operator has to plan enoughunitsthat
required for next day to fulfill load demand. The generation
scheduling of power system is necessary to maintain a
balance between supply and demand, due to the fact that no
practical technology is available for large scale storage of
electricity. In day-ahead scheduling, a day-ahead unit
commitment program is executed to decide the most
economic unit combination with considerations of various
restrictions of units. Previously, a unit can usemultiplesfuel
constrained and it is assumed that only one fuel is
constrained. Adding fuel constraints severely complicates
the unit commitment problem. Thus author[2], utilized
Lagrange multipliers which tackle the unit responsibility
issue within the sight of fuel constraint. when a unit
supplying multiple fuels, the price of fuel at a unit is not
readily available and fuel pricecouldvaryoverdifferenttime
intervals of the study period resulting in an increase in the
complexity of the problem. Thus, in [3] divides the fuel
constrained unit commitment problem into a linear fuel
dispatch (FD) issue and a unit commitment (UC) issue. The
Fuel Dispatch issue improves framework fuel cost and
fulfilling fuel required. It is very difficult aspect of the power
system to incorporating a ramping costs into a scheduling
procedure, since the ramping costs vary with the generation
schedule. By presenting ramping costs, the unit on or off
states can be determined more economically by the
lagrangian method in [4], this method is developed for unit
commitment and economic dispatch problem. A short-term
scheduling issue is solved in [5] by dynamic programming,
and the economic dispatch with transmission and
environmental constraints is solved by an efficient network
flow programming algorithm. An economic dispatch
considering the generator constraints can solved by using
Particle Swarm Optimization in[6,7]. In this method for
practical application of generator operations, a many
nonlinear characteristics of generator, such as ramp rate
limits, prohibited operating zone, and non-smooth cost
functions is considered. Static economic dispatch(SED) can
handle only a single load level at a certain time. However,
SED may fail to deal with the large variations of the load
demand due to the ramp rate limits of the generators,
moreover, it doesnothavethelook-aheadcapability[3,4].For
large variation in load demand and the dynamic nature of
the power systems, it necessary for development of optimal
dynamic dispatch (ODD) problem. ODD is a new update of
SED to determine the generation scheduling of the
committed units, so as to meet the load demand over a time
horizon at minimum operating cost under ramp rate and
other constraints. The dynamic dispatching was first
introduced in [8] and was followed by [9,10]. Inthesepaper,
optimal control dynamic dispatch (OCDD) formulation
models the power system generation by means of state
Equations, where the state variables aretheelectrical power
outputs of the generators and the control inputs are the
ramp rates of the generators. In OCDD the optimization is
done with respect to the ramp rates and the solution
produces an optimal output generator. In[11] the DED
problem the optimization is done with respect to the
dispatch able powers of the units. Some researchers have
considered the ramp rate constraints by solving SED
problem interval by interval and enforcing the ramp rate
constraints from one interval to the next. However, this
approach can lead to suboptimal solutions trajectory for a
given initial generation in the optimal dynamic dispatch
problem is to determine underwhatconstraintstheproblem
will be solved. Broadly, these constraints can be classified
into three kinds: equality constraints, inequalityconstraints,
and dynamic constraints. Some of these constraints such as
load demand balance, and spinning reserve constraints can
be modified when the DED problem is solved in the
deregulated market Environment. The dynamic economic
and emission dispatch is an extension of the conventional
economic dispatch problem [12]. It is used to determine the
optimal generation schedule of on-line generators.
A main aim of this paper is to developed short-term
generation scheduling also known as day ahead scheduling
for ten generating units. All equality and inequality
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 344
constrained is taken to obtained optimal short-term
generation scheduling. PSO techniques are used to make
optimal scheduling, due to its efficienttimecomputationand
required less parameter to developed algorithm.
2. PROBLEM FORMULATION
The objective function is to minimize operating cost are as
follows[13]:
where, FCij and SCij are operating cost(OC) of ith unit in jth
hour and start-up costs of ith unit in jth hour ,Pij its power
output. The Fuel cost as follows:
(1)
Where, a, b and c are cost coefficient. The start up cost
characteristic as follows:
(2)
Where, α is hot start up cost, β is cold start up cost and τ is
cooling time constant. Tij turn off time of ith unit in jth time
period.uij is status of unit ith in jth time period.
The following are the system constraints which are
considered in this problem formulation:
1) Real power balance constraint:
Where, Pij is ith generating unit in jth time period and PD is
power demand.
2) Real power operating limits of units are:
(4)
Where,Pi
min and Pi
max is minimum and maximum generating
power.
3) Unit minimum up/downtimeforthermal generatingunits
and is given as:
(5)
(6)
Where, Ton/TOFF is the unit turn on and turn off time.
4) Spinning reserve constraints:
(7)
Where, Xij is status of generating unit, Di is load demand of
ith unit and R is reserve of generating unit.
3. Overview of Particle Swarm Optimization
Particle swarm optimization wasintroducedbyDr.Eberhart
and Dr. kennedy[14].It is an evolutionary computation type
of new method and population based optimization tool like
GA.PSO is adopted from the naturebehaviorofsocial system
such as bird flocking and fish schooling. The PSO algorithm
requires less memory because ofitssimplicity.PSOissimilar
to the other evolutionary algorithms in that the system is
initialized with a population of random solutions called
particle. These particles flies over fitness function according
to its neighborhood experiences. It moves according to
update velocity vg
n+1 and positionupdatexg
n+1 tofindparticle
best values.
(8)
A position update equation represent as:
(9)
Here, w is the inertia weight parameter which controls the
global and local exploration of the particle. c1 and c2 are
acceleration coefficients respectively, and Rand() are
random numbers between 0 and 1. c1 pulls the particles
towards local best position, c2 pulls towards the global best
position. In particle swarm optimization, a particle velocity
Vmax determines the resolution. If Velocity is too high,
particles may fly past good solutions. If velocity is too small,
particles may not explore a local solutions. Thus, the system
parameters Vmax has the beneficial effect of the preventing
explosion and scales the exploration of the particle
search[15].Thus, inertia weight w provides a balance
between global exploitation and local explorations, which
requiring less number of iteration to find a sufficiently
optimal solution. Since, W indicates decreases linearly from
about 0.9 to 0.4 approx during a run, which determines
follows,
(10)
where, w is inertia weight constant of particle, an
exploration of search space is controlled by inertia constant
is given in[5]. wmax is maximum weight and wmin is minimum
weight.
A. Algorithm of particle swarm optimization for Scheduling
Step by Step procedure as follows:
Step-1: Initialization of the particles: For a populationsizeP,
the particles are randomly generated and located between
the maximum and the minimum operating limits of the
generators units.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 345
Step-2: Define fitness function:a randomparticlesgenerated
start moving towards fitnees function according to define
velocity. It is define to minimize cost function.
Step-3:Initialization of Pbest and Gbest: The fitness values
obtained for the initial particles are set as the initial Pbest
values of the particle. The best value among all particle
called Gbest.
Step-4: update velocity using equation(8) to move particles
towards neighborhood best position.
Step-5:update position using equation (9) according to
update velocity .
Step-6:If the fitness value of each individual is better than
previous P-best, the current value is set to be P-best. If the
best P-best is better than G-best, the best P-best is set to be
G-best. The value of fitness function is to analyzes.
Step-7: If number of iteration reaches its maximum value
than stop iteration. Otherwise, repeat from step-2. Thus, at
the end Gbest obtain is considered as optimal value of
generating units.
4. Results and Discussion
A system of ten generating unit data are used to obtain
optimal scheduling using particle swarm optimization
technique. Unit data for 10 generating unit and loaddemand
over 24 time horizon in[16]. Unitcommitmentandeconomic
dispatch is main important task for preparing generation
scheduling. A system operator which plan an optimal
scheduling by considering both unit commitment and
economic dispatch problems. It is possible to ON all
generating unit over all time period, but it is not economical
to keep all unit ON. Thus, for obtaining best generation
scheduling it is essential to commit enough generating unit
for required load, are shown in table 1.
Table-1: unit commitment for ten generating unit
UNITS HOUR(1-24)
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 0 0
4 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
5 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0
6 0 0 0 0 0 0 0 0 1 1 1 1 1 1 0 0 0 0 0 1 1 0 0 0
7 0 0 0 0 0 0 0 0 1 1 1 1 1 1 0 0 0 0 0 1 1 0 0 0
8 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 1 0 0 0 0
9 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0
10 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0
Unit ON and OFF status is indicated by 1 and 0 respectively.
The binary number 1 indicated that unit is available for
required time slots, while 0 indicates that unit is not
generate any power for particular time periods. Unit 1 and2
are consider as base load power plant, which is available at
all time and unit 9 and 10 are costly unit, so it is ON over a
peak time period at 12th hour respectively. These unit are
able to supply for dynamic load demand The dynamic load
demand over 24 time period is shown in fig(1) a different
load at each time intervals. A maximum load is 1500 MW
Fig(1) Load curves for different time periods
at 12th hour and minimum load is 700MW at 1st hour . A PSO
method is utilize for ten generatingunit,whichtakenvarious
parameter data: such as population size is 70, particle is 10
unit , wmax and wmin are 0.9 and 0.4 respectively, velocity is
10%, acceleration constant c1 and c2 are 2.0 and number of
iteration is 100. Operating cost oftengeneratingunitinclude
production cost and start up cost both followsquadraticcost
function and exponential function, which are utilizes by
satisfying all constraints for calculations.Implementingdata
of ten generating unit in PSO method and individually
analyzes results for all time period for differentloads.Result
of all unit and their operating cost is shown in table(2).
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 346
Table -2: result of different generating unit over a different time period and total operating cost
Hour
(hr)
p1
(MW)
p2
(MW)
p3
(MW)
p4
(MW)
p5
(MW)
p6
(MW)
p7
(MW)
p8
(MW)
p9
(MW)
p10
(MW)
Load
(MW)
Cost
($)
Start
up cost
($)
total
cost
($)
1 454.21 245.79 0 0 0 0 0 0 0 0 700 13674 0 13674
2 449.09 300.919 0 0 0 0 0 0 0 0 750 14541 0 14541
3 455 367.25 0 0 27.75 0 0 0 0 0 850 16790 1298 18088
4 442.59 385.59 0 0 121.82 0 0 0 0 0 950 18540 0 18540
5 455 381.64 0 130 33.36 0 0 0 0 0 1000 20001 807 20809
6 455 357.97 130 130 27.03 0 0 0 0 0 1100 22355 793 23148
7 455 455 94.33 120.67 25 0 0 0 0 0 1150 23171 0 23171
8 455 455 130 102.7 57.3 0 0 0 0 0 1200 24140 0 24140
9 440.28 418.2 120 130 88.52 80 25 0 0 0 1300 27200 768 27968
10 455 455 120.78 130 120 44 25 50.22 0 0 1400 29950 90 30040
11 455 455 130 130 119.55 80 25.45 55 0 0 1450 31449 0 31449
12 455 455 130 130 162 80 25.46 17.25 29 17 1500 33700 180 33880
13 455 455 120.78 130 120 44 25 50.22 0 0 1400 29950 0 29950
14 440.28 418.2 120 130 88.52 80 25 0 0 0 1300 27200 0 27200
15 455 455 130 102.7 57.3 0 0 0 0 0 1200 24140 0 24140
16 455 455 20.33 95 25.67 0 0 0 0 0 1050 21500 0 21500
17 455 381.64 0 130 33.36 0 0 0 0 0 1000 20001 0 20001
18 455 357.97 130 130 27.03 0 0 0 0 0 1100 22355 0 22355
19 455 455 130 102.7 57.3 0 0 0 0 0 1200 24140 0 24140
20 455 455 120.78 130 120 44 25 50.22 0 0 1400 29950 858 30808
21 440.28 418.2 120 130 88.52 80 25 0 0 0 1300 27200 0 27200
22 455 357.97 130 130 27.03 0 0 0 0 0 1100 22355 0 22355
23 455 410 0 0 35 0 0 0 0 0 900 17595 0 17595
24 454 346 0 0 0 0 0 0 0 0 800 15410 0 15410
557319 4794 562113
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 347
Result obtained by using approach method, it is found that
fuel cost for differenet generating unit and start up cost are
$ 5,57,319 and $ 4794 repectively. Total operating cost for
the generating unit is $ 5,62,113. A PSO convergence
characteristic shown in fig(2), which shown that PSO is able
Fig(2) convergence of PSO
to converge successfully at each iteration. Result of cost
obtained are compared with other techniques, which used
same data to obtain generation scheduling problems. PSO
result are verify with genetic algorithm[16], evolutionary
programming[17] and genetic algorithm based
lagrangian[18], shown in table-3.
Table-3: Comparison of PSO result with GA and GA-LR
A comparison shows effectiveness of this method, which is
roboust and efficient towards useful minimization of
operating cost and time required for computational is less.
5. CONCLUSION
This paper solved optimal scheduling problem along with
economic problem using PSO method. From experimental
result, total operating cost obtained is $ 5,62,113 and best
optimal generation for ten different unit is generated, which
is found better than result obtained by using other
techniques suchas GA ,EP and LR-GA. Thus, it was concluded
that this approach method isvery useful forsystemoperator
to obtained short-term scheduling along with economic
benefit forsatisfying dynamic load over 24 hourtimeperiod.
REFERENCES
[1] Yamin, H. Y. (2004). Review on methods of generation
scheduling in electric power systems. Electric Power
Systems Research, 69(2-3),227-248.
[2] Cohen, A. I., & Wan, S. H. (1987). A method for solving
the fuel constrained unit commitment problem. IEEE
Transactions on Power Systems, 2(3), 608-614.
[3] Vemuri, S., & Lemonidis, L. (1992). Fuel constrainedunit
commitment. IEEE transactionsonpowersystems,7(1),
410-415.
[4] Wang, C., & Shahidehpour, S. M. (1995). Optimal
generation scheduling with ramping costs. IEEE
Transactions on Power Systems, 10(1), 60-67.
[5] Momoh, J. A., & Zhu, J. (2003). Optimal generation
scheduling based on AHP/ANP. IEEE Transactions on
Systems, Man, and Cybernetics, Part B(Cybernetics),
33(3), 531-535.
[6] Gaing, Z. L. (2003). Particle swarm optimization to
solving the economicdispatchconsideringthegenerator
constraints. IEEE transactions on power systems,18(3),
1187-1195.
[7] R.C. Eberhart and Y. Shi, “Comparison between genetic
algorithms and particleswarmoptimization,”Proc.IEEE
Int. Conf. Evol. Comput., pp.611-616, 1998.
[8] T.E. Bechert, H.G. Kwatny, On the optimal dynamic
dispatch of real power,IEEE Trans. Power Apparatus
Syst. PAS-91 (1972) 889–898.
[9] D.W. Ross, S. Kim, Dynamic economic dispatch of
generation, IEEE Trans. Power Apparatus Syst. PAS-99
(6) (1980) 2060–2068.
[10] D.L. Travers, R.J. Kaye,Dynamicdispatchbyconstructive
dynamic programming, IEEE Trans. Power Syst. 13 (1)
(1998) 72–78.
[11] K.S. Hindi, M.R. Ab Ghani, Multi-period economic
dispatch for large scale power systems, Proc. IEE Pt. C
136 (3) (1989) 130–136.
[12] Aiguo Zhang, Jianhua Zhang, Jingfu Shang, Jialin Qin,
"Security and economic dispatch of power system with
environmental consideration "IEEE/PES Gen. Meet,
2009, pp.1-6.
[13] S.J. Wang, S.M. Shahidehpour, D.S. Kirschen, S. M.
Mokhtari, G.D.I Irisarri, Short-term generation
scheduling with transmission and environmental
constraints using an augmented Lagrangian relaxation
IEEE Trans. Power Syst. 10 (3)(1995).
Technique GA EP LR-GA PSO
Cost 5,65,825 5,65,352 5,64,800 5,62,113
Time 211 100 518 95
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 348
[14] James kennedy and rusel Eberhart , particle swarm
optimization Purdue school of engineering and
technology.(1995) vol:1000.
[15] Zhu, H., Ngah, S., Xu, Y., Tanabe, Y., & Baba, T. (2008). A
Random time-varying particle swarm optimization for
local positioning system International Journal of
Computer Science and Network security,8(6).
[16] S.A. Kazarlis, A. G. Bakirtzis, and V. Petridis, “ A Genetic
Algorithm Solution to the Unit Commitment Problem,”
IEEE Trans. Power Systems, Vol. 11, No. 1, 1996, pp
83-92.
[17] K. A. Juste, H. Kita, E. Tanaka, and J. Hasegawa, “ An
evolutionary Programming solution to the unit
commitment problem,” IEEE Trans.Power Syst., vol. 14,
pp. 1452–1459, Nov. 1999.
[18] C. P. Cheng, C. W. Liu, and C. C. Liu, “ Unit Commitment
by Lagrangian RelaxationandGenetic Algorithms,”IEEE
Trans. Power Systems, Vol. 15, pp. 707-714, 2000.
BIOGRAPHIES
Nitish R. Patel
M.Tech, Research scholar,
Department of EE, SPCE,
Visnagar,Gujarat,India.
Nilesh K. Patel
Associate Professor,
Department of EE, SPCE,
Visnagar, Gujarat, India
2nd
Au
thor
Photo
1’st
Author
Photo

More Related Content

What's hot

Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
IRJET Journal
 
Gravitational-Search Algorithm for Optimal Controllers Design of Doubly-fed I...
Gravitational-Search Algorithm for Optimal Controllers Design of Doubly-fed I...Gravitational-Search Algorithm for Optimal Controllers Design of Doubly-fed I...
Gravitational-Search Algorithm for Optimal Controllers Design of Doubly-fed I...
IJECEIAES
 
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
IJECEIAES
 
Compromising between-eld-&-eed-using-gatool-matlab
Compromising between-eld-&-eed-using-gatool-matlabCompromising between-eld-&-eed-using-gatool-matlab
Compromising between-eld-&-eed-using-gatool-matlab
Subhankar Sau
 
HYDROTHERMAL COORDINATION FOR SHORT RANGE FIXED HEAD STATIONS USING FAST GENE...
HYDROTHERMAL COORDINATION FOR SHORT RANGE FIXED HEAD STATIONS USING FAST GENE...HYDROTHERMAL COORDINATION FOR SHORT RANGE FIXED HEAD STATIONS USING FAST GENE...
HYDROTHERMAL COORDINATION FOR SHORT RANGE FIXED HEAD STATIONS USING FAST GENE...
ecij
 
Short term Multi Chain Hydrothermal Scheduling Using Modified Gravitational S...
Short term Multi Chain Hydrothermal Scheduling Using Modified Gravitational S...Short term Multi Chain Hydrothermal Scheduling Using Modified Gravitational S...
Short term Multi Chain Hydrothermal Scheduling Using Modified Gravitational S...
IJARTES
 
A Genetic Algorithm Approach to Solve Unit Commitment Problem
A Genetic Algorithm Approach to Solve Unit Commitment ProblemA Genetic Algorithm Approach to Solve Unit Commitment Problem
A Genetic Algorithm Approach to Solve Unit Commitment Problem
IOSR Journals
 
Relevance of Particle Swarm Optimization Technique for the Solution of Econom...
Relevance of Particle Swarm Optimization Technique for the Solution of Econom...Relevance of Particle Swarm Optimization Technique for the Solution of Econom...
Relevance of Particle Swarm Optimization Technique for the Solution of Econom...
IRJET Journal
 
Soft Computing Technique Based Enhancement of Transmission System Lodability ...
Soft Computing Technique Based Enhancement of Transmission System Lodability ...Soft Computing Technique Based Enhancement of Transmission System Lodability ...
Soft Computing Technique Based Enhancement of Transmission System Lodability ...
IJERA Editor
 
Load shedding in power system using the AHP algorithm and Artificial Neural N...
Load shedding in power system using the AHP algorithm and Artificial Neural N...Load shedding in power system using the AHP algorithm and Artificial Neural N...
Load shedding in power system using the AHP algorithm and Artificial Neural N...
IJAEMSJORNAL
 
GWO-based estimation of input-output parameters of thermal power plants
GWO-based estimation of input-output parameters of thermal power plantsGWO-based estimation of input-output parameters of thermal power plants
GWO-based estimation of input-output parameters of thermal power plants
TELKOMNIKA JOURNAL
 
Unit commitment
Unit commitmentUnit commitment
Unit commitment
Ahmed M. Elkholy
 
Security Constrained UCP with Operational and Power Flow Constraints
Security Constrained UCP with Operational and Power Flow ConstraintsSecurity Constrained UCP with Operational and Power Flow Constraints
Security Constrained UCP with Operational and Power Flow Constraints
IDES Editor
 
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
IRJET Journal
 
IRJET- Advance Approach for Load Balancing in Cloud Computing using (HMSO) Hy...
IRJET- Advance Approach for Load Balancing in Cloud Computing using (HMSO) Hy...IRJET- Advance Approach for Load Balancing in Cloud Computing using (HMSO) Hy...
IRJET- Advance Approach for Load Balancing in Cloud Computing using (HMSO) Hy...
IRJET Journal
 
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
paperpublications3
 
An Improved Particle Swarm Optimization for Proficient Solving of Unit Commit...
An Improved Particle Swarm Optimization for Proficient Solving of Unit Commit...An Improved Particle Swarm Optimization for Proficient Solving of Unit Commit...
An Improved Particle Swarm Optimization for Proficient Solving of Unit Commit...
IDES Editor
 
power Reliability pollard
power Reliability pollardpower Reliability pollard
power Reliability pollard
Musa Tufekci
 
Metaheuristics-based Optimal Reactive Power Management in Offshore Wind Farms...
Metaheuristics-based Optimal Reactive Power Management in Offshore Wind Farms...Metaheuristics-based Optimal Reactive Power Management in Offshore Wind Farms...
Metaheuristics-based Optimal Reactive Power Management in Offshore Wind Farms...
Aimilia-Myrsini Theologi
 

What's hot (20)

Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
 
Gravitational-Search Algorithm for Optimal Controllers Design of Doubly-fed I...
Gravitational-Search Algorithm for Optimal Controllers Design of Doubly-fed I...Gravitational-Search Algorithm for Optimal Controllers Design of Doubly-fed I...
Gravitational-Search Algorithm for Optimal Controllers Design of Doubly-fed I...
 
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
Resource aware wind farm and D-STATCOM optimal sizing and placement in a dist...
 
Compromising between-eld-&-eed-using-gatool-matlab
Compromising between-eld-&-eed-using-gatool-matlabCompromising between-eld-&-eed-using-gatool-matlab
Compromising between-eld-&-eed-using-gatool-matlab
 
HYDROTHERMAL COORDINATION FOR SHORT RANGE FIXED HEAD STATIONS USING FAST GENE...
HYDROTHERMAL COORDINATION FOR SHORT RANGE FIXED HEAD STATIONS USING FAST GENE...HYDROTHERMAL COORDINATION FOR SHORT RANGE FIXED HEAD STATIONS USING FAST GENE...
HYDROTHERMAL COORDINATION FOR SHORT RANGE FIXED HEAD STATIONS USING FAST GENE...
 
Short term Multi Chain Hydrothermal Scheduling Using Modified Gravitational S...
Short term Multi Chain Hydrothermal Scheduling Using Modified Gravitational S...Short term Multi Chain Hydrothermal Scheduling Using Modified Gravitational S...
Short term Multi Chain Hydrothermal Scheduling Using Modified Gravitational S...
 
A Genetic Algorithm Approach to Solve Unit Commitment Problem
A Genetic Algorithm Approach to Solve Unit Commitment ProblemA Genetic Algorithm Approach to Solve Unit Commitment Problem
A Genetic Algorithm Approach to Solve Unit Commitment Problem
 
Relevance of Particle Swarm Optimization Technique for the Solution of Econom...
Relevance of Particle Swarm Optimization Technique for the Solution of Econom...Relevance of Particle Swarm Optimization Technique for the Solution of Econom...
Relevance of Particle Swarm Optimization Technique for the Solution of Econom...
 
Soft Computing Technique Based Enhancement of Transmission System Lodability ...
Soft Computing Technique Based Enhancement of Transmission System Lodability ...Soft Computing Technique Based Enhancement of Transmission System Lodability ...
Soft Computing Technique Based Enhancement of Transmission System Lodability ...
 
Load shedding in power system using the AHP algorithm and Artificial Neural N...
Load shedding in power system using the AHP algorithm and Artificial Neural N...Load shedding in power system using the AHP algorithm and Artificial Neural N...
Load shedding in power system using the AHP algorithm and Artificial Neural N...
 
GWO-based estimation of input-output parameters of thermal power plants
GWO-based estimation of input-output parameters of thermal power plantsGWO-based estimation of input-output parameters of thermal power plants
GWO-based estimation of input-output parameters of thermal power plants
 
30120130406002
3012013040600230120130406002
30120130406002
 
Unit commitment
Unit commitmentUnit commitment
Unit commitment
 
Security Constrained UCP with Operational and Power Flow Constraints
Security Constrained UCP with Operational and Power Flow ConstraintsSecurity Constrained UCP with Operational and Power Flow Constraints
Security Constrained UCP with Operational and Power Flow Constraints
 
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
IRJET-Comparative Analysis of Unit Commitment Problem of Electric Power Syste...
 
IRJET- Advance Approach for Load Balancing in Cloud Computing using (HMSO) Hy...
IRJET- Advance Approach for Load Balancing in Cloud Computing using (HMSO) Hy...IRJET- Advance Approach for Load Balancing in Cloud Computing using (HMSO) Hy...
IRJET- Advance Approach for Load Balancing in Cloud Computing using (HMSO) Hy...
 
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
 
An Improved Particle Swarm Optimization for Proficient Solving of Unit Commit...
An Improved Particle Swarm Optimization for Proficient Solving of Unit Commit...An Improved Particle Swarm Optimization for Proficient Solving of Unit Commit...
An Improved Particle Swarm Optimization for Proficient Solving of Unit Commit...
 
power Reliability pollard
power Reliability pollardpower Reliability pollard
power Reliability pollard
 
Metaheuristics-based Optimal Reactive Power Management in Offshore Wind Farms...
Metaheuristics-based Optimal Reactive Power Management in Offshore Wind Farms...Metaheuristics-based Optimal Reactive Power Management in Offshore Wind Farms...
Metaheuristics-based Optimal Reactive Power Management in Offshore Wind Farms...
 

Similar to IRJET- Optimal Generation Scheduling for Thermal Units

Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
IJECEIAES
 
Optimum Location of DG Units Considering Operation Conditions
Optimum Location of DG Units Considering Operation ConditionsOptimum Location of DG Units Considering Operation Conditions
Optimum Location of DG Units Considering Operation Conditions
Editor IJCATR
 
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
IRJET Journal
 
Gs3511851192
Gs3511851192Gs3511851192
Gs3511851192
IJERA Editor
 
Elk 24-5-32-1410-127
Elk 24-5-32-1410-127Elk 24-5-32-1410-127
Elk 24-5-32-1410-127
Insanul Aziz
 
IRJET- Swarm Optimization Technique for Economic Load Dispatch
IRJET- Swarm Optimization Technique for Economic Load DispatchIRJET- Swarm Optimization Technique for Economic Load Dispatch
IRJET- Swarm Optimization Technique for Economic Load Dispatch
IRJET Journal
 
V.KARTHIKEYAN PUBLISHED ARTICLE
V.KARTHIKEYAN PUBLISHED ARTICLEV.KARTHIKEYAN PUBLISHED ARTICLE
V.KARTHIKEYAN PUBLISHED ARTICLE
KARTHIKEYAN V
 
V.KARTHIKEYAN PUBLISHED ARTICLE A..
V.KARTHIKEYAN PUBLISHED ARTICLE A..V.KARTHIKEYAN PUBLISHED ARTICLE A..
V.KARTHIKEYAN PUBLISHED ARTICLE A..
KARTHIKEYAN V
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IJERD Editor
 
A new approach to the solution of economic dispatch using particle Swarm opt...
A new approach to the solution of economic dispatch using particle Swarm  opt...A new approach to the solution of economic dispatch using particle Swarm  opt...
A new approach to the solution of economic dispatch using particle Swarm opt...
ijcsa
 
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET Journal
 
The optimal solution for unit commitment problem using binary hybrid grey wol...
The optimal solution for unit commitment problem using binary hybrid grey wol...The optimal solution for unit commitment problem using binary hybrid grey wol...
The optimal solution for unit commitment problem using binary hybrid grey wol...
IJECEIAES
 
A Review on Various Techniques Used for Economic Load Dispatch in Power System
A Review on Various Techniques Used for Economic Load Dispatch in Power SystemA Review on Various Techniques Used for Economic Load Dispatch in Power System
A Review on Various Techniques Used for Economic Load Dispatch in Power System
ijtsrd
 
IRJET- PSO Tuned PID Controller for Single-Area Multi- Source LFC System
IRJET- PSO Tuned PID Controller for Single-Area Multi- Source LFC SystemIRJET- PSO Tuned PID Controller for Single-Area Multi- Source LFC System
IRJET- PSO Tuned PID Controller for Single-Area Multi- Source LFC System
IRJET Journal
 
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
IJAPEJOURNAL
 
Solving combined economic emission dispatch problem in wind integrated power ...
Solving combined economic emission dispatch problem in wind integrated power ...Solving combined economic emission dispatch problem in wind integrated power ...
Solving combined economic emission dispatch problem in wind integrated power ...
nooriasukmaningtyas
 
IRJET- Fuel Cost Reduction for Thermal Power Generator by using G.A, PSO, QPS...
IRJET- Fuel Cost Reduction for Thermal Power Generator by using G.A, PSO, QPS...IRJET- Fuel Cost Reduction for Thermal Power Generator by using G.A, PSO, QPS...
IRJET- Fuel Cost Reduction for Thermal Power Generator by using G.A, PSO, QPS...
IRJET Journal
 
A039101011
A039101011A039101011
A039101011
inventionjournals
 
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
IRJET Journal
 
Security Constraint Unit Commitment Considering Line and Unit Contingencies-p...
Security Constraint Unit Commitment Considering Line and Unit Contingencies-p...Security Constraint Unit Commitment Considering Line and Unit Contingencies-p...
Security Constraint Unit Commitment Considering Line and Unit Contingencies-p...
IJAPEJOURNAL
 

Similar to IRJET- Optimal Generation Scheduling for Thermal Units (20)

Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
Reliability Constrained Unit Commitment Considering the Effect of DG and DR P...
 
Optimum Location of DG Units Considering Operation Conditions
Optimum Location of DG Units Considering Operation ConditionsOptimum Location of DG Units Considering Operation Conditions
Optimum Location of DG Units Considering Operation Conditions
 
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
IRJET- Comparison of GA and PSO Optimization Techniques to Optimal Planning o...
 
Gs3511851192
Gs3511851192Gs3511851192
Gs3511851192
 
Elk 24-5-32-1410-127
Elk 24-5-32-1410-127Elk 24-5-32-1410-127
Elk 24-5-32-1410-127
 
IRJET- Swarm Optimization Technique for Economic Load Dispatch
IRJET- Swarm Optimization Technique for Economic Load DispatchIRJET- Swarm Optimization Technique for Economic Load Dispatch
IRJET- Swarm Optimization Technique for Economic Load Dispatch
 
V.KARTHIKEYAN PUBLISHED ARTICLE
V.KARTHIKEYAN PUBLISHED ARTICLEV.KARTHIKEYAN PUBLISHED ARTICLE
V.KARTHIKEYAN PUBLISHED ARTICLE
 
V.KARTHIKEYAN PUBLISHED ARTICLE A..
V.KARTHIKEYAN PUBLISHED ARTICLE A..V.KARTHIKEYAN PUBLISHED ARTICLE A..
V.KARTHIKEYAN PUBLISHED ARTICLE A..
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
A new approach to the solution of economic dispatch using particle Swarm opt...
A new approach to the solution of economic dispatch using particle Swarm  opt...A new approach to the solution of economic dispatch using particle Swarm  opt...
A new approach to the solution of economic dispatch using particle Swarm opt...
 
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
IRJET- Maximization of Net Profit by Optimal Placement and Sizing of DG in Di...
 
The optimal solution for unit commitment problem using binary hybrid grey wol...
The optimal solution for unit commitment problem using binary hybrid grey wol...The optimal solution for unit commitment problem using binary hybrid grey wol...
The optimal solution for unit commitment problem using binary hybrid grey wol...
 
A Review on Various Techniques Used for Economic Load Dispatch in Power System
A Review on Various Techniques Used for Economic Load Dispatch in Power SystemA Review on Various Techniques Used for Economic Load Dispatch in Power System
A Review on Various Techniques Used for Economic Load Dispatch in Power System
 
IRJET- PSO Tuned PID Controller for Single-Area Multi- Source LFC System
IRJET- PSO Tuned PID Controller for Single-Area Multi- Source LFC SystemIRJET- PSO Tuned PID Controller for Single-Area Multi- Source LFC System
IRJET- PSO Tuned PID Controller for Single-Area Multi- Source LFC System
 
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
 
Solving combined economic emission dispatch problem in wind integrated power ...
Solving combined economic emission dispatch problem in wind integrated power ...Solving combined economic emission dispatch problem in wind integrated power ...
Solving combined economic emission dispatch problem in wind integrated power ...
 
IRJET- Fuel Cost Reduction for Thermal Power Generator by using G.A, PSO, QPS...
IRJET- Fuel Cost Reduction for Thermal Power Generator by using G.A, PSO, QPS...IRJET- Fuel Cost Reduction for Thermal Power Generator by using G.A, PSO, QPS...
IRJET- Fuel Cost Reduction for Thermal Power Generator by using G.A, PSO, QPS...
 
A039101011
A039101011A039101011
A039101011
 
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
 
Security Constraint Unit Commitment Considering Line and Unit Contingencies-p...
Security Constraint Unit Commitment Considering Line and Unit Contingencies-p...Security Constraint Unit Commitment Considering Line and Unit Contingencies-p...
Security Constraint Unit Commitment Considering Line and Unit Contingencies-p...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 

Recently uploaded (20)

The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 

IRJET- Optimal Generation Scheduling for Thermal Units

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 343 Optimal Generation Scheduling For Thermal Units Nitish R. Patel1, Nilesh K. Patel2 1PG student, Department of Electrical Engineering, Sankalchand Patel College of Engineering, Gujarat, India 2Associate professor, Department of Electrical Engineering, Sankalchand Patel College of Engineering, Gujarat, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - The main aim of this paper is to develop short- term generation scheduling. The scheduling problem is formulated by considering productioncostandstart-upcostof generating units and satisfying all equality and inequality constraint. A PSO techniques is used to obtain optimal scheduling of ten generating unit. Results generated are compared with other techniques. It was found that PSO technique are very effective and efficient to solved short term generation scheduling problem andprovideeconomic benefits to the system operator to developed optimal scheduling. Key Words: short-term scheduling,PSO,Economic Dispatch 1. INTRODUCTION In deregulated power system, all the generating company are independently and separately operated. The system operator plan day ahead scheduling, that how many generating units are carried out to satisfy load demand. A short-term scheduling also known as day ahead scheduling. In power system, consumer demand changes continuously, its varied according to day-time, evening and morning time[1]. Thus, system operator has to plan enoughunitsthat required for next day to fulfill load demand. The generation scheduling of power system is necessary to maintain a balance between supply and demand, due to the fact that no practical technology is available for large scale storage of electricity. In day-ahead scheduling, a day-ahead unit commitment program is executed to decide the most economic unit combination with considerations of various restrictions of units. Previously, a unit can usemultiplesfuel constrained and it is assumed that only one fuel is constrained. Adding fuel constraints severely complicates the unit commitment problem. Thus author[2], utilized Lagrange multipliers which tackle the unit responsibility issue within the sight of fuel constraint. when a unit supplying multiple fuels, the price of fuel at a unit is not readily available and fuel pricecouldvaryoverdifferenttime intervals of the study period resulting in an increase in the complexity of the problem. Thus, in [3] divides the fuel constrained unit commitment problem into a linear fuel dispatch (FD) issue and a unit commitment (UC) issue. The Fuel Dispatch issue improves framework fuel cost and fulfilling fuel required. It is very difficult aspect of the power system to incorporating a ramping costs into a scheduling procedure, since the ramping costs vary with the generation schedule. By presenting ramping costs, the unit on or off states can be determined more economically by the lagrangian method in [4], this method is developed for unit commitment and economic dispatch problem. A short-term scheduling issue is solved in [5] by dynamic programming, and the economic dispatch with transmission and environmental constraints is solved by an efficient network flow programming algorithm. An economic dispatch considering the generator constraints can solved by using Particle Swarm Optimization in[6,7]. In this method for practical application of generator operations, a many nonlinear characteristics of generator, such as ramp rate limits, prohibited operating zone, and non-smooth cost functions is considered. Static economic dispatch(SED) can handle only a single load level at a certain time. However, SED may fail to deal with the large variations of the load demand due to the ramp rate limits of the generators, moreover, it doesnothavethelook-aheadcapability[3,4].For large variation in load demand and the dynamic nature of the power systems, it necessary for development of optimal dynamic dispatch (ODD) problem. ODD is a new update of SED to determine the generation scheduling of the committed units, so as to meet the load demand over a time horizon at minimum operating cost under ramp rate and other constraints. The dynamic dispatching was first introduced in [8] and was followed by [9,10]. Inthesepaper, optimal control dynamic dispatch (OCDD) formulation models the power system generation by means of state Equations, where the state variables aretheelectrical power outputs of the generators and the control inputs are the ramp rates of the generators. In OCDD the optimization is done with respect to the ramp rates and the solution produces an optimal output generator. In[11] the DED problem the optimization is done with respect to the dispatch able powers of the units. Some researchers have considered the ramp rate constraints by solving SED problem interval by interval and enforcing the ramp rate constraints from one interval to the next. However, this approach can lead to suboptimal solutions trajectory for a given initial generation in the optimal dynamic dispatch problem is to determine underwhatconstraintstheproblem will be solved. Broadly, these constraints can be classified into three kinds: equality constraints, inequalityconstraints, and dynamic constraints. Some of these constraints such as load demand balance, and spinning reserve constraints can be modified when the DED problem is solved in the deregulated market Environment. The dynamic economic and emission dispatch is an extension of the conventional economic dispatch problem [12]. It is used to determine the optimal generation schedule of on-line generators. A main aim of this paper is to developed short-term generation scheduling also known as day ahead scheduling for ten generating units. All equality and inequality
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 344 constrained is taken to obtained optimal short-term generation scheduling. PSO techniques are used to make optimal scheduling, due to its efficienttimecomputationand required less parameter to developed algorithm. 2. PROBLEM FORMULATION The objective function is to minimize operating cost are as follows[13]: where, FCij and SCij are operating cost(OC) of ith unit in jth hour and start-up costs of ith unit in jth hour ,Pij its power output. The Fuel cost as follows: (1) Where, a, b and c are cost coefficient. The start up cost characteristic as follows: (2) Where, α is hot start up cost, β is cold start up cost and τ is cooling time constant. Tij turn off time of ith unit in jth time period.uij is status of unit ith in jth time period. The following are the system constraints which are considered in this problem formulation: 1) Real power balance constraint: Where, Pij is ith generating unit in jth time period and PD is power demand. 2) Real power operating limits of units are: (4) Where,Pi min and Pi max is minimum and maximum generating power. 3) Unit minimum up/downtimeforthermal generatingunits and is given as: (5) (6) Where, Ton/TOFF is the unit turn on and turn off time. 4) Spinning reserve constraints: (7) Where, Xij is status of generating unit, Di is load demand of ith unit and R is reserve of generating unit. 3. Overview of Particle Swarm Optimization Particle swarm optimization wasintroducedbyDr.Eberhart and Dr. kennedy[14].It is an evolutionary computation type of new method and population based optimization tool like GA.PSO is adopted from the naturebehaviorofsocial system such as bird flocking and fish schooling. The PSO algorithm requires less memory because ofitssimplicity.PSOissimilar to the other evolutionary algorithms in that the system is initialized with a population of random solutions called particle. These particles flies over fitness function according to its neighborhood experiences. It moves according to update velocity vg n+1 and positionupdatexg n+1 tofindparticle best values. (8) A position update equation represent as: (9) Here, w is the inertia weight parameter which controls the global and local exploration of the particle. c1 and c2 are acceleration coefficients respectively, and Rand() are random numbers between 0 and 1. c1 pulls the particles towards local best position, c2 pulls towards the global best position. In particle swarm optimization, a particle velocity Vmax determines the resolution. If Velocity is too high, particles may fly past good solutions. If velocity is too small, particles may not explore a local solutions. Thus, the system parameters Vmax has the beneficial effect of the preventing explosion and scales the exploration of the particle search[15].Thus, inertia weight w provides a balance between global exploitation and local explorations, which requiring less number of iteration to find a sufficiently optimal solution. Since, W indicates decreases linearly from about 0.9 to 0.4 approx during a run, which determines follows, (10) where, w is inertia weight constant of particle, an exploration of search space is controlled by inertia constant is given in[5]. wmax is maximum weight and wmin is minimum weight. A. Algorithm of particle swarm optimization for Scheduling Step by Step procedure as follows: Step-1: Initialization of the particles: For a populationsizeP, the particles are randomly generated and located between the maximum and the minimum operating limits of the generators units.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 345 Step-2: Define fitness function:a randomparticlesgenerated start moving towards fitnees function according to define velocity. It is define to minimize cost function. Step-3:Initialization of Pbest and Gbest: The fitness values obtained for the initial particles are set as the initial Pbest values of the particle. The best value among all particle called Gbest. Step-4: update velocity using equation(8) to move particles towards neighborhood best position. Step-5:update position using equation (9) according to update velocity . Step-6:If the fitness value of each individual is better than previous P-best, the current value is set to be P-best. If the best P-best is better than G-best, the best P-best is set to be G-best. The value of fitness function is to analyzes. Step-7: If number of iteration reaches its maximum value than stop iteration. Otherwise, repeat from step-2. Thus, at the end Gbest obtain is considered as optimal value of generating units. 4. Results and Discussion A system of ten generating unit data are used to obtain optimal scheduling using particle swarm optimization technique. Unit data for 10 generating unit and loaddemand over 24 time horizon in[16]. Unitcommitmentandeconomic dispatch is main important task for preparing generation scheduling. A system operator which plan an optimal scheduling by considering both unit commitment and economic dispatch problems. It is possible to ON all generating unit over all time period, but it is not economical to keep all unit ON. Thus, for obtaining best generation scheduling it is essential to commit enough generating unit for required load, are shown in table 1. Table-1: unit commitment for ten generating unit UNITS HOUR(1-24) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 0 0 4 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 5 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 6 0 0 0 0 0 0 0 0 1 1 1 1 1 1 0 0 0 0 0 1 1 0 0 0 7 0 0 0 0 0 0 0 0 1 1 1 1 1 1 0 0 0 0 0 1 1 0 0 0 8 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 1 0 0 0 0 9 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 Unit ON and OFF status is indicated by 1 and 0 respectively. The binary number 1 indicated that unit is available for required time slots, while 0 indicates that unit is not generate any power for particular time periods. Unit 1 and2 are consider as base load power plant, which is available at all time and unit 9 and 10 are costly unit, so it is ON over a peak time period at 12th hour respectively. These unit are able to supply for dynamic load demand The dynamic load demand over 24 time period is shown in fig(1) a different load at each time intervals. A maximum load is 1500 MW Fig(1) Load curves for different time periods at 12th hour and minimum load is 700MW at 1st hour . A PSO method is utilize for ten generatingunit,whichtakenvarious parameter data: such as population size is 70, particle is 10 unit , wmax and wmin are 0.9 and 0.4 respectively, velocity is 10%, acceleration constant c1 and c2 are 2.0 and number of iteration is 100. Operating cost oftengeneratingunitinclude production cost and start up cost both followsquadraticcost function and exponential function, which are utilizes by satisfying all constraints for calculations.Implementingdata of ten generating unit in PSO method and individually analyzes results for all time period for differentloads.Result of all unit and their operating cost is shown in table(2).
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 346 Table -2: result of different generating unit over a different time period and total operating cost Hour (hr) p1 (MW) p2 (MW) p3 (MW) p4 (MW) p5 (MW) p6 (MW) p7 (MW) p8 (MW) p9 (MW) p10 (MW) Load (MW) Cost ($) Start up cost ($) total cost ($) 1 454.21 245.79 0 0 0 0 0 0 0 0 700 13674 0 13674 2 449.09 300.919 0 0 0 0 0 0 0 0 750 14541 0 14541 3 455 367.25 0 0 27.75 0 0 0 0 0 850 16790 1298 18088 4 442.59 385.59 0 0 121.82 0 0 0 0 0 950 18540 0 18540 5 455 381.64 0 130 33.36 0 0 0 0 0 1000 20001 807 20809 6 455 357.97 130 130 27.03 0 0 0 0 0 1100 22355 793 23148 7 455 455 94.33 120.67 25 0 0 0 0 0 1150 23171 0 23171 8 455 455 130 102.7 57.3 0 0 0 0 0 1200 24140 0 24140 9 440.28 418.2 120 130 88.52 80 25 0 0 0 1300 27200 768 27968 10 455 455 120.78 130 120 44 25 50.22 0 0 1400 29950 90 30040 11 455 455 130 130 119.55 80 25.45 55 0 0 1450 31449 0 31449 12 455 455 130 130 162 80 25.46 17.25 29 17 1500 33700 180 33880 13 455 455 120.78 130 120 44 25 50.22 0 0 1400 29950 0 29950 14 440.28 418.2 120 130 88.52 80 25 0 0 0 1300 27200 0 27200 15 455 455 130 102.7 57.3 0 0 0 0 0 1200 24140 0 24140 16 455 455 20.33 95 25.67 0 0 0 0 0 1050 21500 0 21500 17 455 381.64 0 130 33.36 0 0 0 0 0 1000 20001 0 20001 18 455 357.97 130 130 27.03 0 0 0 0 0 1100 22355 0 22355 19 455 455 130 102.7 57.3 0 0 0 0 0 1200 24140 0 24140 20 455 455 120.78 130 120 44 25 50.22 0 0 1400 29950 858 30808 21 440.28 418.2 120 130 88.52 80 25 0 0 0 1300 27200 0 27200 22 455 357.97 130 130 27.03 0 0 0 0 0 1100 22355 0 22355 23 455 410 0 0 35 0 0 0 0 0 900 17595 0 17595 24 454 346 0 0 0 0 0 0 0 0 800 15410 0 15410 557319 4794 562113
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 347 Result obtained by using approach method, it is found that fuel cost for differenet generating unit and start up cost are $ 5,57,319 and $ 4794 repectively. Total operating cost for the generating unit is $ 5,62,113. A PSO convergence characteristic shown in fig(2), which shown that PSO is able Fig(2) convergence of PSO to converge successfully at each iteration. Result of cost obtained are compared with other techniques, which used same data to obtain generation scheduling problems. PSO result are verify with genetic algorithm[16], evolutionary programming[17] and genetic algorithm based lagrangian[18], shown in table-3. Table-3: Comparison of PSO result with GA and GA-LR A comparison shows effectiveness of this method, which is roboust and efficient towards useful minimization of operating cost and time required for computational is less. 5. CONCLUSION This paper solved optimal scheduling problem along with economic problem using PSO method. From experimental result, total operating cost obtained is $ 5,62,113 and best optimal generation for ten different unit is generated, which is found better than result obtained by using other techniques suchas GA ,EP and LR-GA. Thus, it was concluded that this approach method isvery useful forsystemoperator to obtained short-term scheduling along with economic benefit forsatisfying dynamic load over 24 hourtimeperiod. REFERENCES [1] Yamin, H. Y. (2004). Review on methods of generation scheduling in electric power systems. Electric Power Systems Research, 69(2-3),227-248. [2] Cohen, A. I., & Wan, S. H. (1987). A method for solving the fuel constrained unit commitment problem. IEEE Transactions on Power Systems, 2(3), 608-614. [3] Vemuri, S., & Lemonidis, L. (1992). Fuel constrainedunit commitment. IEEE transactionsonpowersystems,7(1), 410-415. [4] Wang, C., & Shahidehpour, S. M. (1995). Optimal generation scheduling with ramping costs. IEEE Transactions on Power Systems, 10(1), 60-67. [5] Momoh, J. A., & Zhu, J. (2003). Optimal generation scheduling based on AHP/ANP. IEEE Transactions on Systems, Man, and Cybernetics, Part B(Cybernetics), 33(3), 531-535. [6] Gaing, Z. L. (2003). Particle swarm optimization to solving the economicdispatchconsideringthegenerator constraints. IEEE transactions on power systems,18(3), 1187-1195. [7] R.C. Eberhart and Y. Shi, “Comparison between genetic algorithms and particleswarmoptimization,”Proc.IEEE Int. Conf. Evol. Comput., pp.611-616, 1998. [8] T.E. Bechert, H.G. Kwatny, On the optimal dynamic dispatch of real power,IEEE Trans. Power Apparatus Syst. PAS-91 (1972) 889–898. [9] D.W. Ross, S. Kim, Dynamic economic dispatch of generation, IEEE Trans. Power Apparatus Syst. PAS-99 (6) (1980) 2060–2068. [10] D.L. Travers, R.J. Kaye,Dynamicdispatchbyconstructive dynamic programming, IEEE Trans. Power Syst. 13 (1) (1998) 72–78. [11] K.S. Hindi, M.R. Ab Ghani, Multi-period economic dispatch for large scale power systems, Proc. IEE Pt. C 136 (3) (1989) 130–136. [12] Aiguo Zhang, Jianhua Zhang, Jingfu Shang, Jialin Qin, "Security and economic dispatch of power system with environmental consideration "IEEE/PES Gen. Meet, 2009, pp.1-6. [13] S.J. Wang, S.M. Shahidehpour, D.S. Kirschen, S. M. Mokhtari, G.D.I Irisarri, Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation IEEE Trans. Power Syst. 10 (3)(1995). Technique GA EP LR-GA PSO Cost 5,65,825 5,65,352 5,64,800 5,62,113 Time 211 100 518 95
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 348 [14] James kennedy and rusel Eberhart , particle swarm optimization Purdue school of engineering and technology.(1995) vol:1000. [15] Zhu, H., Ngah, S., Xu, Y., Tanabe, Y., & Baba, T. (2008). A Random time-varying particle swarm optimization for local positioning system International Journal of Computer Science and Network security,8(6). [16] S.A. Kazarlis, A. G. Bakirtzis, and V. Petridis, “ A Genetic Algorithm Solution to the Unit Commitment Problem,” IEEE Trans. Power Systems, Vol. 11, No. 1, 1996, pp 83-92. [17] K. A. Juste, H. Kita, E. Tanaka, and J. Hasegawa, “ An evolutionary Programming solution to the unit commitment problem,” IEEE Trans.Power Syst., vol. 14, pp. 1452–1459, Nov. 1999. [18] C. P. Cheng, C. W. Liu, and C. C. Liu, “ Unit Commitment by Lagrangian RelaxationandGenetic Algorithms,”IEEE Trans. Power Systems, Vol. 15, pp. 707-714, 2000. BIOGRAPHIES Nitish R. Patel M.Tech, Research scholar, Department of EE, SPCE, Visnagar,Gujarat,India. Nilesh K. Patel Associate Professor, Department of EE, SPCE, Visnagar, Gujarat, India 2nd Au thor Photo 1’st Author Photo