This document summarizes several previous studies on causes and effects of construction project delays in different countries. The top ten most common causes of delay identified are poor coordination, lack of experienced staff, contractor financial issues, insufficient planning, poor government supervision, client changes, payment delays, late materials procurement, design changes, and inadequate site study. The main effects are cost overruns, schedule overruns, disputes, arbitration, litigation and abandonment. While most studies examined causes or effects, the goal of this research is to identify methods to minimize construction project delays in Afghanistan.
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...IAEME Publication
Real estate sector in present scenario is going through a lean patch, many organisations are either running in loss or with a marginal profits. As in state government and central government departments contractors are facing huge problems that are in turn tending to decrease in contractor profits. The present study focuses on study of various factors that affect contractor’s performance who have been awarded projects on the basis of lowest bid awards. The study analyses various factors and their impacts on the basis of responses collected form a survey. On the basis of overall index and relative importance index factor causing a major impact on contractor’s efficiency have been identified.
Green Building Effect in Commercial Building vivatechijri
The key reason behind any environmental strain is the haphazard usage of global natural resources leading to, pollution in the environment, sea level rising, warming the earth, depletion of natural resources etc. The drastic climate variation has been observed worldwide, which in fact is mainly due to the release of CO2 from every energy actions. The building sector consumes nearly 40 % of the total energy and accounts for 30 percent of world greenhouse gas emissions. With all the green features modeled, the project building could achieve 33.76% energy improvement over the baseline building in the present model. The formulated water conservation strategy includes recycled water from sewage, rainwater harvesting, metering and sub metering, and low flow fixtures. The maximum quantity of recycled water generated inside the building is 157.3 KL/month and the total saving of freshwater is 53.85%.
Causes of delays on Construction Projects in Kuwait according to opinion of e...IJERA Editor
This paper presents an investigation into analysis of the causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait. This is achieved through identification of the major causes of delays in the construction industry as reported in literature and using a questionnaire survey to collect the views of the various key players in the Kuwaiti construction industry. The data is analyzed and the views of the groups surveyed discussed and the relative importance index used to rank the causes of delays in the construction industry as per the questionnaire responses obtained. .It is found that the top 10 causes of delays in construction projects in Kuwait are as listed below. Using a lowest price bidding and tendering system Poor performance of the main contractor Inadequate experience or qualifications of main contractor’s staff Delay of payments from client to other parties Poor performance of subcontractors Shortage in the supply of general labour Frequent changes of subcontractors Delay in decision making by the client Poor management of subcontractors Conflict between the main parties to the contract Inappropriate methods used by the main contractor Proposals of ways to effectively prevent delays in the future construction projects managed in Kuwait construction industry were developed from the identified causes delay
Time delay and cost escalation in construction worksvivatechijri
The objective of the present study was to measure the effects of delay in construction projects like cost-overrun, time-overrun, litigation and project abandonment. Data on the study variables has been collected through a structured questionnaire. Statistical tool One-Way ANOVA has been applied for data analysis and inference. It is found that delay in construction projects significantly lead to cost overrun, time overrun, litigation and project abandonment. The findings of the study also provide significant insights to the construction industry so that they may formulate strategies in order to avoid delay and its consequences. Moreover, the recommendations and limitations are discussed in the conclusion part of the study.
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...IAEME Publication
Real estate sector in present scenario is going through a lean patch, many organisations are either running in loss or with a marginal profits. As in state government and central government departments contractors are facing huge problems that are in turn tending to decrease in contractor profits. The present study focuses on study of various factors that affect contractor’s performance who have been awarded projects on the basis of lowest bid awards. The study analyses various factors and their impacts on the basis of responses collected form a survey. On the basis of overall index and relative importance index factor causing a major impact on contractor’s efficiency have been identified.
Green Building Effect in Commercial Building vivatechijri
The key reason behind any environmental strain is the haphazard usage of global natural resources leading to, pollution in the environment, sea level rising, warming the earth, depletion of natural resources etc. The drastic climate variation has been observed worldwide, which in fact is mainly due to the release of CO2 from every energy actions. The building sector consumes nearly 40 % of the total energy and accounts for 30 percent of world greenhouse gas emissions. With all the green features modeled, the project building could achieve 33.76% energy improvement over the baseline building in the present model. The formulated water conservation strategy includes recycled water from sewage, rainwater harvesting, metering and sub metering, and low flow fixtures. The maximum quantity of recycled water generated inside the building is 157.3 KL/month and the total saving of freshwater is 53.85%.
Causes of delays on Construction Projects in Kuwait according to opinion of e...IJERA Editor
This paper presents an investigation into analysis of the causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait. This is achieved through identification of the major causes of delays in the construction industry as reported in literature and using a questionnaire survey to collect the views of the various key players in the Kuwaiti construction industry. The data is analyzed and the views of the groups surveyed discussed and the relative importance index used to rank the causes of delays in the construction industry as per the questionnaire responses obtained. .It is found that the top 10 causes of delays in construction projects in Kuwait are as listed below. Using a lowest price bidding and tendering system Poor performance of the main contractor Inadequate experience or qualifications of main contractor’s staff Delay of payments from client to other parties Poor performance of subcontractors Shortage in the supply of general labour Frequent changes of subcontractors Delay in decision making by the client Poor management of subcontractors Conflict between the main parties to the contract Inappropriate methods used by the main contractor Proposals of ways to effectively prevent delays in the future construction projects managed in Kuwait construction industry were developed from the identified causes delay
Time delay and cost escalation in construction worksvivatechijri
The objective of the present study was to measure the effects of delay in construction projects like cost-overrun, time-overrun, litigation and project abandonment. Data on the study variables has been collected through a structured questionnaire. Statistical tool One-Way ANOVA has been applied for data analysis and inference. It is found that delay in construction projects significantly lead to cost overrun, time overrun, litigation and project abandonment. The findings of the study also provide significant insights to the construction industry so that they may formulate strategies in order to avoid delay and its consequences. Moreover, the recommendations and limitations are discussed in the conclusion part of the study.
Effect of construction delays on project time overruneSAT Journals
Abstract The time and cost for performance of a project are usually important to the employer and contractor. About 57% of Indian construction projects are experiencing time overrun. These time overruns always contributed as expensive to all parties. This paper highlights the types of construction delays due to which project suffer time and cost overrun. Construction delay is considered to be one of the recurring problems in the construction industry and it has an adverse effect on project success in terms of time, cost and quality. The construction industry is the tool through which a society achieves its goal of urban and rural development. It is one of the sectors that provides important ingredient for the development of an economy. This paper studies external and internal factors that influence the construction process and outlines the effect of delay in large construction projects. Various media reports shows incidents of extended delays and extensive cost overruns in infrastructure projects. These delayed projects are further can conclude additional delays and this affects an ongoing projects and also new projects which could not be started due to pending projects whose completion date already elongated. Realizing the density of matter this paper studies the performance of previous year 2012 ongoing and also completed projects. These projects are from around 17 various central sectors costing Rs. 1000 crore and above (Mega Projects). Keywords: Delays, Time overrun, Cost overrun, Megaprojects etc
Causes and Effects of Change Orders on Construction Projects in KuwaitIJERA Editor
This research investigates the change orders in public and private construction projects in Kuwait. The study in this research presents the results of a questionnaire surveying the owners, contractors and consultants on a sample comprising 385 engineers representing the construction industry. The responses to the questionnaire help in identifying the general characteristics of the construction industry in Kuwait as well as ranking the most common causes of changes, their effects on the projects and the control measures to address the changes. The results of the questionnaire indicate that the owner is the most responsible party causing changes. The study identifies that the first cause is change of plans by owner, otherwise increase in cost of the project is the first effect. All changes to design documents are checked and reviewed is the first control.
The infrastructure construction sectors are usually complex. Zero risk construction projects are only an
assumption. The objective of this paper is to identify the risks factor associated with the urban infrastructure
construction projects causing delay. The research found that those risks are directly associated to clients,
contractors, sub-contractors that would cause delay in the construction work. Other factors are also
identified such as project, financial, political, technical, market risk, managerial, resource risk, and force
majeure. All risk factors affect the time, cost and quality performance of the construction project. From risk
management perspective, it is the process on which identifies the risks and analyzed with qualitatively and
quantitatively. All associated risks can treat by various mitigation processes and then mitigating method are
monitored to control the risks. Risk management distinguishes between success and failure of a project.
So, Nepal could use it effectively to meet its growing need of infrastructure and job opportunity
Infrastructure plays a vital role in ensuring a sustained growth trajectory for India, it is imperative that we identify the core issues affecting completion of infrastructure projects in India and chalk out initiatives that need to be acted upon in short term as well as long term. This study attempts to identify these pertinent issues.
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSIAEME Publication
Construction Delays is a major of concern in the private projects construction industry in Jordan. With the fact that construction delays are nothing but loss of time and money such study was conducted to identify the factors that causes the construction delays. Therefore three groups consist of consultants, contractors and owners were questioned, Shortage of manpower (skilled, semiskilled, unskilled labor), Delay in the approval of contractor submissions by the engineer, Shortage of materials, The relationship between different subcontractors’ schedules were the most important factors that cause delays in private projects sector in Jordan. Furthermore one way ANOVA analysis conducted to select factors that share agreement between the three groups.
ER Publication,
IJETR, IJMCTR,
Journals,
International Journals,
High Impact Journals,
Monthly Journal,
Good quality Journals,
Research,
Research Papers,
Research Article,
Free Journals, Open access Journals,
erpublication.org,
Engineering Journal,
Science Journals,
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...IJMREMJournal
The road construction works have tendency to build strong variances among the stakeholder which involved in projects, they can turn quickly into disputes and become difficult to resolve them. All developing countries are increasing their economic growths, Pakistan is one of them which rapidly growing its resources spending on construction projects effectively. Road construction disputes are one the major issues which will affect the successful completion of the projects. This research aim to analyze the causes and impacts of disputes in roads construction projects of Pakistan construction industry. This study is undertaken to identify the causes, impacts and remedial measures/appropriate suggestion to overcome from disputes. The construction claims are considered as one of the most unpleasant and disruptive event of a construction project, which will effects intern of costs overrun, time overrun and dynamic nature of projects. This study is limited to determination of causes and Impacts of disputes as observed by Clients, contractors and consultants working in road construction projects. Get a path way to manage disputes from informed, selection of remedial measures. The data were collected from respondents which are concerned in road construction, after analysis of the data, concluded that incomplete documentation, inappropriate contract system, unrealistic price of tenders, errors in design and overstated claims are the major Causes of disputes in construction projects. Mediation and negotiation were identified the common desired method to manage disputes.
Effect of construction delays on project time overruneSAT Journals
Abstract The time and cost for performance of a project are usually important to the employer and contractor. About 57% of Indian construction projects are experiencing time overrun. These time overruns always contributed as expensive to all parties. This paper highlights the types of construction delays due to which project suffer time and cost overrun. Construction delay is considered to be one of the recurring problems in the construction industry and it has an adverse effect on project success in terms of time, cost and quality. The construction industry is the tool through which a society achieves its goal of urban and rural development. It is one of the sectors that provides important ingredient for the development of an economy. This paper studies external and internal factors that influence the construction process and outlines the effect of delay in large construction projects. Various media reports shows incidents of extended delays and extensive cost overruns in infrastructure projects. These delayed projects are further can conclude additional delays and this affects an ongoing projects and also new projects which could not be started due to pending projects whose completion date already elongated. Realizing the density of matter this paper studies the performance of previous year 2012 ongoing and also completed projects. These projects are from around 17 various central sectors costing Rs. 1000 crore and above (Mega Projects). Keywords: Delays, Time overrun, Cost overrun, Megaprojects etc
Causes and Effects of Change Orders on Construction Projects in KuwaitIJERA Editor
This research investigates the change orders in public and private construction projects in Kuwait. The study in this research presents the results of a questionnaire surveying the owners, contractors and consultants on a sample comprising 385 engineers representing the construction industry. The responses to the questionnaire help in identifying the general characteristics of the construction industry in Kuwait as well as ranking the most common causes of changes, their effects on the projects and the control measures to address the changes. The results of the questionnaire indicate that the owner is the most responsible party causing changes. The study identifies that the first cause is change of plans by owner, otherwise increase in cost of the project is the first effect. All changes to design documents are checked and reviewed is the first control.
The infrastructure construction sectors are usually complex. Zero risk construction projects are only an
assumption. The objective of this paper is to identify the risks factor associated with the urban infrastructure
construction projects causing delay. The research found that those risks are directly associated to clients,
contractors, sub-contractors that would cause delay in the construction work. Other factors are also
identified such as project, financial, political, technical, market risk, managerial, resource risk, and force
majeure. All risk factors affect the time, cost and quality performance of the construction project. From risk
management perspective, it is the process on which identifies the risks and analyzed with qualitatively and
quantitatively. All associated risks can treat by various mitigation processes and then mitigating method are
monitored to control the risks. Risk management distinguishes between success and failure of a project.
So, Nepal could use it effectively to meet its growing need of infrastructure and job opportunity
Infrastructure plays a vital role in ensuring a sustained growth trajectory for India, it is imperative that we identify the core issues affecting completion of infrastructure projects in India and chalk out initiatives that need to be acted upon in short term as well as long term. This study attempts to identify these pertinent issues.
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSIAEME Publication
Construction Delays is a major of concern in the private projects construction industry in Jordan. With the fact that construction delays are nothing but loss of time and money such study was conducted to identify the factors that causes the construction delays. Therefore three groups consist of consultants, contractors and owners were questioned, Shortage of manpower (skilled, semiskilled, unskilled labor), Delay in the approval of contractor submissions by the engineer, Shortage of materials, The relationship between different subcontractors’ schedules were the most important factors that cause delays in private projects sector in Jordan. Furthermore one way ANOVA analysis conducted to select factors that share agreement between the three groups.
ER Publication,
IJETR, IJMCTR,
Journals,
International Journals,
High Impact Journals,
Monthly Journal,
Good quality Journals,
Research,
Research Papers,
Research Article,
Free Journals, Open access Journals,
erpublication.org,
Engineering Journal,
Science Journals,
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...IJMREMJournal
The road construction works have tendency to build strong variances among the stakeholder which involved in projects, they can turn quickly into disputes and become difficult to resolve them. All developing countries are increasing their economic growths, Pakistan is one of them which rapidly growing its resources spending on construction projects effectively. Road construction disputes are one the major issues which will affect the successful completion of the projects. This research aim to analyze the causes and impacts of disputes in roads construction projects of Pakistan construction industry. This study is undertaken to identify the causes, impacts and remedial measures/appropriate suggestion to overcome from disputes. The construction claims are considered as one of the most unpleasant and disruptive event of a construction project, which will effects intern of costs overrun, time overrun and dynamic nature of projects. This study is limited to determination of causes and Impacts of disputes as observed by Clients, contractors and consultants working in road construction projects. Get a path way to manage disputes from informed, selection of remedial measures. The data were collected from respondents which are concerned in road construction, after analysis of the data, concluded that incomplete documentation, inappropriate contract system, unrealistic price of tenders, errors in design and overstated claims are the major Causes of disputes in construction projects. Mediation and negotiation were identified the common desired method to manage disputes.
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...IJMREMJournal
The road construction works have tendency to build strong variances among the stakeholder which involved in
projects, they can turn quickly into disputes and become difficult to resolve them. All developing countries are
increasing their economic growths, Pakistan is one of them which rapidly growing its resources spending on
construction projects effectively. Road construction disputes are one the major issues which will affect the
successful completion of the projects. This research aim to analyze the causes and impacts of disputes in roads
construction projects of Pakistan construction industry. This study is undertaken to identify the causes, impacts
and remedial measures/appropriate suggestion to overcome from disputes. The construction claims are
considered as one of the most unpleasant and disruptive event of a construction project, which will effects intern
of costs overrun, time overrun and dynamic nature of projects. This study is limited to determination of causes
and Impacts of disputes as observed by Clients, contractors and consultants working in road construction projects.
Get a path way to manage disputes from informed, selection of remedial measures. The data were collected from
respondents which are concerned in road construction, after analysis of the data, concluded that incomplete
documentation, inappropriate contract system, unrealistic price of tenders, errors in design and overstated claims
are the major Causes of disputes in construction projects. Mediation and negotiation were identified the common
desired method to manage disputes.
Factors Affecting Cost Escalation in Construction Projects in Gaza StripDr. Amarjeet Singh
Cost escalation is one of serious difficulties that
facing the construction industry. The construction sector
suffers from ever-increasing cost of raw materials,
construction inputs and inflation in domestic and
international markets. The aim of this paper is to identify
factors affecting the cost escalation in construction projects in
the Gaza Strip. This will help the contractors to create
awareness so that timely remedial measures can be taken to
mitigate the resulting problems. A total of 36 cost escalation
factors related to project, supervisor, activity, owner, labour
and equipment and materials were identified through
extensive literature review which were supported by panel of
experts and pilot study. A structured questionnaire was used
to collect primary data. A total of 120 questionnaires were
distributed randomly to owners, consultants and contractors
working in the construction sector in the Gaza Strip to collect
their views about the factors affecting cost escalation. The
questionnaire was divided into two parts. The first part is
general information and the second is factors affecting cost
escalation. The results revealed that the cost of building
materials, permits and approvals, the availability of an
effective supervisory system, the improper cost estimate, the
changes in project, the quality of work, the machinery and
equipment required to carry out the tasks and activities
required for the project completion are the most common
factors leading to the cost escalation of construction projects
in the Gaza Strip.
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) is a double blind peer reviewed International Journal that provides rapid publication (within a month) of articles in all areas of mechanical and civil engineering and its applications. The journal welcomes publications of high quality papers on theoretical developments and practical applications in mechanical and civil engineering. Original research papers, state-of-the-art reviews, and high quality technical notes are invited for publications.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
Time and expense overruns are regular occurrences in the construction industry all around the world but these are a major concern in developing countries such as India, and their consequences can be extremely harmful when public infrastructure projects are concerned. In India as per the MoS & PI report, as of October 2019, there were 552 delayed construction projects, and the mean time overrun in these 552 delayed projects is29.07 months. Many studies in the literature review previously, have concentrated on a variety of infrastructure risk management issues but there have only been a few studies that have looked into the overall dynamics of infrastructure and how a project's timeline can be affected by changing risk interactions. This article aids in the investigation of the variables and causes of construction delays in infrastructure projects.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
Causes of delay in indian transportation infrastructure projectseSAT Journals
Abstract A survey on time performance of different types of construction projects in western Maharashtra was conducted to determine the causes of delay and their importance according to each of the project participants, i.e., the owner, consultant and the contractor. Sixty four causes of delay were identified during the research. It seems that the problem is common and notable as 72% of the total infrastructure projects reported by all the respondents were delivered late, whereas only 28% were completed on time. Clients’ respondents indicated that 59% of the public projects they were involved in were delivered late. Consultants’ respondents reported that 62% of the projects they were involved in were completed late. Contractors’ respondents also share the same view and articulated that 77% of the projects they are involved in exceeded the preset duration. The top five important causes of construction delays in transportation infrastructure projects are mainly Land Acquisition, Environmental Impact of the project, financial closure, Change orders by the client, Poor site management and supervision by contractor .Respondent’s opinion about the contribution towards the delay is 50 % respondent feels that delay in the construction in mainly due to the contractor. 40 % of respondent feel that client is mainly responsible for the delay in construction projects. And only 10 % of respondent feel that delay mainly occur due to consultant. It is evident that consultant as a mediator has less responsibility in construction delays. Keywords: Transportation infrastructure projects; Construction delays; Questionnaire survey; Relative importance index.
Similar to IRJET - Causes, Effects and Minimizing Methods of Construction Projects Delays in Outskirt of Areas Afghanistan (20)
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSveerababupersonal22
It consists of cw radar and fmcw radar ,range measurement,if amplifier and fmcw altimeterThe CW radar operates using continuous wave transmission, while the FMCW radar employs frequency-modulated continuous wave technology. Range measurement is a crucial aspect of radar systems, providing information about the distance to a target. The IF amplifier plays a key role in signal processing, amplifying intermediate frequency signals for further analysis. The FMCW altimeter utilizes frequency-modulated continuous wave technology to accurately measure altitude above a reference point.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Water billing management system project report.pdfKamal Acharya
Our project entitled “Water Billing Management System” aims is to generate Water bill with all the charges and penalty. Manual system that is employed is extremely laborious and quite inadequate. It only makes the process more difficult and hard.
The aim of our project is to develop a system that is meant to partially computerize the work performed in the Water Board like generating monthly Water bill, record of consuming unit of water, store record of the customer and previous unpaid record.
We used HTML/PHP as front end and MYSQL as back end for developing our project. HTML is primarily a visual design environment. We can create a android application by designing the form and that make up the user interface. Adding android application code to the form and the objects such as buttons and text boxes on them and adding any required support code in additional modular.
MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software. It is a stable ,reliable and the powerful solution with the advanced features and advantages which are as follows: Data Security.MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.