Causes, Effects and Minimizing Methods of Construction Projects
Delays in Outskirt of Areas Afghanistan
Hekmatullah rahimi1, Gagandeep2
1student at ME. Construction Technology Management, Chandigarh University, India
2Assistant Professor, Dept. of Civil Engineering, Chandigarh University, India
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Delay of construction projects is a common
problem around the world, but it is a critical challenge to
developing countries. Afghanistan had a promotion in the
implementation of construction projects in the last two
decades, unfortunately, some constructionprojectsfailedtobe
completed within the deadline and initial estimated budget.
Review of previous studies shows, most projectsdelayeddueto
causes as;(1) poor coordination between parties, (2) lack of
experienced staff, (3) poor financial ability of contractor, (4)
insufficient planning by contractors, (5) poor supervision by
governments, (6) order changes by client, (7) payment delay
during project progress, (8) late procurement of construction
materials, (9) project drawing change, (10) changes in
specification, insufficient study of the site and tender form.
where the effects of these causes are time overrun, cost
overrun, dispute, arbitration, litigation, and total
abandonment. how to prevent a project from delay? it needs
methods of minimizing the delay of construction projects and
the main purpose of the research is; first to identifycausesand
effects of project delay in outskirt areas of Afghanistan in the
second part of the research we will identify the methods to
prevent construction projects from a delay.
Key Words: delay causes, delay effects, in construction
industry
1. INTRODUCTION
This document The construction industryhasitsimportance
in the economies of countries. The construction industry is
the provider of employments; it reduces the unemployment
rate in the Job market of the country. According to Economy
Watch, the construction industry contributed around one-
tenth of the total amount of GDP in the whole world, so that
it provides jobs for seven percent employed persons out of
all. Most of the countries in the world compete to gain
developed technology to control time and budget's high
consumption. Projects in the constructionindustryfacetime
overrun due to some causes that impede construction
project. These causes are different from project to project
and country to country. Delaying of construction project
postpone other correlated programsandconsequentlydrive
the project toward complexity, to prevent construction
project from delaying, causes, effects and minimizing
methods of delays in outskirt areas of Afghanistan are the
main purpose of our studies in research.
2. literature review:
(Callegari, Szklo and Schae, 2018) conducted research on
cost overrun and delays of megaprojects in Brazil. The
massage deduced from this study is that; bigger projects
include unmanageable risks that cannot be predicted and
mitigated efficiently. the Result shows that the average cost
of a construction project risen 97.5 % above the initial
estimated cost. the construction project experienced an
average time escalation of 74.28%. (Kaliba, Muya and
Mumba, 2009) studied delays and cost increases in road
projects of Zambia. Data was collected with the help of a
questionnaire, interview, case study from respondents and
projects, where collected data was analyzed using Weight
Opinion Average. WA=
Where WA is a weighted average, Ri is the type of response
in the Likert scale, rang from 1 to 4 and Fi is the frequency of
respondents. The main factors of delay in road construction
projects were procurement of construction materials,
project drawing change, poor coordination betweenparties,
disputes and difficulties between contractors and clients,
staffing problems in the project, poor overseeing of projects
work on-site and changes in specification. For cost
escalation, the main causes were; changes in project scope,
protection and mitigating the cost of environment, technical
challenges, inflation and government pressure, badweather
or climate condition. (Arditi, Nayak and Damci, 2017)
studied the effects of organizational culture on delay in
construction projects. Data collectedusingthequestionnaire
about each culture type in (US, India) from different
companies located in the US and India. the relative
importance of these culture types was measured.
Consequently, this study distinguished that clan culture is
dominated in the US construction organizations where
Indian construction companies are dominated by market
culture. The study shows that delay in construction projects
time in US organization is comparatively lower than to
Indian construction projects. Clan culture focus on
teamwork, company loyalty to employees and staff related
programs. where market culture in the company emphasis
competition not only between employees but also between
organizations. (Senouci, IsmailandEldin,2016) investigated
time delay and cost overrun in Qatari public construction
projects, therefore the researcher scanned extensively
review of international and regional publication to
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1823
distinguish fairly the problem and data was gathered from
122 public construction projects. ANOVA and regression
analysis were done in this work to identify the relationship
of cost overrun with the contract price. Consequently, cost
overrun for building projects escalated with contract prices
but cost overrun for drainage projects decreased with an
escalation of contract prices. (Hamzah et al., 2011) studied
causes of construction delay in Malaysia. The researcher
summarized the causes of construction delay to three main
groups. Excusable, non-excusable, concurrent. Excusable
caused by owner or client, concurrent caused by a third
party (the act of God), non-excusable caused by contractors.
each of these three groups contains different factors for
construction delay. Excusable contains (late in approving
design documents, delay in approving shop drawing, poor
coordination among parties, slowness in the decision-
making process). Non-excusablecontainsfactors(difficulties
in financing, conflicts in sub-contractors, rework due to
mistakes in construction, conflicts between contractors and
other parties, poor coordination with other parties)
concurrent contains factors (fire, flood, damage by wind,
snow, labor dispute. (Alsharif and Karatas, 2016) conducted
research on causal factors of delay in Nuclear Power
Projects. Carefully, casual factors of delay and cost overrun
were investigated with the help of weekly data collected
from an operable nuclear power plant in Michigan USA. In-
depth analysis was undertaken to distinguish causal factors
of delay that have a huge impact on cost and schedule
activities of nuclear projects, three main factors that have a
major impact on project progress were distinguished:
productivity, plant assisting Engineering and design
errors/engineering change request. (Alsuliman, 2019)
studied causes of delay in Saudi public constructionprojects.
Data collected via questionnaire from 211 respondents;
where 112 factors were distinguished that occur in all
phases. These factors were divided into four main classes as
(1) before tender award (2) during award (3) after award
(4) general. Factors included in the first class are; no clear
vision from the government side in the projects, lack of
accuracy in site investigation, lack of coordination among
ministries and companies, lack of accuracy in specification
and drawings, lack of experiencedandskilledEngineers.The
second class includes factors as; insufficient study of thesite
and tender form, award to the lowest bidder, insufficient
analysis of competitor, anawardoftheprojecttocontractors
with low financial and technical potential, tenders are
limited to specific contractors, tenders investigating
committee are fixed and does not change. Third class
includes factors as; delay in delivery of site, dispute on the
site of project, government insufficient and inexperienced
technical staff for overseeing, lack of project management
administration, insufficient coordination among service
provider involved in project, non-qualified consultant,
lateness of the contractors in submitting the sales and
requesting the supplies, weakness and no financial ability of
contractors. The fourth class includes factors as; inexpert
engineers for supervision, poor salaries and incentives for
Engineers, corruption in estimating quantities, and prices.
(Sweis, 2008) investigated delays in constructionprojectsin
Jordan. A questionnaire was prepared based on the Open
Conversion System and 40 potential delay causes were
categorized under three major class (1) Input factors
included labor, material, equipment (2) Internal
environment included contractor, client, Engineer (3)
External factors included; weather, government law. The
questionnaire was sent to a random sample of consultants,
client, and contractors, ANOVA analysis was done on
collected data. It was ranked by taking the average score of
collected data for all the respondents. Consultant responses
indicate that these three causes are most significant; (1)
contractor's insufficient planning for a project (2)
contractor's financial problem (3) order changes from the
owner side. The contractor's responses indicate that the
following factors are more critical; (1) contractor's finance
problems (2) order changes by owner (3) lack of labors. The
owner's responses indicate that; these three factors are
more critical; (1) project insufficient planning andsecluding
by contractors (2) contractors finance problems (3)
unexperienced staff were assigned to project. Consequently,
the factors that are ranked by all respondents most critical
were contractor's financial problems and client's order
changes but the least critical factors were weather
conditions and government law changes. (Aziz, 2013)
conducted research ondelayfactorsinconstruction projects.
This work main object was to distinguish and rank factors
that caused the delay in Egyptian construction projects on
respect of relative importance. Construction project
practitioners, experts were invited to participate in forming
of questioner about 99 factors were listed as part of the
questionnaire survey in 9 categories. The questionnaire was
responded by experts from the public and private
construction companies. For data analysis, the Relative
Impotence Index was used. Factors were ranked according
to their importance and twenty most critical and twenty
least critical were tabulated in this work five factors from
twenty top are payment delay during project progress,
bribes, insufficient planning, equipment shortage, poor site
management. Five factors from the least critical are labor
wounds in a site, no on-time site clearance, theft on-site, the
clash among labors, wasting of time by traffic control ata job
site.(Yang, Yang and Kao, 2010) conducted research on
schedule delay in construction projects under BuildOperate
Transfer contracts. As build operate transfer makes
escalation in public construction projects through private
investment and this method is accepted approximatelyin all
countries around the world gradually increasing. As many
construction projects are implemented in different stages,
sometimes construction projects face hinders thatpostpone
the project performance from its pre-scheduled time and
budget. In this conducted research factors were recognized
in different stages with the help of a questionnaire survey
using traditional statistical analysis methods and structural
equation modeling methods. Consequently, result of studies
shows that signing of agreement is the mostsignificantstage
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1824
of project in which inappropriate contract planning, debt
problem and uncertainty on government political issues,are
most critical causes of delay for constructionprojectsamong
eight stages; (1) feasibilitystudyandplan(2)announcement
and submission of applications (3) evaluation and selection
(4) negotiation and signing of agreement (5) design (6)
construction (7) operation (8) transfer. (Doloi et al., 2012)
studied factors affecting delay in Indian construction
projects. In this research, it was asserted that Indian
construction projects also experienced a delay during its
implementation due to some factors, for better recognition
of these factors questionnaire survey prepared and factors
analysis and regression modeling were used to determine
the importance of delay factors. From the factors analysis,
most critical factors were distinguished as absence of
commitment, poor site management, insufficient
coordination, inappropriate planning, absence of clearance
in project scope, no propercommunication,andsubstandard
contracts and from regression model deduced that slow
decision by client, insufficient laborproductivityand rework
due to mistakes in construction are the causes thataffectthe
overall delay of construction projects.(SambasivanandSoon,
2007) conducted researchonthecausesandeffectsofdelays
in Malaysian construction projects. A questionnaire survey
was performed to split causes and effects of construction
delay from client, contractor, consultant and 150
respondents participated in this survey and the collected
data was analyzed through relative importance index (RII)
and factors were ranked according to high RII, that factors
and effects of delay which have high RII value identified as
most critical factors and effects of delay in construction
projects, so that ten top critical delay factors are;
inappropriate planning by contractor, insufficient site
management, inexperienced contractor, insufficient finance
of client and payment to completed work, subcontractors,
lack of some construction material, skill labor, availabilityof
equipment, insufficient communicationmangeparties,error
during construction. Six effects were also ranked as time
overrun, cost overrun, disputes, arbitration, litigation, and
total abandonment.
3. CONCLUSIONS
Top ten most critical delay causes of constructionprojectsin
previous studies are; (1) poor coordinationbetweenparties,
(2) lack of experienced staff, (3) poor financial ability of
contractor, (4) insufficient planning by contractors,(5)poor
supervision by governments, (6) order changesbyclient,(7)
payment delay during project progress,(8)lateprocurement
of construction materials, (9) project drawing
change,(10)changes in specification, insufficientstudyofthe
site and tender form. Ten least critical delay cause are; (1)
award to the lowest bidder (2) Clan culture and market
culture of company (3) delay in approving shopdrawing,(4)
lack of accuracy in specification and drawings, (5) poor
salaries and incentives for Engineers, (6) corruption in
estimating quantities, prices, (7) equipment shortage, (8)
poor site management. (9) labor woundsina site,noon-time
site clearance, theft on-site, the clash among labors, wasting
of time by traffic control at a job site (10) rework due to
mistakes in construction. Six effects of delay were also
identified as cost overrun, time overrun, disputes,
arbitration, litigation, total abandonment. Many authors
have studied causes but few authors studied the effects of
project delay but no one focused on minimizing methods of
project delay. where we are studying minimizing methods
with cause and effect of project delay in our research.
REFERENCES
WATCH, E., 2010. World construction industry. Retrieved
(08/08/2012), from http://www. economy watch.
com/world-industries/construction/world. html
Alsharif, S. and Karatas, A. (2016) ‘Nuclear Power Plant
Projects’, Procedia Engineering. Elsevier B.V., 145(248), pp.
1486–1492. doi: 10.1016/j.proeng.2016.04.187.
Alsuliman, J. A. (2019) ‘Causes of delay in Saudi public
construction projects’, Alexandria Engineering Journal.
Faculty of Engineering, Alexandria University, 58(2), pp.
801–808. doi: 10.1016/j.aej.2019.07.002.
Arditi, D., Nayak, S. and Damci, A. (2017) ‘ScienceDirect
Effect of organizational culture on delay in construction’,
JPMA. Elsevier Ltd, APM and IPMA, 35(2), pp. 136–147. doi:
10.1016/j.ijproman.2016.10.018.
Aziz, R. F. (2013) ‘Ranking of delay factors in construction
projects after Egyptian revolution’, Alexandria Engineering
Journal. Faculty of Engineering,Alexandria University,52(3),
pp. 387–406. doi: 10.1016/j.aej.2013.03.002.
Callegari, C., Szklo, A. and Schae, R. (2018) ‘Cost overruns
and delays in energy megaprojects : How bigisbig enough ?’,
114(July 2017), pp. 211–220. doi:
10.1016/j.enpol.2017.11.059.
Doloi, H. et al. (2012) ‘Analysing factors affecting delays in
Indian construction projects’, InternationalJournalofProject
Management. APM and IPMA and Elsevier Ltd, 30(4), pp.
479–489. doi: 10.1016/j.ijproman.2011.10.004.
Hamzah, N. et al. (2011) ‘Procedia Engineering Cause of
Construction Delay - Theoretical Framework’, Procedia
Engineering, 20(Kpkt 2010), pp. 490–495. doi:
10.1016/j.proeng.2011.11.192.
Kaliba, C., Muya, M. and Mumba, K. (2009) ‘Cost escalation
and schedule delays inroadconstructionprojectsinZambia’,
International Journal of Project Management. Elsevier Ltd
and IPMA, 27(5), pp. 522–531. doi:
10.1016/j.ijproman.2008.07.003.
Sambasivan, M. and Soon, Y. W. (2007) ‘Causes and effectsof
delays in Malaysian construction industry’, International
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1825
Journal of Project Management, 25(5), pp. 517–526. doi:
10.1016/j.ijproman.2006.11.007.
Senouci, A., Ismail, A. and Eldin, N. (2016) ‘Time Delay and
Cost Overrun in Qatari Public Construction Projects’,
Procedia Engineering. The Author(s), 164(June), pp. 368–
375. doi: 10.1016/j.proeng.2016.11.632.
Sweis, G. (2008) ‘Delays in constructionprojects :Thecaseof
Jordan’, 26, pp. 665–674. doi:
10.1016/j.ijproman.2007.09.009.
Yang, J. Bin, Yang, C. C. and Kao, C. K. (2010) ‘Evaluating
schedule delay causes for private participating public
construction works under the Build-Operate-Transfer
model’, InternationalJournal ofProjectManagement.Elsevier
Ltd and IPMA, 28(6), pp. 569–579. doi:
10.1016/j.ijproman.2009.10.005.
BIOGRAPHIES
Hekmatullah rahimi is a candidate
of Master in Construction
Management and Technology,
Chandigarh University-India. He
did Bachelor of Civil Engineering,
Nangarhar University,2014. His
professional experience included
translator at Afghania Translating
Center from 2018 up to now. from
July 2014 up to Dec,2017 as Civil
EngineeratSwedishCommitteefor
Afghanistan.
Assistant professor Gagandeep
received his B-Techdegreein2012
from Giani Zail Singh college of
Engineering &Technology, M-Tech
from Giani Zail Singh college of
Engineering & Technologyin 2017.
Presently, he is working as
Assistant professor in Department
of Civil Engineering in Chandigarh
University, Gharuan, India. He has
published more than 15 papers in
national and international
Journals/conferences. He has
guided more than 25 M-Tech
thesis.

More Related Content

What's hot

Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
eSAT Journals
 
causes and implication of delay in construction
causes and implication of delay in constructioncauses and implication of delay in construction
causes and implication of delay in constructionsudinak
 
Causes and Effects of Change Orders on Construction Projects in Kuwait
Causes and Effects of Change Orders on Construction Projects in KuwaitCauses and Effects of Change Orders on Construction Projects in Kuwait
Causes and Effects of Change Orders on Construction Projects in Kuwait
IJERA Editor
 
Causes of Variation Orders 1268
Causes of Variation Orders 1268Causes of Variation Orders 1268
Causes of Variation Orders 1268
HASHIM HANIF
 
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
IRJET Journal
 
33 article text-127-1-10-20181005
33 article text-127-1-10-2018100533 article text-127-1-10-20181005
33 article text-127-1-10-20181005
Dr.Madhav Prasad Koirala
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET Journal
 
Time overruns
Time overrunsTime overruns
Time overruns
Bhalchandra Tankkar
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET Journal
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET Journal
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
IRJET Journal
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET Journal
 
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projectsImplementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projectsIAEME Publication
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghana
Alexander Decker
 
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSFACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
IAEME Publication
 
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction ProjectsIRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction Projects
IRJET Journal
 
Ijetr012001
Ijetr012001Ijetr012001
Ijetr012001
ER Publication.org
 
D012261521
D012261521D012261521
D012261521
IOSR Journals
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET Journal
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
Alexander Decker
 

What's hot (20)

Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
 
causes and implication of delay in construction
causes and implication of delay in constructioncauses and implication of delay in construction
causes and implication of delay in construction
 
Causes and Effects of Change Orders on Construction Projects in Kuwait
Causes and Effects of Change Orders on Construction Projects in KuwaitCauses and Effects of Change Orders on Construction Projects in Kuwait
Causes and Effects of Change Orders on Construction Projects in Kuwait
 
Causes of Variation Orders 1268
Causes of Variation Orders 1268Causes of Variation Orders 1268
Causes of Variation Orders 1268
 
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
 
33 article text-127-1-10-20181005
33 article text-127-1-10-2018100533 article text-127-1-10-20181005
33 article text-127-1-10-20181005
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
 
Time overruns
Time overrunsTime overruns
Time overruns
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
 
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projectsImplementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projects
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghana
 
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSFACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
 
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction ProjectsIRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction Projects
 
Ijetr012001
Ijetr012001Ijetr012001
Ijetr012001
 
D012261521
D012261521D012261521
D012261521
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
 

Similar to IRJET - Causes, Effects and Minimizing Methods of Construction Projects Delays in Outskirt of Areas Afghanistan

Ijciet 08 02_005
Ijciet 08 02_005Ijciet 08 02_005
Ijciet 08 02_005
IAEME Publication
 
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
IJMREMJournal
 
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
IJMREMJournal
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
IRJET Journal
 
PAPER ID 109 Presentation.pptx
PAPER ID 109 Presentation.pptxPAPER ID 109 Presentation.pptx
PAPER ID 109 Presentation.pptx
saeedahmed433704
 
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential ProjectsExploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
IRJET Journal
 
Factors Affecting Cost Escalation in Construction Projects in Gaza Strip
Factors Affecting Cost Escalation in Construction Projects in Gaza StripFactors Affecting Cost Escalation in Construction Projects in Gaza Strip
Factors Affecting Cost Escalation in Construction Projects in Gaza Strip
Dr. Amarjeet Singh
 
CSCM Causes of project delay
CSCM Causes of project delayCSCM Causes of project delay
CSCM Causes of project delay
Est
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
iosrjce
 
I012646171
I012646171I012646171
I012646171
IOSR Journals
 
I012646171
I012646171I012646171
I012646171
IOSR Journals
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
eSAT Publishing House
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- Review
IRJET Journal
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
Dr. Amarjeet Singh
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
IRJET Journal
 
Risk management
Risk managementRisk management
Risk management
nashaat algrara
 
Literature Review - Final
Literature Review - FinalLiterature Review - Final
Literature Review - FinalRifan Fhazi
 
10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docx10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docx
EbrahimJemal4
 
Causes of delay in indian transportation
Causes of delay in indian transportationCauses of delay in indian transportation
Causes of delay in indian transportation
eSAT Publishing House
 
Causes of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projectsCauses of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projects
eSAT Journals
 

Similar to IRJET - Causes, Effects and Minimizing Methods of Construction Projects Delays in Outskirt of Areas Afghanistan (20)

Ijciet 08 02_005
Ijciet 08 02_005Ijciet 08 02_005
Ijciet 08 02_005
 
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
 
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
Disputes Impact in Pakistan Construction Industry: A Comprehensive Study of R...
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
 
PAPER ID 109 Presentation.pptx
PAPER ID 109 Presentation.pptxPAPER ID 109 Presentation.pptx
PAPER ID 109 Presentation.pptx
 
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential ProjectsExploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
 
Factors Affecting Cost Escalation in Construction Projects in Gaza Strip
Factors Affecting Cost Escalation in Construction Projects in Gaza StripFactors Affecting Cost Escalation in Construction Projects in Gaza Strip
Factors Affecting Cost Escalation in Construction Projects in Gaza Strip
 
CSCM Causes of project delay
CSCM Causes of project delayCSCM Causes of project delay
CSCM Causes of project delay
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
 
I012646171
I012646171I012646171
I012646171
 
I012646171
I012646171I012646171
I012646171
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- Review
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
 
Risk management
Risk managementRisk management
Risk management
 
Literature Review - Final
Literature Review - FinalLiterature Review - Final
Literature Review - Final
 
10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docx10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docx
 
Causes of delay in indian transportation
Causes of delay in indian transportationCauses of delay in indian transportation
Causes of delay in indian transportation
 
Causes of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projectsCauses of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projects
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 

Recently uploaded (20)

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 

IRJET - Causes, Effects and Minimizing Methods of Construction Projects Delays in Outskirt of Areas Afghanistan

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1822 Causes, Effects and Minimizing Methods of Construction Projects Delays in Outskirt of Areas Afghanistan Hekmatullah rahimi1, Gagandeep2 1student at ME. Construction Technology Management, Chandigarh University, India 2Assistant Professor, Dept. of Civil Engineering, Chandigarh University, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Delay of construction projects is a common problem around the world, but it is a critical challenge to developing countries. Afghanistan had a promotion in the implementation of construction projects in the last two decades, unfortunately, some constructionprojectsfailedtobe completed within the deadline and initial estimated budget. Review of previous studies shows, most projectsdelayeddueto causes as;(1) poor coordination between parties, (2) lack of experienced staff, (3) poor financial ability of contractor, (4) insufficient planning by contractors, (5) poor supervision by governments, (6) order changes by client, (7) payment delay during project progress, (8) late procurement of construction materials, (9) project drawing change, (10) changes in specification, insufficient study of the site and tender form. where the effects of these causes are time overrun, cost overrun, dispute, arbitration, litigation, and total abandonment. how to prevent a project from delay? it needs methods of minimizing the delay of construction projects and the main purpose of the research is; first to identifycausesand effects of project delay in outskirt areas of Afghanistan in the second part of the research we will identify the methods to prevent construction projects from a delay. Key Words: delay causes, delay effects, in construction industry 1. INTRODUCTION This document The construction industryhasitsimportance in the economies of countries. The construction industry is the provider of employments; it reduces the unemployment rate in the Job market of the country. According to Economy Watch, the construction industry contributed around one- tenth of the total amount of GDP in the whole world, so that it provides jobs for seven percent employed persons out of all. Most of the countries in the world compete to gain developed technology to control time and budget's high consumption. Projects in the constructionindustryfacetime overrun due to some causes that impede construction project. These causes are different from project to project and country to country. Delaying of construction project postpone other correlated programsandconsequentlydrive the project toward complexity, to prevent construction project from delaying, causes, effects and minimizing methods of delays in outskirt areas of Afghanistan are the main purpose of our studies in research. 2. literature review: (Callegari, Szklo and Schae, 2018) conducted research on cost overrun and delays of megaprojects in Brazil. The massage deduced from this study is that; bigger projects include unmanageable risks that cannot be predicted and mitigated efficiently. the Result shows that the average cost of a construction project risen 97.5 % above the initial estimated cost. the construction project experienced an average time escalation of 74.28%. (Kaliba, Muya and Mumba, 2009) studied delays and cost increases in road projects of Zambia. Data was collected with the help of a questionnaire, interview, case study from respondents and projects, where collected data was analyzed using Weight Opinion Average. WA= Where WA is a weighted average, Ri is the type of response in the Likert scale, rang from 1 to 4 and Fi is the frequency of respondents. The main factors of delay in road construction projects were procurement of construction materials, project drawing change, poor coordination betweenparties, disputes and difficulties between contractors and clients, staffing problems in the project, poor overseeing of projects work on-site and changes in specification. For cost escalation, the main causes were; changes in project scope, protection and mitigating the cost of environment, technical challenges, inflation and government pressure, badweather or climate condition. (Arditi, Nayak and Damci, 2017) studied the effects of organizational culture on delay in construction projects. Data collectedusingthequestionnaire about each culture type in (US, India) from different companies located in the US and India. the relative importance of these culture types was measured. Consequently, this study distinguished that clan culture is dominated in the US construction organizations where Indian construction companies are dominated by market culture. The study shows that delay in construction projects time in US organization is comparatively lower than to Indian construction projects. Clan culture focus on teamwork, company loyalty to employees and staff related programs. where market culture in the company emphasis competition not only between employees but also between organizations. (Senouci, IsmailandEldin,2016) investigated time delay and cost overrun in Qatari public construction projects, therefore the researcher scanned extensively review of international and regional publication to
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1823 distinguish fairly the problem and data was gathered from 122 public construction projects. ANOVA and regression analysis were done in this work to identify the relationship of cost overrun with the contract price. Consequently, cost overrun for building projects escalated with contract prices but cost overrun for drainage projects decreased with an escalation of contract prices. (Hamzah et al., 2011) studied causes of construction delay in Malaysia. The researcher summarized the causes of construction delay to three main groups. Excusable, non-excusable, concurrent. Excusable caused by owner or client, concurrent caused by a third party (the act of God), non-excusable caused by contractors. each of these three groups contains different factors for construction delay. Excusable contains (late in approving design documents, delay in approving shop drawing, poor coordination among parties, slowness in the decision- making process). Non-excusablecontainsfactors(difficulties in financing, conflicts in sub-contractors, rework due to mistakes in construction, conflicts between contractors and other parties, poor coordination with other parties) concurrent contains factors (fire, flood, damage by wind, snow, labor dispute. (Alsharif and Karatas, 2016) conducted research on causal factors of delay in Nuclear Power Projects. Carefully, casual factors of delay and cost overrun were investigated with the help of weekly data collected from an operable nuclear power plant in Michigan USA. In- depth analysis was undertaken to distinguish causal factors of delay that have a huge impact on cost and schedule activities of nuclear projects, three main factors that have a major impact on project progress were distinguished: productivity, plant assisting Engineering and design errors/engineering change request. (Alsuliman, 2019) studied causes of delay in Saudi public constructionprojects. Data collected via questionnaire from 211 respondents; where 112 factors were distinguished that occur in all phases. These factors were divided into four main classes as (1) before tender award (2) during award (3) after award (4) general. Factors included in the first class are; no clear vision from the government side in the projects, lack of accuracy in site investigation, lack of coordination among ministries and companies, lack of accuracy in specification and drawings, lack of experiencedandskilledEngineers.The second class includes factors as; insufficient study of thesite and tender form, award to the lowest bidder, insufficient analysis of competitor, anawardoftheprojecttocontractors with low financial and technical potential, tenders are limited to specific contractors, tenders investigating committee are fixed and does not change. Third class includes factors as; delay in delivery of site, dispute on the site of project, government insufficient and inexperienced technical staff for overseeing, lack of project management administration, insufficient coordination among service provider involved in project, non-qualified consultant, lateness of the contractors in submitting the sales and requesting the supplies, weakness and no financial ability of contractors. The fourth class includes factors as; inexpert engineers for supervision, poor salaries and incentives for Engineers, corruption in estimating quantities, and prices. (Sweis, 2008) investigated delays in constructionprojectsin Jordan. A questionnaire was prepared based on the Open Conversion System and 40 potential delay causes were categorized under three major class (1) Input factors included labor, material, equipment (2) Internal environment included contractor, client, Engineer (3) External factors included; weather, government law. The questionnaire was sent to a random sample of consultants, client, and contractors, ANOVA analysis was done on collected data. It was ranked by taking the average score of collected data for all the respondents. Consultant responses indicate that these three causes are most significant; (1) contractor's insufficient planning for a project (2) contractor's financial problem (3) order changes from the owner side. The contractor's responses indicate that the following factors are more critical; (1) contractor's finance problems (2) order changes by owner (3) lack of labors. The owner's responses indicate that; these three factors are more critical; (1) project insufficient planning andsecluding by contractors (2) contractors finance problems (3) unexperienced staff were assigned to project. Consequently, the factors that are ranked by all respondents most critical were contractor's financial problems and client's order changes but the least critical factors were weather conditions and government law changes. (Aziz, 2013) conducted research ondelayfactorsinconstruction projects. This work main object was to distinguish and rank factors that caused the delay in Egyptian construction projects on respect of relative importance. Construction project practitioners, experts were invited to participate in forming of questioner about 99 factors were listed as part of the questionnaire survey in 9 categories. The questionnaire was responded by experts from the public and private construction companies. For data analysis, the Relative Impotence Index was used. Factors were ranked according to their importance and twenty most critical and twenty least critical were tabulated in this work five factors from twenty top are payment delay during project progress, bribes, insufficient planning, equipment shortage, poor site management. Five factors from the least critical are labor wounds in a site, no on-time site clearance, theft on-site, the clash among labors, wasting of time by traffic control ata job site.(Yang, Yang and Kao, 2010) conducted research on schedule delay in construction projects under BuildOperate Transfer contracts. As build operate transfer makes escalation in public construction projects through private investment and this method is accepted approximatelyin all countries around the world gradually increasing. As many construction projects are implemented in different stages, sometimes construction projects face hinders thatpostpone the project performance from its pre-scheduled time and budget. In this conducted research factors were recognized in different stages with the help of a questionnaire survey using traditional statistical analysis methods and structural equation modeling methods. Consequently, result of studies shows that signing of agreement is the mostsignificantstage
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1824 of project in which inappropriate contract planning, debt problem and uncertainty on government political issues,are most critical causes of delay for constructionprojectsamong eight stages; (1) feasibilitystudyandplan(2)announcement and submission of applications (3) evaluation and selection (4) negotiation and signing of agreement (5) design (6) construction (7) operation (8) transfer. (Doloi et al., 2012) studied factors affecting delay in Indian construction projects. In this research, it was asserted that Indian construction projects also experienced a delay during its implementation due to some factors, for better recognition of these factors questionnaire survey prepared and factors analysis and regression modeling were used to determine the importance of delay factors. From the factors analysis, most critical factors were distinguished as absence of commitment, poor site management, insufficient coordination, inappropriate planning, absence of clearance in project scope, no propercommunication,andsubstandard contracts and from regression model deduced that slow decision by client, insufficient laborproductivityand rework due to mistakes in construction are the causes thataffectthe overall delay of construction projects.(SambasivanandSoon, 2007) conducted researchonthecausesandeffectsofdelays in Malaysian construction projects. A questionnaire survey was performed to split causes and effects of construction delay from client, contractor, consultant and 150 respondents participated in this survey and the collected data was analyzed through relative importance index (RII) and factors were ranked according to high RII, that factors and effects of delay which have high RII value identified as most critical factors and effects of delay in construction projects, so that ten top critical delay factors are; inappropriate planning by contractor, insufficient site management, inexperienced contractor, insufficient finance of client and payment to completed work, subcontractors, lack of some construction material, skill labor, availabilityof equipment, insufficient communicationmangeparties,error during construction. Six effects were also ranked as time overrun, cost overrun, disputes, arbitration, litigation, and total abandonment. 3. CONCLUSIONS Top ten most critical delay causes of constructionprojectsin previous studies are; (1) poor coordinationbetweenparties, (2) lack of experienced staff, (3) poor financial ability of contractor, (4) insufficient planning by contractors,(5)poor supervision by governments, (6) order changesbyclient,(7) payment delay during project progress,(8)lateprocurement of construction materials, (9) project drawing change,(10)changes in specification, insufficientstudyofthe site and tender form. Ten least critical delay cause are; (1) award to the lowest bidder (2) Clan culture and market culture of company (3) delay in approving shopdrawing,(4) lack of accuracy in specification and drawings, (5) poor salaries and incentives for Engineers, (6) corruption in estimating quantities, prices, (7) equipment shortage, (8) poor site management. (9) labor woundsina site,noon-time site clearance, theft on-site, the clash among labors, wasting of time by traffic control at a job site (10) rework due to mistakes in construction. Six effects of delay were also identified as cost overrun, time overrun, disputes, arbitration, litigation, total abandonment. Many authors have studied causes but few authors studied the effects of project delay but no one focused on minimizing methods of project delay. where we are studying minimizing methods with cause and effect of project delay in our research. REFERENCES WATCH, E., 2010. World construction industry. Retrieved (08/08/2012), from http://www. economy watch. com/world-industries/construction/world. html Alsharif, S. and Karatas, A. (2016) ‘Nuclear Power Plant Projects’, Procedia Engineering. Elsevier B.V., 145(248), pp. 1486–1492. doi: 10.1016/j.proeng.2016.04.187. Alsuliman, J. A. (2019) ‘Causes of delay in Saudi public construction projects’, Alexandria Engineering Journal. Faculty of Engineering, Alexandria University, 58(2), pp. 801–808. doi: 10.1016/j.aej.2019.07.002. Arditi, D., Nayak, S. and Damci, A. (2017) ‘ScienceDirect Effect of organizational culture on delay in construction’, JPMA. Elsevier Ltd, APM and IPMA, 35(2), pp. 136–147. doi: 10.1016/j.ijproman.2016.10.018. Aziz, R. F. (2013) ‘Ranking of delay factors in construction projects after Egyptian revolution’, Alexandria Engineering Journal. Faculty of Engineering,Alexandria University,52(3), pp. 387–406. doi: 10.1016/j.aej.2013.03.002. Callegari, C., Szklo, A. and Schae, R. (2018) ‘Cost overruns and delays in energy megaprojects : How bigisbig enough ?’, 114(July 2017), pp. 211–220. doi: 10.1016/j.enpol.2017.11.059. Doloi, H. et al. (2012) ‘Analysing factors affecting delays in Indian construction projects’, InternationalJournalofProject Management. APM and IPMA and Elsevier Ltd, 30(4), pp. 479–489. doi: 10.1016/j.ijproman.2011.10.004. Hamzah, N. et al. (2011) ‘Procedia Engineering Cause of Construction Delay - Theoretical Framework’, Procedia Engineering, 20(Kpkt 2010), pp. 490–495. doi: 10.1016/j.proeng.2011.11.192. Kaliba, C., Muya, M. and Mumba, K. (2009) ‘Cost escalation and schedule delays inroadconstructionprojectsinZambia’, International Journal of Project Management. Elsevier Ltd and IPMA, 27(5), pp. 522–531. doi: 10.1016/j.ijproman.2008.07.003. Sambasivan, M. and Soon, Y. W. (2007) ‘Causes and effectsof delays in Malaysian construction industry’, International
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1825 Journal of Project Management, 25(5), pp. 517–526. doi: 10.1016/j.ijproman.2006.11.007. Senouci, A., Ismail, A. and Eldin, N. (2016) ‘Time Delay and Cost Overrun in Qatari Public Construction Projects’, Procedia Engineering. The Author(s), 164(June), pp. 368– 375. doi: 10.1016/j.proeng.2016.11.632. Sweis, G. (2008) ‘Delays in constructionprojects :Thecaseof Jordan’, 26, pp. 665–674. doi: 10.1016/j.ijproman.2007.09.009. Yang, J. Bin, Yang, C. C. and Kao, C. K. (2010) ‘Evaluating schedule delay causes for private participating public construction works under the Build-Operate-Transfer model’, InternationalJournal ofProjectManagement.Elsevier Ltd and IPMA, 28(6), pp. 569–579. doi: 10.1016/j.ijproman.2009.10.005. BIOGRAPHIES Hekmatullah rahimi is a candidate of Master in Construction Management and Technology, Chandigarh University-India. He did Bachelor of Civil Engineering, Nangarhar University,2014. His professional experience included translator at Afghania Translating Center from 2018 up to now. from July 2014 up to Dec,2017 as Civil EngineeratSwedishCommitteefor Afghanistan. Assistant professor Gagandeep received his B-Techdegreein2012 from Giani Zail Singh college of Engineering &Technology, M-Tech from Giani Zail Singh college of Engineering & Technologyin 2017. Presently, he is working as Assistant professor in Department of Civil Engineering in Chandigarh University, Gharuan, India. He has published more than 15 papers in national and international Journals/conferences. He has guided more than 25 M-Tech thesis.