International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 01 | Jan-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 177
Factors influencing Time and Cost Overruns in Road
Construction Projects: Addis Ababa, Ethiopian Scenario:
Review paper
Shambel Gebrehiwot Tadewos1, Dixit Patel2
1M.Tech student, Civil Engineering Department, Parul University, Gujarat, India
Abstract—In Ethiopia, number of roads are constructed
from time to time. A number of road networks are increased
over time. The historical data of completed road projects
shows that no one of the projects were completed as planned
and within the estimated cost. No considerable improvement
had occurred over time. The objective of this study is to assess
the existing system and to identify the factors that affect time
and cost overrun in Addis Ababa road projects. This is done
based on wide literature review. Findings of this journal will
help clients, contractors, consultants and any otherconcerned
bodies to consider and give priorities for better road
construction performance in the future.
Key Words: Time Overrun, Cost Overrun, Influences, Addis
Ababa
1. INTRODUCTION
Construction industry, the true power of national economy,
through which the total of physical development is attained.
It is energetic component of country’s economy and has a
significant effect on other industry sectors efficiency and
productivity. It is difficult to think extensiveinvestmentslike
agriculture,manufacturing, fishery, etc.withoutconstruction
facilities are there.
The Performance and successofprojectsaremeasuredbythe
triple project constraints (Cost, time, and quality). Project
success is measured by completing on time within the
estimated cost and quality. Because the industry is a full of
project activities, tasks and constraints that requires
additional budget and cost. According to Faridi et al. (2006)
[7] delays have impact on success project in its cost, time,
safety and quality. The consequences of delay are not
restrictedto construction industryonly, but also impacts the
whole country’s economy. According to Rajakumar A C
(2016) [3], cost and timeoverrunsarecommonindeveloping
countries and impacts more for developing country than
developed once. Ethiopia is a developing country where its
construction sector is affected bycostandtimeoverrun.Road
projects in Ethiopian are victims of this problem. Road
projects, requires huge amountof capital, but it contributeto
the total economy by creation job and have wave effect to
other business activities. The homogeneity in transportation
departments is the failure to finish the projects on time and
within estimated budget (Y. Honrao and Prof. D.B.Desai,
2015) [4]. There are many causes that are accountable for
delays and cost overruns in the industry, so attention should
be given to such factorsasthey causeadditionalexpensethan
initially estimated.
1.1 Objectives of the Study
The study has the following objectives:
1. To assess the existing system of time and cost
overrun.
2. To identify the factors that affects time and cost
overruns in Addis Ababa RoadconstructionProjects.
2. LITERATURE REVIEW
2.1 Definitions
According to Chitkara (2011) [14] cost is defined as the
accounted expenditure, which the owner has agreed to
commit for creating/acquiring the desired facility. Cost
overrun or over budget is defined as final costs exceed the
estimated costs. It is defined as the positive difference
between the final cost of a construction projectatcompletion
and the contract amount agreed by the client and the
contractor during signing of the contract (M. Abubeker J.,
2015) [1]. Actual cost is defined as the accounted costs
actually spent, as determined at the time of project
completion (Chitkara,2011)[14].Estimatedcostisdefinedas
budgeted or forecasted costs at the time of project approval,
which are typically similarto costs presentedin the business
case for a project (Lee, 2008) [13].
According to Lee (2008) [13] construction cost overrun is
defined as the difference between forecasted and actual
construction costs. Every construction company can be
affected by cost overrun.However,micro-scaledconstruction
companiesare the most affected company type because they
have limited capitals and they are more exposed to risks.
In construction, delay can be defined as the time over run,
slippingover its planned scheduleeitherbeyondthedatethat
the parties agreed upon for delivery of a project, or beyond
completion date specified in a contract and it usual problem
in construction projects (M. Abubeker J., 2015). [1]
2.2 Causes of Time and Cost Overrun
T. Siraw Y. (2014), in his study ‘Analysis of Factors
Contributing to time overrunson Road ConstructionProjects
2Assistant prof, Civil Engineering Department, Parul University, Gujarat, India
---------------------------------------------------------------------***---------------------------------------------------------------------
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 1 | January-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 178
under Addis Ababa City Administration’, he concluded that
slow site clearance, contractors’ financialproblems,Inflation,
progress payments delay by owner, inaccurate cost
estimation, and delay in commencement were the major
causesof timeoverrun in Addis AbabaRoadConstruction.[5]
N. Feten (2008) in her study ‘Causes and Effects of Cost
Overrun on PublicBuildingConstructionProjectsinEthiopia’,
sixty seven out of seventy of completed public building
construction projects were investigated and found faced to
cost overrun. From her study she concluded that material
price inflation, fluctuation in currency exchange rate, change
orders and, slow decision making. [9]
B. Ashebir S., M, Wubishet J, and Murad M. (2017), found that
material price strike,poor cost estimation,laterawmaterials
delivery, ambiguous contract documents were top source of
cost overrun and it ranges from 4.16% to 83.2%. [6]
N. Al-Hazim andZ. AbuSalem(2015),concludedthatweather
conditions, terrain conditions, availability of labour, and
variation of order were the main causes of time and cost
overrun in Jordan. Cost overrun ranges from 101% to 600%
and time overrun ranging from 125% to 455%. [8]
In ‘Study of Delay in Execution of Infrastructure Projects –
Highway Construction’,Y. Honrao and Prof. D.B.Desai(2015)
[4], argue that Paymentproblemsbetweencontractorandhis
employees, Shortage of materials, ineffective construction
method implementation were major causes of delay by
contractor. Interference by the owner during execution
operation, delay in decision making by the owner, Delay in
progress payments by ownerwere the majorcausesofdelay.
Lack of experience in consultants were the major causes of
delay. Services and utilities were the most critical factors
having high severity means and most the frequent effects of
delay were cost and time overruns and disruption of traffic
movement.
S. Msafiri A. (2015) studied, ‘Investigation into Factors
Causing Delays in Road Construction Projects in Kenya’. He
identified 141 causes of delay from literature them divided
them into25 broad categories. He concluded thatinadequate
planning and scheduling, slow decision-making and rain,
payment delay by client, claims, and bureaucracy in client
organization were the top five sources of delay. [12]
I. Mahamid (2013), conducted a study on ‘Frequency of time
overrun causes inroad constructioninPalestine:Contractors’
View’. The study was based on 52 factorson case study of 34
contractors. The study was aimed at investigating the
frequency of delay based on contractor’s point of view.
Questionnaire survey was used to collect the data. He
concluded that, division of West Bank, lack of equipment
efficiency, political condition, limited access area, payments
delay by owner, difficultiesin financingprojectbycontractor,
personal conflicts among labours, conflict of consultant with
other parties, conflict between contractor with the other
parties, award to lowest bidder, and contract duration is too
short were the top ten frequent factors. [10]
Indian infrastructure projects are known for time and cost
overruns. For example, Bandra-Worlisea link project, its
planned was Rs 300 crore to be completed by 2004, but it
final cost Rs 1,600 crore with a delay of five years. Hardily,
very few projects complete on time and cost, but the extent
was not studied. Privatization of public service and build
operate and transfer (BOT) is also recommended for
constructing of national highways to avoid the problem.
Technical and natural factors, contractual failures,
organisational or institutional failures, time overruns and
economic factorswere causesof the problem. The study was
aimed atinvestigatingthe causesof delaysand cost overruns
in publically funded infrastructure projects in India (Ram
Singh, 2010). [2]
K. Vaibhav Y. and Dr. D.M. Ghaitidak (2016), in their study
‘Elements of Cost and Schedule Overrun in Construction
Projects’, time and cost overrun had been a major frequent
problem of construction industry. They concluded that, land
acquisition, tender cancellation, weak contractor
mobilization, equipment erection, fund constraints, law &
order problem, delay in supply of equipment, scope change,
forest clearance, slow construction progress, cost escalation
in were the main source of delay and overruns. [11]
3. FINDINGS AND DISCUSSIONS
A desk studywasconducted on10completedroadprojectsin
Addis Ababa (M. Abubeker J., 2015) [1]. According to the
reports, 10 of them had experienced time overrun and cost
overrun. Thus, they take more time and cost than what had
been estimated. The rates are ranging from a minimum of
25% to the maximum of 264.38% time and a minimum of
4.11% to the maximum of 135.06% of cost.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 1 | January-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 179
4. CONCLUSIONS
Road is the main contributor to the country’s economic
development that connects one part to the other part. Addis
Ababa road network plays great role in the economy of the
city and country as well. Road constructions is expected to
complete on time and within estimated budget and open for
traffic, but all of the road projects are always faced to time
overrun andover budget. Different studies in the area shows
that as delay and cost overruns are common phenomenon
and it affects road projects greatly. Financial problems,
improper planning, land acquisition and construction delay,
design changes, less materials and equipment supply by
contractors, incomplete design are themain sourcesof delay
and cost overrun respectively. So, once identified the main
causes it is necessarily to give solutions to complete the
projects on time and estimated cost.
5. FUTURE WORKS
Allpreviousresearchworkswerebasedonliteraturereviews
as and based on questionnaire survey. Most surveys were
considering contractors, clients and consultants, but they do
not include end users. Since the public are end users of the
roads, so researchers should include in their study.
REFERENCES
[1] M. Abubeker J. (2015). “Factors affecting time and cost
overrun in road construction projects in Addis Ababa”,
AAU, School of Civil and Environmental Engineering.
[2] Ram Singh (2010). “Delays and Cost Overruns in
Infrastructure Projects: An Enquiry into Extents,Causes
and Remedies” Department of Economics Delhi School
of Economics University of Delhi
No.
Selected Addis
Ababa Road
Projects name
Contract
Time
(days)
Actual Completed
Time (days)
Time Overrun
(%)
Contract Amount
(Eth.Birr)
Actual
Completed Cost
(Eth. Birr)
Cost
Overrun
(%)
1 Winget Aseco Bridge 330 1048 217.58 154,485,787.41 181,139,826.67 17.25
2
Yekatit 12 square –
Afenchober – Semen 365 1330 264.38 3,62,13,579 5,43,34,900 50.04
hotel urban street
3
Dama Hotel –
Hanamariam
365 1155 216.44 5,42,14,003.00 6,85,63,420.00 26.47
4
Megenagna – Meskel
550 726 32 1,16,24,48,900.69 1,21,45,86,635.23 4.49
Square – Torhiloch
(Lot
1 & Lot 2) Contract
1
5
Meskel flower – Bole
Ruwanda
575 2370 58.42 4,95,87,265.63 7,85,58,144.39 135.06
6
Shola Gebeya –
Lemhotel – Anbessa 575 1232 114.26 10,95,12,767.87 14,53,11,625.22 32.69
Garage
7
Mekanisa
roundabout – Addis
90 270 200
3,65,54,500.46 4,16,54,715.37 13.95
8
Abunepetros square
pastuer
224 763 240.63 14,44,40,764.43 15,03,74,645.56 4.11
9 Megenagna – Ayat 420 709 68.81 22,40,55,813.14 26,51,04,212.54 18.32
10 Gotera – Wellosefer 180 225 25 3,00,00,000 3,24,50,000 8.17
Table-1: Time and cost overrun in Addis Ababa Road Projects [1]
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 1 | January-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 180
[3] Rajakumar A C, (2016). “Analysis of Cost Overrun in
Road Construction Activities – A Critical Review”,
Volume: 03 Issue: 04.
[4] Y. Honrao and Prof. D.B.Desai (2015). “Study of Delay in
Execution of Infrastructure Projects – Highway
Construction,” International Journal of Scientific and
Research Publications, Volume 5, Issue 6.
[5] T. Siraw Y. (2014). “Analysis of Factors Contributing to
time overruns on Road Construction Projects under
Addis Ababa City Administration,” Addis Ababa
University.
[6] B. Ashebir S., M, Wubishet J, and Murad M. (2017).
“Causes of Cost Overrun in Federal Road Projects of
Ethiopia in Case of Southern District,” American Journal
of Civil Engineering, Vol. 5, No. 1, 2017, pp. 27-40.
[7] Faridi et al. (2006). “Significant factors causing delay in
the UAE construction industry”, Construction
Management and Economics, 24, pp.1167–1176.
[8] N. Al-Hazim and Z. Abu Salem (2015), “Delay and cost
overrun in road construction projects in Jordan,”
International Journal of Engineering&Technology,4(2)
pp.288-293.
[9] N. Feten (2008). “Causes and Effects of Cost Overrun on
Public Building Construction Projects in Ethiopia”,
Master Thesis, Addis Ababa University,CivilEngineering
Department, Addis Ababa, Ethiopia.
[10]I. Mahamid (2013). “Frequency of time overrun causes
in road construction in Palestine: Contractors’ View,”
organization, technology and management in
construction an international journal · 5(1), pp. 720-
729.
[11] K. Vaibhav Y. and Dr. D.M. Ghaitidak (2016). “Elements
of Cost and Schedule Overrun in ConstructionProjects,”
Volume 12, Issue 7, PP.64-68.
[12] S. Msafiri A. (2015). “An Investigation into Factors
Causing Delays in Road Construction Projects in
Kenya,” 3(3): pp. 51-63.
[13] Lee (2008). Delay and Cost Overruns in Vietnam Large
Construction: A Comparison with Other Selected
Countries. KSCE Journal of Civil Engineering, Volume
12.Issue 6, pp.367-377.
[14] Chitkara (2011). “Construction Project Management -
Planning, Scheduling and Controlling”, 2nd Edition,
Tata McGraw Hills’.

More Related Content

What's hot

IRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction ProjectsIRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction ProjectsIRJET Journal
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET Journal
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET Journal
 
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projectsImplementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projectsIAEME Publication
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction ProjectIRJET Journal
 
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...IRJET Journal
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...IRJET Journal
 
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...Khalid Yafai
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghanaAlexander Decker
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Alexander Decker
 
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET Journal
 
Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...IAEME Publication
 
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction ProjectsIRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction ProjectsIRJET Journal
 
A fuzzy ahp model in risk ranking
A fuzzy ahp model in risk rankingA fuzzy ahp model in risk ranking
A fuzzy ahp model in risk rankingAlexander Decker
 
1% AIMS Improving Construction productivity. November 30th 2015.
1% AIMS Improving Construction productivity.  November 30th 2015.1% AIMS Improving Construction productivity.  November 30th 2015.
1% AIMS Improving Construction productivity. November 30th 2015.kiebut
 
Green Building Effect in Commercial Building
Green Building Effect in Commercial Building Green Building Effect in Commercial Building
Green Building Effect in Commercial Building vivatechijri
 
Final paper rizky citra islami
Final paper  rizky citra islamiFinal paper  rizky citra islami
Final paper rizky citra islamiRizky Islami
 
Time delay and cost escalation in construction works
Time delay and cost escalation in construction worksTime delay and cost escalation in construction works
Time delay and cost escalation in construction worksvivatechijri
 

What's hot (19)

IRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction ProjectsIRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction Projects
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
 
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projectsImplementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projects
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
 
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
 
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
 
Ijciet 08 04_220
Ijciet 08 04_220Ijciet 08 04_220
Ijciet 08 04_220
 
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghana
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
 
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
 
Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...
 
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction ProjectsIRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction Projects
 
A fuzzy ahp model in risk ranking
A fuzzy ahp model in risk rankingA fuzzy ahp model in risk ranking
A fuzzy ahp model in risk ranking
 
1% AIMS Improving Construction productivity. November 30th 2015.
1% AIMS Improving Construction productivity.  November 30th 2015.1% AIMS Improving Construction productivity.  November 30th 2015.
1% AIMS Improving Construction productivity. November 30th 2015.
 
Green Building Effect in Commercial Building
Green Building Effect in Commercial Building Green Building Effect in Commercial Building
Green Building Effect in Commercial Building
 
Final paper rizky citra islami
Final paper  rizky citra islamiFinal paper  rizky citra islami
Final paper rizky citra islami
 
Time delay and cost escalation in construction works
Time delay and cost escalation in construction worksTime delay and cost escalation in construction works
Time delay and cost escalation in construction works
 

Similar to IRJET-Factors influencing Time and Cost Overruns in Road Construction Projects: Addis Ababa, Ethiopian Scenario: Review paper

IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET Journal
 
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSFACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSIAEME Publication
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTIRJET Journal
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overruneSAT Publishing House
 
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...IRJET Journal
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewIRJET Journal
 
10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docx10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docxEbrahimJemal4
 
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...IJERA Editor
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
 
Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...Associate Professor in VSB Coimbatore
 
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential ProjectsExploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential ProjectsIRJET Journal
 
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
  A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...  A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...IAEME Publication
 
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsRick Vogel
 
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET Journal
 
An Investigation into the Delays in Road Projects in Bahrain
An Investigation into the Delays in Road Projects in BahrainAn Investigation into the Delays in Road Projects in Bahrain
An Investigation into the Delays in Road Projects in BahrainIJRES Journal
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
 

Similar to IRJET-Factors influencing Time and Cost Overruns in Road Construction Projects: Addis Ababa, Ethiopian Scenario: Review paper (20)

D012261521
D012261521D012261521
D012261521
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSFACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
 
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docx10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docx
 
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
 
I012646171
I012646171I012646171
I012646171
 
I012646171
I012646171I012646171
I012646171
 
Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...
 
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential ProjectsExploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
 
Ijciet 08 02_005
Ijciet 08 02_005Ijciet 08 02_005
Ijciet 08 02_005
 
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
  A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...  A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
 
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction Projects
 
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
 
An Investigation into the Delays in Road Projects in Bahrain
An Investigation into the Delays in Road Projects in BahrainAn Investigation into the Delays in Road Projects in Bahrain
An Investigation into the Delays in Road Projects in Bahrain
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 

Recently uploaded (20)

Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 

IRJET-Factors influencing Time and Cost Overruns in Road Construction Projects: Addis Ababa, Ethiopian Scenario: Review paper

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 01 | Jan-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 177 Factors influencing Time and Cost Overruns in Road Construction Projects: Addis Ababa, Ethiopian Scenario: Review paper Shambel Gebrehiwot Tadewos1, Dixit Patel2 1M.Tech student, Civil Engineering Department, Parul University, Gujarat, India Abstract—In Ethiopia, number of roads are constructed from time to time. A number of road networks are increased over time. The historical data of completed road projects shows that no one of the projects were completed as planned and within the estimated cost. No considerable improvement had occurred over time. The objective of this study is to assess the existing system and to identify the factors that affect time and cost overrun in Addis Ababa road projects. This is done based on wide literature review. Findings of this journal will help clients, contractors, consultants and any otherconcerned bodies to consider and give priorities for better road construction performance in the future. Key Words: Time Overrun, Cost Overrun, Influences, Addis Ababa 1. INTRODUCTION Construction industry, the true power of national economy, through which the total of physical development is attained. It is energetic component of country’s economy and has a significant effect on other industry sectors efficiency and productivity. It is difficult to think extensiveinvestmentslike agriculture,manufacturing, fishery, etc.withoutconstruction facilities are there. The Performance and successofprojectsaremeasuredbythe triple project constraints (Cost, time, and quality). Project success is measured by completing on time within the estimated cost and quality. Because the industry is a full of project activities, tasks and constraints that requires additional budget and cost. According to Faridi et al. (2006) [7] delays have impact on success project in its cost, time, safety and quality. The consequences of delay are not restrictedto construction industryonly, but also impacts the whole country’s economy. According to Rajakumar A C (2016) [3], cost and timeoverrunsarecommonindeveloping countries and impacts more for developing country than developed once. Ethiopia is a developing country where its construction sector is affected bycostandtimeoverrun.Road projects in Ethiopian are victims of this problem. Road projects, requires huge amountof capital, but it contributeto the total economy by creation job and have wave effect to other business activities. The homogeneity in transportation departments is the failure to finish the projects on time and within estimated budget (Y. Honrao and Prof. D.B.Desai, 2015) [4]. There are many causes that are accountable for delays and cost overruns in the industry, so attention should be given to such factorsasthey causeadditionalexpensethan initially estimated. 1.1 Objectives of the Study The study has the following objectives: 1. To assess the existing system of time and cost overrun. 2. To identify the factors that affects time and cost overruns in Addis Ababa RoadconstructionProjects. 2. LITERATURE REVIEW 2.1 Definitions According to Chitkara (2011) [14] cost is defined as the accounted expenditure, which the owner has agreed to commit for creating/acquiring the desired facility. Cost overrun or over budget is defined as final costs exceed the estimated costs. It is defined as the positive difference between the final cost of a construction projectatcompletion and the contract amount agreed by the client and the contractor during signing of the contract (M. Abubeker J., 2015) [1]. Actual cost is defined as the accounted costs actually spent, as determined at the time of project completion (Chitkara,2011)[14].Estimatedcostisdefinedas budgeted or forecasted costs at the time of project approval, which are typically similarto costs presentedin the business case for a project (Lee, 2008) [13]. According to Lee (2008) [13] construction cost overrun is defined as the difference between forecasted and actual construction costs. Every construction company can be affected by cost overrun.However,micro-scaledconstruction companiesare the most affected company type because they have limited capitals and they are more exposed to risks. In construction, delay can be defined as the time over run, slippingover its planned scheduleeitherbeyondthedatethat the parties agreed upon for delivery of a project, or beyond completion date specified in a contract and it usual problem in construction projects (M. Abubeker J., 2015). [1] 2.2 Causes of Time and Cost Overrun T. Siraw Y. (2014), in his study ‘Analysis of Factors Contributing to time overrunson Road ConstructionProjects 2Assistant prof, Civil Engineering Department, Parul University, Gujarat, India ---------------------------------------------------------------------***---------------------------------------------------------------------
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 1 | January-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 178 under Addis Ababa City Administration’, he concluded that slow site clearance, contractors’ financialproblems,Inflation, progress payments delay by owner, inaccurate cost estimation, and delay in commencement were the major causesof timeoverrun in Addis AbabaRoadConstruction.[5] N. Feten (2008) in her study ‘Causes and Effects of Cost Overrun on PublicBuildingConstructionProjectsinEthiopia’, sixty seven out of seventy of completed public building construction projects were investigated and found faced to cost overrun. From her study she concluded that material price inflation, fluctuation in currency exchange rate, change orders and, slow decision making. [9] B. Ashebir S., M, Wubishet J, and Murad M. (2017), found that material price strike,poor cost estimation,laterawmaterials delivery, ambiguous contract documents were top source of cost overrun and it ranges from 4.16% to 83.2%. [6] N. Al-Hazim andZ. AbuSalem(2015),concludedthatweather conditions, terrain conditions, availability of labour, and variation of order were the main causes of time and cost overrun in Jordan. Cost overrun ranges from 101% to 600% and time overrun ranging from 125% to 455%. [8] In ‘Study of Delay in Execution of Infrastructure Projects – Highway Construction’,Y. Honrao and Prof. D.B.Desai(2015) [4], argue that Paymentproblemsbetweencontractorandhis employees, Shortage of materials, ineffective construction method implementation were major causes of delay by contractor. Interference by the owner during execution operation, delay in decision making by the owner, Delay in progress payments by ownerwere the majorcausesofdelay. Lack of experience in consultants were the major causes of delay. Services and utilities were the most critical factors having high severity means and most the frequent effects of delay were cost and time overruns and disruption of traffic movement. S. Msafiri A. (2015) studied, ‘Investigation into Factors Causing Delays in Road Construction Projects in Kenya’. He identified 141 causes of delay from literature them divided them into25 broad categories. He concluded thatinadequate planning and scheduling, slow decision-making and rain, payment delay by client, claims, and bureaucracy in client organization were the top five sources of delay. [12] I. Mahamid (2013), conducted a study on ‘Frequency of time overrun causes inroad constructioninPalestine:Contractors’ View’. The study was based on 52 factorson case study of 34 contractors. The study was aimed at investigating the frequency of delay based on contractor’s point of view. Questionnaire survey was used to collect the data. He concluded that, division of West Bank, lack of equipment efficiency, political condition, limited access area, payments delay by owner, difficultiesin financingprojectbycontractor, personal conflicts among labours, conflict of consultant with other parties, conflict between contractor with the other parties, award to lowest bidder, and contract duration is too short were the top ten frequent factors. [10] Indian infrastructure projects are known for time and cost overruns. For example, Bandra-Worlisea link project, its planned was Rs 300 crore to be completed by 2004, but it final cost Rs 1,600 crore with a delay of five years. Hardily, very few projects complete on time and cost, but the extent was not studied. Privatization of public service and build operate and transfer (BOT) is also recommended for constructing of national highways to avoid the problem. Technical and natural factors, contractual failures, organisational or institutional failures, time overruns and economic factorswere causesof the problem. The study was aimed atinvestigatingthe causesof delaysand cost overruns in publically funded infrastructure projects in India (Ram Singh, 2010). [2] K. Vaibhav Y. and Dr. D.M. Ghaitidak (2016), in their study ‘Elements of Cost and Schedule Overrun in Construction Projects’, time and cost overrun had been a major frequent problem of construction industry. They concluded that, land acquisition, tender cancellation, weak contractor mobilization, equipment erection, fund constraints, law & order problem, delay in supply of equipment, scope change, forest clearance, slow construction progress, cost escalation in were the main source of delay and overruns. [11] 3. FINDINGS AND DISCUSSIONS A desk studywasconducted on10completedroadprojectsin Addis Ababa (M. Abubeker J., 2015) [1]. According to the reports, 10 of them had experienced time overrun and cost overrun. Thus, they take more time and cost than what had been estimated. The rates are ranging from a minimum of 25% to the maximum of 264.38% time and a minimum of 4.11% to the maximum of 135.06% of cost.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 1 | January-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 179 4. CONCLUSIONS Road is the main contributor to the country’s economic development that connects one part to the other part. Addis Ababa road network plays great role in the economy of the city and country as well. Road constructions is expected to complete on time and within estimated budget and open for traffic, but all of the road projects are always faced to time overrun andover budget. Different studies in the area shows that as delay and cost overruns are common phenomenon and it affects road projects greatly. Financial problems, improper planning, land acquisition and construction delay, design changes, less materials and equipment supply by contractors, incomplete design are themain sourcesof delay and cost overrun respectively. So, once identified the main causes it is necessarily to give solutions to complete the projects on time and estimated cost. 5. FUTURE WORKS Allpreviousresearchworkswerebasedonliteraturereviews as and based on questionnaire survey. Most surveys were considering contractors, clients and consultants, but they do not include end users. Since the public are end users of the roads, so researchers should include in their study. REFERENCES [1] M. Abubeker J. (2015). “Factors affecting time and cost overrun in road construction projects in Addis Ababa”, AAU, School of Civil and Environmental Engineering. [2] Ram Singh (2010). “Delays and Cost Overruns in Infrastructure Projects: An Enquiry into Extents,Causes and Remedies” Department of Economics Delhi School of Economics University of Delhi No. Selected Addis Ababa Road Projects name Contract Time (days) Actual Completed Time (days) Time Overrun (%) Contract Amount (Eth.Birr) Actual Completed Cost (Eth. Birr) Cost Overrun (%) 1 Winget Aseco Bridge 330 1048 217.58 154,485,787.41 181,139,826.67 17.25 2 Yekatit 12 square – Afenchober – Semen 365 1330 264.38 3,62,13,579 5,43,34,900 50.04 hotel urban street 3 Dama Hotel – Hanamariam 365 1155 216.44 5,42,14,003.00 6,85,63,420.00 26.47 4 Megenagna – Meskel 550 726 32 1,16,24,48,900.69 1,21,45,86,635.23 4.49 Square – Torhiloch (Lot 1 & Lot 2) Contract 1 5 Meskel flower – Bole Ruwanda 575 2370 58.42 4,95,87,265.63 7,85,58,144.39 135.06 6 Shola Gebeya – Lemhotel – Anbessa 575 1232 114.26 10,95,12,767.87 14,53,11,625.22 32.69 Garage 7 Mekanisa roundabout – Addis 90 270 200 3,65,54,500.46 4,16,54,715.37 13.95 8 Abunepetros square pastuer 224 763 240.63 14,44,40,764.43 15,03,74,645.56 4.11 9 Megenagna – Ayat 420 709 68.81 22,40,55,813.14 26,51,04,212.54 18.32 10 Gotera – Wellosefer 180 225 25 3,00,00,000 3,24,50,000 8.17 Table-1: Time and cost overrun in Addis Ababa Road Projects [1]
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 1 | January-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 180 [3] Rajakumar A C, (2016). “Analysis of Cost Overrun in Road Construction Activities – A Critical Review”, Volume: 03 Issue: 04. [4] Y. Honrao and Prof. D.B.Desai (2015). “Study of Delay in Execution of Infrastructure Projects – Highway Construction,” International Journal of Scientific and Research Publications, Volume 5, Issue 6. [5] T. Siraw Y. (2014). “Analysis of Factors Contributing to time overruns on Road Construction Projects under Addis Ababa City Administration,” Addis Ababa University. [6] B. Ashebir S., M, Wubishet J, and Murad M. (2017). “Causes of Cost Overrun in Federal Road Projects of Ethiopia in Case of Southern District,” American Journal of Civil Engineering, Vol. 5, No. 1, 2017, pp. 27-40. [7] Faridi et al. (2006). “Significant factors causing delay in the UAE construction industry”, Construction Management and Economics, 24, pp.1167–1176. [8] N. Al-Hazim and Z. Abu Salem (2015), “Delay and cost overrun in road construction projects in Jordan,” International Journal of Engineering&Technology,4(2) pp.288-293. [9] N. Feten (2008). “Causes and Effects of Cost Overrun on Public Building Construction Projects in Ethiopia”, Master Thesis, Addis Ababa University,CivilEngineering Department, Addis Ababa, Ethiopia. [10]I. Mahamid (2013). “Frequency of time overrun causes in road construction in Palestine: Contractors’ View,” organization, technology and management in construction an international journal · 5(1), pp. 720- 729. [11] K. Vaibhav Y. and Dr. D.M. Ghaitidak (2016). “Elements of Cost and Schedule Overrun in ConstructionProjects,” Volume 12, Issue 7, PP.64-68. [12] S. Msafiri A. (2015). “An Investigation into Factors Causing Delays in Road Construction Projects in Kenya,” 3(3): pp. 51-63. [13] Lee (2008). Delay and Cost Overruns in Vietnam Large Construction: A Comparison with Other Selected Countries. KSCE Journal of Civil Engineering, Volume 12.Issue 6, pp.367-377. [14] Chitkara (2011). “Construction Project Management - Planning, Scheduling and Controlling”, 2nd Edition, Tata McGraw Hills’.