IRJET-Factors influencing Time and Cost Overruns in Road Construction Projects: Addis Ababa, Ethiopian Scenario: Review paper
•
2 likes
•
186 views
IRJET Journal
Follow
https://irjet.net/archives/V5/i1/IRJET-V5I137.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 4
Download now
Download to read offline
Recommended
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...
IJERA Editor
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
IRJET Journal
Ijetr012001
Ijetr012001
ER Publication.org
Effect of construction delays on project time overrun
Effect of construction delays on project time overrun
eSAT Journals
Delay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index Method
IRJET Journal
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET Journal
20320140503023
20320140503023
IAEME Publication
33 article text-127-1-10-20181005
33 article text-127-1-10-20181005
Dr.Madhav Prasad Koirala
Recommended
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...
IJERA Editor
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
IRJET Journal
Ijetr012001
Ijetr012001
ER Publication.org
Effect of construction delays on project time overrun
Effect of construction delays on project time overrun
eSAT Journals
Delay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index Method
IRJET Journal
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET Journal
20320140503023
20320140503023
IAEME Publication
33 article text-127-1-10-20181005
33 article text-127-1-10-20181005
Dr.Madhav Prasad Koirala
IRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction Projects
IRJET Journal
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET Journal
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET Journal
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projects
IAEME Publication
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET Journal
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
IRJET Journal
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
IRJET Journal
Ijciet 08 04_220
Ijciet 08 04_220
IAEME Publication
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
Khalid Yafai
Management of government funded construction projects in ghana
Management of government funded construction projects in ghana
Alexander Decker
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
Alexander Decker
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET Journal
Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...
IAEME Publication
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction Projects
IRJET Journal
A fuzzy ahp model in risk ranking
A fuzzy ahp model in risk ranking
Alexander Decker
1% AIMS Improving Construction productivity. November 30th 2015.
1% AIMS Improving Construction productivity. November 30th 2015.
kiebut
Green Building Effect in Commercial Building
Green Building Effect in Commercial Building
vivatechijri
Final paper rizky citra islami
Final paper rizky citra islami
Rizky Islami
Time delay and cost escalation in construction works
Time delay and cost escalation in construction works
vivatechijri
D012261521
D012261521
IOSR Journals
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET Journal
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
IAEME Publication
More Related Content
What's hot
IRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction Projects
IRJET Journal
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET Journal
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET Journal
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projects
IAEME Publication
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET Journal
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
IRJET Journal
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
IRJET Journal
Ijciet 08 04_220
Ijciet 08 04_220
IAEME Publication
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
Khalid Yafai
Management of government funded construction projects in ghana
Management of government funded construction projects in ghana
Alexander Decker
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
Alexander Decker
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET Journal
Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...
IAEME Publication
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction Projects
IRJET Journal
A fuzzy ahp model in risk ranking
A fuzzy ahp model in risk ranking
Alexander Decker
1% AIMS Improving Construction productivity. November 30th 2015.
1% AIMS Improving Construction productivity. November 30th 2015.
kiebut
Green Building Effect in Commercial Building
Green Building Effect in Commercial Building
vivatechijri
Final paper rizky citra islami
Final paper rizky citra islami
Rizky Islami
Time delay and cost escalation in construction works
Time delay and cost escalation in construction works
vivatechijri
What's hot
(19)
IRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction Projects
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
Implementing eichelay formula in govt. construction projects
Implementing eichelay formula in govt. construction projects
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
Practical Investigation of Factors Affecting Selection of Dispute Resolution ...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
Ijciet 08 04_220
Ijciet 08 04_220
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
Management of government funded construction projects in ghana
Management of government funded construction projects in ghana
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
Performance evaluation of design build projects with and without agency const...
Performance evaluation of design build projects with and without agency const...
IRJET- Risk Management of Contracts in Construction Projects
IRJET- Risk Management of Contracts in Construction Projects
A fuzzy ahp model in risk ranking
A fuzzy ahp model in risk ranking
1% AIMS Improving Construction productivity. November 30th 2015.
1% AIMS Improving Construction productivity. November 30th 2015.
Green Building Effect in Commercial Building
Green Building Effect in Commercial Building
Final paper rizky citra islami
Final paper rizky citra islami
Time delay and cost escalation in construction works
Time delay and cost escalation in construction works
Similar to IRJET-Factors influencing Time and Cost Overruns in Road Construction Projects: Addis Ababa, Ethiopian Scenario: Review paper
D012261521
D012261521
IOSR Journals
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET Journal
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
IAEME Publication
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
IRJET Journal
Effect of construction delays on project time overrun
Effect of construction delays on project time overrun
eSAT Publishing House
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET Journal
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
IRJET Journal
10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docx
EbrahimJemal4
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
IJERA Editor
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
iosrjce
I012646171
I012646171
IOSR Journals
I012646171
I012646171
IOSR Journals
Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...
Associate Professor in VSB Coimbatore
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
IRJET Journal
Ijciet 08 02_005
Ijciet 08 02_005
IAEME Publication
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
IAEME Publication
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction Projects
Rick Vogel
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET Journal
An Investigation into the Delays in Road Projects in Bahrain
An Investigation into the Delays in Road Projects in Bahrain
IJRES Journal
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
Dr. Amarjeet Singh
Similar to IRJET-Factors influencing Time and Cost Overruns in Road Construction Projects: Addis Ababa, Ethiopian Scenario: Review paper
(20)
D012261521
D012261521
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
Effect of construction delays on project time overrun
Effect of construction delays on project time overrun
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
10.11648.j.jccee.20160101.13756.docx
10.11648.j.jccee.20160101.13756.docx
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
I012646171
I012646171
I012646171
I012646171
Examining the Effect of Project Delays in Construction Field, A Case Study of...
Examining the Effect of Project Delays in Construction Field, A Case Study of...
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Ijciet 08 02_005
Ijciet 08 02_005
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction Projects
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
An Investigation into the Delays in Road Projects in Bahrain
An Investigation into the Delays in Road Projects in Bahrain
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
britheesh05
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
PoojaBan
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
959SahilShah
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
Mark Billinghurst
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
Asst.prof M.Gokilavani
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
asadnawaz62
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Dr.Costas Sachpazis
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
Tagore Institute of Engineering And Technology
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
VICTOR MAESTRE RAMIREZ
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
DeepakSakkari2
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
rehmti665
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Soham Mondal
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
null - The Open Security Community
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
NikhilNagaraju
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
GDSCAESB
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
me23b1001
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Anamika Sarkar
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
KurinjimalarL3
power system scada applications and uses
power system scada applications and uses
DevarapalliHaritha
Recently uploaded
(20)
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
power system scada applications and uses
power system scada applications and uses
IRJET-Factors influencing Time and Cost Overruns in Road Construction Projects: Addis Ababa, Ethiopian Scenario: Review paper
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 01 | Jan-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 177 Factors influencing Time and Cost Overruns in Road Construction Projects: Addis Ababa, Ethiopian Scenario: Review paper Shambel Gebrehiwot Tadewos1, Dixit Patel2 1M.Tech student, Civil Engineering Department, Parul University, Gujarat, India Abstract—In Ethiopia, number of roads are constructed from time to time. A number of road networks are increased over time. The historical data of completed road projects shows that no one of the projects were completed as planned and within the estimated cost. No considerable improvement had occurred over time. The objective of this study is to assess the existing system and to identify the factors that affect time and cost overrun in Addis Ababa road projects. This is done based on wide literature review. Findings of this journal will help clients, contractors, consultants and any otherconcerned bodies to consider and give priorities for better road construction performance in the future. Key Words: Time Overrun, Cost Overrun, Influences, Addis Ababa 1. INTRODUCTION Construction industry, the true power of national economy, through which the total of physical development is attained. It is energetic component of country’s economy and has a significant effect on other industry sectors efficiency and productivity. It is difficult to think extensiveinvestmentslike agriculture,manufacturing, fishery, etc.withoutconstruction facilities are there. The Performance and successofprojectsaremeasuredbythe triple project constraints (Cost, time, and quality). Project success is measured by completing on time within the estimated cost and quality. Because the industry is a full of project activities, tasks and constraints that requires additional budget and cost. According to Faridi et al. (2006) [7] delays have impact on success project in its cost, time, safety and quality. The consequences of delay are not restrictedto construction industryonly, but also impacts the whole country’s economy. According to Rajakumar A C (2016) [3], cost and timeoverrunsarecommonindeveloping countries and impacts more for developing country than developed once. Ethiopia is a developing country where its construction sector is affected bycostandtimeoverrun.Road projects in Ethiopian are victims of this problem. Road projects, requires huge amountof capital, but it contributeto the total economy by creation job and have wave effect to other business activities. The homogeneity in transportation departments is the failure to finish the projects on time and within estimated budget (Y. Honrao and Prof. D.B.Desai, 2015) [4]. There are many causes that are accountable for delays and cost overruns in the industry, so attention should be given to such factorsasthey causeadditionalexpensethan initially estimated. 1.1 Objectives of the Study The study has the following objectives: 1. To assess the existing system of time and cost overrun. 2. To identify the factors that affects time and cost overruns in Addis Ababa RoadconstructionProjects. 2. LITERATURE REVIEW 2.1 Definitions According to Chitkara (2011) [14] cost is defined as the accounted expenditure, which the owner has agreed to commit for creating/acquiring the desired facility. Cost overrun or over budget is defined as final costs exceed the estimated costs. It is defined as the positive difference between the final cost of a construction projectatcompletion and the contract amount agreed by the client and the contractor during signing of the contract (M. Abubeker J., 2015) [1]. Actual cost is defined as the accounted costs actually spent, as determined at the time of project completion (Chitkara,2011)[14].Estimatedcostisdefinedas budgeted or forecasted costs at the time of project approval, which are typically similarto costs presentedin the business case for a project (Lee, 2008) [13]. According to Lee (2008) [13] construction cost overrun is defined as the difference between forecasted and actual construction costs. Every construction company can be affected by cost overrun.However,micro-scaledconstruction companiesare the most affected company type because they have limited capitals and they are more exposed to risks. In construction, delay can be defined as the time over run, slippingover its planned scheduleeitherbeyondthedatethat the parties agreed upon for delivery of a project, or beyond completion date specified in a contract and it usual problem in construction projects (M. Abubeker J., 2015). [1] 2.2 Causes of Time and Cost Overrun T. Siraw Y. (2014), in his study ‘Analysis of Factors Contributing to time overrunson Road ConstructionProjects 2Assistant prof, Civil Engineering Department, Parul University, Gujarat, India ---------------------------------------------------------------------***---------------------------------------------------------------------
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 1 | January-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 178 under Addis Ababa City Administration’, he concluded that slow site clearance, contractors’ financialproblems,Inflation, progress payments delay by owner, inaccurate cost estimation, and delay in commencement were the major causesof timeoverrun in Addis AbabaRoadConstruction.[5] N. Feten (2008) in her study ‘Causes and Effects of Cost Overrun on PublicBuildingConstructionProjectsinEthiopia’, sixty seven out of seventy of completed public building construction projects were investigated and found faced to cost overrun. From her study she concluded that material price inflation, fluctuation in currency exchange rate, change orders and, slow decision making. [9] B. Ashebir S., M, Wubishet J, and Murad M. (2017), found that material price strike,poor cost estimation,laterawmaterials delivery, ambiguous contract documents were top source of cost overrun and it ranges from 4.16% to 83.2%. [6] N. Al-Hazim andZ. AbuSalem(2015),concludedthatweather conditions, terrain conditions, availability of labour, and variation of order were the main causes of time and cost overrun in Jordan. Cost overrun ranges from 101% to 600% and time overrun ranging from 125% to 455%. [8] In ‘Study of Delay in Execution of Infrastructure Projects – Highway Construction’,Y. Honrao and Prof. D.B.Desai(2015) [4], argue that Paymentproblemsbetweencontractorandhis employees, Shortage of materials, ineffective construction method implementation were major causes of delay by contractor. Interference by the owner during execution operation, delay in decision making by the owner, Delay in progress payments by ownerwere the majorcausesofdelay. Lack of experience in consultants were the major causes of delay. Services and utilities were the most critical factors having high severity means and most the frequent effects of delay were cost and time overruns and disruption of traffic movement. S. Msafiri A. (2015) studied, ‘Investigation into Factors Causing Delays in Road Construction Projects in Kenya’. He identified 141 causes of delay from literature them divided them into25 broad categories. He concluded thatinadequate planning and scheduling, slow decision-making and rain, payment delay by client, claims, and bureaucracy in client organization were the top five sources of delay. [12] I. Mahamid (2013), conducted a study on ‘Frequency of time overrun causes inroad constructioninPalestine:Contractors’ View’. The study was based on 52 factorson case study of 34 contractors. The study was aimed at investigating the frequency of delay based on contractor’s point of view. Questionnaire survey was used to collect the data. He concluded that, division of West Bank, lack of equipment efficiency, political condition, limited access area, payments delay by owner, difficultiesin financingprojectbycontractor, personal conflicts among labours, conflict of consultant with other parties, conflict between contractor with the other parties, award to lowest bidder, and contract duration is too short were the top ten frequent factors. [10] Indian infrastructure projects are known for time and cost overruns. For example, Bandra-Worlisea link project, its planned was Rs 300 crore to be completed by 2004, but it final cost Rs 1,600 crore with a delay of five years. Hardily, very few projects complete on time and cost, but the extent was not studied. Privatization of public service and build operate and transfer (BOT) is also recommended for constructing of national highways to avoid the problem. Technical and natural factors, contractual failures, organisational or institutional failures, time overruns and economic factorswere causesof the problem. The study was aimed atinvestigatingthe causesof delaysand cost overruns in publically funded infrastructure projects in India (Ram Singh, 2010). [2] K. Vaibhav Y. and Dr. D.M. Ghaitidak (2016), in their study ‘Elements of Cost and Schedule Overrun in Construction Projects’, time and cost overrun had been a major frequent problem of construction industry. They concluded that, land acquisition, tender cancellation, weak contractor mobilization, equipment erection, fund constraints, law & order problem, delay in supply of equipment, scope change, forest clearance, slow construction progress, cost escalation in were the main source of delay and overruns. [11] 3. FINDINGS AND DISCUSSIONS A desk studywasconducted on10completedroadprojectsin Addis Ababa (M. Abubeker J., 2015) [1]. According to the reports, 10 of them had experienced time overrun and cost overrun. Thus, they take more time and cost than what had been estimated. The rates are ranging from a minimum of 25% to the maximum of 264.38% time and a minimum of 4.11% to the maximum of 135.06% of cost.
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 1 | January-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 179 4. CONCLUSIONS Road is the main contributor to the country’s economic development that connects one part to the other part. Addis Ababa road network plays great role in the economy of the city and country as well. Road constructions is expected to complete on time and within estimated budget and open for traffic, but all of the road projects are always faced to time overrun andover budget. Different studies in the area shows that as delay and cost overruns are common phenomenon and it affects road projects greatly. Financial problems, improper planning, land acquisition and construction delay, design changes, less materials and equipment supply by contractors, incomplete design are themain sourcesof delay and cost overrun respectively. So, once identified the main causes it is necessarily to give solutions to complete the projects on time and estimated cost. 5. FUTURE WORKS Allpreviousresearchworkswerebasedonliteraturereviews as and based on questionnaire survey. Most surveys were considering contractors, clients and consultants, but they do not include end users. Since the public are end users of the roads, so researchers should include in their study. REFERENCES [1] M. Abubeker J. (2015). “Factors affecting time and cost overrun in road construction projects in Addis Ababa”, AAU, School of Civil and Environmental Engineering. [2] Ram Singh (2010). “Delays and Cost Overruns in Infrastructure Projects: An Enquiry into Extents,Causes and Remedies” Department of Economics Delhi School of Economics University of Delhi No. Selected Addis Ababa Road Projects name Contract Time (days) Actual Completed Time (days) Time Overrun (%) Contract Amount (Eth.Birr) Actual Completed Cost (Eth. Birr) Cost Overrun (%) 1 Winget Aseco Bridge 330 1048 217.58 154,485,787.41 181,139,826.67 17.25 2 Yekatit 12 square – Afenchober – Semen 365 1330 264.38 3,62,13,579 5,43,34,900 50.04 hotel urban street 3 Dama Hotel – Hanamariam 365 1155 216.44 5,42,14,003.00 6,85,63,420.00 26.47 4 Megenagna – Meskel 550 726 32 1,16,24,48,900.69 1,21,45,86,635.23 4.49 Square – Torhiloch (Lot 1 & Lot 2) Contract 1 5 Meskel flower – Bole Ruwanda 575 2370 58.42 4,95,87,265.63 7,85,58,144.39 135.06 6 Shola Gebeya – Lemhotel – Anbessa 575 1232 114.26 10,95,12,767.87 14,53,11,625.22 32.69 Garage 7 Mekanisa roundabout – Addis 90 270 200 3,65,54,500.46 4,16,54,715.37 13.95 8 Abunepetros square pastuer 224 763 240.63 14,44,40,764.43 15,03,74,645.56 4.11 9 Megenagna – Ayat 420 709 68.81 22,40,55,813.14 26,51,04,212.54 18.32 10 Gotera – Wellosefer 180 225 25 3,00,00,000 3,24,50,000 8.17 Table-1: Time and cost overrun in Addis Ababa Road Projects [1]
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 1 | January-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 180 [3] Rajakumar A C, (2016). “Analysis of Cost Overrun in Road Construction Activities – A Critical Review”, Volume: 03 Issue: 04. [4] Y. Honrao and Prof. D.B.Desai (2015). “Study of Delay in Execution of Infrastructure Projects – Highway Construction,” International Journal of Scientific and Research Publications, Volume 5, Issue 6. [5] T. Siraw Y. (2014). “Analysis of Factors Contributing to time overruns on Road Construction Projects under Addis Ababa City Administration,” Addis Ababa University. [6] B. Ashebir S., M, Wubishet J, and Murad M. (2017). “Causes of Cost Overrun in Federal Road Projects of Ethiopia in Case of Southern District,” American Journal of Civil Engineering, Vol. 5, No. 1, 2017, pp. 27-40. [7] Faridi et al. (2006). “Significant factors causing delay in the UAE construction industry”, Construction Management and Economics, 24, pp.1167–1176. [8] N. Al-Hazim and Z. Abu Salem (2015), “Delay and cost overrun in road construction projects in Jordan,” International Journal of Engineering&Technology,4(2) pp.288-293. [9] N. Feten (2008). “Causes and Effects of Cost Overrun on Public Building Construction Projects in Ethiopia”, Master Thesis, Addis Ababa University,CivilEngineering Department, Addis Ababa, Ethiopia. [10]I. Mahamid (2013). “Frequency of time overrun causes in road construction in Palestine: Contractors’ View,” organization, technology and management in construction an international journal · 5(1), pp. 720- 729. [11] K. Vaibhav Y. and Dr. D.M. Ghaitidak (2016). “Elements of Cost and Schedule Overrun in ConstructionProjects,” Volume 12, Issue 7, PP.64-68. [12] S. Msafiri A. (2015). “An Investigation into Factors Causing Delays in Road Construction Projects in Kenya,” 3(3): pp. 51-63. [13] Lee (2008). Delay and Cost Overruns in Vietnam Large Construction: A Comparison with Other Selected Countries. KSCE Journal of Civil Engineering, Volume 12.Issue 6, pp.367-377. [14] Chitkara (2011). “Construction Project Management - Planning, Scheduling and Controlling”, 2nd Edition, Tata McGraw Hills’.
Download now