This document discusses the benefits of implementing green building techniques in commercial buildings. It describes several green building strategies used in the project building, including green roofing, rainwater harvesting, an HVAC system, glass facades, and a greywater reuse system. With all the green features, the project building achieved a 33.76% energy improvement over the baseline building. The maximum recycled water generated inside the building was 157.3 KL/month, saving 53.85% of freshwater. Some advantages of green buildings are environmental benefits, reduced emissions and costs, while disadvantages include higher initial costs and lack of skilled workers.