1
Geotechnical Engineering–I [CE-221]
BSc Civil Engineering – 4th Semester
by
Dr. Muhammad Irfan
Assistant Professor
Civil Engg. Dept. – UET Lahore
Email: mirfan1@msn.com
Lecture Handouts: https://groups.google.com/d/forum/2016session-geotech-i
Lecture # 18
30-Mar-2018
2
One-Dimensional Consolidation
Drainage and deformations occur in vertical direction only.
(none laterally)
A reasonable simplification for solving consolidation problems
3
1-D Consolidation Theory
(Terzaghi, 1936)
Assumptions of one-dimensional consolidation theory
1. Soil is homogenous.
2. Soil is fully saturated.
3. Coefficient of consolidation (CV) remains constant throughout the soil
mass and also remains constant with time.
4. Coefficient of permeability (k) is constant throughout.
5. Darcy’s law for flow of water through the soil mass is valid,
i.e., v = k.i
6. Consolidation is a one-dimensional problem i.e., water flows in only
one direction and the resulting settlement also occur in one direction
only.
7. Soil particles are assumed to be incompressible i.e., all the settlement
is due to the expulsion of water.
4
1-D Lab Consolidation
NSL
metal ring
SOIL
Porous Stones
Field
Undisturbed soil
specimen
Lab
Consolidometer / Oedometer
Stopwatch
5
1-D Lab Consolidation
 Devised by Carl Terzaghi.
 The apparatus is called Consolidometer /
Oedometer
 Soil specimen placed inside a metal ring
 Two porous stones, one at the top and
other at the bottom of specimen
SOIL
Porous
Stones
 Diameter of specimen = 50-75 mm (2”-3”)
 Diameter/Height: between 2.5 & 5
 Specimen kept submerged in water throughout the test
 Load is applied through a lever arm
 Each load is usually applied for 24hrs (or till deformations become
negligible)
 Each loading increment is usually double the previous load.
 After complete loading, unloading is done in steps.
6
Magnitude of settlement → compression index (Cc)
Rate of consolidation → co-efficient of consolidation (Cv)
1. Time ~ Deformation curve
i. Cv (Coefficient of consolidation)
2. Pressure ~ Deformation curve
i. Cc (Compression index)
ii. Cr (Recompression index)
iii. aV (Coefficient of compressibility)
iv. mV (Coefficient of volume change)
SOIL
Porous
Stones
CONSOLIDATION TEST
- Interpretation of Test Results -
7
Stage–I: Initial compression →
mainly due to preloading.
Stage–II: Primary Consolidation
→ due to dissipation of pore
water pressure (expulsion of
water)
Stage–III: Secondary
Consolidation → due to plastic
readjustment of soil fabric.
CONSOLIDATION TEST
Deformation ~ Time Plot
8
Methods of Determining Cv
1. Casagrande’s log-time
method (1938)
2. Taylor’s Square root of
time method (1948)
CONSOLIDATION TEST
Deformation ~ Time Plot
Used to determine Cv (coefficient
of consolidation)
 Rate of consolidation
 Consolidation Time
9
DEFORMATION ~ TIME PLOT
Casagrande’s log-time method





 

t
HT
CV
2
Used to determine Cv (coefficient
of consolidation)
 Rate of consolidation
 Consolidation Time
U = 100%R100
t1 t2=4t1
x
x
R0
U = 0%
t50
U = 50% R50 = (R0+R100)/2
t50: obtained from deformation ~ time plot
H = t/2 (for two-way drainage)
t = height of specimen
T = Time factor = 0.197 (for u=50%)
R2
R1





 

50
50
2
t
HT
CV
10
 Plot specimen deformation against log-of-time
 R0 and R100 represent dial readings for zero percent
(U0) and 100% (U100) degree of consolidation
respectively.
 For determining U100
 Draw two tangents to the bottom part of curve.
Intersection of these tangents represent U100.
 The corresponding abscissa represent t100.
 For determining U0
 Choose any two times t1 and t2, such that t2 = 4t1
 The corresponding dial readings are R1 and R2
 Mark off vertical distance between R1 & R2 (say ‘x’)
 R0 lies ‘x’ distance above R1.
 R50 represents 50% degree of consolidation (U50)
 R50 lies mid-way between R0 and R100.
 The time (t50) is used for determination of Cv.
U = 100%R100
t1 t2=4t1
x
x
R0
U = 0%
t50
U = 50% R50 = (R0+R100)/2
DEFORMATION ~ TIME PLOT
Casagrande’s log-time method
R2
R1
11
DEFORMATION ~ TIME PLOT
Taylor’s Square-root of Time Method
Uses t90 for computing Cv
Plot deformation ~ square root of time.
 Project the straight line portion of
the initial part of curve backward to
zero time to define R0 or U0.
 Draw a second line from R0 with
abscissa 1.15 times as large as the
corresponding values on the first
line.
 The intersection of the second line
with the laboratory curve defines R90
or U90.
Deformation
time
x
1.15x
U90
U0R0
√t90





 

90
2
90
t
HT
CV
T90 = Time factor for 90% degree of
consolidation (U90).
T90 = 0.848
12
DEFORMATION ~ TIME PLOT
Summary
Used for determining Cv
Cv is used for determining rate of consolidation, and
consolidation time.
Casagrande’s log-time fitting method
Determines Cv corresponding to U=50%.
Deformation ~ log-time plot
Taylor’s square root of time method
Determines Cv corresponding to U=90%.
Deformation ~ square root of time plot
Cv determined from √(time) method is often slightly
greater than the log-time method.





 

50
2
50
t
HT
CV





 

90
2
90
t
HT
CV
13
CONCLUDED
REFERENCE MATERIAL
Principles of Geotechnical Engineering – (7th Edition)
Braja M. Das
Chapter #11
An Introduction to Geotechnical Engineering (2nd Edition)
By R. D. Holtz, W. D. Kovacs and T. C. Sheahan
Chapter #8 & 9

More Related Content

What's hot

Geotechnical Engineering-I [Lec #17: Consolidation]
Geotechnical Engineering-I [Lec #17: Consolidation]Geotechnical Engineering-I [Lec #17: Consolidation]
Geotechnical Engineering-I [Lec #17: Consolidation]
Muhammad Irfan
 
Method of-slices
Method of-slicesMethod of-slices
Method of-slices
baljka311
 
Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]
Muhammad Irfan
 
Stress distribution of the soil
Stress distribution of the soilStress distribution of the soil
Stress distribution of the soil
Dharmik Navadiya
 
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Muhammad Irfan
 
8 compressibility and consolidation
8 compressibility and consolidation8 compressibility and consolidation
8 compressibility and consolidation
Saurabh Kumar
 
Class 5 Permeability Test ( Geotechnical Engineering )
Class 5   Permeability Test ( Geotechnical Engineering )Class 5   Permeability Test ( Geotechnical Engineering )
Class 5 Permeability Test ( Geotechnical Engineering )
Hossam Shafiq I
 
Geotechnical Engineering-I [Lec #23: Soil Permeability]
Geotechnical Engineering-I [Lec #23: Soil Permeability]Geotechnical Engineering-I [Lec #23: Soil Permeability]
Geotechnical Engineering-I [Lec #23: Soil Permeability]
Muhammad Irfan
 
6 effective stress capillarity_permeability
6 effective stress capillarity_permeability6 effective stress capillarity_permeability
6 effective stress capillarity_permeability
Saurabh Kumar
 
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Geotechnical Engineering-II [Lec #3: Direct Shear Test)Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Muhammad Irfan
 
Geotechnical Engineering-I [Lec #2: Introduction-2]
Geotechnical Engineering-I [Lec #2: Introduction-2]Geotechnical Engineering-I [Lec #2: Introduction-2]
Geotechnical Engineering-I [Lec #2: Introduction-2]
Muhammad Irfan
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )
Hossam Shafiq I
 
Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)
Abdul Majid
 
Soil slope stability
Soil slope stabilitySoil slope stability
Soil - Basic Definitions & Relationships
Soil - Basic Definitions & RelationshipsSoil - Basic Definitions & Relationships
Soil - Basic Definitions & Relationships
Arbaz Kazi
 
4 permeability and seepage
4  permeability and seepage4  permeability and seepage
4 permeability and seepage
Khalid Al-Janabi PhD., M.ISGE, M.ISSMGE
 
Geotechnical Engineering-I [Lec #11: USCS & AASHTO]
Geotechnical Engineering-I [Lec #11: USCS & AASHTO]Geotechnical Engineering-I [Lec #11: USCS & AASHTO]
Geotechnical Engineering-I [Lec #11: USCS & AASHTO]
Muhammad Irfan
 
Geotechnical Engineering-I [Lec #10: USCS]
Geotechnical Engineering-I [Lec #10: USCS]Geotechnical Engineering-I [Lec #10: USCS]
Geotechnical Engineering-I [Lec #10: USCS]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #11: Settlement Computation]
Geotechnical Engineering-II [Lec #11: Settlement Computation]Geotechnical Engineering-II [Lec #11: Settlement Computation]
Geotechnical Engineering-II [Lec #11: Settlement Computation]
Muhammad Irfan
 
3 a index properties of soil
3 a index properties of soil3 a index properties of soil
3 a index properties of soil
Saurabh Kumar
 

What's hot (20)

Geotechnical Engineering-I [Lec #17: Consolidation]
Geotechnical Engineering-I [Lec #17: Consolidation]Geotechnical Engineering-I [Lec #17: Consolidation]
Geotechnical Engineering-I [Lec #17: Consolidation]
 
Method of-slices
Method of-slicesMethod of-slices
Method of-slices
 
Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]
 
Stress distribution of the soil
Stress distribution of the soilStress distribution of the soil
Stress distribution of the soil
 
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
 
8 compressibility and consolidation
8 compressibility and consolidation8 compressibility and consolidation
8 compressibility and consolidation
 
Class 5 Permeability Test ( Geotechnical Engineering )
Class 5   Permeability Test ( Geotechnical Engineering )Class 5   Permeability Test ( Geotechnical Engineering )
Class 5 Permeability Test ( Geotechnical Engineering )
 
Geotechnical Engineering-I [Lec #23: Soil Permeability]
Geotechnical Engineering-I [Lec #23: Soil Permeability]Geotechnical Engineering-I [Lec #23: Soil Permeability]
Geotechnical Engineering-I [Lec #23: Soil Permeability]
 
6 effective stress capillarity_permeability
6 effective stress capillarity_permeability6 effective stress capillarity_permeability
6 effective stress capillarity_permeability
 
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Geotechnical Engineering-II [Lec #3: Direct Shear Test)Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
 
Geotechnical Engineering-I [Lec #2: Introduction-2]
Geotechnical Engineering-I [Lec #2: Introduction-2]Geotechnical Engineering-I [Lec #2: Introduction-2]
Geotechnical Engineering-I [Lec #2: Introduction-2]
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )
 
Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)
 
Soil slope stability
Soil slope stabilitySoil slope stability
Soil slope stability
 
Soil - Basic Definitions & Relationships
Soil - Basic Definitions & RelationshipsSoil - Basic Definitions & Relationships
Soil - Basic Definitions & Relationships
 
4 permeability and seepage
4  permeability and seepage4  permeability and seepage
4 permeability and seepage
 
Geotechnical Engineering-I [Lec #11: USCS & AASHTO]
Geotechnical Engineering-I [Lec #11: USCS & AASHTO]Geotechnical Engineering-I [Lec #11: USCS & AASHTO]
Geotechnical Engineering-I [Lec #11: USCS & AASHTO]
 
Geotechnical Engineering-I [Lec #10: USCS]
Geotechnical Engineering-I [Lec #10: USCS]Geotechnical Engineering-I [Lec #10: USCS]
Geotechnical Engineering-I [Lec #10: USCS]
 
Geotechnical Engineering-II [Lec #11: Settlement Computation]
Geotechnical Engineering-II [Lec #11: Settlement Computation]Geotechnical Engineering-II [Lec #11: Settlement Computation]
Geotechnical Engineering-II [Lec #11: Settlement Computation]
 
3 a index properties of soil
3 a index properties of soil3 a index properties of soil
3 a index properties of soil
 

Similar to Geotechnical Engineering-I [Lec #18: Consolidation-II]

Reconsidering some basic aspects of soil mechanics - Laurie Wesley, Universit...
Reconsidering some basic aspects of soil mechanics - Laurie Wesley, Universit...Reconsidering some basic aspects of soil mechanics - Laurie Wesley, Universit...
Reconsidering some basic aspects of soil mechanics - Laurie Wesley, Universit...
scgcolombia
 
Lecture-2 Consolidation PART-1 (geotechnical engineering).pdf
Lecture-2 Consolidation PART-1 (geotechnical engineering).pdfLecture-2 Consolidation PART-1 (geotechnical engineering).pdf
Lecture-2 Consolidation PART-1 (geotechnical engineering).pdf
WaseemUllah71
 
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS
ijiert bestjournal
 
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Muhammad Irfan
 
Vertical Drain
Vertical Drain Vertical Drain
Vertical Drain
Sanchari Halder
 
Chapter 3 -consolidation notes
Chapter 3 -consolidation notesChapter 3 -consolidation notes
Chapter 3 -consolidation notes
DYPCET
 
Chapter 3 -consolidation notes
Chapter 3 -consolidation notesChapter 3 -consolidation notes
Chapter 3 -consolidation notes
DYPCET
 
5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).ppt
JohnAyele
 
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...
P singh
 
Consolidation settlement with sand drains – analytical and numerical approaches
Consolidation settlement with sand drains – analytical and numerical approachesConsolidation settlement with sand drains – analytical and numerical approaches
Consolidation settlement with sand drains – analytical and numerical approaches
Umed Paliwal
 
Correction for construction Settlement
Correction for construction SettlementCorrection for construction Settlement
Correction for construction Settlement
Sanchari Halder
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
imaduddin91
 
Briaud2001
Briaud2001Briaud2001
Briaud2001
quangmaihuy
 
240708
240708240708
240708
dhana555
 
1-D Consolidation Test
1-D Consolidation Test1-D Consolidation Test
1-D Consolidation Test
A K
 
fluid_mechanics_notes.pdf
fluid_mechanics_notes.pdffluid_mechanics_notes.pdf
fluid_mechanics_notes.pdf
TalkingYRwe
 
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
inventionjournals
 
Soil and Water Engineering 03
Soil and Water Engineering  03Soil and Water Engineering  03
Soil and Water Engineering 03
andyheomoiandyheomoi
 
wk1_Introduction.pdf
wk1_Introduction.pdfwk1_Introduction.pdf
wk1_Introduction.pdf
SalamudinSadat1
 
Rubble mound breakwater
Rubble mound breakwaterRubble mound breakwater
Rubble mound breakwater
Nguyen Thanh Luan
 

Similar to Geotechnical Engineering-I [Lec #18: Consolidation-II] (20)

Reconsidering some basic aspects of soil mechanics - Laurie Wesley, Universit...
Reconsidering some basic aspects of soil mechanics - Laurie Wesley, Universit...Reconsidering some basic aspects of soil mechanics - Laurie Wesley, Universit...
Reconsidering some basic aspects of soil mechanics - Laurie Wesley, Universit...
 
Lecture-2 Consolidation PART-1 (geotechnical engineering).pdf
Lecture-2 Consolidation PART-1 (geotechnical engineering).pdfLecture-2 Consolidation PART-1 (geotechnical engineering).pdf
Lecture-2 Consolidation PART-1 (geotechnical engineering).pdf
 
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS
 
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
 
Vertical Drain
Vertical Drain Vertical Drain
Vertical Drain
 
Chapter 3 -consolidation notes
Chapter 3 -consolidation notesChapter 3 -consolidation notes
Chapter 3 -consolidation notes
 
Chapter 3 -consolidation notes
Chapter 3 -consolidation notesChapter 3 -consolidation notes
Chapter 3 -consolidation notes
 
5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).ppt
 
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...
 
Consolidation settlement with sand drains – analytical and numerical approaches
Consolidation settlement with sand drains – analytical and numerical approachesConsolidation settlement with sand drains – analytical and numerical approaches
Consolidation settlement with sand drains – analytical and numerical approaches
 
Correction for construction Settlement
Correction for construction SettlementCorrection for construction Settlement
Correction for construction Settlement
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
Briaud2001
Briaud2001Briaud2001
Briaud2001
 
240708
240708240708
240708
 
1-D Consolidation Test
1-D Consolidation Test1-D Consolidation Test
1-D Consolidation Test
 
fluid_mechanics_notes.pdf
fluid_mechanics_notes.pdffluid_mechanics_notes.pdf
fluid_mechanics_notes.pdf
 
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
 
Soil and Water Engineering 03
Soil and Water Engineering  03Soil and Water Engineering  03
Soil and Water Engineering 03
 
wk1_Introduction.pdf
wk1_Introduction.pdfwk1_Introduction.pdf
wk1_Introduction.pdf
 
Rubble mound breakwater
Rubble mound breakwaterRubble mound breakwater
Rubble mound breakwater
 

More from Muhammad Irfan

Geotechnical Engineering-II [Lec #26: Slope Stability]
Geotechnical Engineering-II [Lec #26: Slope Stability]Geotechnical Engineering-II [Lec #26: Slope Stability]
Geotechnical Engineering-II [Lec #26: Slope Stability]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #24: Coulomb EP Theory]
Geotechnical Engineering-II [Lec #24: Coulomb EP Theory]Geotechnical Engineering-II [Lec #24: Coulomb EP Theory]
Geotechnical Engineering-II [Lec #24: Coulomb EP Theory]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #22: Earth Pressure at Rest]
Geotechnical Engineering-II [Lec #22: Earth Pressure at Rest]Geotechnical Engineering-II [Lec #22: Earth Pressure at Rest]
Geotechnical Engineering-II [Lec #22: Earth Pressure at Rest]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #21: Lateral Earth Pressure)
Geotechnical Engineering-II [Lec #21: Lateral Earth Pressure)Geotechnical Engineering-II [Lec #21: Lateral Earth Pressure)
Geotechnical Engineering-II [Lec #21: Lateral Earth Pressure)
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #20: WT effect on Bearing Capcity)
Geotechnical Engineering-II [Lec #20: WT effect on Bearing Capcity)Geotechnical Engineering-II [Lec #20: WT effect on Bearing Capcity)
Geotechnical Engineering-II [Lec #20: WT effect on Bearing Capcity)
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #14: Timoshenko & Goodier Method]
Geotechnical Engineering-II [Lec #14: Timoshenko & Goodier Method]Geotechnical Engineering-II [Lec #14: Timoshenko & Goodier Method]
Geotechnical Engineering-II [Lec #14: Timoshenko & Goodier Method]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #12: Consolidation Settlement Computation]
Geotechnical Engineering-II [Lec #12: Consolidation Settlement Computation]Geotechnical Engineering-II [Lec #12: Consolidation Settlement Computation]
Geotechnical Engineering-II [Lec #12: Consolidation Settlement Computation]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #9+10: Westergaard Theory]
Geotechnical Engineering-II [Lec #9+10: Westergaard Theory]Geotechnical Engineering-II [Lec #9+10: Westergaard Theory]
Geotechnical Engineering-II [Lec #9+10: Westergaard Theory]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #7: Soil Stresses due to External Load]
Geotechnical Engineering-II [Lec #7: Soil Stresses due to External Load]Geotechnical Engineering-II [Lec #7: Soil Stresses due to External Load]
Geotechnical Engineering-II [Lec #7: Soil Stresses due to External Load]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #5: Triaxial Compression Test]
Geotechnical Engineering-II [Lec #5: Triaxial Compression Test]Geotechnical Engineering-II [Lec #5: Triaxial Compression Test]
Geotechnical Engineering-II [Lec #5: Triaxial Compression Test]
Muhammad Irfan
 
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
Muhammad Irfan
 

More from Muhammad Irfan (20)

Geotechnical Engineering-II [Lec #26: Slope Stability]
Geotechnical Engineering-II [Lec #26: Slope Stability]Geotechnical Engineering-II [Lec #26: Slope Stability]
Geotechnical Engineering-II [Lec #26: Slope Stability]
 
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
 
Geotechnical Engineering-II [Lec #24: Coulomb EP Theory]
Geotechnical Engineering-II [Lec #24: Coulomb EP Theory]Geotechnical Engineering-II [Lec #24: Coulomb EP Theory]
Geotechnical Engineering-II [Lec #24: Coulomb EP Theory]
 
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
 
Geotechnical Engineering-II [Lec #22: Earth Pressure at Rest]
Geotechnical Engineering-II [Lec #22: Earth Pressure at Rest]Geotechnical Engineering-II [Lec #22: Earth Pressure at Rest]
Geotechnical Engineering-II [Lec #22: Earth Pressure at Rest]
 
Geotechnical Engineering-II [Lec #21: Lateral Earth Pressure)
Geotechnical Engineering-II [Lec #21: Lateral Earth Pressure)Geotechnical Engineering-II [Lec #21: Lateral Earth Pressure)
Geotechnical Engineering-II [Lec #21: Lateral Earth Pressure)
 
Geotechnical Engineering-II [Lec #20: WT effect on Bearing Capcity)
Geotechnical Engineering-II [Lec #20: WT effect on Bearing Capcity)Geotechnical Engineering-II [Lec #20: WT effect on Bearing Capcity)
Geotechnical Engineering-II [Lec #20: WT effect on Bearing Capcity)
 
Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]
 
Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #18: Terzaghi Bearing Capacity Equation]
 
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
Geotechnical Engineering-II [Lec #17: Bearing Capacity of Soil]
 
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
 
Geotechnical Engineering-II [Lec #14: Timoshenko & Goodier Method]
Geotechnical Engineering-II [Lec #14: Timoshenko & Goodier Method]Geotechnical Engineering-II [Lec #14: Timoshenko & Goodier Method]
Geotechnical Engineering-II [Lec #14: Timoshenko & Goodier Method]
 
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
 
Geotechnical Engineering-II [Lec #12: Consolidation Settlement Computation]
Geotechnical Engineering-II [Lec #12: Consolidation Settlement Computation]Geotechnical Engineering-II [Lec #12: Consolidation Settlement Computation]
Geotechnical Engineering-II [Lec #12: Consolidation Settlement Computation]
 
Geotechnical Engineering-II [Lec #9+10: Westergaard Theory]
Geotechnical Engineering-II [Lec #9+10: Westergaard Theory]Geotechnical Engineering-II [Lec #9+10: Westergaard Theory]
Geotechnical Engineering-II [Lec #9+10: Westergaard Theory]
 
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
 
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
 
Geotechnical Engineering-II [Lec #7: Soil Stresses due to External Load]
Geotechnical Engineering-II [Lec #7: Soil Stresses due to External Load]Geotechnical Engineering-II [Lec #7: Soil Stresses due to External Load]
Geotechnical Engineering-II [Lec #7: Soil Stresses due to External Load]
 
Geotechnical Engineering-II [Lec #5: Triaxial Compression Test]
Geotechnical Engineering-II [Lec #5: Triaxial Compression Test]Geotechnical Engineering-II [Lec #5: Triaxial Compression Test]
Geotechnical Engineering-II [Lec #5: Triaxial Compression Test]
 
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
Geotechnical Engineering-II [Lec #4: Unconfined Compression Test]
 

Recently uploaded

An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
CVCSOfficial
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
Prakhyath Rai
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 

Recently uploaded (20)

An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 

Geotechnical Engineering-I [Lec #18: Consolidation-II]

  • 1. 1 Geotechnical Engineering–I [CE-221] BSc Civil Engineering – 4th Semester by Dr. Muhammad Irfan Assistant Professor Civil Engg. Dept. – UET Lahore Email: mirfan1@msn.com Lecture Handouts: https://groups.google.com/d/forum/2016session-geotech-i Lecture # 18 30-Mar-2018
  • 2. 2 One-Dimensional Consolidation Drainage and deformations occur in vertical direction only. (none laterally) A reasonable simplification for solving consolidation problems
  • 3. 3 1-D Consolidation Theory (Terzaghi, 1936) Assumptions of one-dimensional consolidation theory 1. Soil is homogenous. 2. Soil is fully saturated. 3. Coefficient of consolidation (CV) remains constant throughout the soil mass and also remains constant with time. 4. Coefficient of permeability (k) is constant throughout. 5. Darcy’s law for flow of water through the soil mass is valid, i.e., v = k.i 6. Consolidation is a one-dimensional problem i.e., water flows in only one direction and the resulting settlement also occur in one direction only. 7. Soil particles are assumed to be incompressible i.e., all the settlement is due to the expulsion of water.
  • 4. 4 1-D Lab Consolidation NSL metal ring SOIL Porous Stones Field Undisturbed soil specimen Lab Consolidometer / Oedometer Stopwatch
  • 5. 5 1-D Lab Consolidation  Devised by Carl Terzaghi.  The apparatus is called Consolidometer / Oedometer  Soil specimen placed inside a metal ring  Two porous stones, one at the top and other at the bottom of specimen SOIL Porous Stones  Diameter of specimen = 50-75 mm (2”-3”)  Diameter/Height: between 2.5 & 5  Specimen kept submerged in water throughout the test  Load is applied through a lever arm  Each load is usually applied for 24hrs (or till deformations become negligible)  Each loading increment is usually double the previous load.  After complete loading, unloading is done in steps.
  • 6. 6 Magnitude of settlement → compression index (Cc) Rate of consolidation → co-efficient of consolidation (Cv) 1. Time ~ Deformation curve i. Cv (Coefficient of consolidation) 2. Pressure ~ Deformation curve i. Cc (Compression index) ii. Cr (Recompression index) iii. aV (Coefficient of compressibility) iv. mV (Coefficient of volume change) SOIL Porous Stones CONSOLIDATION TEST - Interpretation of Test Results -
  • 7. 7 Stage–I: Initial compression → mainly due to preloading. Stage–II: Primary Consolidation → due to dissipation of pore water pressure (expulsion of water) Stage–III: Secondary Consolidation → due to plastic readjustment of soil fabric. CONSOLIDATION TEST Deformation ~ Time Plot
  • 8. 8 Methods of Determining Cv 1. Casagrande’s log-time method (1938) 2. Taylor’s Square root of time method (1948) CONSOLIDATION TEST Deformation ~ Time Plot Used to determine Cv (coefficient of consolidation)  Rate of consolidation  Consolidation Time
  • 9. 9 DEFORMATION ~ TIME PLOT Casagrande’s log-time method         t HT CV 2 Used to determine Cv (coefficient of consolidation)  Rate of consolidation  Consolidation Time U = 100%R100 t1 t2=4t1 x x R0 U = 0% t50 U = 50% R50 = (R0+R100)/2 t50: obtained from deformation ~ time plot H = t/2 (for two-way drainage) t = height of specimen T = Time factor = 0.197 (for u=50%) R2 R1         50 50 2 t HT CV
  • 10. 10  Plot specimen deformation against log-of-time  R0 and R100 represent dial readings for zero percent (U0) and 100% (U100) degree of consolidation respectively.  For determining U100  Draw two tangents to the bottom part of curve. Intersection of these tangents represent U100.  The corresponding abscissa represent t100.  For determining U0  Choose any two times t1 and t2, such that t2 = 4t1  The corresponding dial readings are R1 and R2  Mark off vertical distance between R1 & R2 (say ‘x’)  R0 lies ‘x’ distance above R1.  R50 represents 50% degree of consolidation (U50)  R50 lies mid-way between R0 and R100.  The time (t50) is used for determination of Cv. U = 100%R100 t1 t2=4t1 x x R0 U = 0% t50 U = 50% R50 = (R0+R100)/2 DEFORMATION ~ TIME PLOT Casagrande’s log-time method R2 R1
  • 11. 11 DEFORMATION ~ TIME PLOT Taylor’s Square-root of Time Method Uses t90 for computing Cv Plot deformation ~ square root of time.  Project the straight line portion of the initial part of curve backward to zero time to define R0 or U0.  Draw a second line from R0 with abscissa 1.15 times as large as the corresponding values on the first line.  The intersection of the second line with the laboratory curve defines R90 or U90. Deformation time x 1.15x U90 U0R0 √t90         90 2 90 t HT CV T90 = Time factor for 90% degree of consolidation (U90). T90 = 0.848
  • 12. 12 DEFORMATION ~ TIME PLOT Summary Used for determining Cv Cv is used for determining rate of consolidation, and consolidation time. Casagrande’s log-time fitting method Determines Cv corresponding to U=50%. Deformation ~ log-time plot Taylor’s square root of time method Determines Cv corresponding to U=90%. Deformation ~ square root of time plot Cv determined from √(time) method is often slightly greater than the log-time method.         50 2 50 t HT CV         90 2 90 t HT CV
  • 13. 13 CONCLUDED REFERENCE MATERIAL Principles of Geotechnical Engineering – (7th Edition) Braja M. Das Chapter #11 An Introduction to Geotechnical Engineering (2nd Edition) By R. D. Holtz, W. D. Kovacs and T. C. Sheahan Chapter #8 & 9