Contractors: Get BIM Ready!
#CCTwebinars
The information contained in this presentation and/or demo is confidential
and proprietary to CCT International. It may not be disclosed or
transferred, directly or indirectly, to any third party without the explicit
written permission of CCT International.
CCT International may provide information regarding possible future
product developments including new products, product features, product
interfaces, integration, design, architecture, etc. Any such information is for
discussion purposes only and does not constitute a commitment by CCT
International to do or deliver anything in these product roadmaps or
otherwise. Any such commitment must be explicitly set forth in a written
contract between the customer and CCT International, executed by an
authorized officer of each company.
Disclaimer
Senior Consultant and Writing
publications and articles in
several specialized
magazines, newsletters and
books about BIM, GIS, Project
Controls
Issam El-Absi
CCC/CCT
HELLO!
Providing BIM/Project controls
consultation services to
several reputable
organizations and clients
Chehade Kassouf
CCT
@Chehadekassouf
HELLO!
#CCTwebinars
All our presentations can be found on:
slideshare.net/cctintl
youtube.com/user/cctintl1
Today’s Agenda
1 Knowledge & Experience
2 BIM Adoption
3 Use Case
{ }1 Knowledge & Experience
Since 1997
#CCTwebinars
• CCT is the technology arm of Consolidated Contractors
Company (CCC) since 1997.
• Focused on Construction Optimization and Asset
Management Solutions.
• CCT resources are based in Athens, Dubai, Beirut and
Egypt.
• With a growing install base outside of CCC, CCT has a
fully enabled marketing team and partnership network
focused on selling customers throughout the world.
• Recognized in Europe as a Leading CM Solutions Provider
by ENCORD 5Di
Introduction to CCT
#CCTwebinars
Partners & Associations
• Technology Partners:
• Channel Partners:
• ISO Boards: CCT is an active member in
setting the ISO 15926 Standard
• Research Partners:
#CCTwebinars
MULTI PLATFORM INTERFACES
Electronic Document Management Platform
With BI, Risk Management, Resource Management
xDProject
Controls
BIMConsulting
&Construction
Support
Services
Construction
ERPand
Field
Shop
Drawings&
Fabrications
Asset
Management
&Fleet
Tracking
Data Sources
CAD
Tools
FI/CO WM /
Inventory
Standard
s DBMS
GIS Legac
y
Solutions Map
Schedulin
g Tools
Estimation
Systems
Digital
Pen
Laser
Scann
er
Handover,
QA/QC
#CCTwebinars
#CCTwebinars
• CCT has been Adopting and Implementing
BIM Methods and Tools for the last 19
years
First Success Story
Ritz Carlton Hotel - Doha - 1997
#CCTwebinars
BIM Staff allocation in Projects and Offices (Total 200)
Building Information Modeling (BIM) CCT Group
Athens BIM Centre -> 17 Engineers
Cairo BIM Centre -> 35 Engineers
Palestine BIM Centre -> 30 Engineers
BIM Operations Backbone
CCT has established professional BIM Centers - Centers of Excellence,
where specialized engineers have been recruited and trained to be able to develop efficiently quality BIM
200
200
200
200
200
200
200
150
200
200
200
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Algeria Cairo Marocco Oman Kazahstan Qatar UAE Athens Palaestine Cairo USA
PROJECTS OFFICES
3017
50
44
10154 10
35
3
Current
Projects
Lusail Multi-Purpose Hall
Lusail, Qatar
C Morocco ost: $315 Million
Built up Area: 107,650 m2
Lusail Commercial Boulevard
Doha, Qatar
Cost: $350 Million
Doha’s New Port Project
Doha, Qatar
Cost: $292 Million
Sidra Hospital project
Doha, Qatar
Cost: $2.0 Billion
Built up Area: 200,000m2
Multipurpose Admin Complex
Doha, Qatar
Cost: $205 Million
Built up Area: 34,820 m2
Khlifa Bin Zayed Al Nahyan
Specialized Hospital
Casablanca, Morocco
Cost: $100 Million
Built up Area: 42,000 m2
The Nile Corniche Project
Cairo, Egypt
Cost: $450 Million
Built up Area: 70,000 m2
Abu Dhabi Plaza
Astana, Kazakstan
Cost: $1.3 Billion
Built up Area: 510,000 m2
Midfield Terminal Building
Abu Dhabi, UAE
Cost: $3.0 Billion
Built up Area: 700,000 m2
Emiral Project
Moretti, Algeria
Cost: $230 Million
Built up Area: 60,000 m2
Building Information Modeling (BIM) CCT
#CCTwebinars
Mater Artium Necessitas.
(Necessity is the mother of
invention)
“ “
{ }2 BIM Adoption
How to
#CCTwebinars
Step by Step Approach
#CCTwebinars
BIM Roadmap / Strategy
A n e d u c a t i o n a l p a t h f o r f u t u r e t a l e n t s
Philosophy
Mindset
Investment
Training &
Software
Endurance
Challenges
• Corporate
Vision
• Holistic
Approach
Top
Management
Embracement
Commitment
over time
Company Awareness of
advantages and outcomes
• Financial
Support
• Resources
• Create Partners/ Alliances
• Create & facilitate BIM
Needs
#CCTwebinars
Forming BIM Entity (Department)
A n e d u c a t i o n a l p a t h f o r f u t u r e t a l e n t s
BIM Engineers
• Multi-discipline
• Multi-talent
• Multi-tasking
BIM Center
• Production Hub
• Standards
• Support Projects
• Create Resources
Project/ Site
Team
• Project
Implementation
• Serve Construction
& Project Needs
Automation &
Project Control
Engineers
• Automation
• Project Control
• Engineering point
of view
BIM
Engineers
Sr BIM
Engineers
BIM Team
Leaders/ BIM
Coordinators
BIM
Manager
#CCTwebinars
Forming BIM Entity (Department)
S e l e c t i o n P r o c e s s
Training Period
Assessment Process
Criteria
#CCTwebinars
BIM -
Technical
Skills
Development/
Enhancement
Soft Skills
Development/
Enhancement
Visual Project
Controls &
Integration
Platform
Forming BIM Entity (Department)
T e a m L e a d e r s P r e p a r a t i o n
#CCTwebinars
Forming BIM Entity (Department)
B I M T e a m C a p a c i t y B u i l d i n g a n d K n o w l e d g e T r a n s f e r
Technical/ Engineering Knowledge &
Construction Methodology
Construction Documentation
BIM based Project Controls
concepts, methodology & Systems
BIM based Lifecycle ManagementScope Management & Quantity Surveying
BIM Standards & Procedures
Collaboration, Design
Coordination & Data/ Document
Management & Sharing
#CCTwebinars
Standards and Procedures
S t a n d a r d , P r o c e d u r e s , W o r k f l o w s a n d C o n v e n t i o n s
SuccessfulBIM
Implementation&BIM
basedProjectControl
Capabilities
Standards /
Conventions
Procedures
Workflows
#CCTwebinars
Systems and Automation
S y s t e m s , D e v e l o p m e n t , I n t e g r a t i o n a n d A u t o m a t i o n
• Identification of Existing Systems
• Assessment and Gap Analysis
• Systems Development and Integration Road Map
• Development of Authoring Plugins
• Manage, Monitor & Support Site Production (Lean
construction, tasks follow-up, progress)
#CCTwebinars
3D Based
BIM
Platform
Productivity
Tools
Data Warehouse
Finance and
Procurement
Management System
Site Inventory &
Machinery
Management System
QS Productivity Tools
Document Management
System/ Collaboration
Platform
QS Tendering
Management
Site Diary
Systems and Automation
S y s t e m s , D e v e l o p m e n t , I n t e g r a t i o n a n d A u t o m a t i o n
#CCTwebinars
Systems and Automation
S y s t e m s , D e v e l o p m e n t , I n t e g r a t i o n a n d A u t o m a t i o n
{ }3 Use Case
Before and After
#CCTwebinars
• Inconsistent site productivity
• Difficulty in pin-pointing root cause of low project performance
• Scope Definition is dependent on S/C
• Data / Workflows silos
• Difficulty in matching linking sources of information
(documents, material, model)
• BIM lifespan ends at the design coordination phase
• Re – Entering same data several times
• Planning function is limited to 4D and progress presentation
• Inconsistent reporting from different stakeholders for the same scope
Before
#CCTwebinars
• Identified reasons for low productivity and taking
prompt corrective measures
• BIM is the single source of truth for the project scope
• Full integration between ERP, BIM, Planning,
Estimation and site systems
• BIM is being used by most of the project team
,Planning, Estimation, Contracts, Construction etc…
• Proper System Integration “Data is entered once used
every where”
• Planning is the heart of construction management,
providing work fronts through workflows
After
#CCTwebinars
Systems and Automation
D o c u m e n t s L i n k e d t o B I M 3 D M o d e l O b j e c t s
#CCTwebinars
Systems and Automation
M a t e r i a l M a n a g e m e n t E R P l i n k e d t o 3 D B I M M o d e l O b j e c t s
#CCTwebinars
Systems and Automation
M a t e r i a l , B I M , D o c u m e n t N a m i n g S t a n d a r d i n A c t i o n
#CCTwebinars
Systems and Automation
P l a n n i n g W o r k f l o w w i t h E m p h a s i s o n S i t e / O f f i c e C o l l a b o r a t i o n
#CCTwebinars
Systems and Automation
I n s t a n t R e p o r t i n g P r o v i d i n g M a n a g e m e n t I n f o r m a t i o n f o r
C a l c u l a t e d D e c i s i o n s
#CCTwebinars
An extra dimension in reporting
All In One portal
Regardless of the source.
Ability to Understand the client requirement
TCA Report
Tender Cost Analysis (TCA) by Bill
TCA Report
Contract Sum Analysis Report - Original Working Budget Report
CCM Report
System Formwork
CCM Report
Project Cash Flow
CCM Report
Material Usage Report
CCM Report
Non Conformance Report - NCR
CCM Report
Certified vs Actual Cost statement report
CCM Report
Preliminaries - Overall Cost
CCM Report
Staff Overhead Cost Report
CCM Report
Administration Cost (water, electricity usage)
CCM Report
Consultant OT
5th BIM & LEAN CONSTRUCTION CONFERENCE
STAY TUNED!
www.bimconference.me
Dubai | UAE
May 2017!
www.cctintl.com
Follow us on Social Media
facebook.com/cctintl2
linkedin.com/company/cctintl
@cctintl
youtube.com/user/cctintl1
And now for the
questions…

More Related Content

What's hot

BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together?
CCT International
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIM
CCT International
 
BIM Based Project Controls
BIM Based Project ControlsBIM Based Project Controls
BIM Based Project Controls
CCT International
 
Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution Teams
CCT International
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
CCT International
 
BIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to useBIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to use
BuiltEnvironmentUBM
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
BIM User Day
 
BIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case studyBIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case study
BuiltEnvironmentUBM
 
4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies
BIM User Day
 
Bim cafm presentation 23 june2014
Bim cafm presentation 23 june2014Bim cafm presentation 23 june2014
Bim cafm presentation 23 june2014
Eamonn Roarke
 
BIM Show Live 2015: Single or Multiple Models
BIM Show Live 2015: Single or Multiple ModelsBIM Show Live 2015: Single or Multiple Models
BIM Show Live 2015: Single or Multiple Models
BuiltEnvironmentUBM
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
Russell and Dawson
 
BIM - Changing Perceptions of Design-Build
BIM - Changing Perceptions of Design-BuildBIM - Changing Perceptions of Design-Build
BIM - Changing Perceptions of Design-Build
Ajaz Hasan
 
4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study
BIM User Day
 
1st Qatar BIM User DAY BIM processes Case Study #2
1st Qatar BIM User DAY  BIM processes Case Study #21st Qatar BIM User DAY  BIM processes Case Study #2
1st Qatar BIM User DAY BIM processes Case Study #2
BIM User Day
 
Bim implementation qatar
Bim implementation qatarBim implementation qatar
Bim implementation qatar
Omar Selim
 
1st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #11st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #1
BIM User Day
 
11.30 uur thomas vandenbergh - uitdagingen bij de introductie van bim binne...
11.30 uur   thomas vandenbergh - uitdagingen bij de introductie van bim binne...11.30 uur   thomas vandenbergh - uitdagingen bij de introductie van bim binne...
11.30 uur thomas vandenbergh - uitdagingen bij de introductie van bim binne...
Muriel Walter
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project
BIM User Day
 
4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards
BIM User Day
 

What's hot (20)

BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together?
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIM
 
BIM Based Project Controls
BIM Based Project ControlsBIM Based Project Controls
BIM Based Project Controls
 
Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution Teams
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
BIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to useBIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to use
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
 
BIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case studyBIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case study
 
4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies
 
Bim cafm presentation 23 june2014
Bim cafm presentation 23 june2014Bim cafm presentation 23 june2014
Bim cafm presentation 23 june2014
 
BIM Show Live 2015: Single or Multiple Models
BIM Show Live 2015: Single or Multiple ModelsBIM Show Live 2015: Single or Multiple Models
BIM Show Live 2015: Single or Multiple Models
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
 
BIM - Changing Perceptions of Design-Build
BIM - Changing Perceptions of Design-BuildBIM - Changing Perceptions of Design-Build
BIM - Changing Perceptions of Design-Build
 
4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study
 
1st Qatar BIM User DAY BIM processes Case Study #2
1st Qatar BIM User DAY  BIM processes Case Study #21st Qatar BIM User DAY  BIM processes Case Study #2
1st Qatar BIM User DAY BIM processes Case Study #2
 
Bim implementation qatar
Bim implementation qatarBim implementation qatar
Bim implementation qatar
 
1st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #11st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #1
 
11.30 uur thomas vandenbergh - uitdagingen bij de introductie van bim binne...
11.30 uur   thomas vandenbergh - uitdagingen bij de introductie van bim binne...11.30 uur   thomas vandenbergh - uitdagingen bij de introductie van bim binne...
11.30 uur thomas vandenbergh - uitdagingen bij de introductie van bim binne...
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project
 
4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards
 

Viewers also liked

AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
CCT International
 
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
CCT International
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
CCT International
 
Lintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheetLintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheet
Electromate
 
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
CCT International
 
Почему ССС ?
Почему ССС ?Почему ССС ?
Почему ССС ?
Leon Lunsky
 
BIM: Data Everywhere
BIM: Data EverywhereBIM: Data Everywhere
BIM: Data Everywhere
pwcom.co.uk Ltd
 
SPOOL TRACKING SYSTEM
SPOOL TRACKING SYSTEMSPOOL TRACKING SYSTEM
SPOOL TRACKING SYSTEMRenee gatdula
 
проект "РосПил". Отчет за 2011-2012 гг.
проект "РосПил". Отчет за 2011-2012 гг.проект "РосПил". Отчет за 2011-2012 гг.
проект "РосПил". Отчет за 2011-2012 гг.ros-pil
 
client centered therapy
client centered therapyclient centered therapy
client centered therapyume habiba
 
Muhammed- Prophet of Islam
Muhammed- Prophet of IslamMuhammed- Prophet of Islam
Muhammed- Prophet of Islam
Fatima Mian
 
Client centered therapy
Client  centered therapyClient  centered therapy
Client centered therapy
Ynaffets Erialc Siason
 
Imagine a World Without Isometric
Imagine a World Without IsometricImagine a World Without Isometric
Imagine a World Without Isometric
CCT International
 
Entendiendo al e-shopper
Entendiendo al e-shopperEntendiendo al e-shopper
Entendiendo al e-shopper
ADICT Active Retail
 
GWT 2014: Emergency Conference - 01 Introduzione
GWT 2014: Emergency Conference - 01 IntroduzioneGWT 2014: Emergency Conference - 01 Introduzione
GWT 2014: Emergency Conference - 01 Introduzione
Planetek Italia Srl
 
Die neuen Features der 1&1 Do-It-Yourself Homepage im Überblick
Die neuen Features der 1&1 Do-It-Yourself Homepage im ÜberblickDie neuen Features der 1&1 Do-It-Yourself Homepage im Überblick
Die neuen Features der 1&1 Do-It-Yourself Homepage im Überblick
1&1
 
Marthapacheco actividad1 2mapac
Marthapacheco actividad1 2mapacMarthapacheco actividad1 2mapac
Marthapacheco actividad1 2mapac
Marthika Pacheco
 
Hosted accountants presentation
Hosted accountants presentationHosted accountants presentation
Hosted accountants presentation
David Watson
 
Manual: Whatsapp en Tablet
Manual: Whatsapp en TabletManual: Whatsapp en Tablet
Manual: Whatsapp en Tablet
Platinum
 

Viewers also liked (20)

AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
 
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 
Lintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheetLintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheet
 
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
 
Почему ССС ?
Почему ССС ?Почему ССС ?
Почему ССС ?
 
BIM: Data Everywhere
BIM: Data EverywhereBIM: Data Everywhere
BIM: Data Everywhere
 
SPOOL TRACKING SYSTEM
SPOOL TRACKING SYSTEMSPOOL TRACKING SYSTEM
SPOOL TRACKING SYSTEM
 
проект "РосПил". Отчет за 2011-2012 гг.
проект "РосПил". Отчет за 2011-2012 гг.проект "РосПил". Отчет за 2011-2012 гг.
проект "РосПил". Отчет за 2011-2012 гг.
 
client centered therapy
client centered therapyclient centered therapy
client centered therapy
 
Muhammed- Prophet of Islam
Muhammed- Prophet of IslamMuhammed- Prophet of Islam
Muhammed- Prophet of Islam
 
Client centered therapy
Client  centered therapyClient  centered therapy
Client centered therapy
 
Imagine a World Without Isometric
Imagine a World Without IsometricImagine a World Without Isometric
Imagine a World Without Isometric
 
Entendiendo al e-shopper
Entendiendo al e-shopperEntendiendo al e-shopper
Entendiendo al e-shopper
 
GWT 2014: Emergency Conference - 01 Introduzione
GWT 2014: Emergency Conference - 01 IntroduzioneGWT 2014: Emergency Conference - 01 Introduzione
GWT 2014: Emergency Conference - 01 Introduzione
 
Die neuen Features der 1&1 Do-It-Yourself Homepage im Überblick
Die neuen Features der 1&1 Do-It-Yourself Homepage im ÜberblickDie neuen Features der 1&1 Do-It-Yourself Homepage im Überblick
Die neuen Features der 1&1 Do-It-Yourself Homepage im Überblick
 
Marthapacheco actividad1 2mapac
Marthapacheco actividad1 2mapacMarthapacheco actividad1 2mapac
Marthapacheco actividad1 2mapac
 
Hosted accountants presentation
Hosted accountants presentationHosted accountants presentation
Hosted accountants presentation
 
case-study-actelion
case-study-actelioncase-study-actelion
case-study-actelion
 
Manual: Whatsapp en Tablet
Manual: Whatsapp en TabletManual: Whatsapp en Tablet
Manual: Whatsapp en Tablet
 

Similar to Contractors: Get BIM Ready!

3D Models for Construction Estimating
3D Models for Construction Estimating3D Models for Construction Estimating
3D Models for Construction Estimating
Ian McGaw
 
CFW An Introduction to Building Information Modelling
CFW An Introduction to Building Information Modelling CFW An Introduction to Building Information Modelling
CFW An Introduction to Building Information Modelling
Rae Davies
 
How education estates can benefit from better information management
How education estates can benefit from better information managementHow education estates can benefit from better information management
How education estates can benefit from better information management
BSRIA
 
On line BIM project execution by PLANNERLY
On line BIM project execution by PLANNERLYOn line BIM project execution by PLANNERLY
On line BIM project execution by PLANNERLY
Stephen Au
 
Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...
p6academy
 
Software Professional Services Project Management
Software Professional Services Project ManagementSoftware Professional Services Project Management
Software Professional Services Project Management
Chuck Crafton
 
Trimble, TILOS & The Future
Trimble, TILOS & The FutureTrimble, TILOS & The Future
Trimble, TILOS & The Future
DAT Computer Concepts
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
VincentPoon15
 
#FiaComit Inside a digital asset
#FiaComit Inside a digital asset#FiaComit Inside a digital asset
#FiaComit Inside a digital asset
Comit Projects Ltd
 
COMIT Community Day Autumn 2018 - SAP
COMIT Community Day Autumn 2018 - SAPCOMIT Community Day Autumn 2018 - SAP
COMIT Community Day Autumn 2018 - SAP
Comit Projects Ltd
 
Integrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk SolutionsIntegrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk Solutions
Rich Hanapole
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
Omar Selim
 
Digital construction for Integrated Project Delivery
Digital construction for Integrated Project DeliveryDigital construction for Integrated Project Delivery
Digital construction for Integrated Project Delivery
Stephen Au
 
BIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction ProjectsBIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction Projects
PMA Consultants
 
Bim&revit
Bim&revitBim&revit
Bim&revit
Omar Selim
 
BIM project execution
BIM project executionBIM project execution
BIM project execution
Stephen Au
 
HVAC CAD Design Services
HVAC CAD Design ServicesHVAC CAD Design Services
HVAC CAD Design Services
Building Information Modelling
 
Enterprise architecture artefacts
Enterprise architecture artefactsEnterprise architecture artefacts
Enterprise architecture artefacts
Brian Loomis
 
The Practical Application of 5D BIM to controls
The Practical Application of 5D BIM to controlsThe Practical Application of 5D BIM to controls
The Practical Application of 5D BIM to controls
LogiKal Projects
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDFSandy .
 

Similar to Contractors: Get BIM Ready! (20)

3D Models for Construction Estimating
3D Models for Construction Estimating3D Models for Construction Estimating
3D Models for Construction Estimating
 
CFW An Introduction to Building Information Modelling
CFW An Introduction to Building Information Modelling CFW An Introduction to Building Information Modelling
CFW An Introduction to Building Information Modelling
 
How education estates can benefit from better information management
How education estates can benefit from better information managementHow education estates can benefit from better information management
How education estates can benefit from better information management
 
On line BIM project execution by PLANNERLY
On line BIM project execution by PLANNERLYOn line BIM project execution by PLANNERLY
On line BIM project execution by PLANNERLY
 
Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...
 
Software Professional Services Project Management
Software Professional Services Project ManagementSoftware Professional Services Project Management
Software Professional Services Project Management
 
Trimble, TILOS & The Future
Trimble, TILOS & The FutureTrimble, TILOS & The Future
Trimble, TILOS & The Future
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
 
#FiaComit Inside a digital asset
#FiaComit Inside a digital asset#FiaComit Inside a digital asset
#FiaComit Inside a digital asset
 
COMIT Community Day Autumn 2018 - SAP
COMIT Community Day Autumn 2018 - SAPCOMIT Community Day Autumn 2018 - SAP
COMIT Community Day Autumn 2018 - SAP
 
Integrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk SolutionsIntegrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk Solutions
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
Digital construction for Integrated Project Delivery
Digital construction for Integrated Project DeliveryDigital construction for Integrated Project Delivery
Digital construction for Integrated Project Delivery
 
BIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction ProjectsBIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction Projects
 
Bim&revit
Bim&revitBim&revit
Bim&revit
 
BIM project execution
BIM project executionBIM project execution
BIM project execution
 
HVAC CAD Design Services
HVAC CAD Design ServicesHVAC CAD Design Services
HVAC CAD Design Services
 
Enterprise architecture artefacts
Enterprise architecture artefactsEnterprise architecture artefacts
Enterprise architecture artefacts
 
The Practical Application of 5D BIM to controls
The Practical Application of 5D BIM to controlsThe Practical Application of 5D BIM to controls
The Practical Application of 5D BIM to controls
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
 

More from CCT International

Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
CCT International
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction Industry
CCT International
 
IBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCIBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCC
CCT International
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
CCT International
 
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
CCT International
 
Asset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementAsset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset Management
CCT International
 
Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to Practice
CCT International
 
Smart Construction Site
Smart Construction SiteSmart Construction Site
Smart Construction Site
CCT International
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
CCT International
 
Digital Pens - Firas Hijazi - FIATECH and COMIT
Digital Pens - Firas Hijazi - FIATECH and COMITDigital Pens - Firas Hijazi - FIATECH and COMIT
Digital Pens - Firas Hijazi - FIATECH and COMIT
CCT International
 
Advanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceAdvanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a Glance
CCT International
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life Implementation
CCT International
 
Top 10 BIM Tips for Contractors
Top 10 BIM Tips for ContractorsTop 10 BIM Tips for Contractors
Top 10 BIM Tips for Contractors
CCT International
 
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi LabbanFiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
CCT International
 

More from CCT International (14)

Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction Industry
 
IBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCIBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCC
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
 
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
 
Asset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementAsset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset Management
 
Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to Practice
 
Smart Construction Site
Smart Construction SiteSmart Construction Site
Smart Construction Site
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
 
Digital Pens - Firas Hijazi - FIATECH and COMIT
Digital Pens - Firas Hijazi - FIATECH and COMITDigital Pens - Firas Hijazi - FIATECH and COMIT
Digital Pens - Firas Hijazi - FIATECH and COMIT
 
Advanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceAdvanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a Glance
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life Implementation
 
Top 10 BIM Tips for Contractors
Top 10 BIM Tips for ContractorsTop 10 BIM Tips for Contractors
Top 10 BIM Tips for Contractors
 
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi LabbanFiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
 

Recently uploaded

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 

Recently uploaded (20)

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 

Contractors: Get BIM Ready!

  • 2. #CCTwebinars The information contained in this presentation and/or demo is confidential and proprietary to CCT International. It may not be disclosed or transferred, directly or indirectly, to any third party without the explicit written permission of CCT International. CCT International may provide information regarding possible future product developments including new products, product features, product interfaces, integration, design, architecture, etc. Any such information is for discussion purposes only and does not constitute a commitment by CCT International to do or deliver anything in these product roadmaps or otherwise. Any such commitment must be explicitly set forth in a written contract between the customer and CCT International, executed by an authorized officer of each company. Disclaimer
  • 3. Senior Consultant and Writing publications and articles in several specialized magazines, newsletters and books about BIM, GIS, Project Controls Issam El-Absi CCC/CCT HELLO!
  • 4. Providing BIM/Project controls consultation services to several reputable organizations and clients Chehade Kassouf CCT @Chehadekassouf HELLO!
  • 5. #CCTwebinars All our presentations can be found on: slideshare.net/cctintl youtube.com/user/cctintl1
  • 6. Today’s Agenda 1 Knowledge & Experience 2 BIM Adoption 3 Use Case
  • 7. { }1 Knowledge & Experience Since 1997
  • 8. #CCTwebinars • CCT is the technology arm of Consolidated Contractors Company (CCC) since 1997. • Focused on Construction Optimization and Asset Management Solutions. • CCT resources are based in Athens, Dubai, Beirut and Egypt. • With a growing install base outside of CCC, CCT has a fully enabled marketing team and partnership network focused on selling customers throughout the world. • Recognized in Europe as a Leading CM Solutions Provider by ENCORD 5Di Introduction to CCT
  • 9. #CCTwebinars Partners & Associations • Technology Partners: • Channel Partners: • ISO Boards: CCT is an active member in setting the ISO 15926 Standard • Research Partners:
  • 10. #CCTwebinars MULTI PLATFORM INTERFACES Electronic Document Management Platform With BI, Risk Management, Resource Management xDProject Controls BIMConsulting &Construction Support Services Construction ERPand Field Shop Drawings& Fabrications Asset Management &Fleet Tracking Data Sources CAD Tools FI/CO WM / Inventory Standard s DBMS GIS Legac y Solutions Map Schedulin g Tools Estimation Systems Digital Pen Laser Scann er Handover, QA/QC
  • 12. #CCTwebinars • CCT has been Adopting and Implementing BIM Methods and Tools for the last 19 years First Success Story Ritz Carlton Hotel - Doha - 1997
  • 13. #CCTwebinars BIM Staff allocation in Projects and Offices (Total 200) Building Information Modeling (BIM) CCT Group Athens BIM Centre -> 17 Engineers Cairo BIM Centre -> 35 Engineers Palestine BIM Centre -> 30 Engineers BIM Operations Backbone CCT has established professional BIM Centers - Centers of Excellence, where specialized engineers have been recruited and trained to be able to develop efficiently quality BIM 200 200 200 200 200 200 200 150 200 200 200 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Algeria Cairo Marocco Oman Kazahstan Qatar UAE Athens Palaestine Cairo USA PROJECTS OFFICES 3017 50 44 10154 10 35 3
  • 14. Current Projects Lusail Multi-Purpose Hall Lusail, Qatar C Morocco ost: $315 Million Built up Area: 107,650 m2 Lusail Commercial Boulevard Doha, Qatar Cost: $350 Million Doha’s New Port Project Doha, Qatar Cost: $292 Million Sidra Hospital project Doha, Qatar Cost: $2.0 Billion Built up Area: 200,000m2 Multipurpose Admin Complex Doha, Qatar Cost: $205 Million Built up Area: 34,820 m2 Khlifa Bin Zayed Al Nahyan Specialized Hospital Casablanca, Morocco Cost: $100 Million Built up Area: 42,000 m2 The Nile Corniche Project Cairo, Egypt Cost: $450 Million Built up Area: 70,000 m2 Abu Dhabi Plaza Astana, Kazakstan Cost: $1.3 Billion Built up Area: 510,000 m2 Midfield Terminal Building Abu Dhabi, UAE Cost: $3.0 Billion Built up Area: 700,000 m2 Emiral Project Moretti, Algeria Cost: $230 Million Built up Area: 60,000 m2 Building Information Modeling (BIM) CCT
  • 15. #CCTwebinars Mater Artium Necessitas. (Necessity is the mother of invention) “ “
  • 16. { }2 BIM Adoption How to
  • 18. #CCTwebinars BIM Roadmap / Strategy A n e d u c a t i o n a l p a t h f o r f u t u r e t a l e n t s Philosophy Mindset Investment Training & Software Endurance Challenges • Corporate Vision • Holistic Approach Top Management Embracement Commitment over time Company Awareness of advantages and outcomes • Financial Support • Resources • Create Partners/ Alliances • Create & facilitate BIM Needs
  • 19. #CCTwebinars Forming BIM Entity (Department) A n e d u c a t i o n a l p a t h f o r f u t u r e t a l e n t s BIM Engineers • Multi-discipline • Multi-talent • Multi-tasking BIM Center • Production Hub • Standards • Support Projects • Create Resources Project/ Site Team • Project Implementation • Serve Construction & Project Needs Automation & Project Control Engineers • Automation • Project Control • Engineering point of view BIM Engineers Sr BIM Engineers BIM Team Leaders/ BIM Coordinators BIM Manager
  • 20. #CCTwebinars Forming BIM Entity (Department) S e l e c t i o n P r o c e s s Training Period Assessment Process Criteria
  • 21. #CCTwebinars BIM - Technical Skills Development/ Enhancement Soft Skills Development/ Enhancement Visual Project Controls & Integration Platform Forming BIM Entity (Department) T e a m L e a d e r s P r e p a r a t i o n
  • 22. #CCTwebinars Forming BIM Entity (Department) B I M T e a m C a p a c i t y B u i l d i n g a n d K n o w l e d g e T r a n s f e r Technical/ Engineering Knowledge & Construction Methodology Construction Documentation BIM based Project Controls concepts, methodology & Systems BIM based Lifecycle ManagementScope Management & Quantity Surveying BIM Standards & Procedures Collaboration, Design Coordination & Data/ Document Management & Sharing
  • 23. #CCTwebinars Standards and Procedures S t a n d a r d , P r o c e d u r e s , W o r k f l o w s a n d C o n v e n t i o n s SuccessfulBIM Implementation&BIM basedProjectControl Capabilities Standards / Conventions Procedures Workflows
  • 24. #CCTwebinars Systems and Automation S y s t e m s , D e v e l o p m e n t , I n t e g r a t i o n a n d A u t o m a t i o n • Identification of Existing Systems • Assessment and Gap Analysis • Systems Development and Integration Road Map • Development of Authoring Plugins • Manage, Monitor & Support Site Production (Lean construction, tasks follow-up, progress)
  • 25. #CCTwebinars 3D Based BIM Platform Productivity Tools Data Warehouse Finance and Procurement Management System Site Inventory & Machinery Management System QS Productivity Tools Document Management System/ Collaboration Platform QS Tendering Management Site Diary Systems and Automation S y s t e m s , D e v e l o p m e n t , I n t e g r a t i o n a n d A u t o m a t i o n
  • 26. #CCTwebinars Systems and Automation S y s t e m s , D e v e l o p m e n t , I n t e g r a t i o n a n d A u t o m a t i o n
  • 27. { }3 Use Case Before and After
  • 28. #CCTwebinars • Inconsistent site productivity • Difficulty in pin-pointing root cause of low project performance • Scope Definition is dependent on S/C • Data / Workflows silos • Difficulty in matching linking sources of information (documents, material, model) • BIM lifespan ends at the design coordination phase • Re – Entering same data several times • Planning function is limited to 4D and progress presentation • Inconsistent reporting from different stakeholders for the same scope Before
  • 29. #CCTwebinars • Identified reasons for low productivity and taking prompt corrective measures • BIM is the single source of truth for the project scope • Full integration between ERP, BIM, Planning, Estimation and site systems • BIM is being used by most of the project team ,Planning, Estimation, Contracts, Construction etc… • Proper System Integration “Data is entered once used every where” • Planning is the heart of construction management, providing work fronts through workflows After
  • 30. #CCTwebinars Systems and Automation D o c u m e n t s L i n k e d t o B I M 3 D M o d e l O b j e c t s
  • 31. #CCTwebinars Systems and Automation M a t e r i a l M a n a g e m e n t E R P l i n k e d t o 3 D B I M M o d e l O b j e c t s
  • 32. #CCTwebinars Systems and Automation M a t e r i a l , B I M , D o c u m e n t N a m i n g S t a n d a r d i n A c t i o n
  • 33. #CCTwebinars Systems and Automation P l a n n i n g W o r k f l o w w i t h E m p h a s i s o n S i t e / O f f i c e C o l l a b o r a t i o n
  • 34. #CCTwebinars Systems and Automation I n s t a n t R e p o r t i n g P r o v i d i n g M a n a g e m e n t I n f o r m a t i o n f o r C a l c u l a t e d D e c i s i o n s
  • 35. #CCTwebinars An extra dimension in reporting All In One portal Regardless of the source. Ability to Understand the client requirement
  • 36. TCA Report Tender Cost Analysis (TCA) by Bill
  • 37. TCA Report Contract Sum Analysis Report - Original Working Budget Report
  • 42. CCM Report Certified vs Actual Cost statement report
  • 45. CCM Report Administration Cost (water, electricity usage)
  • 47. 5th BIM & LEAN CONSTRUCTION CONFERENCE STAY TUNED! www.bimconference.me Dubai | UAE May 2017!
  • 48. www.cctintl.com Follow us on Social Media facebook.com/cctintl2 linkedin.com/company/cctintl @cctintl youtube.com/user/cctintl1
  • 49. And now for the questions…