KHURAIS-GOSP PROJECT
SPOOLS TRACKING SYSTEM
Programmed by : Renee Gatdula
Spool Tracking System“Special Kind of Tool”
Gathered Data’s from:
SPOOLGEN – Master Listing of Plan Spools
PTS – Master File of Plan/Done, PK/PF (Shop/Field Weld) in Dia-inch.
GEMAPI – Master file of Issued Material
TEDFLOW – Master file of Hydrotest Status (Testpack/Laid-up/Re-ins.)
Gives Information and Data’s of:
QC Fabrication – Date Released from the Fabrication.
Material Controller – Date’s/Ref. of Spools for FBE(Liquid Coating),NDT
QC/Painting Department – Date Released from Painting Department
Testpack – Status of testpack per Line Number on Weld done/ Test Date
Re-Instated – Date Re-ins.
Material Issuance – Date release to site for installation
LAID-UP – Date Laid-up
Author by : Nicola Negri
This is the Main Screen
HEADER’S DESCRIPTION
1. TEST PACKAGE NO
2. P.I.D NO
3. LINE NUMBER
4. SPOOL NO
5. LINE Dia. (Average Diameter of the Spool)
6. PIPING CLASS (Base Material of the Spool)
7. Fab PK Plan (Dia-inch Plan as per Welding Map –Shop Welding)
8. Fab PK Done (Fabrication status if shop weld is done)
9. Fab QC Date Release
10. FBE Ref No (Document Reference for Internal FBE Coating)
11. FBE Date Send (Date of the Spool send fro FBE Coating)
12. FBE Date Received (Date of the Spool received from FBE Coating)
13. QC Paint Rel. Date (Date of the Spool Released from Painting Department)
14. LAYDOWN/ISS DATE (Date Issued/Received to WORKSITE)
15. SITE PF PLAN (Plan Field Welding as per Welding Map)
16. SITE PF DONE (Actual Field Welded Done as per PTS – Pipe Trucking System)
17. PTS Progress (Status of Weld done)
18. FAB SOP (Fabrication SCOPE OF WORK – if/or send to SUBCON)
FILTER DATA BY TEST PACKAGE DATAS:
ALL OF THE LINE NUMBER/SPOOL NO UNDER TESTPACK NO 0123 WILL BE
FILTERED AND SHOWN ON SCREEN.
FROM THIS POINT OF VIEW YOU CAN SEE/ANALYSE THE STATUS OF YOUR
TESTPACK NO 0123 PER LINE NUMBER BY SPOOL NO.
PRINTING SUMMARY REPORT BY TESTPACK
SUMMARY REPORT OF TESTPACK (TESTED, LAID-UP, RE-INSTATED)
ON SCREEN WILL APPEAR
THE SUMMARY REPORT
LAID-UP DATE
RE-INSTATED DATE
And some Info’s
TESTED DATE
SAMPLE ON SCREEN AND PRINT-OUT OF THE
SUMMARY REPORT BY TESTPACK
FILTER DATA BY LINE NUMBER
ALL OF THE INFORMATION REGUARDING LINE
NUMBER B32-SR-0378 WILL BE
DISPLAY ON SCREEN.
TAKE NOTE OF THE TESTPACK NUMBER- IN
ONE LINE NUMBER THERE MAYBE 2 OR 3
TESTPACK NO.
SAMPLE ON SCREEN AND PRINT-OUT OF THE
SUMMARY REPORT BY LINE NUMBER
SAMPLE ON SCREEN AND PRINT-OUT OF THE
SUMMARY REPORT BY LINE NUMBER

More Related Content

What's hot

Carus: Celebrating a Century
Carus: Celebrating a Century Carus: Celebrating a Century
Carus: Celebrating a Century Carus Corporation
 
B-TECH TRANSCRIPT
B-TECH TRANSCRIPTB-TECH TRANSCRIPT
B-TECH TRANSCRIPTAjeet Vakil
 
experience certificate
experience certificateexperience certificate
experience certificateBineesh Rajan
 
Sandvik process systems kumar swamy (paper)
Sandvik process systems   kumar swamy (paper)Sandvik process systems   kumar swamy (paper)
Sandvik process systems kumar swamy (paper)KVVKSwamy
 
19.Experience Certificate ABB
19.Experience Certificate ABB19.Experience Certificate ABB
19.Experience Certificate ABBYassin Osman
 
Study 2: Front-End Engineering Design and Project Definition
Study 2: Front-End Engineering Design and Project DefinitionStudy 2: Front-End Engineering Design and Project Definition
Study 2: Front-End Engineering Design and Project DefinitionGerard B. Hawkins
 
Aramco experience letter
Aramco experience letterAramco experience letter
Aramco experience letterSaifur rahman
 
Best Management Practices & Environmental Regulations For Galvanizing Indust...
Best Management Practices& Environmental Regulations For Galvanizing Indust...Best Management Practices& Environmental Regulations For Galvanizing Indust...
Best Management Practices & Environmental Regulations For Galvanizing Indust...Ranveer Singh Mahwar
 
PQHRM & TRANSCRIPT0001
PQHRM & TRANSCRIPT0001PQHRM & TRANSCRIPT0001
PQHRM & TRANSCRIPT0001Suraj Liyanage
 
NUS - Master Degree Certification - Gauthameswar Anandhasayanam
NUS - Master Degree Certification - Gauthameswar AnandhasayanamNUS - Master Degree Certification - Gauthameswar Anandhasayanam
NUS - Master Degree Certification - Gauthameswar AnandhasayanamGauthameswar Anandhasayanam
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specificationChiragShah127
 
Coal to Methanol Senior Design Project Final Report
Coal to Methanol Senior Design Project Final ReportCoal to Methanol Senior Design Project Final Report
Coal to Methanol Senior Design Project Final ReportKyle Mattson, EIT
 
Unisa Diploma - Project Management
Unisa Diploma - Project ManagementUnisa Diploma - Project Management
Unisa Diploma - Project ManagementSamantha de Canha
 
Br. C.A.T. International Co. Limited
Br. C.A.T. International Co. LimitedBr. C.A.T. International Co. Limited
Br. C.A.T. International Co. LimitedManojKumar6714
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbookram111eg
 
Experience Letter ZKB PK
Experience Letter ZKB PKExperience Letter ZKB PK
Experience Letter ZKB PKSaqlain Akhtar
 

What's hot (20)

Carus: Celebrating a Century
Carus: Celebrating a Century Carus: Celebrating a Century
Carus: Celebrating a Century
 
B-TECH TRANSCRIPT
B-TECH TRANSCRIPTB-TECH TRANSCRIPT
B-TECH TRANSCRIPT
 
experience certificate
experience certificateexperience certificate
experience certificate
 
Akbar Resume (1)
Akbar Resume (1)Akbar Resume (1)
Akbar Resume (1)
 
Sandvik process systems kumar swamy (paper)
Sandvik process systems   kumar swamy (paper)Sandvik process systems   kumar swamy (paper)
Sandvik process systems kumar swamy (paper)
 
NU certificate 1993
NU certificate 1993NU certificate 1993
NU certificate 1993
 
19.Experience Certificate ABB
19.Experience Certificate ABB19.Experience Certificate ABB
19.Experience Certificate ABB
 
Study 2: Front-End Engineering Design and Project Definition
Study 2: Front-End Engineering Design and Project DefinitionStudy 2: Front-End Engineering Design and Project Definition
Study 2: Front-End Engineering Design and Project Definition
 
Aramco experience letter
Aramco experience letterAramco experience letter
Aramco experience letter
 
Best Management Practices & Environmental Regulations For Galvanizing Indust...
Best Management Practices& Environmental Regulations For Galvanizing Indust...Best Management Practices& Environmental Regulations For Galvanizing Indust...
Best Management Practices & Environmental Regulations For Galvanizing Indust...
 
PQHRM & TRANSCRIPT0001
PQHRM & TRANSCRIPT0001PQHRM & TRANSCRIPT0001
PQHRM & TRANSCRIPT0001
 
NUS - Master Degree Certification - Gauthameswar Anandhasayanam
NUS - Master Degree Certification - Gauthameswar AnandhasayanamNUS - Master Degree Certification - Gauthameswar Anandhasayanam
NUS - Master Degree Certification - Gauthameswar Anandhasayanam
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specification
 
Ammonia production
Ammonia productionAmmonia production
Ammonia production
 
Petrochemicals an Overview (1 of 3)
Petrochemicals an Overview (1 of 3)Petrochemicals an Overview (1 of 3)
Petrochemicals an Overview (1 of 3)
 
Coal to Methanol Senior Design Project Final Report
Coal to Methanol Senior Design Project Final ReportCoal to Methanol Senior Design Project Final Report
Coal to Methanol Senior Design Project Final Report
 
Unisa Diploma - Project Management
Unisa Diploma - Project ManagementUnisa Diploma - Project Management
Unisa Diploma - Project Management
 
Br. C.A.T. International Co. Limited
Br. C.A.T. International Co. LimitedBr. C.A.T. International Co. Limited
Br. C.A.T. International Co. Limited
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 
Experience Letter ZKB PK
Experience Letter ZKB PKExperience Letter ZKB PK
Experience Letter ZKB PK
 

Viewers also liked

Lintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheetLintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheetElectromate
 
Spool barcode identify
Spool barcode identifySpool barcode identify
Spool barcode identifyAbby Phungyen
 
Piping construction-std
Piping construction-stdPiping construction-std
Piping construction-stdthanhuce
 
Welspun Presentation
Welspun PresentationWelspun Presentation
Welspun PresentationJoel Johnson
 
Pipe Spool fabrication Division Presentation for MHI 25-07-13
Pipe Spool fabrication Division Presentation for MHI 25-07-13Pipe Spool fabrication Division Presentation for MHI 25-07-13
Pipe Spool fabrication Division Presentation for MHI 25-07-13Ricardo Wagemaker
 
Welding of Similar & dissimilar - Metal filler chart
Welding of Similar & dissimilar - Metal filler chartWelding of Similar & dissimilar - Metal filler chart
Welding of Similar & dissimilar - Metal filler chartVidhi Sukhadiya
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c newJithu John
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanDavid H Moloney
 
Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturingphysics101
 
Guide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsGuide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsTonni Bruce
 
WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)Abrianto Akuan
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guideram111eg
 

Viewers also liked (18)

AUTOSPOOL - PIPING SPOOLING SOFTWARE
AUTOSPOOL - PIPING SPOOLING SOFTWAREAUTOSPOOL - PIPING SPOOLING SOFTWARE
AUTOSPOOL - PIPING SPOOLING SOFTWARE
 
Lintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheetLintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheet
 
Spool barcode identify
Spool barcode identifySpool barcode identify
Spool barcode identify
 
AGUA POTABLE
AGUA POTABLEAGUA POTABLE
AGUA POTABLE
 
Piping construction-std
Piping construction-stdPiping construction-std
Piping construction-std
 
Welspun Presentation
Welspun PresentationWelspun Presentation
Welspun Presentation
 
Pipe Spool fabrication Division Presentation for MHI 25-07-13
Pipe Spool fabrication Division Presentation for MHI 25-07-13Pipe Spool fabrication Division Presentation for MHI 25-07-13
Pipe Spool fabrication Division Presentation for MHI 25-07-13
 
Contractors: Get BIM Ready!
Contractors: Get BIM Ready!Contractors: Get BIM Ready!
Contractors: Get BIM Ready!
 
Electrode selection
Electrode selection  Electrode selection
Electrode selection
 
Welding of Similar & dissimilar - Metal filler chart
Welding of Similar & dissimilar - Metal filler chartWelding of Similar & dissimilar - Metal filler chart
Welding of Similar & dissimilar - Metal filler chart
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c new
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
 
Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturing
 
Welders qualification
Welders qualificationWelders qualification
Welders qualification
 
Guide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsGuide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wps
 
WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)
 
Pressure vessels
Pressure vesselsPressure vessels
Pressure vessels
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
 

Similar to SPOOL TRACKING SYSTEM

Fsfbglexibility Improvement 06.01,24.pdf
Fsfbglexibility Improvement 06.01,24.pdfFsfbglexibility Improvement 06.01,24.pdf
Fsfbglexibility Improvement 06.01,24.pdfzzsse
 
Functional specification doc Gst purcahse register
Functional specification doc Gst purcahse registerFunctional specification doc Gst purcahse register
Functional specification doc Gst purcahse registerLokesh Modem
 
Import of Lead Scrap/Used Lead Acid Batteries - Requirements and Standard...
Import of Lead Scrap/Used Lead Acid Batteries  -   Requirements and Standard...Import of Lead Scrap/Used Lead Acid Batteries  -   Requirements and Standard...
Import of Lead Scrap/Used Lead Acid Batteries - Requirements and Standard...Ranveer Singh Mahwar
 
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdfPROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdfhasan752746
 
Balloon Project Summary
Balloon Project SummaryBalloon Project Summary
Balloon Project Summaryrhlee46
 
Page 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdfPage 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdfvishveswar9
 
1.0 SPCPLUS_training_English_Verson_15032011.pdf
1.0 SPCPLUS_training_English_Verson_15032011.pdf1.0 SPCPLUS_training_English_Verson_15032011.pdf
1.0 SPCPLUS_training_English_Verson_15032011.pdfTheHoang19
 
Lincolnton Kaizen Event Final Pitch - Infographics
Lincolnton Kaizen Event Final Pitch - InfographicsLincolnton Kaizen Event Final Pitch - Infographics
Lincolnton Kaizen Event Final Pitch - InfographicsDerek Baker
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONElliott Molnar
 
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...Kalaivanan Murthy
 
Production Recapitulation Template
Production Recapitulation TemplateProduction Recapitulation Template
Production Recapitulation TemplateAndi Anriansyah
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande
 

Similar to SPOOL TRACKING SYSTEM (20)

Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
Raju Thamke_CV
Raju Thamke_CVRaju Thamke_CV
Raju Thamke_CV
 
Fsfbglexibility Improvement 06.01,24.pdf
Fsfbglexibility Improvement 06.01,24.pdfFsfbglexibility Improvement 06.01,24.pdf
Fsfbglexibility Improvement 06.01,24.pdf
 
Functional specification doc Gst purcahse register
Functional specification doc Gst purcahse registerFunctional specification doc Gst purcahse register
Functional specification doc Gst purcahse register
 
Import of Lead Scrap/Used Lead Acid Batteries - Requirements and Standard...
Import of Lead Scrap/Used Lead Acid Batteries  -   Requirements and Standard...Import of Lead Scrap/Used Lead Acid Batteries  -   Requirements and Standard...
Import of Lead Scrap/Used Lead Acid Batteries - Requirements and Standard...
 
RFP-Test-Design_Psychometrics-2011
RFP-Test-Design_Psychometrics-2011RFP-Test-Design_Psychometrics-2011
RFP-Test-Design_Psychometrics-2011
 
CV Piping Designer & Supervisor
CV Piping Designer & SupervisorCV Piping Designer & Supervisor
CV Piping Designer & Supervisor
 
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdfPROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
 
AGP-13-R
AGP-13-RAGP-13-R
AGP-13-R
 
Balloon Project Summary
Balloon Project SummaryBalloon Project Summary
Balloon Project Summary
 
Page 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdfPage 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdf
 
8D Catalog.pdf
8D Catalog.pdf8D Catalog.pdf
8D Catalog.pdf
 
1.0 SPCPLUS_training_English_Verson_15032011.pdf
1.0 SPCPLUS_training_English_Verson_15032011.pdf1.0 SPCPLUS_training_English_Verson_15032011.pdf
1.0 SPCPLUS_training_English_Verson_15032011.pdf
 
Lincolnton Kaizen Event Final Pitch - Infographics
Lincolnton Kaizen Event Final Pitch - InfographicsLincolnton Kaizen Event Final Pitch - Infographics
Lincolnton Kaizen Event Final Pitch - Infographics
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
 
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
 
Production Recapitulation Template
Production Recapitulation TemplateProduction Recapitulation Template
Production Recapitulation Template
 
Engineering Division
Engineering DivisionEngineering Division
Engineering Division
 
LAMINE Anouar en
LAMINE Anouar enLAMINE Anouar en
LAMINE Anouar en
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)
 

SPOOL TRACKING SYSTEM

  • 2. Programmed by : Renee Gatdula Spool Tracking System“Special Kind of Tool” Gathered Data’s from: SPOOLGEN – Master Listing of Plan Spools PTS – Master File of Plan/Done, PK/PF (Shop/Field Weld) in Dia-inch. GEMAPI – Master file of Issued Material TEDFLOW – Master file of Hydrotest Status (Testpack/Laid-up/Re-ins.) Gives Information and Data’s of: QC Fabrication – Date Released from the Fabrication. Material Controller – Date’s/Ref. of Spools for FBE(Liquid Coating),NDT QC/Painting Department – Date Released from Painting Department Testpack – Status of testpack per Line Number on Weld done/ Test Date Re-Instated – Date Re-ins. Material Issuance – Date release to site for installation LAID-UP – Date Laid-up Author by : Nicola Negri
  • 3. This is the Main Screen HEADER’S DESCRIPTION 1. TEST PACKAGE NO 2. P.I.D NO 3. LINE NUMBER 4. SPOOL NO 5. LINE Dia. (Average Diameter of the Spool) 6. PIPING CLASS (Base Material of the Spool) 7. Fab PK Plan (Dia-inch Plan as per Welding Map –Shop Welding) 8. Fab PK Done (Fabrication status if shop weld is done) 9. Fab QC Date Release 10. FBE Ref No (Document Reference for Internal FBE Coating) 11. FBE Date Send (Date of the Spool send fro FBE Coating) 12. FBE Date Received (Date of the Spool received from FBE Coating) 13. QC Paint Rel. Date (Date of the Spool Released from Painting Department) 14. LAYDOWN/ISS DATE (Date Issued/Received to WORKSITE) 15. SITE PF PLAN (Plan Field Welding as per Welding Map) 16. SITE PF DONE (Actual Field Welded Done as per PTS – Pipe Trucking System) 17. PTS Progress (Status of Weld done) 18. FAB SOP (Fabrication SCOPE OF WORK – if/or send to SUBCON)
  • 4. FILTER DATA BY TEST PACKAGE DATAS: ALL OF THE LINE NUMBER/SPOOL NO UNDER TESTPACK NO 0123 WILL BE FILTERED AND SHOWN ON SCREEN. FROM THIS POINT OF VIEW YOU CAN SEE/ANALYSE THE STATUS OF YOUR TESTPACK NO 0123 PER LINE NUMBER BY SPOOL NO.
  • 6. SUMMARY REPORT OF TESTPACK (TESTED, LAID-UP, RE-INSTATED) ON SCREEN WILL APPEAR THE SUMMARY REPORT LAID-UP DATE RE-INSTATED DATE And some Info’s TESTED DATE
  • 7. SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY TESTPACK
  • 8. FILTER DATA BY LINE NUMBER ALL OF THE INFORMATION REGUARDING LINE NUMBER B32-SR-0378 WILL BE DISPLAY ON SCREEN. TAKE NOTE OF THE TESTPACK NUMBER- IN ONE LINE NUMBER THERE MAYBE 2 OR 3 TESTPACK NO.
  • 9. SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY LINE NUMBER
  • 10. SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY LINE NUMBER