The Construction Industry Productivity Dilemma
Elements of a Successful Project Delivery
Advanced Work Packaging (AWP)
Structure
Deliverables
Practice Model
A vision for our Industry
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo
Case Studies:
To illustrate the process, we draw on Supertech’s participation in the development and maintenance of a number of industry projects such as:
Jindal Steel and Power’s (JSPL) 12.5 MTA Steel Plant Project Control System. http://www.jindalsteelpower.com/ facilities/domestic/orissa/angul.aspx We consider this to be a Large Industrial Project (Mega Project).
The Construction Industry Productivity Dilemma
Elements of a Successful Project Delivery
Advanced Work Packaging (AWP)
Structure
Deliverables
Practice Model
A vision for our Industry
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo
Case Studies:
To illustrate the process, we draw on Supertech’s participation in the development and maintenance of a number of industry projects such as:
Jindal Steel and Power’s (JSPL) 12.5 MTA Steel Plant Project Control System. http://www.jindalsteelpower.com/ facilities/domestic/orissa/angul.aspx We consider this to be a Large Industrial Project (Mega Project).
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo
The Cost Plan - Work Breakdown Structure
What is a Cost Plan ? Cost Plan is the Estimate for the project based on the Scope of Work Measured Trade Elements
The Cost Plan has a Cost Work Breakdown Structure (CWBS) To Mirror The Project Scope of Work.
Typical CWBS for an Industrial/Infrastructure Project:
Level 1 - The Project
Level 2 - Phase/Stage - Separable Portions
Level 3 - Area /Facility – Construction Zones
Level 4 - Resource - Trade Based Activities
Level 5 - Resource Trade Based Elements - Units of Measure and Pricing
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...Project Controls Expo
BMT Hi-Q Sigma Overview
• A professional services company compromising of 120 consultants across offices in Bath, Basingstoke and London.
• OperaJng across the Defence, JusJce, Energy and TransportaJon sectors.
• Achieved a turnover in 2011 of ~ £12M.
• As an employee benefit trust with no manufacturing or supply chain
interests, we provide truly imparJal advice, assistance.
• In the complex world which we know you face every day, our goal is simple and steadfast:
to bring clarity
www.workpackaging.org
Engineering think systems..
Procurement think commodities..
Construction think “all” and geographically
…Can AWP align those different perspectives?
www.workpackaging.org
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo
• Common Challenges & Manage Risk
• Your Main Link for Performance Measurement-Control
Accounts
• Data Integration throughout the cost management lifecycle Requirements
• Special Focus:Cost & Schedule Integration
• Methods for Transferring Data
• A Little about ARES Software and PRISMG2
Industry engineering process evolves from Hardware based development to Digital based development. This process innovation increases efficiency, reduces development period, and enhances product quality. CAE's responsibility increases and encounter high demand from design engineering, test, styling, and upper management.
How CAE can meet the expectations and can evolve to be the core functionality in development process?
Speakers
Dr. Byungsik Kang, Vice President, Hyundai Kia Motors
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Aconex
Parsons, one of the world’s largest construction and engineering companies, discuss best practices on how they structure decisions and processes on complex infrastructure projects.
Boston Consulting Group provide insight on how they assist some of the world’s largest JVs and PPPs.
See a demonstration of process management, including submittals, RFIs, commissioning and handover using Aconex.
AVEVA World Conference NA - Tom Singer, Aker SolutionsVanessa Erickson
Aker Solutions has an ambitious digitalization agenda and a long technology development relationship with AVEVA. This presentation shares examples of how Aker Solutions solves complex business problems with many stakeholders in 3D, using innovative engineering automation and connecting data.
Use cases both from the field concept phase and from project execution are included, showing that data driven decisions result in a better business case throughout field life while reducing risk in project execution.
RT332: Measuring Progress and Productivity in Model-based EngineeringAVEVA Group plc
CII is an organization consisting of owners, constructors, designers, and academia dedicated to improving the construction industry as a whole, providing meaningful research to yield useful tools to improve all aspects of the construction industry. Learn how AVEVA is collaborating with CII's Research Team 332 on researching and developing adoptable and adaptable solutions for the task of progressing and measuring productivity within 3D modeling environments.
Presented by:
Dr. Mani Golparvar-Fard—University of Illinois at Urbana-Champaign
Gustavo Garciat—University of Illinois at Urbana-Champaign
Derwin Cartmel—Day & Zimmermann
Discover how AVEVA can transform your business today
www.aveva.com
Transformational Change in Managing Assets for Operational Excellence by Jan ...AVEVA Group plc
Jan Shumate, Eastman Chemical Company discusses the ‘Transformational Change in Managing Assets for Operational Excellence’ at the AVEVA World Summit 2016, New Orleans. Jan outlines ‘The Journey from Documents to Data’ and by using AVEVA Integrated Engineering and Design (IE&D) solution, learn how Eastman created a data-centric engineering platform to improve their plan engineering processes.
Discover how you can also maintain an evergreen digital asset for plant operations using AVEVA software the same way Eastman Chemical Company have. Contact us at http://www.aveva.com/en/Contact.aspx to start transforming your business today.
AVEVA World Conference NA - Greg Pada, Digital Twin SolutionsAVEVA-Americas
Industry 4.0 is the buzzword of the day. It speaks to a massive shift in reliance on centralized universally accessible data that enables tools to drive efficiencies in all aspects of business. AVEVA’s core data-centric philosophy is leading this shift in the world of Industrial Facility Engineering. EPC 4.0 is coming.
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA-Americas
There has been a decade’s long vision that technology will assist us with project design and execution, handling 2D and 3D design and data integration, saving time and improving quality. However, our industry still seems to get to the end of the project and break out the colored pencils and Excel / Access to see what we missed.
Are we finally on a path where the tools are going to deliver the vision?
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo
The Cost Plan - Work Breakdown Structure
What is a Cost Plan ? Cost Plan is the Estimate for the project based on the Scope of Work Measured Trade Elements
The Cost Plan has a Cost Work Breakdown Structure (CWBS) To Mirror The Project Scope of Work.
Typical CWBS for an Industrial/Infrastructure Project:
Level 1 - The Project
Level 2 - Phase/Stage - Separable Portions
Level 3 - Area /Facility – Construction Zones
Level 4 - Resource - Trade Based Activities
Level 5 - Resource Trade Based Elements - Units of Measure and Pricing
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...Project Controls Expo
BMT Hi-Q Sigma Overview
• A professional services company compromising of 120 consultants across offices in Bath, Basingstoke and London.
• OperaJng across the Defence, JusJce, Energy and TransportaJon sectors.
• Achieved a turnover in 2011 of ~ £12M.
• As an employee benefit trust with no manufacturing or supply chain
interests, we provide truly imparJal advice, assistance.
• In the complex world which we know you face every day, our goal is simple and steadfast:
to bring clarity
www.workpackaging.org
Engineering think systems..
Procurement think commodities..
Construction think “all” and geographically
…Can AWP align those different perspectives?
www.workpackaging.org
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo
• Common Challenges & Manage Risk
• Your Main Link for Performance Measurement-Control
Accounts
• Data Integration throughout the cost management lifecycle Requirements
• Special Focus:Cost & Schedule Integration
• Methods for Transferring Data
• A Little about ARES Software and PRISMG2
Industry engineering process evolves from Hardware based development to Digital based development. This process innovation increases efficiency, reduces development period, and enhances product quality. CAE's responsibility increases and encounter high demand from design engineering, test, styling, and upper management.
How CAE can meet the expectations and can evolve to be the core functionality in development process?
Speakers
Dr. Byungsik Kang, Vice President, Hyundai Kia Motors
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Aconex
Parsons, one of the world’s largest construction and engineering companies, discuss best practices on how they structure decisions and processes on complex infrastructure projects.
Boston Consulting Group provide insight on how they assist some of the world’s largest JVs and PPPs.
See a demonstration of process management, including submittals, RFIs, commissioning and handover using Aconex.
AVEVA World Conference NA - Tom Singer, Aker SolutionsVanessa Erickson
Aker Solutions has an ambitious digitalization agenda and a long technology development relationship with AVEVA. This presentation shares examples of how Aker Solutions solves complex business problems with many stakeholders in 3D, using innovative engineering automation and connecting data.
Use cases both from the field concept phase and from project execution are included, showing that data driven decisions result in a better business case throughout field life while reducing risk in project execution.
RT332: Measuring Progress and Productivity in Model-based EngineeringAVEVA Group plc
CII is an organization consisting of owners, constructors, designers, and academia dedicated to improving the construction industry as a whole, providing meaningful research to yield useful tools to improve all aspects of the construction industry. Learn how AVEVA is collaborating with CII's Research Team 332 on researching and developing adoptable and adaptable solutions for the task of progressing and measuring productivity within 3D modeling environments.
Presented by:
Dr. Mani Golparvar-Fard—University of Illinois at Urbana-Champaign
Gustavo Garciat—University of Illinois at Urbana-Champaign
Derwin Cartmel—Day & Zimmermann
Discover how AVEVA can transform your business today
www.aveva.com
Transformational Change in Managing Assets for Operational Excellence by Jan ...AVEVA Group plc
Jan Shumate, Eastman Chemical Company discusses the ‘Transformational Change in Managing Assets for Operational Excellence’ at the AVEVA World Summit 2016, New Orleans. Jan outlines ‘The Journey from Documents to Data’ and by using AVEVA Integrated Engineering and Design (IE&D) solution, learn how Eastman created a data-centric engineering platform to improve their plan engineering processes.
Discover how you can also maintain an evergreen digital asset for plant operations using AVEVA software the same way Eastman Chemical Company have. Contact us at http://www.aveva.com/en/Contact.aspx to start transforming your business today.
AVEVA World Conference NA - Greg Pada, Digital Twin SolutionsAVEVA-Americas
Industry 4.0 is the buzzword of the day. It speaks to a massive shift in reliance on centralized universally accessible data that enables tools to drive efficiencies in all aspects of business. AVEVA’s core data-centric philosophy is leading this shift in the world of Industrial Facility Engineering. EPC 4.0 is coming.
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA-Americas
There has been a decade’s long vision that technology will assist us with project design and execution, handling 2D and 3D design and data integration, saving time and improving quality. However, our industry still seems to get to the end of the project and break out the colored pencils and Excel / Access to see what we missed.
Are we finally on a path where the tools are going to deliver the vision?
Leveraging C3D® to Ensure Compliance of Site Execution TeamsCCT International
Presented by Dr. Amr El-Sersy on October 10 2017, at the 2017 AWP conference in Houston, Texas, USA.
Dr. Amr El-Sersy is CCT's VP of Marketing and Business Consulting Services.
Mission-Critical Facilities Design Courses and Credential Programs BrochureStrategic Media Asia
Strategic Media Asia Ltd (SMA) is one of the Approved CPD Course Providers of the Chartered Institution of Building Services Engineers (CIBSE). SMA exists to provide an interactive environment and opportunities for members of IDC industry and engineers to exchange professional views and experience on data center design, critical infrastructure system, electrical and mechanical facilities, etc.
SMA connects IT, Facilities and Design. For details, please visit http://www.stmedia-asia.com/trainings.html or the knowledge blog http://green-data.blogspot.com.
CADISON® Project Engineer is your tool for plant design, Engineering calculations and detailing of your plant by adding all required components (objects) to the project while taking them from the catalogue. Simple Drag & Drop operations are sufficient with completely text based operations without the obligation to have a graphical environment.
CADISON® Project Engineer is your tool for plant design, Engineering calculations and detailing of your plant by adding all required components (objects) to the project while taking them from the catalogue. Simple Drag & Drop operations are sufficient with completely text based operations without the obligation to have a graphical environment. This approach is called "Conceptual Engineering". The target of CADISON® Project Engineer is to provide the user with data for calculation without large efforts and already at a very early time.
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
Webinar presented by Mr. Zuhair Haddad, CCT's Chairman for the Lean Construction Institute on 1 September 2016.
Hospitals are ecosystems of diverse functions: laboratories, imaging units, ERs, surgery and operating rooms, inpatient quarters, etc. This makes building them one of the most complex tasks, specifically room completion systems as each set of rooms have their own furnishing and finishing requirements. This entails the existence of several number of trades, where coordination grows exponentially in importance. King Hussein Cancer Center in Jordan is a prime example with fast track requirements (3 years delivery) which increase the complexity further.
Join in this webinar Consolidated Contractors Company (CCC), a leading global construction contractor who will share the above case study where BIM, advanced work packaging and Lean were implemented in an integrated approach to manage the finishing activities for the hospital. The presenter will share some of key drivers for the success of this implementation:
• BIM authoring requirements to suit project controls
• Leveraging BIM to manage schedule, cost, sub-contractors, and material delivery.
• Installation Work Packages (IWPs) creation
• IWPs management using Lean approach
• Collaboration using BIM to support Lean processes
• Lessons learned.
About the Presenter:
Zuhair Haddad is the CIO, Corporate Asset and Risk Management for Consolidated Contractors Company (CCC). He is in charge of mapping out and implementing the Project Control IT and Communication strategy for CCC group as well as directly overseeing CCC’s Information Systems, Corporate Risk, Communication and E-procurement Departments. He also leads the Plants Machinery and Vehicles (PMV) Department which manages CCC’s extensive fleet of construction equipment. Zuhair holds a Masters in Construction Management from Stanford University and a Bachelor of Science from the California State University of Chico in Civil Engineering. In 2014, Zuhair and two other inventors were granted a US Patent for their invention entitled: “System and method for hybrid solid and surface modeling for computer-aided design environments."
The Information ChallengeManaging Construction with BIMCCT International
Presentation of Zuhair Haddad CIO, Corporate Asset and Risk Management for Consolidated Contractors Company (CCC) at the 3rd Annual BIM conference Dubai (25-26 February, 2
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Advanced Work Packaging - CCT Solutions at a Glance
1. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
CCT Solutions at a Glance
AMR H. ELSERSY, Ph.D.
VP Marketing & Consulting Services
2. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
Who We Are
• CCT was established in 1999, as the technology
arm of a global construction contractor (CCC).
• Our project control solutions are used on
landmark projects.
• Our consulting services are based on proven
long experience in construction
• C3D is our solution for managing construction
based on AWP+ methodology!
• We offer comprehensive solutions for site
management, visual project control, pipeline
construction, testing and commissioning .
• Our mobile solutions are designed for control
of material, welding, progress, crew-based
timesheet, GIS data, etc.
3. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
Our Challenge
• We’re involved typically in large fast track LSTK
projects.
• We work with many O/O, EP companies who have
different requirements, design & ERP systems, and
work practices.
• Typically, we are faced with large inconsistent
information that we need to process in order to
manage construction.
• Hence, our solutions have to be powerful and
flexible.
• Our solutions should offer effective supply chain
management up to project handover.
• Our mission is to provide visual methods to
manage complex projects effectively.
4. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
C3D allows users to link 3D objects to multifaceted data in an
object oriented fashion. BIM data is modeled in classes and
hierarchies (PCWBS, OBS, CBS, SBS, RBS, EWP, CWP, IWP etc.).
View BIM data
hierarchies in
any structure
you wish
Sort BIM
components as
needed and by
any class or value
Properties
on the fly
Colorize according
to construction
requirements
(progress,
material shortage,
WFP)
Smooth 3D rendering optimized for very large models
5. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
Relations Creation: C3D allows the user to create links
between classes utilizing sophisticated tools, such as:
– Volumes selection
– Non-Uniform volumes selection (2D Maps)
– Timeline Snippets allowing re-execution of instruction
when changes occurs.
IWPs Definition using volumes
Timelines for Linking
2D Maps
6. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
Data Concurrency
– Temporal database structure
– Data history maintenance via static save, scope and revision
control.
– Geometrical & data comparison of different versions of data
7. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
Integration:
Having an open architecture, C3D can integrate with several
cost estimation systems, scheduling software, ERP solutions,
etc.
8. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
• Interoperability:
– C3D is a CAD-neutral vendor platform.
– C3D can read from SmartPlant 3D, PDMS, Revit,
Autocad, Microstation, Tekla, IFC, XML (ISO 15926),
STEP (ISO 10303), ACIS SAT, etc.
• Scalability:
– C3D was designed for large projects, capable of handling
multiple models from multiple disciplines.
– Data integration progressively
• Industry Recognition:
– Fiatech, CIFE, ENCORD
9. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
Our Offering
We offer IT solutions and best practices to help you
manage and integrate various construction data
related to:
– Scope (MTO / BOQ)
– Planning & Scheduling
– Budget / Cost
– Material Procurement and warehousing
– Pre-fabrication and field installation progress.
– Testing and commissioning
– Etc.
10. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
Our Offering
Our solution, C3D, provide you the means to:
– Build CWPs and IWPs according to schedule and progress
targets.
– Identify in detail the current scope, resources, HSE and QC
requirements to complete these WPs.
– Perform weekly/ monthly look-ahead planning.
– Prioritize between IWPs according to schedule and
commissioning priorities.
– Assure availability of resources.
– Balance work assignments between crews.
– Track & verify progress and site productivity.
– Identify bottleneck operations and resources
– Assure compliance with QC and HSE requirements
11. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
• Attend our presentation tomorrow at 3:30PM. We
will show in detail AWP implementation in an on-
going project.
• Visit our booth for demos on C3D and other CCT
solutions.
Challenges and Lessons Learned
12. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.