Landslide control measures
Landslide control measures are implemented after adequate study and
understanding of the causes of the landslide occurrences, the landslide inducing
processes and their mechanism.The foremost requirements for slide control are
reliable information on the geologic structure of the ground adjoining the land
under considerations, hydro-geological study as well as geomorphological
attribute which may directly lead to a failure of the slope. Landslide control
measures include two types of works,
(i) prevention works and (ii) detention works.
The former intends to stop or mitigate a landslide motion by changing the
natural
conditions, such as, topographical, geotechnical and water conditions at a
landslide site, while the latter aims at detaining a part of the landslide motion or
the entire landslide motion using structural control works.
Surface Drainage:
• The first preventive remedial measure is to control the surface drainage of
the landslide area.
• All perennial or temporary jhoras (small streams) or water
courses should be prevented from entering the slide area.
For the immediate provisional diversion of water,
any pipes available may be used.
• For discharging rain water from the slide, open
ditches of adequate dimensions, and modifying gradient are done.
• At the sometime, the ground surface should be leveled and depressions and all cracks
• need to be so filled as to ensure a continuous runoff of surface.
• They are paved either by natural stone of suitable properties, or by concrete tiles set into
a sand
• bed and the joints are seated by cement mixture. In case of sandy soils, ditch
• bottom and walls are consolidated by asphalt, bitumen or oil sprinkle.
Deep trench drains:
Filter fabric is an effective means of drainage for landslide control. Clogproof
filter fabric covered drains consist of a permeable gravel core, surrounded
by a filter fabric to prevent clogging.The gravel size is either 16-32 mm or 35-70
mm to ensure a sufficiently high void ratio.The average amount of material
needed per metre of drain length is about one cubic metre of gravel and five
square metres of filter fabric.
Retaining wails and similar structures:
i. The foundation of the retaining walls should lie on the
ii. hard strata or rock and should be free from scour, frost, and surface water.
iii. The base of the foundation must be wide enough to distribute the
pressure over the foundation.
iv. The stone to be need should be more than 0.14 cubic metres in size,
v. and the width of each stone should be more than 1.5 time its height.
Masonry walls:
• Retaining walls above four metres in height are built either in lime or cement mortar
masonry or in dry stone masonry with 0.6 m wide mortar masonry bands three to
found metres apart, laid both in horizontal and vertical directions.
• The top thickness is usually 0.6 m, the front batter one to four, and the back face
vertical.
• Masonry courses are made
• normal to face batter and the back of the wall can be finished rough.
Concrete retaining walls:
• The stability of the whole body of the walls and the stem is considered in
the design.The body of the walls is taken to include the mass of soil directly
above the heel of the wail and earth pressure.
• Weep holes are generally kept in the wall. Several landslides have been
protected by Concrete retaining walls inside and outside the town.
Anchored walls:
• A deep pre-stressed anchor is also applied for stabilizing soil slopes.
• Walls with pre-stressed anchors have a major advantage because they actively oppose
the movement of the soil mass, rather than behaving passively as in thecase of
unstressed anchors and gravity structures.
• Pre-stressed anchors are employed either in combination with retaining structures, or
alone, to reduce the driving forces of a landslide and to increase the normal effective
stresses on its slip surface.
THANKS…

More Related Content

What's hot

Types of Retaining walls..
Types of Retaining walls..Types of Retaining walls..
Types of Retaining walls..
Shan Khan
 
Principles and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrinciples and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil walls
Prakash Ravindran
 
Theory of structures 002
Theory of structures 002Theory of structures 002
Reinforced earth & its application
Reinforced earth & its applicationReinforced earth & its application
Reinforced earth & its application
Budarapu Venkat Pranay
 
Retaining wall
Retaining wallRetaining wall
Retaining wall
51412
 
First Use Of Geosynthetic Reinforced Soil – Integrated Bridge System in Il...
First Use Of Geosynthetic Reinforced Soil – Integrated Bridge System in Il...First Use Of Geosynthetic Reinforced Soil – Integrated Bridge System in Il...
First Use Of Geosynthetic Reinforced Soil – Integrated Bridge System in Il...
thomas-engineering
 
Theory of structures
Theory of structuresTheory of structures
Modes of failure earth dams
Modes of failure   earth damsModes of failure   earth dams
Modes of failure earth dams
saibabu48
 
Shoring system and Dewatering
Shoring system and DewateringShoring system and Dewatering
Shoring system and Dewatering
SALEM MOHAMMED
 
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMSGEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
LorevieOlaes
 
Advancement in retaining wall
Advancement  in retaining wallAdvancement  in retaining wall
Classification of retaining wall
Classification of retaining wallClassification of retaining wall
Classification of retaining wall
Vijay Chandolia
 
Re wall12
Re wall12Re wall12
PROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURES
PROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURESPROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURES
PROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURES
Indrajit Sardar
 
Lecture 4
Lecture 4Lecture 4
Earthen dams
Earthen damsEarthen dams
Earthen dams
vaignan
 
Engineering Geology
Engineering GeologyEngineering Geology
Engineering Geology
GAURAV. H .TANDON
 
SEAPAGE
SEAPAGESEAPAGE
SEAPAGE
Meesum Zaidi
 
Research in geotechnical engineering
Research in geotechnical engineeringResearch in geotechnical engineering
Research in geotechnical engineering
Abhineet Godayal CE
 

What's hot (19)

Types of Retaining walls..
Types of Retaining walls..Types of Retaining walls..
Types of Retaining walls..
 
Principles and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrinciples and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil walls
 
Theory of structures 002
Theory of structures 002Theory of structures 002
Theory of structures 002
 
Reinforced earth & its application
Reinforced earth & its applicationReinforced earth & its application
Reinforced earth & its application
 
Retaining wall
Retaining wallRetaining wall
Retaining wall
 
First Use Of Geosynthetic Reinforced Soil – Integrated Bridge System in Il...
First Use Of Geosynthetic Reinforced Soil – Integrated Bridge System in Il...First Use Of Geosynthetic Reinforced Soil – Integrated Bridge System in Il...
First Use Of Geosynthetic Reinforced Soil – Integrated Bridge System in Il...
 
Theory of structures
Theory of structuresTheory of structures
Theory of structures
 
Modes of failure earth dams
Modes of failure   earth damsModes of failure   earth dams
Modes of failure earth dams
 
Shoring system and Dewatering
Shoring system and DewateringShoring system and Dewatering
Shoring system and Dewatering
 
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMSGEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
 
Advancement in retaining wall
Advancement  in retaining wallAdvancement  in retaining wall
Advancement in retaining wall
 
Classification of retaining wall
Classification of retaining wallClassification of retaining wall
Classification of retaining wall
 
Re wall12
Re wall12Re wall12
Re wall12
 
PROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURES
PROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURESPROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURES
PROJECT REPORT ON SOIL REINFORCEMENT RETAINING STRUCTURES
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 
Earthen dams
Earthen damsEarthen dams
Earthen dams
 
Engineering Geology
Engineering GeologyEngineering Geology
Engineering Geology
 
SEAPAGE
SEAPAGESEAPAGE
SEAPAGE
 
Research in geotechnical engineering
Research in geotechnical engineeringResearch in geotechnical engineering
Research in geotechnical engineering
 

Similar to Construction techniques and measures

soil retention in construction -Group 7 powerpoint
    soil retention in construction -Group 7 powerpoint    soil retention in construction -Group 7 powerpoint
soil retention in construction -Group 7 powerpoint
Lawin Langat
 
chapter-6 Expansive Soils.pptx
chapter-6 Expansive Soils.pptxchapter-6 Expansive Soils.pptx
chapter-6 Expansive Soils.pptx
kemal56
 
Soil improvement Methods.pptx
Soil improvement Methods.pptxSoil improvement Methods.pptx
Soil improvement Methods.pptx
FlittiAbdelhamid
 
9487 (1).ppt
9487 (1).ppt9487 (1).ppt
9487 (1).ppt
ssuser82bba1
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
YingHongKang
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
Arpit Sethia
 
WRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity damsWRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity dams
MitaliShelke
 
م.92-#تواصل_تطوير-أ.د.نبيل السيد إمام-خيارات التأسيس في التربة الانتفاخية
م.92-#تواصل_تطوير-أ.د.نبيل السيد إمام-خيارات التأسيس في التربة الانتفاخيةم.92-#تواصل_تطوير-أ.د.نبيل السيد إمام-خيارات التأسيس في التربة الانتفاخية
م.92-#تواصل_تطوير-أ.د.نبيل السيد إمام-خيارات التأسيس في التربة الانتفاخية
Egyptian Engineers Association
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
Rimpi Baro
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
GAURAV. H .TANDON
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketing
Aditya Sanyal
 
Akash verma.pptx
Akash verma.pptxAkash verma.pptx
Akash verma.pptx
AMITYADAV960525
 
Chapter 6.0 modern foundation tech. & ground improvement
Chapter 6.0   modern foundation tech. & ground improvement Chapter 6.0   modern foundation tech. & ground improvement
Chapter 6.0 modern foundation tech. & ground improvement
DYPCET
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
DHAVASHANKARAN D
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
Seminar Links
 
Interlocking pavement
Interlocking pavementInterlocking pavement
Interlocking pavement
Himanshu Gupta
 
6.1 Grouting.pptx
6.1 Grouting.pptx6.1 Grouting.pptx
6.1 Grouting.pptx
kaustubhpetare
 
1.9 GROUTING.ppt
1.9 GROUTING.ppt1.9 GROUTING.ppt
1.9 GROUTING.ppt
Venkatesh Baskar
 
Grouting n gunintung
Grouting n gunintungGrouting n gunintung
Diaphragm walls
Diaphragm wallsDiaphragm walls
Diaphragm walls
Nguyen Bao
 

Similar to Construction techniques and measures (20)

soil retention in construction -Group 7 powerpoint
    soil retention in construction -Group 7 powerpoint    soil retention in construction -Group 7 powerpoint
soil retention in construction -Group 7 powerpoint
 
chapter-6 Expansive Soils.pptx
chapter-6 Expansive Soils.pptxchapter-6 Expansive Soils.pptx
chapter-6 Expansive Soils.pptx
 
Soil improvement Methods.pptx
Soil improvement Methods.pptxSoil improvement Methods.pptx
Soil improvement Methods.pptx
 
9487 (1).ppt
9487 (1).ppt9487 (1).ppt
9487 (1).ppt
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
 
WRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity damsWRE II construction of galleries in gravity dams
WRE II construction of galleries in gravity dams
 
م.92-#تواصل_تطوير-أ.د.نبيل السيد إمام-خيارات التأسيس في التربة الانتفاخية
م.92-#تواصل_تطوير-أ.د.نبيل السيد إمام-خيارات التأسيس في التربة الانتفاخيةم.92-#تواصل_تطوير-أ.د.نبيل السيد إمام-خيارات التأسيس في التربة الانتفاخية
م.92-#تواصل_تطوير-أ.د.نبيل السيد إمام-خيارات التأسيس في التربة الانتفاخية
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketing
 
Akash verma.pptx
Akash verma.pptxAkash verma.pptx
Akash verma.pptx
 
Chapter 6.0 modern foundation tech. & ground improvement
Chapter 6.0   modern foundation tech. & ground improvement Chapter 6.0   modern foundation tech. & ground improvement
Chapter 6.0 modern foundation tech. & ground improvement
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Interlocking pavement
Interlocking pavementInterlocking pavement
Interlocking pavement
 
6.1 Grouting.pptx
6.1 Grouting.pptx6.1 Grouting.pptx
6.1 Grouting.pptx
 
1.9 GROUTING.ppt
1.9 GROUTING.ppt1.9 GROUTING.ppt
1.9 GROUTING.ppt
 
Grouting n gunintung
Grouting n gunintungGrouting n gunintung
Grouting n gunintung
 
Diaphragm walls
Diaphragm wallsDiaphragm walls
Diaphragm walls
 

More from Devesh Tripathi

Wall finishes
Wall finishesWall finishes
Wall finishes
Devesh Tripathi
 
Thermosetting plastics & rubber
Thermosetting plastics & rubberThermosetting plastics & rubber
Thermosetting plastics & rubber
Devesh Tripathi
 
Thermoplastics
ThermoplasticsThermoplastics
Thermoplastics
Devesh Tripathi
 
Roomi darwaza
Roomi darwazaRoomi darwaza
Roomi darwaza
Devesh Tripathi
 
Roof coverings 2
Roof coverings 2Roof coverings 2
Roof coverings 2
Devesh Tripathi
 
Presentation on flood disaster management
Presentation on flood disaster managementPresentation on flood disaster management
Presentation on flood disaster management
Devesh Tripathi
 
Joints ppt devesh
Joints ppt deveshJoints ppt devesh
Joints ppt devesh
Devesh Tripathi
 
Jaisalmer ppt
Jaisalmer pptJaisalmer ppt
Jaisalmer ppt
Devesh Tripathi
 
Interior designing
Interior designingInterior designing
Interior designing
Devesh Tripathi
 
Devesh report
Devesh reportDevesh report
Devesh report
Devesh Tripathi
 
Devesh ppt
Devesh pptDevesh ppt
Devesh ppt
Devesh Tripathi
 
Devesh ppt history
Devesh ppt historyDevesh ppt history
Devesh ppt history
Devesh Tripathi
 
Ceiling
CeilingCeiling
Arcuated structure ppt
Arcuated structure pptArcuated structure ppt
Arcuated structure ppt
Devesh Tripathi
 
Aluminium
AluminiumAluminium
Aluminium
Devesh Tripathi
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
Devesh Tripathi
 
Steel
SteelSteel

More from Devesh Tripathi (17)

Wall finishes
Wall finishesWall finishes
Wall finishes
 
Thermosetting plastics & rubber
Thermosetting plastics & rubberThermosetting plastics & rubber
Thermosetting plastics & rubber
 
Thermoplastics
ThermoplasticsThermoplastics
Thermoplastics
 
Roomi darwaza
Roomi darwazaRoomi darwaza
Roomi darwaza
 
Roof coverings 2
Roof coverings 2Roof coverings 2
Roof coverings 2
 
Presentation on flood disaster management
Presentation on flood disaster managementPresentation on flood disaster management
Presentation on flood disaster management
 
Joints ppt devesh
Joints ppt deveshJoints ppt devesh
Joints ppt devesh
 
Jaisalmer ppt
Jaisalmer pptJaisalmer ppt
Jaisalmer ppt
 
Interior designing
Interior designingInterior designing
Interior designing
 
Devesh report
Devesh reportDevesh report
Devesh report
 
Devesh ppt
Devesh pptDevesh ppt
Devesh ppt
 
Devesh ppt history
Devesh ppt historyDevesh ppt history
Devesh ppt history
 
Ceiling
CeilingCeiling
Ceiling
 
Arcuated structure ppt
Arcuated structure pptArcuated structure ppt
Arcuated structure ppt
 
Aluminium
AluminiumAluminium
Aluminium
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Steel
SteelSteel
Steel
 

Recently uploaded

Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
Chevonnese Chevers Whyte, MBA, B.Sc.
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Denish Jangid
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
BoudhayanBhattachari
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
imrankhan141184
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
Wahiba Chair Training & Consulting
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
spdendr
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 

Recently uploaded (20)

Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 

Construction techniques and measures

  • 2. Landslide control measures Landslide control measures are implemented after adequate study and understanding of the causes of the landslide occurrences, the landslide inducing processes and their mechanism.The foremost requirements for slide control are reliable information on the geologic structure of the ground adjoining the land under considerations, hydro-geological study as well as geomorphological attribute which may directly lead to a failure of the slope. Landslide control measures include two types of works, (i) prevention works and (ii) detention works. The former intends to stop or mitigate a landslide motion by changing the natural conditions, such as, topographical, geotechnical and water conditions at a landslide site, while the latter aims at detaining a part of the landslide motion or the entire landslide motion using structural control works.
  • 3. Surface Drainage: • The first preventive remedial measure is to control the surface drainage of the landslide area. • All perennial or temporary jhoras (small streams) or water courses should be prevented from entering the slide area. For the immediate provisional diversion of water, any pipes available may be used. • For discharging rain water from the slide, open ditches of adequate dimensions, and modifying gradient are done. • At the sometime, the ground surface should be leveled and depressions and all cracks • need to be so filled as to ensure a continuous runoff of surface. • They are paved either by natural stone of suitable properties, or by concrete tiles set into a sand • bed and the joints are seated by cement mixture. In case of sandy soils, ditch • bottom and walls are consolidated by asphalt, bitumen or oil sprinkle.
  • 4. Deep trench drains: Filter fabric is an effective means of drainage for landslide control. Clogproof filter fabric covered drains consist of a permeable gravel core, surrounded by a filter fabric to prevent clogging.The gravel size is either 16-32 mm or 35-70 mm to ensure a sufficiently high void ratio.The average amount of material needed per metre of drain length is about one cubic metre of gravel and five square metres of filter fabric.
  • 5. Retaining wails and similar structures: i. The foundation of the retaining walls should lie on the ii. hard strata or rock and should be free from scour, frost, and surface water. iii. The base of the foundation must be wide enough to distribute the pressure over the foundation. iv. The stone to be need should be more than 0.14 cubic metres in size, v. and the width of each stone should be more than 1.5 time its height.
  • 6. Masonry walls: • Retaining walls above four metres in height are built either in lime or cement mortar masonry or in dry stone masonry with 0.6 m wide mortar masonry bands three to found metres apart, laid both in horizontal and vertical directions. • The top thickness is usually 0.6 m, the front batter one to four, and the back face vertical. • Masonry courses are made • normal to face batter and the back of the wall can be finished rough.
  • 7. Concrete retaining walls: • The stability of the whole body of the walls and the stem is considered in the design.The body of the walls is taken to include the mass of soil directly above the heel of the wail and earth pressure. • Weep holes are generally kept in the wall. Several landslides have been protected by Concrete retaining walls inside and outside the town.
  • 8. Anchored walls: • A deep pre-stressed anchor is also applied for stabilizing soil slopes. • Walls with pre-stressed anchors have a major advantage because they actively oppose the movement of the soil mass, rather than behaving passively as in thecase of unstressed anchors and gravity structures. • Pre-stressed anchors are employed either in combination with retaining structures, or alone, to reduce the driving forces of a landslide and to increase the normal effective stresses on its slip surface.