AN OVERVIEW: CRITICAL FACTORS AFFECTING THE SUCCESS OF
CONSTRUCTION PROJECT IN GWALIOR
Pratiksha Pandey1, Dr Mukesh Pandey2, Sohit Agarwal3
1M.Tech student Department of Civil Engineering, ITM University Gwalior, Madhya Pradesh, India
2Head of Department Civil Engineering, ITM University Gwalior, Madhya Pradesh, India
3Assistance Professor, Dept. of civil Engineering, ITM University Gwalior, Madhya Pradesh, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract :The growth of performance has become more
critical to the success of a construction project. The
construction industries are facing complexity in theprojects
due to some critical factors. In the previous researches,
different critical factors have beenproposed.Someofcritical
factors have been listed commonly in the previous review
papers which have been minimized by using different
approaches and methodologies. Also, different ideologies
have been proposed for the successof a constructionproject.
This literature review has been done to gather the
information about the causes and their factors which may
affect the performance of construction projects.
The main objective of this review paper is to cover most of
the factors which may be considered critical during any
project. This investigationmayinturnhelptheorganizations
in assessing the performance of the project management.
Keywords : critical factor, factor affecting success,
performance.
1.INTRODUCTION
For the success of the project it is mandatory to investigate
the factors which may affect the performance of the project.
Such factors may known as critical factors.it is necessary to
possibly minimize those factors in large number for the
success of any project.Forminimizingthe maximum number
of errors from the project first it is needed to be identify the
problems. A success project may called that project which is
completed as per the planned timing and budget. And if any
of these two are not fulfilled then the construction project
must considered as the failed project. Construction
industries are very much suffering from these issues like
projects are not being completed as per the planned time
duration and also there are many critical factors occurs in
the project which may the main reason of these failure. The
right approach of starting any project should be first
examine the construction site. And let know the do’s and
don’ts in the project.
1.1 Object and Motive:
As I have mentioned at the starting of this paper that what is
critical factors and how they effect on construction project”
so my object of this study is to know thatthecriticalfactorsof
the construction project which are the main cause of the
failure of the construction project.by examine those critical
factors in this paperwillcategorizedthosefactorsasthemost
responsible factors for the failure of the project. I am doing
this by preparing questionnaire survey.
1.2 Literature Review:
By the time of the study of this case, have been gone through
different literatures, which are defining the major causes of
affecting the success of the construction projects in their
respective areas and also having some of the solutions for
minimalizing those factors which are the cause of the
affecting the success of the constructionproject.Someofcase
studies are given below-
According to T. Anoop, SS. Asadi, A.V.S. Prasad in November-
December 2016, Volume 7, Issue 6.
In this paper they had prepared a framework on the
performance of the construction projects on developing
countries. they had given some factors which may affect the
project performance and they are as follows- cost, quality,
site, dispute, safety, project time.
They mainly indicated six factors in their respective paper
which factors are affecting the success of the construction
projects, client related factor, consultant related factor,
extreme environmental related factor, supply chain related
factors ,contractor related factor. These are the mainly
responsible factor for affecting the project success of the
paper.
The data of this paper has been analyzed by using SPSS
(Stactical Package forthe SocialScience)Person’scorrelation
and Regression Analysis.
According to Afshin Pakseresht29, Dr Gholamreza Asgari30 in
December 2012, Volume 4, NO 8.
In this paper a study have been performed in Pars Garma
Company. Twostageprogrammehavebeenperformedinthis
research. Theypreparedonequestionnaireanddistributedin
58 employees of the company (staff manager, technical
expert, project manager). And in the second stage they
eliminated the lowest factors and again prepared one
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2922
questionnaire and it circulated in 15 organizational expert.
And the final proposed critical factors are givenrespectively-
contractorrelatedfactors,consultantrelatedfactors,contract
related factors, employer related factors, effective factor in
project management, project management related factor,
project logistics related factor.
The data of the paper has been analyzed by Z-test and SPSS
software 16.
According to Nipin Joseph Babu, in (March-April)Vol.12,Ver.V
As the complexityanddifficultiesareverycommonnowdays,
and construction projects are facing many problems due to
this. They have tried to focus on those factors which are
responsible for the complexity of the project and tried to
minimize them hypothetically. Shortage of material have
been listed number one in this research. Mainly focused
factors in this papers are given below-
Cost factors, timefactors,qualityfactors,productivityfactors,
client-satisfactionfactors,regularandcommunitysatisfaction
factors, people factors, health and safety factors, innovation
and learning factors, environment factors.
They have determined the data by RII method.
According to 1SAMART HOMTHONG, 2WUTTHIPONG,2nd April
2016.
Main focus of this paper was to group the factors in different
categories and conduct survey for all of those categories to
analyze which are the mainly responsible factors amongst
them. They proposed nine categories of 179 identified. And
listed top 10 factors from each categories and ranked them
accordingly. There are some most effective factors are
mention- major group, time performance, cost performance,
quality performance, health and safety performance,
environment performance, productivity, risk management,
human resources.
They applied RII method for ranking.
According to Muhammad Saqib, Sarosh H. Lodi, in August,
2008, Karachi, Pakistan.
As the intricacy and complications present in the
construction projects. To restrict these types of
inconvenience during the construction project they have
been gone through one survey to identify the main issues
which are affecting the success of construction projects. And
they find out 77 such small and big causes. And divided them
in 7 different sections top 5 factors from every section have
been analyzed by their ranking. And they finally proposed 5
major factors which were top ranked amongst all of the
sections, which are mentioned below-
Contractor-related factor, project related factors,
procurement related factors, design team factors, project
management factors.
According to Alis Kahwajian1), Shukri Baba2), Omar Amudi3),
Mohammed Wanos4), Jordan Journal of civil engineering,
volume 8, 2014.
Main focus of this paper to collaborate the public and private
sectors for the economic and social development. While
working on this partnershiptheyhavefacedmanychallenges
such as weakness in the administrative and legal difficulties
of public sector, lack of legislation. They have proposed this
partnership on the legal grounds for the development of
Syria. 22 main factors were find out and analyzed by
questionnaire based investigation. The top most 5 critical
factors are,favorablelegalframework,politicalsupport,good
governance, stable macro-economic environment,
appropriate risk allocation and risk sharing.
According to Albert P.C Chan, David Scott, Ada P. Chan in 2004
A conceptualframeworkforthesuccessaffectingfactorshave
been given in this paper. Hypothetically they have been
proposed the construction project will be moreexecutedand
successful and also of shorter duration and overall
management should be smoother if complexity oftheproject
become less. They have been focused on the critical factors
affecting success and not on the project success.Mainlythere
are 5 major critical factors are given which are having
numbers of factors there are 44 such factors have been
investigated top 4 factors of this investigation – project
management actions, external environment, project related
factors.
According to Zarina Alias, E.M.A. Zawawi, Khalid Yusof, Arish,
NM, 20014
Main motive of this research is to enhance the construction
project success. In this paper a wide study has done from the
past/previous papers in which different variables have been
proposed andlisted on the topasthemostaffectedfactorsfor
the successful projects. They held one survey and targeted
experienced folks such as architects, engineers,
manufacturers and so on, they discussed some factors which
should be minimized for improvement of construction
industries of Malaysia, and also they should practically
implement on the constructionsites.Theyinvestigatedallthe
influencing factors, and mainly focused on 5 (CSFs) – project
procedure, project management action, external issues,
human factors, project related factors.
 Construction Projects takes place in a complex and
challenging environment.Areliablewaytominimizethe
complexity of construction project is to work on those
factors and try to minimize them which are the main
causes of complexityandcomingin-betweenthesuccess
of the construction projects, some of such factors have
been investigated while studying various researches
papers. - Environment factors, project management
actions, contractor elated, cost related factors, quality
related factors.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2923
REFERENCES
[1] Zarina Alias, E.M.A. Zawawi, Khalid Yusof, Aris, NM,
‘‘Determining Critical Success factors of Project
Management Practice: A conceptual framework”,
Procedia – social and Behavioral Science, 4-5 January
2014.
[2] Muhammad Saqib, Rizwan U. Farooqui, Sarosh H. Lodi,
‘‘Assessment of Critical SuccessFactorsforConstruction
Projects in Pakistan”, First International Conference on
Construction in Developing Countries (ICCIDC-1), 4-5
August, 2008.
[3] 1SAMARAT HOMTHONG, 2WUTTHIPONG MOUNGNOI,
‘‘CRITICAL SUCCESS FECTORS INFLUENCING
CONSTRUCTION PROJECTS PERFORMANCE FOR
DIFFERENT OBJECTIVES: OPERATION AND
MENTINANCE PHASE”, Proceeding of 35th ISERD
International Conference, Singapore, 2nd April 2016.
[4] Alis Kahwajian1), Shukri Baba2), Omar Amudi3),
Mohhamed Wanos4), ‘‘Identification of Critical Success
Factors for Public Private Partnership Construction
Projects in Syria”, Jordan Journal of Civil Engineering,
volume 8, no 4, 2014.
[5] Nipin Joseph Babu, ‘‘Factors Affecting Success of
Construction Projects”, IOSR Journal of Mechanical and
Civil Engineering (IOSR-JMCE), Volume 12, Issue 2, Ver.
V, (March-April) 2015.
[6] Albert P.C. Chan1, David Scott2, Ada P.L. Chan3, ‘‘Factors
Affecting the Success of Construction Projects”,
JOURNAL OF CONSTRUCTION ENGINEERING AND
MANAGEMENT, January/ February 2004.
[7] T. Anoop, SS. Asadi, A.V.S. Prasad, ‘‘The Critical Success
Factors Affecting The Performance Of Construction
Industries”, International Journal Of Civil Engineering
And Technology (IJCIET), Volume 7, Issue 6, November-
December 2016.
[8] Afshin Pakseresht29, Dr. Gholamreza Asgari30,
“Determining the Critical Success Factors in
Construction Projects:AHPApproach’’,Vol 4,no8,2012.

More Related Content

What's hot

ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
IAEME Publication
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET Journal
 
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
IAEME Publication
 
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachBuilding a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
IRJET Journal
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
IRJET Journal
 
Literature Review - Final
Literature Review - FinalLiterature Review - Final
Literature Review - Final
Rifan Fhazi
 
D012251726
D012251726D012251726
D012251726
IOSR Journals
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET Journal
 
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
Vamsi Kovalam
 
D012261521
D012261521D012261521
D012261521
IOSR Journals
 
Factors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction ProjectsFactors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction Projects
ijtsrd
 
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IAEME Publication
 
Risk management
Risk managementRisk management
Risk management
nashaat algrara
 
A systematic review of uncertainties in
A systematic review of uncertainties inA systematic review of uncertainties in
A systematic review of uncertainties in
ijseajournal
 
To Identify the Various Constraints for Delays in Construction Work and Sugge...
To Identify the Various Constraints for Delays in Construction Work and Sugge...To Identify the Various Constraints for Delays in Construction Work and Sugge...
To Identify the Various Constraints for Delays in Construction Work and Sugge...
Harish Rajmane
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET Journal
 
33 article text-127-1-10-20181005
33 article text-127-1-10-2018100533 article text-127-1-10-20181005
33 article text-127-1-10-20181005
Dr.Madhav Prasad Koirala
 
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
A Makwana
 
Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...
ijtsrd
 
Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.
Rizwan Khurram
 

What's hot (20)

ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
 
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachBuilding a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
 
Literature Review - Final
Literature Review - FinalLiterature Review - Final
Literature Review - Final
 
D012251726
D012251726D012251726
D012251726
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
 
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
STUDY AND ANALYSIS OF CONCRETE STRENGTH PARAMETERS USING VETIVER GRASS ASH AS...
 
D012261521
D012261521D012261521
D012261521
 
Factors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction ProjectsFactors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction Projects
 
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
 
Risk management
Risk managementRisk management
Risk management
 
A systematic review of uncertainties in
A systematic review of uncertainties inA systematic review of uncertainties in
A systematic review of uncertainties in
 
To Identify the Various Constraints for Delays in Construction Work and Sugge...
To Identify the Various Constraints for Delays in Construction Work and Sugge...To Identify the Various Constraints for Delays in Construction Work and Sugge...
To Identify the Various Constraints for Delays in Construction Work and Sugge...
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
33 article text-127-1-10-20181005
33 article text-127-1-10-2018100533 article text-127-1-10-20181005
33 article text-127-1-10-20181005
 
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
 
Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...
 
Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.
 

Similar to An Overview: Critical Factors Affecting The Success of Construction Project in Gwalior

Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- Review
IRJET Journal
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET Journal
 
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET Journal
 
Causes of Construction Injuries.pdf
Causes of Construction Injuries.pdfCauses of Construction Injuries.pdf
Causes of Construction Injuries.pdf
AizaSajjan
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
IRJET Journal
 
Risk Management in Medium Sized Commercial Buildings
Risk Management in Medium Sized Commercial BuildingsRisk Management in Medium Sized Commercial Buildings
Risk Management in Medium Sized Commercial Buildings
IRJET Journal
 
A Framework For Project Success
A Framework For Project SuccessA Framework For Project Success
A Framework For Project Success
Daniel Wachtel
 
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
IRJET Journal
 
Risk Management In High Rise Construction Projects
Risk Management In High Rise Construction ProjectsRisk Management In High Rise Construction Projects
Risk Management In High Rise Construction Projects
IRJET Journal
 
Proposal .pdf
Proposal .pdfProposal .pdf
Proposal .pdf
Engr_Emad Khan
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET Journal
 
I012646171
I012646171I012646171
I012646171
IOSR Journals
 
I012646171
I012646171I012646171
I012646171
IOSR Journals
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
IRJET Journal
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IJERD Editor
 
Analyse the effect of a Work culture of a construction company
Analyse the effect of a Work culture of a construction companyAnalyse the effect of a Work culture of a construction company
Analyse the effect of a Work culture of a construction company
IRJET Journal
 
IRJET- Risk Assessment of Public Private Partnership Projects In Kerala
IRJET- Risk Assessment of Public Private Partnership Projects In KeralaIRJET- Risk Assessment of Public Private Partnership Projects In Kerala
IRJET- Risk Assessment of Public Private Partnership Projects In Kerala
IRJET Journal
 
BEST PRACTICES OF PM EFFECT ON PROJECT SUCCESS
BEST PRACTICES OF PM EFFECT ON  PROJECT SUCCESSBEST PRACTICES OF PM EFFECT ON  PROJECT SUCCESS
BEST PRACTICES OF PM EFFECT ON PROJECT SUCCESS
Muhammad Awais
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
IRJET Journal
 
Ijciet 08 02_005
Ijciet 08 02_005Ijciet 08 02_005
Ijciet 08 02_005
IAEME Publication
 

Similar to An Overview: Critical Factors Affecting The Success of Construction Project in Gwalior (20)

Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- Review
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
 
Causes of Construction Injuries.pdf
Causes of Construction Injuries.pdfCauses of Construction Injuries.pdf
Causes of Construction Injuries.pdf
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
Risk Management in Medium Sized Commercial Buildings
Risk Management in Medium Sized Commercial BuildingsRisk Management in Medium Sized Commercial Buildings
Risk Management in Medium Sized Commercial Buildings
 
A Framework For Project Success
A Framework For Project SuccessA Framework For Project Success
A Framework For Project Success
 
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
 
Risk Management In High Rise Construction Projects
Risk Management In High Rise Construction ProjectsRisk Management In High Rise Construction Projects
Risk Management In High Rise Construction Projects
 
Proposal .pdf
Proposal .pdfProposal .pdf
Proposal .pdf
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
I012646171
I012646171I012646171
I012646171
 
I012646171
I012646171I012646171
I012646171
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Analyse the effect of a Work culture of a construction company
Analyse the effect of a Work culture of a construction companyAnalyse the effect of a Work culture of a construction company
Analyse the effect of a Work culture of a construction company
 
IRJET- Risk Assessment of Public Private Partnership Projects In Kerala
IRJET- Risk Assessment of Public Private Partnership Projects In KeralaIRJET- Risk Assessment of Public Private Partnership Projects In Kerala
IRJET- Risk Assessment of Public Private Partnership Projects In Kerala
 
BEST PRACTICES OF PM EFFECT ON PROJECT SUCCESS
BEST PRACTICES OF PM EFFECT ON  PROJECT SUCCESSBEST PRACTICES OF PM EFFECT ON  PROJECT SUCCESS
BEST PRACTICES OF PM EFFECT ON PROJECT SUCCESS
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
 
Ijciet 08 02_005
Ijciet 08 02_005Ijciet 08 02_005
Ijciet 08 02_005
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
um7474492
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 

Recently uploaded (20)

Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 

An Overview: Critical Factors Affecting The Success of Construction Project in Gwalior

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2921 AN OVERVIEW: CRITICAL FACTORS AFFECTING THE SUCCESS OF CONSTRUCTION PROJECT IN GWALIOR Pratiksha Pandey1, Dr Mukesh Pandey2, Sohit Agarwal3 1M.Tech student Department of Civil Engineering, ITM University Gwalior, Madhya Pradesh, India 2Head of Department Civil Engineering, ITM University Gwalior, Madhya Pradesh, India 3Assistance Professor, Dept. of civil Engineering, ITM University Gwalior, Madhya Pradesh, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract :The growth of performance has become more critical to the success of a construction project. The construction industries are facing complexity in theprojects due to some critical factors. In the previous researches, different critical factors have beenproposed.Someofcritical factors have been listed commonly in the previous review papers which have been minimized by using different approaches and methodologies. Also, different ideologies have been proposed for the successof a constructionproject. This literature review has been done to gather the information about the causes and their factors which may affect the performance of construction projects. The main objective of this review paper is to cover most of the factors which may be considered critical during any project. This investigationmayinturnhelptheorganizations in assessing the performance of the project management. Keywords : critical factor, factor affecting success, performance. 1.INTRODUCTION For the success of the project it is mandatory to investigate the factors which may affect the performance of the project. Such factors may known as critical factors.it is necessary to possibly minimize those factors in large number for the success of any project.Forminimizingthe maximum number of errors from the project first it is needed to be identify the problems. A success project may called that project which is completed as per the planned timing and budget. And if any of these two are not fulfilled then the construction project must considered as the failed project. Construction industries are very much suffering from these issues like projects are not being completed as per the planned time duration and also there are many critical factors occurs in the project which may the main reason of these failure. The right approach of starting any project should be first examine the construction site. And let know the do’s and don’ts in the project. 1.1 Object and Motive: As I have mentioned at the starting of this paper that what is critical factors and how they effect on construction project” so my object of this study is to know thatthecriticalfactorsof the construction project which are the main cause of the failure of the construction project.by examine those critical factors in this paperwillcategorizedthosefactorsasthemost responsible factors for the failure of the project. I am doing this by preparing questionnaire survey. 1.2 Literature Review: By the time of the study of this case, have been gone through different literatures, which are defining the major causes of affecting the success of the construction projects in their respective areas and also having some of the solutions for minimalizing those factors which are the cause of the affecting the success of the constructionproject.Someofcase studies are given below- According to T. Anoop, SS. Asadi, A.V.S. Prasad in November- December 2016, Volume 7, Issue 6. In this paper they had prepared a framework on the performance of the construction projects on developing countries. they had given some factors which may affect the project performance and they are as follows- cost, quality, site, dispute, safety, project time. They mainly indicated six factors in their respective paper which factors are affecting the success of the construction projects, client related factor, consultant related factor, extreme environmental related factor, supply chain related factors ,contractor related factor. These are the mainly responsible factor for affecting the project success of the paper. The data of this paper has been analyzed by using SPSS (Stactical Package forthe SocialScience)Person’scorrelation and Regression Analysis. According to Afshin Pakseresht29, Dr Gholamreza Asgari30 in December 2012, Volume 4, NO 8. In this paper a study have been performed in Pars Garma Company. Twostageprogrammehavebeenperformedinthis research. Theypreparedonequestionnaireanddistributedin 58 employees of the company (staff manager, technical expert, project manager). And in the second stage they eliminated the lowest factors and again prepared one
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2922 questionnaire and it circulated in 15 organizational expert. And the final proposed critical factors are givenrespectively- contractorrelatedfactors,consultantrelatedfactors,contract related factors, employer related factors, effective factor in project management, project management related factor, project logistics related factor. The data of the paper has been analyzed by Z-test and SPSS software 16. According to Nipin Joseph Babu, in (March-April)Vol.12,Ver.V As the complexityanddifficultiesareverycommonnowdays, and construction projects are facing many problems due to this. They have tried to focus on those factors which are responsible for the complexity of the project and tried to minimize them hypothetically. Shortage of material have been listed number one in this research. Mainly focused factors in this papers are given below- Cost factors, timefactors,qualityfactors,productivityfactors, client-satisfactionfactors,regularandcommunitysatisfaction factors, people factors, health and safety factors, innovation and learning factors, environment factors. They have determined the data by RII method. According to 1SAMART HOMTHONG, 2WUTTHIPONG,2nd April 2016. Main focus of this paper was to group the factors in different categories and conduct survey for all of those categories to analyze which are the mainly responsible factors amongst them. They proposed nine categories of 179 identified. And listed top 10 factors from each categories and ranked them accordingly. There are some most effective factors are mention- major group, time performance, cost performance, quality performance, health and safety performance, environment performance, productivity, risk management, human resources. They applied RII method for ranking. According to Muhammad Saqib, Sarosh H. Lodi, in August, 2008, Karachi, Pakistan. As the intricacy and complications present in the construction projects. To restrict these types of inconvenience during the construction project they have been gone through one survey to identify the main issues which are affecting the success of construction projects. And they find out 77 such small and big causes. And divided them in 7 different sections top 5 factors from every section have been analyzed by their ranking. And they finally proposed 5 major factors which were top ranked amongst all of the sections, which are mentioned below- Contractor-related factor, project related factors, procurement related factors, design team factors, project management factors. According to Alis Kahwajian1), Shukri Baba2), Omar Amudi3), Mohammed Wanos4), Jordan Journal of civil engineering, volume 8, 2014. Main focus of this paper to collaborate the public and private sectors for the economic and social development. While working on this partnershiptheyhavefacedmanychallenges such as weakness in the administrative and legal difficulties of public sector, lack of legislation. They have proposed this partnership on the legal grounds for the development of Syria. 22 main factors were find out and analyzed by questionnaire based investigation. The top most 5 critical factors are,favorablelegalframework,politicalsupport,good governance, stable macro-economic environment, appropriate risk allocation and risk sharing. According to Albert P.C Chan, David Scott, Ada P. Chan in 2004 A conceptualframeworkforthesuccessaffectingfactorshave been given in this paper. Hypothetically they have been proposed the construction project will be moreexecutedand successful and also of shorter duration and overall management should be smoother if complexity oftheproject become less. They have been focused on the critical factors affecting success and not on the project success.Mainlythere are 5 major critical factors are given which are having numbers of factors there are 44 such factors have been investigated top 4 factors of this investigation – project management actions, external environment, project related factors. According to Zarina Alias, E.M.A. Zawawi, Khalid Yusof, Arish, NM, 20014 Main motive of this research is to enhance the construction project success. In this paper a wide study has done from the past/previous papers in which different variables have been proposed andlisted on the topasthemostaffectedfactorsfor the successful projects. They held one survey and targeted experienced folks such as architects, engineers, manufacturers and so on, they discussed some factors which should be minimized for improvement of construction industries of Malaysia, and also they should practically implement on the constructionsites.Theyinvestigatedallthe influencing factors, and mainly focused on 5 (CSFs) – project procedure, project management action, external issues, human factors, project related factors.  Construction Projects takes place in a complex and challenging environment.Areliablewaytominimizethe complexity of construction project is to work on those factors and try to minimize them which are the main causes of complexityandcomingin-betweenthesuccess of the construction projects, some of such factors have been investigated while studying various researches papers. - Environment factors, project management actions, contractor elated, cost related factors, quality related factors.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2923 REFERENCES [1] Zarina Alias, E.M.A. Zawawi, Khalid Yusof, Aris, NM, ‘‘Determining Critical Success factors of Project Management Practice: A conceptual framework”, Procedia – social and Behavioral Science, 4-5 January 2014. [2] Muhammad Saqib, Rizwan U. Farooqui, Sarosh H. Lodi, ‘‘Assessment of Critical SuccessFactorsforConstruction Projects in Pakistan”, First International Conference on Construction in Developing Countries (ICCIDC-1), 4-5 August, 2008. [3] 1SAMARAT HOMTHONG, 2WUTTHIPONG MOUNGNOI, ‘‘CRITICAL SUCCESS FECTORS INFLUENCING CONSTRUCTION PROJECTS PERFORMANCE FOR DIFFERENT OBJECTIVES: OPERATION AND MENTINANCE PHASE”, Proceeding of 35th ISERD International Conference, Singapore, 2nd April 2016. [4] Alis Kahwajian1), Shukri Baba2), Omar Amudi3), Mohhamed Wanos4), ‘‘Identification of Critical Success Factors for Public Private Partnership Construction Projects in Syria”, Jordan Journal of Civil Engineering, volume 8, no 4, 2014. [5] Nipin Joseph Babu, ‘‘Factors Affecting Success of Construction Projects”, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), Volume 12, Issue 2, Ver. V, (March-April) 2015. [6] Albert P.C. Chan1, David Scott2, Ada P.L. Chan3, ‘‘Factors Affecting the Success of Construction Projects”, JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, January/ February 2004. [7] T. Anoop, SS. Asadi, A.V.S. Prasad, ‘‘The Critical Success Factors Affecting The Performance Of Construction Industries”, International Journal Of Civil Engineering And Technology (IJCIET), Volume 7, Issue 6, November- December 2016. [8] Afshin Pakseresht29, Dr. Gholamreza Asgari30, “Determining the Critical Success Factors in Construction Projects:AHPApproach’’,Vol 4,no8,2012.