International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1288
EVM WITHOUT QUALITY IS UNSUITABLE FOR SOFTWARE PROJECT &
PROGRAM MANAGEMENT
Ms. Vanshika T1, Dr. Poonam Sinha2, Ms. Rachna Kulhare3
1Department of I T, UIT, BU Bhopal
2 Professor, Department of Electronics, UIT BU, Bhopal
3Asst. Professor, Department of I T, UIT BU, Bhopal
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract: Earned Value Analysis/Management is an
industry standard method of measuring project's progress at
any given point in time; forecasting its completion date and
final cost, and analyzing variances in the schedule and budget
as the project proceeds. It compares the planned amount of
work with what has actually been completed, to determine if
the cost, schedule, and work accomplished are progressing in
accordance with the plan. As work is completed, it is
considered "earned".
EVM /EVA missed to consider a significant and important
aspect of Project Management - Quality which is completely
missing from its landscape. This paper aims to highlights, how
not including quality in traditional EVM is
detrimental/counterproductive in reporting project progress
of software projects.
Keywords: Program Management, Project Management,
EVM, Earned Value Management, Cost of Quality
1. INTRODUCTION
IT entities are remarkably complex compared to any other
construct since there are no two parts alike in general. IT
cannot ignore or simplify details of the real world.
Complexity grows exponentially as the size of the system
increases. Since there is no physical reality, it cannot be
accurately modeled as in the case of, for example,
construction. The projectsarecontinuouslysubjecttochange
even after being completed.Incontrast,manufacturedthings,
such as buildings, cars, and computers are rarely changed
after manufacturing. They are simply outdated by later
models. For example, callbacks of automobiles occur
reasonably infrequent.
In particular, because of the changeability, IT projects are
subject to continuous changes which makes planning and
controlling very hard. Additionally, complexity and
invisibility bring other challenges into management. In the
light of these essential difficulties, the newconceptthatdoes
not exist in traditional projects comes out as an inevitable
part of IT project: reworking. It represents all the changes
to the existing system as well as corrective actions of
defective, failed or non-conforming items. Reworking itself
introduces further complexity in terms of planning,
estimating, monitoring and controlling. It could also cause
further rework in a recursive cycle that can affecttheproject
timeline. In various studies performed it has been reported
that approximately 40% of the total IT project budget was
spent for reworking. The studies also show that the cost of
rework can approach 50% of the project budgetforthelarge
IT projects. Reworking impacts the entire development
process from definition to implementation and testing.
IT projects are suffering a lot from reworking. Based on the
essential characteristics of the IT developments projects
especially and the quality related issues, reworking is
accepted as a natural consequenceandanindispensable part
of the projects. For the projects of the other industries like
construction projects, reworking is not very common or
acceptable particularly after some milestones. As a result,
the consequences of reworking are not so visible for those
projects in most cases.
IT projects especially development projects have significant
rework effort directly influenced by quality factors. The
quality of the work matters and affects the quantity as well
in terms of reworking. A research shows that IT
development specialists spend about 40 to 50 percent of
their time on avoidable rework rather than on work that’s
done right in the first time. Another study states that
software vendors typically spend 30% to 50% of their
development budget on detecting and fixing errors.
EVM in a traditional form focuses on the three main
elements of software project success: scope, schedule and
cost. It essentially emphases the quantity of the work
performed. It does not deal with the quality explicitly. EVM
assumes quality to be part of scope element. It means when
the task is completed, it is supposedtobecompletedwithout
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1289
any quality deficiency. Therefore, the quality shortages or
issues are not considered explicitly in EVM. In traditional
project management, those three elementswouldbe enough
by considering quality dimension already in the scope since
there are no significant changeability as in case of IT
development projects. Even though this approach might
work for many project management disciplines, IT projects
could not utilize EVM properly because reworking is an
inevitable part of its projects.
The main issue of EVM is the volatility of the value earned.
Any kind of reworking i.e. unpredictable changes,
requirement and design errors, software bugs affect the EV.
If we would do it 100% correct in every aspect for the first
time, we would not have such an issue and we would have
exactly the same EV in every calculation. As an example, the
following is a very ordinary scenario in a development
project: At a given time in the project, the task is completed
and the scope is achieved, but after some time, it is changed
due to defects, and more effort is spent. The scope is still the
same but cost spent is more, it is not the cost of scope, it is
the cost of quality for scope was not complete before.
EV is particularly significant and key data of EVM in order to
reveal the current status as well as predicting the future of
the project. It is vital to have EV as accurate as possible, it is
difficult to get the same EV at any time of project progress
because of the rework or the changes that are inherent of
any IT project. For that reason, we need an improved EVM
approach for IT projects to calculate more accurate EV, to
provide enhanced current and future estimates of the
projects and to have an idea about the project quality status.
EVM does not represent the quality status of a project in any
way. Since EVM does not consider the quality dimension
explicitly, it does not measure anything related to quality
and therefore does not give any clues to the project
managers regarding the quality perspective while
understanding the progress of the project. Quality is a vital
success factor and the fourth dimension of a projectandalso
affects the other dimensions, scope, scheduleandcostindue
course.
Applying traditional EVM could give IT project manager’s
incorrect information. Even at a specific time the project is
supposed to be on track, the additional cost/effort would still
be needed for the features that are already completed. Since
these later costs may approach 50% of the total IT project
cost, this fact should not be ignored and needs to becarefully
considered.
2. COMPARISION OF EVM/EVA WITH AND
WITHOUT INCLUDING QUALITY FACTOR IN EV
MEASUREMENT
2.1 Calculation using Traditional EVM
The project in analysis, is a simple software development
project with multiple phases and was executed using the
waterfall methodology for software development. It follows
incremental development approach where in there were
some major releases along with minor releases planned and
executed.
The project executing team consisted of 5 main people; with
clear responsibility ranging from project management,
software coding, design analyst, testing and providing post
implementation support. Entire team was located in the
same premise. Along with the main team, there were 2
business experts who were involved during therequirement
phase of the project and during acceptance testing. Project
plan at high level is shown below:
PROJECT START DATE 01-May-2016
PROJECT END DATE 31-Jan-2017
AGGREGATE MONTHLY
PLANNING UNIT HOURS
COST ENTRY ACTUAL COST
The EVM application data as giveninthetablesaboveresults
in following calculations:
SNAPSHOT DATE 31-Jan-2017
PROJECT START DATE 01-May-2016
PROJECT END DATE 31-Jan-2017
PLANNED VALUE (PV) 309610
EARNED VALUE (EV) 305386
ACTUAL COST (AC) 337660
BUDGET AT
COMPLETION (BAC)
309610
VARIANCES
SCHEDULE
VARIANCE (SV)
-4224
BEHIND
SCHEDULE
COST VARIANCE
(CV)
-32274
OVER PLANNED
COST
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1290
INDICES
SCHEDULE PERFORMANCE
INDEX (SPI)
0.99
COST PERFORMANCE INDEX (CPI) 0.90
TO-COMPLETE PERFORMANCE
INDEX (TCPI)
Option 1: To Complete On Planned
Budget
-0.15
Option 2: To Complete on new
EAC Budget
0.90
FORECASTING
METHOD SPI & CPI
ESTIMATE TO COMPLETE (ETC) 4735
ESTIMATE AT COMPLETION
(EAC)
342395
VARIANCE AT COMPLETION
(VAC)
-32785
ESTIMATED COMPLETION DATE 03-Feb-2017
From the EVM implementation, the picturefortask looksOK.
Most of the tasks planned were executed on time, though
there are a few tasks that have been delayed but the overall
project has been completed on-time. Though the cost that
was budget for the project has gone up. The total cost of the
project has gone up by 32,785. Also in case if no new
additional resources were provided that project wouldhave
completed on 03-Feb-2017 rather that the scheduleddateof
31-Jan-2017.
Now from the look of EVM, thoughthereissomedelayduring
the later phases of the project, it does not look too bad. Cost
in the project has over shooted by around 10%.
2.2 Calculation using EVM with Quality / Rework
factor included (iEVM)
SNAPSHOT DATE 31-Oct-2016
PROJECT START DATE 01-May-2016
PROJECT END DATE 31-Jan-2017
PLANNED VALUE (PV) 265760
EARNED VALUE (EV) 233816
ACTUAL COST (AC) 252300
BUDGET AT
COMPLETION (BAC)
309610
EARNED VALUE
(EVest)
per iEVM
Methodology
-142724
INDICES
SCHEDULE
PERFORMANCE
INDEX (SPI)
0.88
SCHEDULE
PERFORMANCE
INDEX (SPIest)
per iEVM
Methodology
0.66
VARIANCES
SCHEDULE VARIANCE
(SV)
-4224
BEHIND
SCHEDULE
SCHEDULE VARIANCE
(SVest)
per iEVM
Methodology
-142724
BEHIND
SCHEDULE
COST VARIANCE (CV) 53086
UNDER
PLANNED
COST
COST VARIANCE
(CVest)
per iEVM
Methodology
-85414
OVER
PLANNED
COST
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1291
COST PERFORMANCE
INDEX (CPI)
0.93
TO-COMPLETE
PERFORMANCE
INDEX (TCPI)
Option 1: To Complete
On Planned Budget
1.32
HARDER
TO
COMPLETE
Option 2: To Complete
on new EAC Budget
0.82
EASIER TO
COMPLETE
FORECASTING
METHOD SPI & CPI
ESTIMATE TO COMPLETE (ETC) 92959
ESTIMATE TO COMPLETE (ETCest)
per iEVM Methodology
ESTIMATE AT COMPLETION (EAC) 345259
ESTIMATE AT COMPLETION
(EACest)
per iEVM Methodology
VARIANCE AT COMPLETION (VAC) -35649
VARIANCE AT COMPLETION
(VACest)
per iEVM Methodology
ESTIMATED COMPLETION DATE 09-Mar-2017
In the above project case study context, the aim was to
explore the applicability of new EVM model that we
introduced in chapter 3, iEVM and too validate the
applicability of themodel.CasestudyexploreswhetheriEVM
can be applied properlytosoftwaredevelopmentprojectsby
integrating quality aspects and overcoming the problems
associated with EVM.
2.3 Results
As can be seen above from through EVM the resultsason31-
Oct-2016 EV = 233,816 (EVM method) whereasEV 166,886
(through iEVM method). iEVM method takes into
consideration the rework that was done on the task before
31-Oct-2017 and thus shows that the actual amountofvalue
earned is significantly low.
The value also shows that projectissignificantlydelayed and
if it goes in the same and with the same set of resources the
estimated project completion will be 09-March-2017.
The iEVM methodology also shows a vast difference in Cost
Variance thorough EMV and iEMV method. In case of EVM it
shows that CV is under planned cost where as if we take
rework in consideration per iEVM the CV is way above the
planned cost.
3. CONCLUSION
iEVM, which is the extension of traditional EVM and
incorporates quality cost metrics into the model. iEVM
provides the usableandvaluablemodel forsoftwareprojects
since it takes the significant quality costs into consideration.
Even though the software projects suffer from a lot of
reworking, those costs are not incorporated into traditional
EVM. iEVM provides the quality related metrics to the
project manager in order to not only track the quality status
but also integrate the cost of quality with the project cost
status.
iEVM will deliver more visibility to effort and costs, more
accurate forecasts and better predictions of future.
Including FCs into total costs will increase the visibility of
the project aspect, quality status and effort should become
visible. The revealed FCs will result in more accurate total
cost, schedule and cost indices and so improvestheaccuracy
of the project. Accuracy in current progress informationwill
enable more accurate estimations of futurevaluesofproject.
The accurate progress information and forecasts are the
main targets of project management since they allow the
project manager to understand the present clearly getting
him necessary actions. Depending on the status of the
project, the project manager could get different actions like
informing the stakeholders about these trendsandforecasts
or calibrating the project budget and schedule, or
investigating the reasons behind andsotakingthenecessary
actions to make the project on track.
The literature also shows, that even EVM is a powerful
method to reflect project progress in terms of scope, time
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1292
and cost, especially for the first time implementation of the
tasks, it could not represent the later reworking and could
not incorporate the reworking costs and its effects into the
method. Although the project manager observes that the
project is on track by EVM at a given time during project
execution, there could be some cost and schedule problems
due to the quality issues and subsequent reworking efforts.
By providing accurate project progress, iEVM (which
includes quality) removes this complication. Two main
objectives of traditional EVM is to measure the progress
clearly and to estimate future correctly. iEVMimprovesboth
for the software projects with high FCs. If there were no
reworking for the software projects, iEVM would be same as
the traditional EVM and such improvement may not be
needed.
Main benefits that iEVM would provide to software projects
are summarized in the followings:
 Providing CC indices and benchmarking
opportunity at the beginning of the project
 Revealing hidden FCs and integrating them into
project managementandperformancemanagement
- more visibility
 Measuring the quality status of a project at a given
time in addition to schedule and cost – more
visibility
 Estimating the project progress more accurately at
any given time using past quality cost data –more
accuracy
 Estimating project future more realistically – more
predictability
ACKNOWLEDGEMENT
The authors would like to express deepest gratitude to staff,
colleagues of UIT, Barkatullah University Bhopal for their
guidance, encouragement, endless patience and continuous
support for making this paper.
REFERENCES
[1]. J. Li, Z. Ma and H. Dong, "Monitoring Software
Projects with Earned Value Analysis and Use Case Point," in
IEEE/ACIS International Conference, Portland, 2008.
[2]. J. M. Juran, Quality Control Handbook, 1st ed., New
York: McGraw-Hill, 1951
[3]. A. V. Feigenbaum, "Total Quality Control," Harvard
Business Review, vol. 34, no. 6, pp. 93-101, 1956.
[4]. P. B. Crosby, Quality is Free: The Art of Making
Quality Certain, Mentor, 1980
[5]. S. T. Knox, "Modeling the cost of software quality,"
Digital Technical Journal, vol. V, no. 4,
[6]. S. P. Vedula, "Benchmarking Software Quality with
Applied Cost of Quality," 01 09 2012. [Online]. Available:
www.tcs.com/SiteCollectionDocuments/White
%20Papers/Benchmarking_software_Quality.pdf.
[7]. P. Efe and O. Demirors, "ApplyingEVMina Software
Company: Benefits and Difficulties," in Proceedings of the
39th EUROMICRO Conference on Software Engineering and
Advanced Applications (SEAA), Santander, 2013.
[8]. L. M. Karg, M. Grottke and A. Beckhaus, "A
systematic literature review of software quality cost
research," Journal of Systems and Software, vol. 84
[9]. J. Creswell, Educational research: Planning,
conducting, and evaluating quantitative and qualitative,
Upper Saddle River, NJ: Merrill Prentice Hall, 2002
[10]. J. Fitzpatrick, J. R. Sanders and B. Worthen,Program
evaluation: Alternative approaches and practical guidelines,
Boston: Pearson Education, 2004.
[11]. T. Foss, E. Stensrud, B. Kitchenham and I. Myrtveit,
"A Simulation Study of the Model Evaluation Criterion
MMREF," IEEE Transactions on Software Engineering, vol.
29, no. 11, pp. 985-995 , 2003.
[12]. B. Kitchenham, L. Pickard and M. Sheppard, "What
accuracy statistics really measure," IEE Proceedings
Software, vol. 148, no. 3
[13]. PINAR EFE, Graduateschool ofinformatics,
Middle Eastern Technical University Publications
“EVM and quality Earned Value Management”

More Related Content

What's hot

Software Project Planning 1
Software Project Planning 1Software Project Planning 1
Software Project Planning 1Gagan Deep
 
D0365030036
D0365030036D0365030036
D0365030036theijes
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSGlen Alleman
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET Journal
 
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsSe 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsbabak danyal
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisSeta Ohanesian, PMP, LEED AP
 
Narrated Version Dallas MPUG
Narrated Version Dallas MPUGNarrated Version Dallas MPUG
Narrated Version Dallas MPUGGlen Alleman
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOEGlen Alleman
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling DiagramsSaqib Raza
 
SOLVING PROJECT ALLOCATION RESOURCE PROBLEMS WITH AEROSPACE ERP
SOLVING PROJECT ALLOCATION RESOURCE PROBLEMS WITH AEROSPACE ERPSOLVING PROJECT ALLOCATION RESOURCE PROBLEMS WITH AEROSPACE ERP
SOLVING PROJECT ALLOCATION RESOURCE PROBLEMS WITH AEROSPACE ERPKevin West
 
Software Project Planning II
Software Project Planning IISoftware Project Planning II
Software Project Planning IIGagan Deep
 
Glenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineeringGlenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineeringatr2006
 
Lect3 conventional vs modern spm
Lect3 conventional vs modern spmLect3 conventional vs modern spm
Lect3 conventional vs modern spmmeena466141
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic AbundanceGlen Alleman
 
Mbse – A Historical Perspective Haskins Keynote Ic Mbse2010
Mbse – A Historical Perspective Haskins Keynote Ic Mbse2010Mbse – A Historical Perspective Haskins Keynote Ic Mbse2010
Mbse – A Historical Perspective Haskins Keynote Ic Mbse2010chaskins25
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Glen Alleman
 
Software Project Planning V
Software Project Planning VSoftware Project Planning V
Software Project Planning VGagan Deep
 

What's hot (20)

IMP IMS overview
IMP IMS overviewIMP IMS overview
IMP IMS overview
 
Software Project Planning 1
Software Project Planning 1Software Project Planning 1
Software Project Planning 1
 
D0365030036
D0365030036D0365030036
D0365030036
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
 
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsSe 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative Analysis
 
Narrated Version Dallas MPUG
Narrated Version Dallas MPUGNarrated Version Dallas MPUG
Narrated Version Dallas MPUG
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOE
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling Diagrams
 
SOLVING PROJECT ALLOCATION RESOURCE PROBLEMS WITH AEROSPACE ERP
SOLVING PROJECT ALLOCATION RESOURCE PROBLEMS WITH AEROSPACE ERPSOLVING PROJECT ALLOCATION RESOURCE PROBLEMS WITH AEROSPACE ERP
SOLVING PROJECT ALLOCATION RESOURCE PROBLEMS WITH AEROSPACE ERP
 
Software Project Planning II
Software Project Planning IISoftware Project Planning II
Software Project Planning II
 
Glenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineeringGlenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineering
 
Lect3 conventional vs modern spm
Lect3 conventional vs modern spmLect3 conventional vs modern spm
Lect3 conventional vs modern spm
 
Lec#1
Lec#1Lec#1
Lec#1
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Mbse – A Historical Perspective Haskins Keynote Ic Mbse2010
Mbse – A Historical Perspective Haskins Keynote Ic Mbse2010Mbse – A Historical Perspective Haskins Keynote Ic Mbse2010
Mbse – A Historical Perspective Haskins Keynote Ic Mbse2010
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
Staffing level estimation
Staffing level estimation Staffing level estimation
Staffing level estimation
 
Software Project Planning V
Software Project Planning VSoftware Project Planning V
Software Project Planning V
 

Similar to EVM Without Quality is Unsuitable for Software Project & Program Management

Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...IRJET Journal
 
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...IRJET Journal
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET Journal
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET Journal
 
Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...IRJET Journal
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...IRJET Journal
 
Tracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using PrimaveraTracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using PrimaveraIRJET Journal
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET Journal
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on SiteIRJET Journal
 
IRJET- Comparative Analysis between Sequential and Iterative Project Manageme...
IRJET- Comparative Analysis between Sequential and Iterative Project Manageme...IRJET- Comparative Analysis between Sequential and Iterative Project Manageme...
IRJET- Comparative Analysis between Sequential and Iterative Project Manageme...IRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
IRJET- Value Management
IRJET- Value ManagementIRJET- Value Management
IRJET- Value ManagementIRJET Journal
 
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction ProjectEarned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Projectijtsrd
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET Journal
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET Journal
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementIRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...IJMIT JOURNAL
 
Lect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationLect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationMubashir Ali
 

Similar to EVM Without Quality is Unsuitable for Software Project & Program Management (20)

Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
 
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
 
Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
 
Tracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using PrimaveraTracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using Primavera
 
T24 Temenos Earned Value Management & Project Planning Presentation
T24 Temenos Earned Value Management & Project Planning PresentationT24 Temenos Earned Value Management & Project Planning Presentation
T24 Temenos Earned Value Management & Project Planning Presentation
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
 
IRJET- Comparative Analysis between Sequential and Iterative Project Manageme...
IRJET- Comparative Analysis between Sequential and Iterative Project Manageme...IRJET- Comparative Analysis between Sequential and Iterative Project Manageme...
IRJET- Comparative Analysis between Sequential and Iterative Project Manageme...
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
IRJET- Value Management
IRJET- Value ManagementIRJET- Value Management
IRJET- Value Management
 
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction ProjectEarned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Project
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
 
Lect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationLect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost Estimation
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

EVM Without Quality is Unsuitable for Software Project & Program Management

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1288 EVM WITHOUT QUALITY IS UNSUITABLE FOR SOFTWARE PROJECT & PROGRAM MANAGEMENT Ms. Vanshika T1, Dr. Poonam Sinha2, Ms. Rachna Kulhare3 1Department of I T, UIT, BU Bhopal 2 Professor, Department of Electronics, UIT BU, Bhopal 3Asst. Professor, Department of I T, UIT BU, Bhopal ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract: Earned Value Analysis/Management is an industry standard method of measuring project's progress at any given point in time; forecasting its completion date and final cost, and analyzing variances in the schedule and budget as the project proceeds. It compares the planned amount of work with what has actually been completed, to determine if the cost, schedule, and work accomplished are progressing in accordance with the plan. As work is completed, it is considered "earned". EVM /EVA missed to consider a significant and important aspect of Project Management - Quality which is completely missing from its landscape. This paper aims to highlights, how not including quality in traditional EVM is detrimental/counterproductive in reporting project progress of software projects. Keywords: Program Management, Project Management, EVM, Earned Value Management, Cost of Quality 1. INTRODUCTION IT entities are remarkably complex compared to any other construct since there are no two parts alike in general. IT cannot ignore or simplify details of the real world. Complexity grows exponentially as the size of the system increases. Since there is no physical reality, it cannot be accurately modeled as in the case of, for example, construction. The projectsarecontinuouslysubjecttochange even after being completed.Incontrast,manufacturedthings, such as buildings, cars, and computers are rarely changed after manufacturing. They are simply outdated by later models. For example, callbacks of automobiles occur reasonably infrequent. In particular, because of the changeability, IT projects are subject to continuous changes which makes planning and controlling very hard. Additionally, complexity and invisibility bring other challenges into management. In the light of these essential difficulties, the newconceptthatdoes not exist in traditional projects comes out as an inevitable part of IT project: reworking. It represents all the changes to the existing system as well as corrective actions of defective, failed or non-conforming items. Reworking itself introduces further complexity in terms of planning, estimating, monitoring and controlling. It could also cause further rework in a recursive cycle that can affecttheproject timeline. In various studies performed it has been reported that approximately 40% of the total IT project budget was spent for reworking. The studies also show that the cost of rework can approach 50% of the project budgetforthelarge IT projects. Reworking impacts the entire development process from definition to implementation and testing. IT projects are suffering a lot from reworking. Based on the essential characteristics of the IT developments projects especially and the quality related issues, reworking is accepted as a natural consequenceandanindispensable part of the projects. For the projects of the other industries like construction projects, reworking is not very common or acceptable particularly after some milestones. As a result, the consequences of reworking are not so visible for those projects in most cases. IT projects especially development projects have significant rework effort directly influenced by quality factors. The quality of the work matters and affects the quantity as well in terms of reworking. A research shows that IT development specialists spend about 40 to 50 percent of their time on avoidable rework rather than on work that’s done right in the first time. Another study states that software vendors typically spend 30% to 50% of their development budget on detecting and fixing errors. EVM in a traditional form focuses on the three main elements of software project success: scope, schedule and cost. It essentially emphases the quantity of the work performed. It does not deal with the quality explicitly. EVM assumes quality to be part of scope element. It means when the task is completed, it is supposedtobecompletedwithout
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1289 any quality deficiency. Therefore, the quality shortages or issues are not considered explicitly in EVM. In traditional project management, those three elementswouldbe enough by considering quality dimension already in the scope since there are no significant changeability as in case of IT development projects. Even though this approach might work for many project management disciplines, IT projects could not utilize EVM properly because reworking is an inevitable part of its projects. The main issue of EVM is the volatility of the value earned. Any kind of reworking i.e. unpredictable changes, requirement and design errors, software bugs affect the EV. If we would do it 100% correct in every aspect for the first time, we would not have such an issue and we would have exactly the same EV in every calculation. As an example, the following is a very ordinary scenario in a development project: At a given time in the project, the task is completed and the scope is achieved, but after some time, it is changed due to defects, and more effort is spent. The scope is still the same but cost spent is more, it is not the cost of scope, it is the cost of quality for scope was not complete before. EV is particularly significant and key data of EVM in order to reveal the current status as well as predicting the future of the project. It is vital to have EV as accurate as possible, it is difficult to get the same EV at any time of project progress because of the rework or the changes that are inherent of any IT project. For that reason, we need an improved EVM approach for IT projects to calculate more accurate EV, to provide enhanced current and future estimates of the projects and to have an idea about the project quality status. EVM does not represent the quality status of a project in any way. Since EVM does not consider the quality dimension explicitly, it does not measure anything related to quality and therefore does not give any clues to the project managers regarding the quality perspective while understanding the progress of the project. Quality is a vital success factor and the fourth dimension of a projectandalso affects the other dimensions, scope, scheduleandcostindue course. Applying traditional EVM could give IT project manager’s incorrect information. Even at a specific time the project is supposed to be on track, the additional cost/effort would still be needed for the features that are already completed. Since these later costs may approach 50% of the total IT project cost, this fact should not be ignored and needs to becarefully considered. 2. COMPARISION OF EVM/EVA WITH AND WITHOUT INCLUDING QUALITY FACTOR IN EV MEASUREMENT 2.1 Calculation using Traditional EVM The project in analysis, is a simple software development project with multiple phases and was executed using the waterfall methodology for software development. It follows incremental development approach where in there were some major releases along with minor releases planned and executed. The project executing team consisted of 5 main people; with clear responsibility ranging from project management, software coding, design analyst, testing and providing post implementation support. Entire team was located in the same premise. Along with the main team, there were 2 business experts who were involved during therequirement phase of the project and during acceptance testing. Project plan at high level is shown below: PROJECT START DATE 01-May-2016 PROJECT END DATE 31-Jan-2017 AGGREGATE MONTHLY PLANNING UNIT HOURS COST ENTRY ACTUAL COST The EVM application data as giveninthetablesaboveresults in following calculations: SNAPSHOT DATE 31-Jan-2017 PROJECT START DATE 01-May-2016 PROJECT END DATE 31-Jan-2017 PLANNED VALUE (PV) 309610 EARNED VALUE (EV) 305386 ACTUAL COST (AC) 337660 BUDGET AT COMPLETION (BAC) 309610 VARIANCES SCHEDULE VARIANCE (SV) -4224 BEHIND SCHEDULE COST VARIANCE (CV) -32274 OVER PLANNED COST
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1290 INDICES SCHEDULE PERFORMANCE INDEX (SPI) 0.99 COST PERFORMANCE INDEX (CPI) 0.90 TO-COMPLETE PERFORMANCE INDEX (TCPI) Option 1: To Complete On Planned Budget -0.15 Option 2: To Complete on new EAC Budget 0.90 FORECASTING METHOD SPI & CPI ESTIMATE TO COMPLETE (ETC) 4735 ESTIMATE AT COMPLETION (EAC) 342395 VARIANCE AT COMPLETION (VAC) -32785 ESTIMATED COMPLETION DATE 03-Feb-2017 From the EVM implementation, the picturefortask looksOK. Most of the tasks planned were executed on time, though there are a few tasks that have been delayed but the overall project has been completed on-time. Though the cost that was budget for the project has gone up. The total cost of the project has gone up by 32,785. Also in case if no new additional resources were provided that project wouldhave completed on 03-Feb-2017 rather that the scheduleddateof 31-Jan-2017. Now from the look of EVM, thoughthereissomedelayduring the later phases of the project, it does not look too bad. Cost in the project has over shooted by around 10%. 2.2 Calculation using EVM with Quality / Rework factor included (iEVM) SNAPSHOT DATE 31-Oct-2016 PROJECT START DATE 01-May-2016 PROJECT END DATE 31-Jan-2017 PLANNED VALUE (PV) 265760 EARNED VALUE (EV) 233816 ACTUAL COST (AC) 252300 BUDGET AT COMPLETION (BAC) 309610 EARNED VALUE (EVest) per iEVM Methodology -142724 INDICES SCHEDULE PERFORMANCE INDEX (SPI) 0.88 SCHEDULE PERFORMANCE INDEX (SPIest) per iEVM Methodology 0.66 VARIANCES SCHEDULE VARIANCE (SV) -4224 BEHIND SCHEDULE SCHEDULE VARIANCE (SVest) per iEVM Methodology -142724 BEHIND SCHEDULE COST VARIANCE (CV) 53086 UNDER PLANNED COST COST VARIANCE (CVest) per iEVM Methodology -85414 OVER PLANNED COST
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1291 COST PERFORMANCE INDEX (CPI) 0.93 TO-COMPLETE PERFORMANCE INDEX (TCPI) Option 1: To Complete On Planned Budget 1.32 HARDER TO COMPLETE Option 2: To Complete on new EAC Budget 0.82 EASIER TO COMPLETE FORECASTING METHOD SPI & CPI ESTIMATE TO COMPLETE (ETC) 92959 ESTIMATE TO COMPLETE (ETCest) per iEVM Methodology ESTIMATE AT COMPLETION (EAC) 345259 ESTIMATE AT COMPLETION (EACest) per iEVM Methodology VARIANCE AT COMPLETION (VAC) -35649 VARIANCE AT COMPLETION (VACest) per iEVM Methodology ESTIMATED COMPLETION DATE 09-Mar-2017 In the above project case study context, the aim was to explore the applicability of new EVM model that we introduced in chapter 3, iEVM and too validate the applicability of themodel.CasestudyexploreswhetheriEVM can be applied properlytosoftwaredevelopmentprojectsby integrating quality aspects and overcoming the problems associated with EVM. 2.3 Results As can be seen above from through EVM the resultsason31- Oct-2016 EV = 233,816 (EVM method) whereasEV 166,886 (through iEVM method). iEVM method takes into consideration the rework that was done on the task before 31-Oct-2017 and thus shows that the actual amountofvalue earned is significantly low. The value also shows that projectissignificantlydelayed and if it goes in the same and with the same set of resources the estimated project completion will be 09-March-2017. The iEVM methodology also shows a vast difference in Cost Variance thorough EMV and iEMV method. In case of EVM it shows that CV is under planned cost where as if we take rework in consideration per iEVM the CV is way above the planned cost. 3. CONCLUSION iEVM, which is the extension of traditional EVM and incorporates quality cost metrics into the model. iEVM provides the usableandvaluablemodel forsoftwareprojects since it takes the significant quality costs into consideration. Even though the software projects suffer from a lot of reworking, those costs are not incorporated into traditional EVM. iEVM provides the quality related metrics to the project manager in order to not only track the quality status but also integrate the cost of quality with the project cost status. iEVM will deliver more visibility to effort and costs, more accurate forecasts and better predictions of future. Including FCs into total costs will increase the visibility of the project aspect, quality status and effort should become visible. The revealed FCs will result in more accurate total cost, schedule and cost indices and so improvestheaccuracy of the project. Accuracy in current progress informationwill enable more accurate estimations of futurevaluesofproject. The accurate progress information and forecasts are the main targets of project management since they allow the project manager to understand the present clearly getting him necessary actions. Depending on the status of the project, the project manager could get different actions like informing the stakeholders about these trendsandforecasts or calibrating the project budget and schedule, or investigating the reasons behind andsotakingthenecessary actions to make the project on track. The literature also shows, that even EVM is a powerful method to reflect project progress in terms of scope, time
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1292 and cost, especially for the first time implementation of the tasks, it could not represent the later reworking and could not incorporate the reworking costs and its effects into the method. Although the project manager observes that the project is on track by EVM at a given time during project execution, there could be some cost and schedule problems due to the quality issues and subsequent reworking efforts. By providing accurate project progress, iEVM (which includes quality) removes this complication. Two main objectives of traditional EVM is to measure the progress clearly and to estimate future correctly. iEVMimprovesboth for the software projects with high FCs. If there were no reworking for the software projects, iEVM would be same as the traditional EVM and such improvement may not be needed. Main benefits that iEVM would provide to software projects are summarized in the followings:  Providing CC indices and benchmarking opportunity at the beginning of the project  Revealing hidden FCs and integrating them into project managementandperformancemanagement - more visibility  Measuring the quality status of a project at a given time in addition to schedule and cost – more visibility  Estimating the project progress more accurately at any given time using past quality cost data –more accuracy  Estimating project future more realistically – more predictability ACKNOWLEDGEMENT The authors would like to express deepest gratitude to staff, colleagues of UIT, Barkatullah University Bhopal for their guidance, encouragement, endless patience and continuous support for making this paper. REFERENCES [1]. J. Li, Z. Ma and H. Dong, "Monitoring Software Projects with Earned Value Analysis and Use Case Point," in IEEE/ACIS International Conference, Portland, 2008. [2]. J. M. Juran, Quality Control Handbook, 1st ed., New York: McGraw-Hill, 1951 [3]. A. V. Feigenbaum, "Total Quality Control," Harvard Business Review, vol. 34, no. 6, pp. 93-101, 1956. [4]. P. B. Crosby, Quality is Free: The Art of Making Quality Certain, Mentor, 1980 [5]. S. T. Knox, "Modeling the cost of software quality," Digital Technical Journal, vol. V, no. 4, [6]. S. P. Vedula, "Benchmarking Software Quality with Applied Cost of Quality," 01 09 2012. [Online]. Available: www.tcs.com/SiteCollectionDocuments/White %20Papers/Benchmarking_software_Quality.pdf. [7]. P. Efe and O. Demirors, "ApplyingEVMina Software Company: Benefits and Difficulties," in Proceedings of the 39th EUROMICRO Conference on Software Engineering and Advanced Applications (SEAA), Santander, 2013. [8]. L. M. Karg, M. Grottke and A. Beckhaus, "A systematic literature review of software quality cost research," Journal of Systems and Software, vol. 84 [9]. J. Creswell, Educational research: Planning, conducting, and evaluating quantitative and qualitative, Upper Saddle River, NJ: Merrill Prentice Hall, 2002 [10]. J. Fitzpatrick, J. R. Sanders and B. Worthen,Program evaluation: Alternative approaches and practical guidelines, Boston: Pearson Education, 2004. [11]. T. Foss, E. Stensrud, B. Kitchenham and I. Myrtveit, "A Simulation Study of the Model Evaluation Criterion MMREF," IEEE Transactions on Software Engineering, vol. 29, no. 11, pp. 985-995 , 2003. [12]. B. Kitchenham, L. Pickard and M. Sheppard, "What accuracy statistics really measure," IEE Proceedings Software, vol. 148, no. 3 [13]. PINAR EFE, Graduateschool ofinformatics, Middle Eastern Technical University Publications “EVM and quality Earned Value Management”