Delay in Construction its Causes and Mitigation: A review
Akshay M. Tayade1 and Parag S. Mahatme2
1PG Student, Department of Civil Engineering, Prof. Ram Meghe College of Engineering and Management, Badnera.
2Assistant Professor, Department of Civil Engineering, Prof. Ram Meghe College of Engineering and Management,
Badnera.
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - The construction industry is a huge sector all
over the world. constructionindustryplayanimportantrolein
increasing the gdp of the nation because the number ofpeople
involved in the sector is huge which increase the buying and
spending of the people .To managetheconstructionindustryis
not a easy job and sometime which lead to delay in the
construction .delay can be of any type and need special
attention toward the work when the workisinprogress.asthe
number of stakeholders is on the higher side then it is
necessary to check whether they are performing their duty or
not. Due to the delay several activates are disturb and which
lead increase the cost of the project .Theobjectiveofthispaper
is to study the causes of delays in construction work and how
can we reduce it by proper method.
Key Words: Delay, Mitigation, Problems
1. INTRODUCTION
The construction industry in world is one of the important
sectors that contribute to world economic growth. The
industry acts as a catalyst for our economy through the
creation of industries such as education, finances,
manufacture, service, and many others. The problem of
delays in the construction industry is a global issue. A
construction project may defined as a successful project
when it is completed on time, within the budget, with
appropriate quality, follow the specifications and to
stakeholders' satisfaction. Other than that, functionality,
profitability to contractors and absence of claims have also
been used as measures of project success Delayisa situation
when a project is not completed within the agreed contract
period. The project is skid over its planned schedule and is
considered a common problem in construction projects.It is
very infrequently to see a construction project is completed
on time. Delays can make the disruption of work and loss of
productivity get a rise, other than that completion of the
project are late, increased time-relatedcostsandthird-party
claims. Delays are very costly and always result in disputes
and claims. Therefore, it is important to keeptrack ofproject
progress to avoid the possibility of delay occurrence or
identify it at the early stages.[1]
In Saudi Arabia, Assaf et. al. (2006) conduced a research
about construction project delay different type of project in
the state. During the study it was observed that 70% of
projects experiencetimeoverrun.Thesurveywasconducted
with 23 contractors, 19 consultant and 15 owners. Seventy-
three cause of delay was recognized and the causes are
grouped into nine classes. The outcome of the survey that
agreed by all three parties is change order. The overall
results are stated that the factor related to labor, contractor,
project, owner and consultant are in the highest rank. [2]
Shabbab Al Hammadi, M. Sadique Nawab.studied that the
construction project consists of three phases namely:
Conception, designing and Construction. Timely completion
of projects is an indicator of efficient construction industry.
Construction time‖ often serves as a benchmark for
assessing the performance of a project and the efficiency of
the project organisation.A project is said to be successful on
timely completion. The time required to complete
construction of projects is often more than specified time in
Contract. These overruns or time extensions happensdueto
many reasons, such as designer changes or errors,economic
conditions, resource availability and performance of project
parties. Usually, majority of project delay occurs during
Construction phase, where unforeseen factors are always
involved.[3]
Abd El-Razek et al. (2008) studied delay in building
construction project in Egypt, a total number of 32 delay
causes were selected grouped according to responsibility
(contractor, consultant, owner and common responsibility)
and categorized under 9 groups namely (financing,
manpower, Changes, Contractual relationships,
Environment, Equipment, Rules and regulations, Materials,
Scheduling and Control ). Each delay causewasmeasured on
a Likert scale using four options: very important; important;
somewhat important; and not important. On the basis of
survey and overall results, they concluded that the most
important causes were: financing by contractor during
construction; delays in contractor‘s payment by owner;
design changes by owner or his agent during construction;
partial payments during construction; and non-utilizationof
professional construction/contractual management.[3]
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2535
Arditi & Pattanakitchamrron (2006) stated that delays in
construction can cause a numberofchangesina project such
as late completion, lost productivity, acceleration, increased
costs, and contract termination. The party experiencing
damages and the parties responsible for them in order to
recover time and cost. However, in general delay situations
are complex in nature. A delay in an activity may not result
in the same amount of project delay. A delay caused by a
party may or may not affect the project completion date and
may or may not cause damage to another party. A delay may
occur concurrently with other delays and all of them may
impact the project completion date.[4]
Kumaraswamy et al. also done a surveyonfindingthecauses
of construction delays but in HongKong. Thesurveyexposed
the differences in perceptions of the relative importance of
factors between the three groups, that is clients, contractors
and consultants indicative of their experiences, possible
prejudices and lack of effective communication.[1]
2. TYPE OF DELAY
Fig.1 shows the type of delay
Delays generally fall into four categories.Delayisconsidered
a major cause of construction claim.
In the process of determining the effect of a delay on the
project, the analyst must determine whether the delay is
critical or noncritical. The analyst must also assess if delay
are concurrent. All delays that are identified in the analysis
will be either excusable or non-excusable. Delay can be
further categorized into compensable or non-compensable
delays.[4]
 Critical and Non-Critical Delays
Delays that affect the project completion, or in some cases a
milestone date, are considered as critical delays, and delays
that do not affect the project completion,ora milestonedate,
are noncritical delays. If these activities are delayed, the
project completion date or a milestone daterwill bedelayed.
The determining which activities truly control the project
completion date depends on the following: [4]
a. The project itself
b. The contractor’s plan and schedule (particularly the
critical path)
c. The requirement of the contract for sequence and
phasing
d. The physical constraint of the project, i.e. how to build
the job from a practical perspective
 Excusable and Non-Excusable Delays
Excusable delays are those not attributable to the
contractor's actions or inactions and typically include
unforeseen events. It allows the contractor to obtain a time
extension to complete the contract without being penalized.
However, this type of delay normally does not entitle the
contractor to any damages caused by the delay.
The examples of excusable delays toa contractor'sactionare
differing site conditions, design problems, changes to the
work, inclement weather, and strikes. This type of clause
sometimes called a "force majeure" clause, lists excusable
delays. As this list implies when unanticipated outside
'forces delay completion of the contractor's work, the delay
is generally considered as excusable.[1]
Non-excusable delays are events that are within the
contractor’s control or that are foreseeable. These are some
examples or non-excusable delays: [5]
a. Late performance of sub-contractors
b. Untimely performance by suppliers
c. Faulty workmanship by the contractor or sub-
contractors
d. A project-specific labor strike caused by either the
contractor’s unwillingness to meet with labor
representative or by unfair labor practices
 Compensable Delays and Non-Compensable Delays
A compensable delay is a delay where the contractor is
entitled to a time extension and to additional compensation.
Relating back to the excusable and non-excusable delays,
only excusable delays can be compensable. Non-
compensable delays mean that although an excusable delay
may have occurred, the contractor is not entitled to any
added compensation resulting from the excusable delay.
Thus, the question of whether a delay is compensable must
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2536
be answered. Additionally, a non-excusable delay warrants
neither additional compensation nor a time extension.
Whether or not a delay is compensable depends primarily
on the terms of the contract. In the most cases, a contract
specifically notes the kinds of delays that are non-
compensable, for which the contractor does not receive any
additional money but may be allowed a time extension. [5]
 Concurrent Delays
The concept of concurrent delay has become a verycommon
presentation as part of some analysis of constructiondelays.
The concurrency argument is not just from thestandpointof
determining the project’s critical delays but from the
standpoint of assigning responsibility for damages
associated with delays to the critical path. Owners will often
cite concurrent delays by the contractor as a reason for
issuing a time extension without additional compensation.
Contractors will often cite concurrentdelaysbytheowneras
a reason why liquidated damages should not be assessedfor
its delays.[4]
3. CLASSIFICATION OF CAUSES OF DELAY
The causes of construction delayscouldvaryfromcountryto
country because of the differences in political, economic,
social, and environmental conditions, and government
regulations. In previous studies, different researchers have
examined construction project delays from a different
perspective and identified several different causes of delay.
From these studies and the interviews that the authors
conducted with engineers experienced in project execution,
24 potential causes of delay were identified. The pertinence
of these causes was verified through senior engineers,
involved in the construction projects implemented by three
government-owned, major infrastructure construction
organizations; BD, RDA, and NWSDB. The selected causes
were classified into three main categories, namely,
management-related causes, finance-related causes, and
construction-related causes, based on the origin, as follows:
[6]
Management Related Causes (MRC)
a. Poor project planning & scheduling
b. Incompetence of key staff
c. Poor decision making by management
d. Poor coordination with sub contractors
e. Delays in material supply
f. Disputes with other parties
g. Internal organisational problems
h. Disputes with other parties
i. Fraudulent practices in the organisation
Finance Related Causes (FRC)
a. Low profit margin
b. Inadequate cash flow management
c. Inefficiency in billing and collecting payments
d. Poor estimation practices
e. Inadequate progress reviews
f. Poor cost controlling system
Construction Related Causes (CRC)
a. Handling of too many projects at a given time
b. Faulty work
c. Poor communication with other parties
d. Insufficient quality control
e. Poor supervision of work
f. Insufficient availability of equipment
g. Unqualified workforce
 Methods of Minimizing Construction Delays
When a construction delay occurs, there is no question that
the Owner suffers financially. But the extent to which an
Owner can recover its loss of income from the Contractor,
and more importantly minimizethe risk thatsuchdelayswill
occur, depends largely on how theconstructioncontractwas
drawn up.[4]
Methods of Minimizing Construction Delays
a. Frequent progress meeting.
b. Use up-to-date technology utilization .
c. Use proper and modern construction equipment.
d. Use appropriate construction methods .
e. Effective strategic planning .
f. Proper material procurement .
g. Accurate initial cost estimates .
h. Clear information and communication channels
i. Frequent coordination between the parties involved.
An analysis is needed to identify the impact of delay on time
and cost followed by taking the appropriate action to
mitigate delay and minimize the cost required. Mitigation
efforts are necessary to minimize losses and this can be
achieved by many procedures such as protection of
uncompleted work, timely and reasonable reprocurement,
and timely changing or cancellation of purchase orders. It is
important to predict and identify the problems in the early
stages of construction and diagnose the cause to and
implement the most appropriate and economical solutions.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2537
This factor increases the probability of delay occurrences in
construction projects and makes effective management
important to reduce the diversions from the original
program.[7]
Table -1: Mitigation plan for different causes of delay.
Sr
.
Causes of delay Group Mitigation plan
1 Legal disputes b/w
various parts
Project Amicable solution
should be provided
between parts.
Appoint arbitrator
to take final
decision.
2 neffective delay
penalties
Project Monetary penalties
should be effective
on
consultant/contract
or for any delay in
project and it should
be in signed
agreement.
3 Delay in progress
paymentsbyowner
Owner It should be
compensated by
making advance
payment to
vendors/contractors
4 Delay to furnish
and deliver the site
to the contractor by
the owner
Owner Motivate contractor
by paying bonus so
as to complete work
as per rescheduled
activities. Labors
can be paid extra for
extra work done to
complete work on
schedule.
5 Change orders by
owner during
construction
Owner Owner should stick
upon their orders. If
orders needs to be
changed then owner
should plan it ahead
so as not to impact
on schedule
6 Late in revising and
approving design
documents by
owner
Owner Prior execution of
project, owner must
have finalized
drawings and
documents.
7 Delay in approving
sample materials
Owner Prior to execution of
project, material
sample should be
finalized as per its
availabilityandneed
of project.
8 Poor
communicationand
coordination by
owner and other
parties
Owner Weekly review
meetings should
followed religiously
by owner to track
project progress.
9 Slowness in
decision making
process by owner
Owner Decision process
should be simpler
and faster
1
0
Rework due to
errors during
construction
Contracto
r
Work should
progress asper plan.
Engineer/Architect
should monitor
ongoing work so as
to avoid any errors
during execution of
work. Timely
monitoring work
will reduce the need
of rework
1
1
Conflicts b/w
contractor and
other parties
(consultant and
owner)
Contracto
r
Owner should
conduct
weekly/monthly
meetings so that
alarming issues
betweencontractors
and other parties
can be addressed
1
2
Poor site
management and
supervision by
contractor
Contracto
r
Qualified and
experienced staff
should be hired for
site management
and supervision
1
3
Poor
communicationand
coordination by
contractor with
other parties
Contracto
r
Contractor should
co-ordinate with
subcontractor and
other parties on
weekly basis.
Contractors should
publish work
schedule on regular
basis.
1
4
Ineffective
planning and
scheduling of
Contracto
r
Planning/Schedulin
g should be practical
and achievable.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2538
project by
contractor
Planning and
schedule should be
reviewed by
experienced staff
and owner.
1
5
Improper
construction
methods
Contracto
r
Consultant should
provide timely
guidance on work
methodology to
accelerate the
1
6
Delay in
performing
inspection and
testing by
consultant
Consultan
t
Consultant should
timely inspect the
site
1
7
Delay in approving
major changes in
the scope of work
by consultant
Consultan
t
Scope of Work
should be finalized
by taking meetings
so as to avoid any
delay in approval
process. Work
schedule should be
planned in
accordance to that
1
8
Inflexibility
(rigidity) of
consultant
Consultan
t
Before project
execution, owner
should ensure that
consultant is aware
of his
responsibilities &
expectations set by
owner. A signed
legal agreement
should be in place
for the same.
1
9
Mistakes and
discrepancies in
design documents
Design Design documents
should be reviewed
by consultant.
2
0
Delays in
producing design
documents
Design Design document
schedule must be
strictly adhered by
consultant and
design engineer. In
case of any delay
made by consultant
and designengineer,
owner should
schedule meeting
and make the
project expectations
clear to them
2
1
Insufficient data
collection and
survey before
design
Design Consultant should
provide complete
data needed for
designing to Design
Engineers
2
2
Misunderstanding
of owner’s
requirements by
design engineer
Design Requirement
gathering should be
properly done by
having repeated
meetings and
reviews with
Owner/Client
2
3
Changesinmaterial
types and
specifications
duringconstruction
Materials It's part and parcel
of project but can be
avoided by taking
fast decisions and
having backup plan.
Backup plan (like
vendors list) would
avoid any delay in
delivery of material.
2
4
Delay in material
delivery
Materials Delivery schedule
should be adhered
with proper
planning like having
material in place
before execution
and making advance
payments for
booking material in
case of scarcity.
Backup plan like
material vendorslist
should be handy.
2
5
Damage of sorted
material while they
are needed
urgently
Materials Sufficient material
should be in store,
considering the
material damage
2
6
Late procurement
of materials
Materials Material should be
procured as per the
need of project and
availability in
market. If there is
scarcity of material
in market then it
should be booked in
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2539
advance by making
partial payments
2
7
Shortage of
equipment
Equipmen
t
Equipment's should
be made available
by contractor as per
scheduleandproject
status
2
8
Low level of
equipmentoperator
’s skill
Equipmen
t
Skilledlaborsshould
be hired by
contractor for usage
of equipment's
2
9
Low productivity
and efficiency of
equipment
Equipmen
t
Equipmentselection
should be done as
per its productivity
and need of project.
Skilledlaborsshould
be hired for using
equipment
3
0
Shortage of labors Labor Equipment's should
be usedtomaximum
so as to reduce
dependency on
labors.
3
1
Unqualified
workforce
Labor Skilledlaborsshould
be hired for work.
Trainings should be
provided to
unskilled labors.
3
2
Low productivity
level of labors
Labor Contractor should
sort out difficulties
faced by labors
during work and
motivate them by
providing incentives
for good work
3
3
Personal conflicts
among labors
Labor Contractor should
handle conflicts by
having proper
communication.
3
4
Delay in obtaining
permits from
municipality
External Documents should
be complete.
Process ofapprovals
should be started
early
3
5
Rain effect on
construction
External Activities should be
planned and
prioritized by
considering
3 Unavailability of External Basic utilities on site
6 utilities in site
(such as, water,
electricity,
telephone, etc.)
should be
considered during
planning and
arranged before
start of project
execution
3
7
Effect of social and
cultural factors
External While planning
consideration of
labors social &
cultural factors
should be done.
4. CONCLUSION
After studing various literature it was observe that thereare
several type of delay which are discus in the paper and we
classify the delay according to the delay type .which help to
understand the delay properly and after that we can plan to
reduce the delay effect on the constructionproject.the delay
such as non-excuable, excusable, concurrent, non
concurrent,compensable and non compensable are studied
in detail from which we came to know that if there is any
delay in construction project we can classify that delay
properly and manage the construction project.
REFERENCES
1. INTAN DIANA BINTI MUSA (2012)THE CAUSES AND
EFFECT OF DELAY IN CONSTRUCTION
INDUSTRY PROJECT ,
2. N. Hamzaha, M.A. Khoirya, I. Arshada, N. M. Tawilb and
A. I. Che Anib (2011) Cause of Construction Delay -
Theoretical Framework , The 2ndInternational Building
Control Conference, 490 – 495
3. Ghada Taha1, Mohamed Badawy 2, Omar El-Nawawy3
(2016)A Model for Evaluation of Delays in Construction
Projects,
4. KANG SIK WEI (2010) CAUSES, EFFECTS AND
METHODS OF MINIMIZING DELAYS IN CONSTRUCTION
PROJECTS, UNIVERSITI TEKNOLOGI MALAYSIA,
5. Twana Ahmed,(2015),Delay in Construction
Project,researchgate,1-18
6. D. A. R. Dolage and T. Pathmarajah,(2015)Mitigation of
Delays Attributable to the Contractors in the
Construction Industry of Sri Lanka - Consultants’, The
Institution of Engineers, Sri lanka,21-30
7. Aamon Monty Mukasera, (2016),An investigation into
causes, effects and measures for minimising time
overruns in road construction projects in
Malawi,university of Bolton.1-120
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2540
8. Aleksander Srdić, Assoc. Prof. Jana Šelih,(2015),Delays
in ConstructionProjects:CausesandMitigation,research
paper,3-5
9. SYMON ANTONY KWATSIMA(2016), AN
INVESTIGATION INTO THE CAUSES OF DELAY IN
LARGE CONSTRUCTION PROJECTS IN KENYA , JOMO
KENYATTA UNIVERSITY OF
AGRICULTURE AND TECHNOLOGY.
10. Frank D.K. Fugar and Adwoa B. Agyakwah-Baah
(2010)Delays in Building Construction Projects in
Ghana, Australasian Journal of Construction Economics
and Building,103-116
11. Mrs. Rani M. Mate ,Dr. G. A. Hinge ,(2015)Delay
Mitigation in the Construction Industry ,international
Journal of Engineering Research & Technology,issn
2278-0181
.

More Related Content

What's hot

IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...IRJET Journal
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET Journal
 
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & FactorsDELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & FactorsTwana Ahmad
 
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & FactorsDELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & FactorsTwana Ahmad
 
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET Journal
 
It Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsIt Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsFrancis Ho
 
Analysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsAnalysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsIRJET Journal
 
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractProject Controls Expo
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...World-Academic Journal
 
Why does an eot not automatically entitle a contractor to prolongation costs ...
Why does an eot not automatically entitle a contractor to prolongation costs ...Why does an eot not automatically entitle a contractor to prolongation costs ...
Why does an eot not automatically entitle a contractor to prolongation costs ...Iffat Al Gharbi
 
EOT Related Cost Compensation Determination
EOT Related Cost Compensation DeterminationEOT Related Cost Compensation Determination
EOT Related Cost Compensation DeterminationVimal Daluwatta
 
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Sankalp Swarnkar
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET Journal
 
Delay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential ProjectDelay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential ProjectIRJET Journal
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overruneSAT Journals
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"Abhishek Shah
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
 
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...IJERA Editor
 
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...Gaurav Verma
 

What's hot (20)

IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
 
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & FactorsDELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
 
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & FactorsDELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
 
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
 
It Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsIt Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction Contracts
 
Analysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsAnalysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction Projects
 
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
 
Why does an eot not automatically entitle a contractor to prolongation costs ...
Why does an eot not automatically entitle a contractor to prolongation costs ...Why does an eot not automatically entitle a contractor to prolongation costs ...
Why does an eot not automatically entitle a contractor to prolongation costs ...
 
EOT Related Cost Compensation Determination
EOT Related Cost Compensation DeterminationEOT Related Cost Compensation Determination
EOT Related Cost Compensation Determination
 
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
Delay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential ProjectDelay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential Project
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...
 
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
 

Similar to IRJET- Delay in Construction its Causes and Mitigation: A Review

Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...IRJET Journal
 
A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...IRJET Journal
 
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...IJMER
 
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsRick Vogel
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of timeJoseph Sangpang
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTIRJET Journal
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewIRJET Journal
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersIOSR Journals
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersIOSR Journals
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersIOSR Journals
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction ProjectIRJET Journal
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET Journal
 
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectsAnalysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectseSAT Journals
 
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectsAnalysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectseSAT Journals
 
Analysis of factors contributing delays and claims in
Analysis of factors contributing delays and claims inAnalysis of factors contributing delays and claims in
Analysis of factors contributing delays and claims ineSAT Publishing House
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
Management For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of DelayManagement For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of DelayIRJET Journal
 
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...IRJET Journal
 

Similar to IRJET- Delay in Construction its Causes and Mitigation: A Review (20)

Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...
 
A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...
 
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
 
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction Projects
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of time
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
 
Causes of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge GirdersCauses of Delay in Construction of Bridge Girders
Causes of Delay in Construction of Bridge Girders
 
B012140812
B012140812B012140812
B012140812
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
 
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectsAnalysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
 
Analysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projectsAnalysis of factors contributing delays and claims in construction projects
Analysis of factors contributing delays and claims in construction projects
 
Analysis of factors contributing delays and claims in
Analysis of factors contributing delays and claims inAnalysis of factors contributing delays and claims in
Analysis of factors contributing delays and claims in
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
Management For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of DelayManagement For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of Delay
 
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

IRJET- Delay in Construction its Causes and Mitigation: A Review

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2534 Delay in Construction its Causes and Mitigation: A review Akshay M. Tayade1 and Parag S. Mahatme2 1PG Student, Department of Civil Engineering, Prof. Ram Meghe College of Engineering and Management, Badnera. 2Assistant Professor, Department of Civil Engineering, Prof. Ram Meghe College of Engineering and Management, Badnera. ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - The construction industry is a huge sector all over the world. constructionindustryplayanimportantrolein increasing the gdp of the nation because the number ofpeople involved in the sector is huge which increase the buying and spending of the people .To managetheconstructionindustryis not a easy job and sometime which lead to delay in the construction .delay can be of any type and need special attention toward the work when the workisinprogress.asthe number of stakeholders is on the higher side then it is necessary to check whether they are performing their duty or not. Due to the delay several activates are disturb and which lead increase the cost of the project .Theobjectiveofthispaper is to study the causes of delays in construction work and how can we reduce it by proper method. Key Words: Delay, Mitigation, Problems 1. INTRODUCTION The construction industry in world is one of the important sectors that contribute to world economic growth. The industry acts as a catalyst for our economy through the creation of industries such as education, finances, manufacture, service, and many others. The problem of delays in the construction industry is a global issue. A construction project may defined as a successful project when it is completed on time, within the budget, with appropriate quality, follow the specifications and to stakeholders' satisfaction. Other than that, functionality, profitability to contractors and absence of claims have also been used as measures of project success Delayisa situation when a project is not completed within the agreed contract period. The project is skid over its planned schedule and is considered a common problem in construction projects.It is very infrequently to see a construction project is completed on time. Delays can make the disruption of work and loss of productivity get a rise, other than that completion of the project are late, increased time-relatedcostsandthird-party claims. Delays are very costly and always result in disputes and claims. Therefore, it is important to keeptrack ofproject progress to avoid the possibility of delay occurrence or identify it at the early stages.[1] In Saudi Arabia, Assaf et. al. (2006) conduced a research about construction project delay different type of project in the state. During the study it was observed that 70% of projects experiencetimeoverrun.Thesurveywasconducted with 23 contractors, 19 consultant and 15 owners. Seventy- three cause of delay was recognized and the causes are grouped into nine classes. The outcome of the survey that agreed by all three parties is change order. The overall results are stated that the factor related to labor, contractor, project, owner and consultant are in the highest rank. [2] Shabbab Al Hammadi, M. Sadique Nawab.studied that the construction project consists of three phases namely: Conception, designing and Construction. Timely completion of projects is an indicator of efficient construction industry. Construction time‖ often serves as a benchmark for assessing the performance of a project and the efficiency of the project organisation.A project is said to be successful on timely completion. The time required to complete construction of projects is often more than specified time in Contract. These overruns or time extensions happensdueto many reasons, such as designer changes or errors,economic conditions, resource availability and performance of project parties. Usually, majority of project delay occurs during Construction phase, where unforeseen factors are always involved.[3] Abd El-Razek et al. (2008) studied delay in building construction project in Egypt, a total number of 32 delay causes were selected grouped according to responsibility (contractor, consultant, owner and common responsibility) and categorized under 9 groups namely (financing, manpower, Changes, Contractual relationships, Environment, Equipment, Rules and regulations, Materials, Scheduling and Control ). Each delay causewasmeasured on a Likert scale using four options: very important; important; somewhat important; and not important. On the basis of survey and overall results, they concluded that the most important causes were: financing by contractor during construction; delays in contractor‘s payment by owner; design changes by owner or his agent during construction; partial payments during construction; and non-utilizationof professional construction/contractual management.[3]
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2535 Arditi & Pattanakitchamrron (2006) stated that delays in construction can cause a numberofchangesina project such as late completion, lost productivity, acceleration, increased costs, and contract termination. The party experiencing damages and the parties responsible for them in order to recover time and cost. However, in general delay situations are complex in nature. A delay in an activity may not result in the same amount of project delay. A delay caused by a party may or may not affect the project completion date and may or may not cause damage to another party. A delay may occur concurrently with other delays and all of them may impact the project completion date.[4] Kumaraswamy et al. also done a surveyonfindingthecauses of construction delays but in HongKong. Thesurveyexposed the differences in perceptions of the relative importance of factors between the three groups, that is clients, contractors and consultants indicative of their experiences, possible prejudices and lack of effective communication.[1] 2. TYPE OF DELAY Fig.1 shows the type of delay Delays generally fall into four categories.Delayisconsidered a major cause of construction claim. In the process of determining the effect of a delay on the project, the analyst must determine whether the delay is critical or noncritical. The analyst must also assess if delay are concurrent. All delays that are identified in the analysis will be either excusable or non-excusable. Delay can be further categorized into compensable or non-compensable delays.[4]  Critical and Non-Critical Delays Delays that affect the project completion, or in some cases a milestone date, are considered as critical delays, and delays that do not affect the project completion,ora milestonedate, are noncritical delays. If these activities are delayed, the project completion date or a milestone daterwill bedelayed. The determining which activities truly control the project completion date depends on the following: [4] a. The project itself b. The contractor’s plan and schedule (particularly the critical path) c. The requirement of the contract for sequence and phasing d. The physical constraint of the project, i.e. how to build the job from a practical perspective  Excusable and Non-Excusable Delays Excusable delays are those not attributable to the contractor's actions or inactions and typically include unforeseen events. It allows the contractor to obtain a time extension to complete the contract without being penalized. However, this type of delay normally does not entitle the contractor to any damages caused by the delay. The examples of excusable delays toa contractor'sactionare differing site conditions, design problems, changes to the work, inclement weather, and strikes. This type of clause sometimes called a "force majeure" clause, lists excusable delays. As this list implies when unanticipated outside 'forces delay completion of the contractor's work, the delay is generally considered as excusable.[1] Non-excusable delays are events that are within the contractor’s control or that are foreseeable. These are some examples or non-excusable delays: [5] a. Late performance of sub-contractors b. Untimely performance by suppliers c. Faulty workmanship by the contractor or sub- contractors d. A project-specific labor strike caused by either the contractor’s unwillingness to meet with labor representative or by unfair labor practices  Compensable Delays and Non-Compensable Delays A compensable delay is a delay where the contractor is entitled to a time extension and to additional compensation. Relating back to the excusable and non-excusable delays, only excusable delays can be compensable. Non- compensable delays mean that although an excusable delay may have occurred, the contractor is not entitled to any added compensation resulting from the excusable delay. Thus, the question of whether a delay is compensable must
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2536 be answered. Additionally, a non-excusable delay warrants neither additional compensation nor a time extension. Whether or not a delay is compensable depends primarily on the terms of the contract. In the most cases, a contract specifically notes the kinds of delays that are non- compensable, for which the contractor does not receive any additional money but may be allowed a time extension. [5]  Concurrent Delays The concept of concurrent delay has become a verycommon presentation as part of some analysis of constructiondelays. The concurrency argument is not just from thestandpointof determining the project’s critical delays but from the standpoint of assigning responsibility for damages associated with delays to the critical path. Owners will often cite concurrent delays by the contractor as a reason for issuing a time extension without additional compensation. Contractors will often cite concurrentdelaysbytheowneras a reason why liquidated damages should not be assessedfor its delays.[4] 3. CLASSIFICATION OF CAUSES OF DELAY The causes of construction delayscouldvaryfromcountryto country because of the differences in political, economic, social, and environmental conditions, and government regulations. In previous studies, different researchers have examined construction project delays from a different perspective and identified several different causes of delay. From these studies and the interviews that the authors conducted with engineers experienced in project execution, 24 potential causes of delay were identified. The pertinence of these causes was verified through senior engineers, involved in the construction projects implemented by three government-owned, major infrastructure construction organizations; BD, RDA, and NWSDB. The selected causes were classified into three main categories, namely, management-related causes, finance-related causes, and construction-related causes, based on the origin, as follows: [6] Management Related Causes (MRC) a. Poor project planning & scheduling b. Incompetence of key staff c. Poor decision making by management d. Poor coordination with sub contractors e. Delays in material supply f. Disputes with other parties g. Internal organisational problems h. Disputes with other parties i. Fraudulent practices in the organisation Finance Related Causes (FRC) a. Low profit margin b. Inadequate cash flow management c. Inefficiency in billing and collecting payments d. Poor estimation practices e. Inadequate progress reviews f. Poor cost controlling system Construction Related Causes (CRC) a. Handling of too many projects at a given time b. Faulty work c. Poor communication with other parties d. Insufficient quality control e. Poor supervision of work f. Insufficient availability of equipment g. Unqualified workforce  Methods of Minimizing Construction Delays When a construction delay occurs, there is no question that the Owner suffers financially. But the extent to which an Owner can recover its loss of income from the Contractor, and more importantly minimizethe risk thatsuchdelayswill occur, depends largely on how theconstructioncontractwas drawn up.[4] Methods of Minimizing Construction Delays a. Frequent progress meeting. b. Use up-to-date technology utilization . c. Use proper and modern construction equipment. d. Use appropriate construction methods . e. Effective strategic planning . f. Proper material procurement . g. Accurate initial cost estimates . h. Clear information and communication channels i. Frequent coordination between the parties involved. An analysis is needed to identify the impact of delay on time and cost followed by taking the appropriate action to mitigate delay and minimize the cost required. Mitigation efforts are necessary to minimize losses and this can be achieved by many procedures such as protection of uncompleted work, timely and reasonable reprocurement, and timely changing or cancellation of purchase orders. It is important to predict and identify the problems in the early stages of construction and diagnose the cause to and implement the most appropriate and economical solutions.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2537 This factor increases the probability of delay occurrences in construction projects and makes effective management important to reduce the diversions from the original program.[7] Table -1: Mitigation plan for different causes of delay. Sr . Causes of delay Group Mitigation plan 1 Legal disputes b/w various parts Project Amicable solution should be provided between parts. Appoint arbitrator to take final decision. 2 neffective delay penalties Project Monetary penalties should be effective on consultant/contract or for any delay in project and it should be in signed agreement. 3 Delay in progress paymentsbyowner Owner It should be compensated by making advance payment to vendors/contractors 4 Delay to furnish and deliver the site to the contractor by the owner Owner Motivate contractor by paying bonus so as to complete work as per rescheduled activities. Labors can be paid extra for extra work done to complete work on schedule. 5 Change orders by owner during construction Owner Owner should stick upon their orders. If orders needs to be changed then owner should plan it ahead so as not to impact on schedule 6 Late in revising and approving design documents by owner Owner Prior execution of project, owner must have finalized drawings and documents. 7 Delay in approving sample materials Owner Prior to execution of project, material sample should be finalized as per its availabilityandneed of project. 8 Poor communicationand coordination by owner and other parties Owner Weekly review meetings should followed religiously by owner to track project progress. 9 Slowness in decision making process by owner Owner Decision process should be simpler and faster 1 0 Rework due to errors during construction Contracto r Work should progress asper plan. Engineer/Architect should monitor ongoing work so as to avoid any errors during execution of work. Timely monitoring work will reduce the need of rework 1 1 Conflicts b/w contractor and other parties (consultant and owner) Contracto r Owner should conduct weekly/monthly meetings so that alarming issues betweencontractors and other parties can be addressed 1 2 Poor site management and supervision by contractor Contracto r Qualified and experienced staff should be hired for site management and supervision 1 3 Poor communicationand coordination by contractor with other parties Contracto r Contractor should co-ordinate with subcontractor and other parties on weekly basis. Contractors should publish work schedule on regular basis. 1 4 Ineffective planning and scheduling of Contracto r Planning/Schedulin g should be practical and achievable.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2538 project by contractor Planning and schedule should be reviewed by experienced staff and owner. 1 5 Improper construction methods Contracto r Consultant should provide timely guidance on work methodology to accelerate the 1 6 Delay in performing inspection and testing by consultant Consultan t Consultant should timely inspect the site 1 7 Delay in approving major changes in the scope of work by consultant Consultan t Scope of Work should be finalized by taking meetings so as to avoid any delay in approval process. Work schedule should be planned in accordance to that 1 8 Inflexibility (rigidity) of consultant Consultan t Before project execution, owner should ensure that consultant is aware of his responsibilities & expectations set by owner. A signed legal agreement should be in place for the same. 1 9 Mistakes and discrepancies in design documents Design Design documents should be reviewed by consultant. 2 0 Delays in producing design documents Design Design document schedule must be strictly adhered by consultant and design engineer. In case of any delay made by consultant and designengineer, owner should schedule meeting and make the project expectations clear to them 2 1 Insufficient data collection and survey before design Design Consultant should provide complete data needed for designing to Design Engineers 2 2 Misunderstanding of owner’s requirements by design engineer Design Requirement gathering should be properly done by having repeated meetings and reviews with Owner/Client 2 3 Changesinmaterial types and specifications duringconstruction Materials It's part and parcel of project but can be avoided by taking fast decisions and having backup plan. Backup plan (like vendors list) would avoid any delay in delivery of material. 2 4 Delay in material delivery Materials Delivery schedule should be adhered with proper planning like having material in place before execution and making advance payments for booking material in case of scarcity. Backup plan like material vendorslist should be handy. 2 5 Damage of sorted material while they are needed urgently Materials Sufficient material should be in store, considering the material damage 2 6 Late procurement of materials Materials Material should be procured as per the need of project and availability in market. If there is scarcity of material in market then it should be booked in
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2539 advance by making partial payments 2 7 Shortage of equipment Equipmen t Equipment's should be made available by contractor as per scheduleandproject status 2 8 Low level of equipmentoperator ’s skill Equipmen t Skilledlaborsshould be hired by contractor for usage of equipment's 2 9 Low productivity and efficiency of equipment Equipmen t Equipmentselection should be done as per its productivity and need of project. Skilledlaborsshould be hired for using equipment 3 0 Shortage of labors Labor Equipment's should be usedtomaximum so as to reduce dependency on labors. 3 1 Unqualified workforce Labor Skilledlaborsshould be hired for work. Trainings should be provided to unskilled labors. 3 2 Low productivity level of labors Labor Contractor should sort out difficulties faced by labors during work and motivate them by providing incentives for good work 3 3 Personal conflicts among labors Labor Contractor should handle conflicts by having proper communication. 3 4 Delay in obtaining permits from municipality External Documents should be complete. Process ofapprovals should be started early 3 5 Rain effect on construction External Activities should be planned and prioritized by considering 3 Unavailability of External Basic utilities on site 6 utilities in site (such as, water, electricity, telephone, etc.) should be considered during planning and arranged before start of project execution 3 7 Effect of social and cultural factors External While planning consideration of labors social & cultural factors should be done. 4. CONCLUSION After studing various literature it was observe that thereare several type of delay which are discus in the paper and we classify the delay according to the delay type .which help to understand the delay properly and after that we can plan to reduce the delay effect on the constructionproject.the delay such as non-excuable, excusable, concurrent, non concurrent,compensable and non compensable are studied in detail from which we came to know that if there is any delay in construction project we can classify that delay properly and manage the construction project. REFERENCES 1. INTAN DIANA BINTI MUSA (2012)THE CAUSES AND EFFECT OF DELAY IN CONSTRUCTION INDUSTRY PROJECT , 2. N. Hamzaha, M.A. Khoirya, I. Arshada, N. M. Tawilb and A. I. Che Anib (2011) Cause of Construction Delay - Theoretical Framework , The 2ndInternational Building Control Conference, 490 – 495 3. Ghada Taha1, Mohamed Badawy 2, Omar El-Nawawy3 (2016)A Model for Evaluation of Delays in Construction Projects, 4. KANG SIK WEI (2010) CAUSES, EFFECTS AND METHODS OF MINIMIZING DELAYS IN CONSTRUCTION PROJECTS, UNIVERSITI TEKNOLOGI MALAYSIA, 5. Twana Ahmed,(2015),Delay in Construction Project,researchgate,1-18 6. D. A. R. Dolage and T. Pathmarajah,(2015)Mitigation of Delays Attributable to the Contractors in the Construction Industry of Sri Lanka - Consultants’, The Institution of Engineers, Sri lanka,21-30 7. Aamon Monty Mukasera, (2016),An investigation into causes, effects and measures for minimising time overruns in road construction projects in Malawi,university of Bolton.1-120
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 02 | Feb 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 2540 8. Aleksander Srdić, Assoc. Prof. Jana Šelih,(2015),Delays in ConstructionProjects:CausesandMitigation,research paper,3-5 9. SYMON ANTONY KWATSIMA(2016), AN INVESTIGATION INTO THE CAUSES OF DELAY IN LARGE CONSTRUCTION PROJECTS IN KENYA , JOMO KENYATTA UNIVERSITY OF AGRICULTURE AND TECHNOLOGY. 10. Frank D.K. Fugar and Adwoa B. Agyakwah-Baah (2010)Delays in Building Construction Projects in Ghana, Australasian Journal of Construction Economics and Building,103-116 11. Mrs. Rani M. Mate ,Dr. G. A. Hinge ,(2015)Delay Mitigation in the Construction Industry ,international Journal of Engineering Research & Technology,issn 2278-0181 .