International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 433
Implementation of 5S in the Manufacturing Industry
Ashwin Desai1, Shreedhar Shelar2, Akhilesh Amane3, Ajay Sutar4,Sourabh Chougule5,
Viraj Chougule6
1Assistant Professor, Mechanical Engineering Department, D. Y. Patil College of Engineering & Technology,
Kolhapur, Maharashtra, India.
2,3,4,5,6Student, Mechanical Engineering Department, D. Y. Patil College of Engineering & Technology, Kolhapur,
Maharashtra, India.
----------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - 5S is a quality improvement technique. The 5s
technique (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) would
strongly support the main objective small and medium scale
organization to achieve continuous improvement and
higher performance. In manufacturing environment
implementation of 5S can result in considerable
improvement, performance besides with housekeeping and
health and safety.
Key Words: 5S, Seiri, Seiton, Seiso, Seiketsu, Shitsuke
1. INTRODUCTION
5S is originated from japan. 5S is a part of kaizen. 5s is an
effective technique of leans manufacturing.5s gets its
name because of 5 activities, namely seiri, seiton, seiso,
seiketsu, and shitsuke. It means to sort, set in order, shine,
standardize and sustain. Sort means Determine necessary
and unnecessary material. Set in order means keeping the
material according to the need. Shine improves the worker
attitude regarding his work which helps in increasing
productivity. Standardize is a method of simplification
The main aim of this paper is to implement the 5S
methodology in Toolex Engineers Pvt. Ltd. Situated at C-9
Gokul shirgaon, Kolhapur, 416234.Before implementation
of 5S at Toolex Engineers Pvt. Ltd. We visited Aditech
Industries situated at Uchgaon, Kolhapur. As the reference.
The Aditech industries had implemented 5S technique
from last 5 years. We recorded all the data from the
industries and finally concluded that 5S technique is
processing in which all the management level of the
company should be effectively involved that is from top-
level management up to the bottom level management. 5S
is a continuous process which should be implemented
form first day and should be carried out forever. Every
employee of an organization should be involved in 5S.
Fig. 1 Schematic Diagram of 5S
2. LITERATURE REVIEW
This section reviews the current literature on 5S practices
it explores the concept of 5S, Basic information with all
pros and cons about the 5S.
According to Shahryar Sorooshian et al. (2012) –5S is a
very effective technique to manage the work environment
quality.
According to Derya Sevim Korkut et al. (2009) - The clean
and steady environment targeted by 5S has positive
impacts on work safety, quality, efficiency, and morale.
According to J. Michalska et al. (2007) - 5S implementation
results in increasing efficiency, safety, and reduction of
industrial pollution.
According to Arash Ghodrati et al. (2013) - This paper is
aimed to determine performance factors and
characteristics in industrial organizations and identifying
the effectiveness.
According to Prof. S. B. Khedkar et al. (2012) - This
research effort shows significant improvements to safety,
productivity, efficiency, morale, and housekeeping.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 434
2.1 Lean Manufacturing
5S is one of the essential steps in motion and bring about a
flourishing lean culture (Cooper et. al. 2007). 5S
implementation is a simple strategy to maintain each
department of the company effectively. Lean
manufacturing is a method by which we can minimize the
waste in a manufacturing industry without sacrificing
productivity, which can cause a problem. The best method
or a first step should be taken for the lean manufacturing
is implementation of 5S, with all the ‘S' implementation i.e.
Sort, Set in Order, Shine, Standardize and Sustain
improves work culture aesthetically and ergonomically,
thus it improves productivity of an employee and also
minimization in errors this it minimizes the total waste.
3. PROBLEM STATEMENT
The company we selected is small scale industry which is
the manufacturing of assemblies & machined components.
The problem associated with the company is due to limited
space, workforce and the area covered due to non-moving
material. The Non-moving material is a material in which it
cannot be moved or used from the last six months. So it
covers the space in the storage department and for the old
and new stock. The storage department because of this
non-profitable inventory gets increased and the net
inventory required for an industry gets increased. Because
of unorganized and non-moving material it so difficult to
search any type of material or component so each rack in
the industry should be organized in such a way that anyone
can find the material as early as possible.
As the material is unorganized so the time required for
finding material or component is increased and thus the
productivity of worker decreases due to increase workload.
The inward material section and outward material section
should not be combined. Each section should have proper
space allotted. As both departments are combined in the
industry. The material was placed on the gangways
because of less area and maximum jobs hence either job
should be stored vertically instead of horizontal.
4. METHODOLOGY
Following method was adopted to implement 5s.
 To create awareness among the employees for the
implementation of 5s.
 The organization was simplified into various
zones consisting of various departments along
with it (Example- Storage Department Zone,
Machining Department Zone, Office Zone, Quality
Control Zone, etc.)
 The ‘1S' activity undertaken by the 1st zone
(storage zone) under the guidance of the zone
leader.
 The audit was conducted by the apex team of an
organization and the corrective measure was
taken on it.
 Similarly, rest ‘4S' were implemented one after
other successfully.
Fig. 2 Apex team authorization chart
5. THE 5S STEPS
5.1 Sort (Sieri)
Something used once a year would not be an everyday
item and we would not necessarily need all of the
everyday items at once but if lost, a replacement would be
necessary
Sort by the tools that are frequently used are placed within
easy to reach, and those are not used are moved to the
non-moving material storage department
All the items are classified in the terms of necessary items,
unnecessary and may not necessary items
The goal is to eliminate non-essential items from the
workplace, items are "red tagged" and stored in a local red
tag area for a specific period of time.
5.2 Set In Order (Sieton)
The next step after identifying the unneeded item is to
organize the needed item as per the specific job
requirements in each station.
Organize arrange and identify everything in the work area,
as well as though out facilities so that items can be
•APEX Team Head
•Top Level Management Representative
•Coordinator
•Middle Level Management Representative
•Zone Leader
•Dpartment Head
•Zone Member
•Worker
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 435
efficiently and effectively retrieved and return to their
proper storage location.
The important part of inset in order is putting everything
in its proper place and setting up a system so that
everything can be returned to its proper place. The second
step in 5S is where good labelling and identification
practice are important
The types of equipment, tools, and materials used as well
as a proper storage location, need to be identified and
labelled.
The goal of setting in order is to create a standardize and
consistent way to store and retrieve tools and materials.
5.3 Shine (Seiso)
Efforts to keep work area clean and orderly to ensure
propose -work. This means cleaning and maintaining the
newly organized workplace.
It can involve routine tasks such as mopping or reforming
maintenance on machinery tools and other equipment
5S projects that are almost entirely focused on cleaning
and painting, this step is needed to have the full
involvement of employee to gather the data at what they
feel needs to be cleaned and how often it should be
cleaned.
Develop and follow a regular cleaning and maintenance
schedule. Cleanliness can show the effectiveness of the
workplace and workers working condition have full
competence in the company also moral of the employee
get increases
5.4 Standardize (Seiketsu)
After the cleaning activity is done in the company. Next
stage is to be standardizing the process area. It is essential
for maintaining the previous three S. describes the role
models for adhering to the standard of the previous 3S and
encourage others to follow them.
Make rules and procedures to promote a good work
environment until the first 3S.
Maintain an environment where S1andS3 are
implemented in the same manner throughout the
company.
Checklist development and regular use of it.
5.5 Sustain (Shitsuke)
Every person in the industry has to follow the procedure
as defined in the workplace. It must be followed by
discipline and sincerity among the workplace and follow
the procedure as defined.
Self-discipline is the final step in the entire 5S system but
it is tough to maintain
6. IMPLEMENTATION OF 5S
6.1 Guidelines for practicing SORT
1S during 1st S, we sorted items in terms of necessary and
unnecessary requirements. Then we apply the red tag on
unnecessary components in the storage section.
 The necessary items are kept in the shelf
according to its usage also frequently used
material kept at the easily reachable position to
the worker.
 Approximately 600 kg of material removed from
the storage department.
Fig. 4 Measuring a number of components
6.2 Guidelines for practicing SET IN ORDER
 During implementing 2nd S everything in its
proper place.
 Set components as per there requirement, weight,
use, and orientation.
 Assign a fixed location for each item.
 Arrange all necessary items.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 436
Fig. 5 after 2S Implementation
Fig. 6 Details of a table after implementation of 2S
6.3 Guidelines for practicing SHINE
 When you implement 3rd S two things will
happen 1st your employees will like to come to
work in a clean environment and 2nd is moral of
the employees gets increases towards work.
 Clean all the machines so the life of the machines
increases.
 Clean all work floor area of the industry so
chances of accidents get eliminated.
 It includes a daily checklist to made sure works
done as per define.
Fig. 7 Machine after implementation of 3S
6.4 Guidelines for practicing STANDARDIZE
 The standardize pillar utilize a set of
schedules and checklists that can be followed
so each step of 5S performed exactly the same
way every day.
 This stage is defined to create procedure and
routines.
 The checklist is a visual signpost to ensure
the daily 3S are carried out in the work area.
TOOLEX ENGINEERS PVT. LTD.
PART NO.
PART DESCRIPTION
BIN NO.
DATE REC. QTY. ISSUED
QTY.
NAME OF
PERSON
BAL.
QTY.
Fig. 3 Bin Card Format
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 437
Fig. 4 Bin Card Used
6.5 Guidelines for practicing SUSTAIN
 Every person in the industry has to follow the
procedure as defined.
 It must be followed by discipline and
sincerely among the workplace
 Self-discipline is the final step in the entire 5S
system.
Fig. 4 Bin Card is maintained
7. CASE STUDY
The 5s technique was introduced to the employees and
awareness is created among them. In short, the technique
we explained to then must be carried continuously it is a
technique in which regular participation of every worker
is necessary.
7.1 5S Approach in the Company
The result in this study, we observed 15% free space was
available before implementation of 1Sand after
implementing 1S it is increased to 35%.
1S:
 During 1S we sorted items in terms of necessary
and unnecessary requirement then we applied the
red tag on the unnecessary component in the
storage section.
 The necessary items are kept in the shelf
according to usage also frequently used material
kept at the easily reachable position to the
worker.
 Approximately 600 Kg of material removed from
the storage section.
Space
Occupied
85%
Free
Space
Available
15%
Before 5S Implementation (Zone 1)
Free
Space
Available
35%
Space
Occupied
65%
After 5s Implementation
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 438
2S:
 After implementing 2S the workspace, storage
department, work process is simplified.
 In short, each and every material is arranged as
per orientation, use, weight, type of job.
 The visual calculation was improved as thus time
consumption gets reduced.
3S:
 Floor space was cleaned.
 Notice board was cleaned
 All the machines were cleaned and colored
4S:
 The checklist process was daily carried out.
 Made rules and procedure to produce a good
working environment
 Bin card system was applied in which inventory
quantity is easily measured
 1S to 3S should be implemented strictly in the
organization
5S:
 The technique told to employees is maintained by
them continuously
 It includes team co-ordination which enhances
moral worker
 Bin cards were maintained properly by updating
quantity, date, and material.
8. CONCLUSIONS
It is a relatively effective technique which can be applied
in an organization with the active participation of
employees and the results of it are rapidly visible. 5S is
effectiveness to manage tools and materials which can
improve housekeeping and environmental conditions.
 Unwanted material is removed from the
workspace, (Approximately 200 different types of
parts were removed).
 More space is now available for utilization.
 The time required for searching the required
things are reduced up to 50% because of proper
arrangements.
 As the tools are always clean and in good
condition, quality of finished product is increased.
 Cost engaged with hidden scrap is saved.
After the successful implementation of our project, we
conclude that 5s implementation is beneficial for all the
industries whose working environment is not good or too
old. It improves quality as well as work ethic in the
organization.
ACKNOWLEDGMENT
We would like to place our deep sense of gratitude to Mr.
Sarang S. Jadhav (CEO) Toolex Engineers Pvt. Ltd. for his
generous guidance, help and useful suggestions. Also, we
would like to thank Mr. Digvijay D. Bhosale (Manager
Supplier Chain) Toolex Engineers Pvt. Ltd> for his
valuable guidance.
REFERENCES
1. Shahryar Sorooshian, Meysam Salimi, Shanthi
Bavani, Hasti Aminattaheri, Experience of 5S
Implementation, Journal of Applied Sciences
Research, 8(7), 2012, 3855-3859.
2. Derya Sevim Korkut, Nevzat Cakıcıer, E.Seda
Erdinler, Göksel Ulay, and Ahmet Muhlis Dogan,
5S activities and its application at a sample
company, African Journal of Biotechnology Vol. 8
(8), 20 April 2009, 1720-1728.
3. J. Michalska, D. Szewieczek, The 5S methodology
as a tool for improving the organization, Journal of
Achievements in Materials and Manufacturing
Engineering, Volume 24(2), October 2007, 211-
214.
4. Arash Ghodrati, Norzima Zulkifli, The Impact of 5S
Implementation on Industrial Organizations’
Performance, International Journal of Business
and Management Invention, vol.2(3), 2013, 43-49.
5. Jose H. Ablanedo-Rosas, Bahram Alidaee, Juan
Carlos Moreno and Javier Urbina Quality
improvement supported by the 5S, an empirical
case study of Mexican organizations, International
Journal of Production Research, Vol. 48 (23), 1
December 2010, 7063–7087.
BIOGRAPHIES
Ashwin Vijay Desai, working as
an assistant professor from 9
years in D.Y. Patil College of
Engineering and Technology,
Kolhapur, Maharashtra, India
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 439
Shreedhar Prakash Shelar,
Pursuing Final Year in Bachelor of
Mechanical Engineering degree
from D.Y. Patil College of
Engineering and Technology,
Kolhapur, under the affiliation of
Shivaji University, Maharashtra,
India.
Akhilesh Mukund Amane,
Pursuing Final Year in Bachelor of
Mechanical Engineering degree
from D.Y. Patil College of
Engineering and Technology,
Kolhapur, under the affiliation of
Shivaji University, Maharashtra,
India.
Ajay Harishchandra Sutar,
Pursuing Final Year in Bachelor of
Mechanical Engineering degree
from D.Y. Patil College of
Engineering and Technology,
Kolhapur, under the affiliation of
Shivaji University, Maharashtra,
India.
Sourabh Subhash Chougule,
Pursuing Final Year in Bachelor of
Mechanical Engineering degree
from D.Y. Patil College of
Engineering and Technology,
Kolhapur, under the affiliation of
Shivaji University, Maharashtra,
India.
Viraj Balaso Chougule, Pursuing
Final Year in Bachelor of
Mechanical Engineering degree
from D.Y. Patil College of
Engineering and Technology,
Kolhapur, under the affiliation of
Shivaji University, Maharashtra,
India.

More Related Content

What's hot

Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...ijtsrd
 
Total Productive Maintenance - A Systematic Review
Total Productive Maintenance - A Systematic ReviewTotal Productive Maintenance - A Systematic Review
Total Productive Maintenance - A Systematic Reviewijsrd.com
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVsanjay kumar A M
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide shareK. M. Hasan Ripon
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...ijsrd.com
 
Productivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sectorProductivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sectorEmdadul Haque
 
Larry Hortillano Barong
Larry Hortillano BarongLarry Hortillano Barong
Larry Hortillano BarongLarry Barong
 
Resume MilanRana
Resume MilanRanaResume MilanRana
Resume MilanRanaMILAN RANA
 
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...akshay hebbar
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by LeanANITHA BALA
 
Research paper ppt on 5 s
Research paper ppt on 5 sResearch paper ppt on 5 s
Research paper ppt on 5 sFaizan Ali
 
Basic of manufacturing system
Basic of manufacturing systemBasic of manufacturing system
Basic of manufacturing systemRashidi Asari
 

What's hot (20)

Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...
 
Tauqeer Ahmad
Tauqeer AhmadTauqeer Ahmad
Tauqeer Ahmad
 
Total Productive Maintenance - A Systematic Review
Total Productive Maintenance - A Systematic ReviewTotal Productive Maintenance - A Systematic Review
Total Productive Maintenance - A Systematic Review
 
TQM basics, History and Tools
TQM basics, History and Tools TQM basics, History and Tools
TQM basics, History and Tools
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
Anthony gachie c.v
Anthony gachie c.v  Anthony gachie c.v
Anthony gachie c.v
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide share
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
 
Anthony gachie c.v
Anthony gachie c.v Anthony gachie c.v
Anthony gachie c.v
 
Ieh a3
Ieh a3Ieh a3
Ieh a3
 
Jeremy Hergert
Jeremy HergertJeremy Hergert
Jeremy Hergert
 
Productivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sectorProductivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sector
 
Larry Hortillano Barong
Larry Hortillano BarongLarry Hortillano Barong
Larry Hortillano Barong
 
Resume MilanRana
Resume MilanRanaResume MilanRana
Resume MilanRana
 
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by Lean
 
Research paper ppt on 5 s
Research paper ppt on 5 sResearch paper ppt on 5 s
Research paper ppt on 5 s
 
Work study
Work studyWork study
Work study
 
Basic of manufacturing system
Basic of manufacturing systemBasic of manufacturing system
Basic of manufacturing system
 

Similar to IRJET- Implementation of 5S in the Manufacturing Industry

Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyImplementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyIRJET Journal
 
IRJET- Study and Implementation of ‘5 S’ System in Manufacturing Industry
IRJET-  	  Study and Implementation of ‘5 S’ System in Manufacturing IndustryIRJET-  	  Study and Implementation of ‘5 S’ System in Manufacturing Industry
IRJET- Study and Implementation of ‘5 S’ System in Manufacturing IndustryIRJET Journal
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentIRJET Journal
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIRJET Journal
 
Improvement of Plant Layout by using 5S technique-An industrial case study
Improvement of Plant Layout by using 5S technique-An industrial case studyImprovement of Plant Layout by using 5S technique-An industrial case study
Improvement of Plant Layout by using 5S technique-An industrial case studyIJMER
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing CompanyIRJET Journal
 
Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...
Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...
Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...IRJET Journal
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semGuddu Ali
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET Journal
 
Bbgo410 630414115358 organisational_behaviour
Bbgo410 630414115358 organisational_behaviourBbgo410 630414115358 organisational_behaviour
Bbgo410 630414115358 organisational_behaviourrabwah
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction ProjectIRJET Journal
 
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...Dereck Downing
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) ConceptIRJET Journal
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six SigmaIRJET Journal
 
IRJET- Implementation of 5S Methodology in Higher Education Institute
IRJET- Implementation of 5S Methodology in Higher Education InstituteIRJET- Implementation of 5S Methodology in Higher Education Institute
IRJET- Implementation of 5S Methodology in Higher Education InstituteIRJET Journal
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workloadeSAT Publishing House
 
report li azim
report li azimreport li azim
report li azimAzrul Azim
 

Similar to IRJET- Implementation of 5S in the Manufacturing Industry (20)

Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyImplementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
 
IRJET- Study and Implementation of ‘5 S’ System in Manufacturing Industry
IRJET-  	  Study and Implementation of ‘5 S’ System in Manufacturing IndustryIRJET-  	  Study and Implementation of ‘5 S’ System in Manufacturing Industry
IRJET- Study and Implementation of ‘5 S’ System in Manufacturing Industry
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
 
Improvement of Plant Layout by using 5S technique-An industrial case study
Improvement of Plant Layout by using 5S technique-An industrial case studyImprovement of Plant Layout by using 5S technique-An industrial case study
Improvement of Plant Layout by using 5S technique-An industrial case study
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
 
Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...
Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...
Optimizing Workplace Efficiency and Productivity: An Introduction to the 5S S...
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in Company
 
Bbgo410 630414115358 organisational_behaviour
Bbgo410 630414115358 organisational_behaviourBbgo410 630414115358 organisational_behaviour
Bbgo410 630414115358 organisational_behaviour
 
Eb4301774779
Eb4301774779Eb4301774779
Eb4301774779
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
Lean tool 5 s
Lean tool    5 sLean tool    5 s
Lean tool 5 s
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six Sigma
 
IRJET- Implementation of 5S Methodology in Higher Education Institute
IRJET- Implementation of 5S Methodology in Higher Education InstituteIRJET- Implementation of 5S Methodology in Higher Education Institute
IRJET- Implementation of 5S Methodology in Higher Education Institute
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
 
report li azim
report li azimreport li azim
report li azim
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

IRJET- Implementation of 5S in the Manufacturing Industry

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 433 Implementation of 5S in the Manufacturing Industry Ashwin Desai1, Shreedhar Shelar2, Akhilesh Amane3, Ajay Sutar4,Sourabh Chougule5, Viraj Chougule6 1Assistant Professor, Mechanical Engineering Department, D. Y. Patil College of Engineering & Technology, Kolhapur, Maharashtra, India. 2,3,4,5,6Student, Mechanical Engineering Department, D. Y. Patil College of Engineering & Technology, Kolhapur, Maharashtra, India. ----------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - 5S is a quality improvement technique. The 5s technique (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) would strongly support the main objective small and medium scale organization to achieve continuous improvement and higher performance. In manufacturing environment implementation of 5S can result in considerable improvement, performance besides with housekeeping and health and safety. Key Words: 5S, Seiri, Seiton, Seiso, Seiketsu, Shitsuke 1. INTRODUCTION 5S is originated from japan. 5S is a part of kaizen. 5s is an effective technique of leans manufacturing.5s gets its name because of 5 activities, namely seiri, seiton, seiso, seiketsu, and shitsuke. It means to sort, set in order, shine, standardize and sustain. Sort means Determine necessary and unnecessary material. Set in order means keeping the material according to the need. Shine improves the worker attitude regarding his work which helps in increasing productivity. Standardize is a method of simplification The main aim of this paper is to implement the 5S methodology in Toolex Engineers Pvt. Ltd. Situated at C-9 Gokul shirgaon, Kolhapur, 416234.Before implementation of 5S at Toolex Engineers Pvt. Ltd. We visited Aditech Industries situated at Uchgaon, Kolhapur. As the reference. The Aditech industries had implemented 5S technique from last 5 years. We recorded all the data from the industries and finally concluded that 5S technique is processing in which all the management level of the company should be effectively involved that is from top- level management up to the bottom level management. 5S is a continuous process which should be implemented form first day and should be carried out forever. Every employee of an organization should be involved in 5S. Fig. 1 Schematic Diagram of 5S 2. LITERATURE REVIEW This section reviews the current literature on 5S practices it explores the concept of 5S, Basic information with all pros and cons about the 5S. According to Shahryar Sorooshian et al. (2012) –5S is a very effective technique to manage the work environment quality. According to Derya Sevim Korkut et al. (2009) - The clean and steady environment targeted by 5S has positive impacts on work safety, quality, efficiency, and morale. According to J. Michalska et al. (2007) - 5S implementation results in increasing efficiency, safety, and reduction of industrial pollution. According to Arash Ghodrati et al. (2013) - This paper is aimed to determine performance factors and characteristics in industrial organizations and identifying the effectiveness. According to Prof. S. B. Khedkar et al. (2012) - This research effort shows significant improvements to safety, productivity, efficiency, morale, and housekeeping.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 434 2.1 Lean Manufacturing 5S is one of the essential steps in motion and bring about a flourishing lean culture (Cooper et. al. 2007). 5S implementation is a simple strategy to maintain each department of the company effectively. Lean manufacturing is a method by which we can minimize the waste in a manufacturing industry without sacrificing productivity, which can cause a problem. The best method or a first step should be taken for the lean manufacturing is implementation of 5S, with all the ‘S' implementation i.e. Sort, Set in Order, Shine, Standardize and Sustain improves work culture aesthetically and ergonomically, thus it improves productivity of an employee and also minimization in errors this it minimizes the total waste. 3. PROBLEM STATEMENT The company we selected is small scale industry which is the manufacturing of assemblies & machined components. The problem associated with the company is due to limited space, workforce and the area covered due to non-moving material. The Non-moving material is a material in which it cannot be moved or used from the last six months. So it covers the space in the storage department and for the old and new stock. The storage department because of this non-profitable inventory gets increased and the net inventory required for an industry gets increased. Because of unorganized and non-moving material it so difficult to search any type of material or component so each rack in the industry should be organized in such a way that anyone can find the material as early as possible. As the material is unorganized so the time required for finding material or component is increased and thus the productivity of worker decreases due to increase workload. The inward material section and outward material section should not be combined. Each section should have proper space allotted. As both departments are combined in the industry. The material was placed on the gangways because of less area and maximum jobs hence either job should be stored vertically instead of horizontal. 4. METHODOLOGY Following method was adopted to implement 5s.  To create awareness among the employees for the implementation of 5s.  The organization was simplified into various zones consisting of various departments along with it (Example- Storage Department Zone, Machining Department Zone, Office Zone, Quality Control Zone, etc.)  The ‘1S' activity undertaken by the 1st zone (storage zone) under the guidance of the zone leader.  The audit was conducted by the apex team of an organization and the corrective measure was taken on it.  Similarly, rest ‘4S' were implemented one after other successfully. Fig. 2 Apex team authorization chart 5. THE 5S STEPS 5.1 Sort (Sieri) Something used once a year would not be an everyday item and we would not necessarily need all of the everyday items at once but if lost, a replacement would be necessary Sort by the tools that are frequently used are placed within easy to reach, and those are not used are moved to the non-moving material storage department All the items are classified in the terms of necessary items, unnecessary and may not necessary items The goal is to eliminate non-essential items from the workplace, items are "red tagged" and stored in a local red tag area for a specific period of time. 5.2 Set In Order (Sieton) The next step after identifying the unneeded item is to organize the needed item as per the specific job requirements in each station. Organize arrange and identify everything in the work area, as well as though out facilities so that items can be •APEX Team Head •Top Level Management Representative •Coordinator •Middle Level Management Representative •Zone Leader •Dpartment Head •Zone Member •Worker
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 435 efficiently and effectively retrieved and return to their proper storage location. The important part of inset in order is putting everything in its proper place and setting up a system so that everything can be returned to its proper place. The second step in 5S is where good labelling and identification practice are important The types of equipment, tools, and materials used as well as a proper storage location, need to be identified and labelled. The goal of setting in order is to create a standardize and consistent way to store and retrieve tools and materials. 5.3 Shine (Seiso) Efforts to keep work area clean and orderly to ensure propose -work. This means cleaning and maintaining the newly organized workplace. It can involve routine tasks such as mopping or reforming maintenance on machinery tools and other equipment 5S projects that are almost entirely focused on cleaning and painting, this step is needed to have the full involvement of employee to gather the data at what they feel needs to be cleaned and how often it should be cleaned. Develop and follow a regular cleaning and maintenance schedule. Cleanliness can show the effectiveness of the workplace and workers working condition have full competence in the company also moral of the employee get increases 5.4 Standardize (Seiketsu) After the cleaning activity is done in the company. Next stage is to be standardizing the process area. It is essential for maintaining the previous three S. describes the role models for adhering to the standard of the previous 3S and encourage others to follow them. Make rules and procedures to promote a good work environment until the first 3S. Maintain an environment where S1andS3 are implemented in the same manner throughout the company. Checklist development and regular use of it. 5.5 Sustain (Shitsuke) Every person in the industry has to follow the procedure as defined in the workplace. It must be followed by discipline and sincerity among the workplace and follow the procedure as defined. Self-discipline is the final step in the entire 5S system but it is tough to maintain 6. IMPLEMENTATION OF 5S 6.1 Guidelines for practicing SORT 1S during 1st S, we sorted items in terms of necessary and unnecessary requirements. Then we apply the red tag on unnecessary components in the storage section.  The necessary items are kept in the shelf according to its usage also frequently used material kept at the easily reachable position to the worker.  Approximately 600 kg of material removed from the storage department. Fig. 4 Measuring a number of components 6.2 Guidelines for practicing SET IN ORDER  During implementing 2nd S everything in its proper place.  Set components as per there requirement, weight, use, and orientation.  Assign a fixed location for each item.  Arrange all necessary items.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 436 Fig. 5 after 2S Implementation Fig. 6 Details of a table after implementation of 2S 6.3 Guidelines for practicing SHINE  When you implement 3rd S two things will happen 1st your employees will like to come to work in a clean environment and 2nd is moral of the employees gets increases towards work.  Clean all the machines so the life of the machines increases.  Clean all work floor area of the industry so chances of accidents get eliminated.  It includes a daily checklist to made sure works done as per define. Fig. 7 Machine after implementation of 3S 6.4 Guidelines for practicing STANDARDIZE  The standardize pillar utilize a set of schedules and checklists that can be followed so each step of 5S performed exactly the same way every day.  This stage is defined to create procedure and routines.  The checklist is a visual signpost to ensure the daily 3S are carried out in the work area. TOOLEX ENGINEERS PVT. LTD. PART NO. PART DESCRIPTION BIN NO. DATE REC. QTY. ISSUED QTY. NAME OF PERSON BAL. QTY. Fig. 3 Bin Card Format
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 437 Fig. 4 Bin Card Used 6.5 Guidelines for practicing SUSTAIN  Every person in the industry has to follow the procedure as defined.  It must be followed by discipline and sincerely among the workplace  Self-discipline is the final step in the entire 5S system. Fig. 4 Bin Card is maintained 7. CASE STUDY The 5s technique was introduced to the employees and awareness is created among them. In short, the technique we explained to then must be carried continuously it is a technique in which regular participation of every worker is necessary. 7.1 5S Approach in the Company The result in this study, we observed 15% free space was available before implementation of 1Sand after implementing 1S it is increased to 35%. 1S:  During 1S we sorted items in terms of necessary and unnecessary requirement then we applied the red tag on the unnecessary component in the storage section.  The necessary items are kept in the shelf according to usage also frequently used material kept at the easily reachable position to the worker.  Approximately 600 Kg of material removed from the storage section. Space Occupied 85% Free Space Available 15% Before 5S Implementation (Zone 1) Free Space Available 35% Space Occupied 65% After 5s Implementation
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 438 2S:  After implementing 2S the workspace, storage department, work process is simplified.  In short, each and every material is arranged as per orientation, use, weight, type of job.  The visual calculation was improved as thus time consumption gets reduced. 3S:  Floor space was cleaned.  Notice board was cleaned  All the machines were cleaned and colored 4S:  The checklist process was daily carried out.  Made rules and procedure to produce a good working environment  Bin card system was applied in which inventory quantity is easily measured  1S to 3S should be implemented strictly in the organization 5S:  The technique told to employees is maintained by them continuously  It includes team co-ordination which enhances moral worker  Bin cards were maintained properly by updating quantity, date, and material. 8. CONCLUSIONS It is a relatively effective technique which can be applied in an organization with the active participation of employees and the results of it are rapidly visible. 5S is effectiveness to manage tools and materials which can improve housekeeping and environmental conditions.  Unwanted material is removed from the workspace, (Approximately 200 different types of parts were removed).  More space is now available for utilization.  The time required for searching the required things are reduced up to 50% because of proper arrangements.  As the tools are always clean and in good condition, quality of finished product is increased.  Cost engaged with hidden scrap is saved. After the successful implementation of our project, we conclude that 5s implementation is beneficial for all the industries whose working environment is not good or too old. It improves quality as well as work ethic in the organization. ACKNOWLEDGMENT We would like to place our deep sense of gratitude to Mr. Sarang S. Jadhav (CEO) Toolex Engineers Pvt. Ltd. for his generous guidance, help and useful suggestions. Also, we would like to thank Mr. Digvijay D. Bhosale (Manager Supplier Chain) Toolex Engineers Pvt. Ltd> for his valuable guidance. REFERENCES 1. Shahryar Sorooshian, Meysam Salimi, Shanthi Bavani, Hasti Aminattaheri, Experience of 5S Implementation, Journal of Applied Sciences Research, 8(7), 2012, 3855-3859. 2. Derya Sevim Korkut, Nevzat Cakıcıer, E.Seda Erdinler, Göksel Ulay, and Ahmet Muhlis Dogan, 5S activities and its application at a sample company, African Journal of Biotechnology Vol. 8 (8), 20 April 2009, 1720-1728. 3. J. Michalska, D. Szewieczek, The 5S methodology as a tool for improving the organization, Journal of Achievements in Materials and Manufacturing Engineering, Volume 24(2), October 2007, 211- 214. 4. Arash Ghodrati, Norzima Zulkifli, The Impact of 5S Implementation on Industrial Organizations’ Performance, International Journal of Business and Management Invention, vol.2(3), 2013, 43-49. 5. Jose H. Ablanedo-Rosas, Bahram Alidaee, Juan Carlos Moreno and Javier Urbina Quality improvement supported by the 5S, an empirical case study of Mexican organizations, International Journal of Production Research, Vol. 48 (23), 1 December 2010, 7063–7087. BIOGRAPHIES Ashwin Vijay Desai, working as an assistant professor from 9 years in D.Y. Patil College of Engineering and Technology, Kolhapur, Maharashtra, India
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 439 Shreedhar Prakash Shelar, Pursuing Final Year in Bachelor of Mechanical Engineering degree from D.Y. Patil College of Engineering and Technology, Kolhapur, under the affiliation of Shivaji University, Maharashtra, India. Akhilesh Mukund Amane, Pursuing Final Year in Bachelor of Mechanical Engineering degree from D.Y. Patil College of Engineering and Technology, Kolhapur, under the affiliation of Shivaji University, Maharashtra, India. Ajay Harishchandra Sutar, Pursuing Final Year in Bachelor of Mechanical Engineering degree from D.Y. Patil College of Engineering and Technology, Kolhapur, under the affiliation of Shivaji University, Maharashtra, India. Sourabh Subhash Chougule, Pursuing Final Year in Bachelor of Mechanical Engineering degree from D.Y. Patil College of Engineering and Technology, Kolhapur, under the affiliation of Shivaji University, Maharashtra, India. Viraj Balaso Chougule, Pursuing Final Year in Bachelor of Mechanical Engineering degree from D.Y. Patil College of Engineering and Technology, Kolhapur, under the affiliation of Shivaji University, Maharashtra, India.