IRJET- Scheduling and Labour Management for Residential Building Project using Primavera
•
0 likes
•
71 views
IRJET Journal
Follow
https://www.irjet.net/archives/V6/i7/IRJET-V6I7237.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 5
Download now
Download to read offline
Recommended
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET Journal
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
IRJET Journal
Tracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using Primavera
IRJET Journal
76 s201905
76 s201905
IJRAT
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET Journal
Project typed
Project typed
Rahul
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET Journal
IRJET- Last Planner System
IRJET- Last Planner System
IRJET Journal
Recommended
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET Journal
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
IRJET Journal
Tracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using Primavera
IRJET Journal
76 s201905
76 s201905
IJRAT
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET Journal
Project typed
Project typed
Rahul
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET Journal
IRJET- Last Planner System
IRJET- Last Planner System
IRJET Journal
Project Planning and Scheduling
Project Planning and Scheduling
ijtsrd
Review on Planning and Scheduling of Construction Project by Management Tool ...
Review on Planning and Scheduling of Construction Project by Management Tool ...
ijtsrd
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013
IRJET Journal
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
Construction Project management
Construction Project management
Anupama holla
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Ahmed Fouad, MCIArb, PMP, SP, RMP
20320130405009
20320130405009
IAEME Publication
H1303024956
H1303024956
IOSR Journals
Project Management- introduction
Project Management- introduction
Aditi Garg
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
IAEME Publication
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
IRJET Journal
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET Journal
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET Journal
Resource scheduling in Construction Project Using Microsoft Project
Resource scheduling in Construction Project Using Microsoft Project
Sagar Kaptan
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
ijtsrd
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
Sagar Kaptan
Introduction to WorksLink
Introduction to WorksLink
Andrew McGrath
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET Journal
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
IRJET Journal
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
IRJET Journal
Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6
IRJET Journal
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET Journal
More Related Content
What's hot
Project Planning and Scheduling
Project Planning and Scheduling
ijtsrd
Review on Planning and Scheduling of Construction Project by Management Tool ...
Review on Planning and Scheduling of Construction Project by Management Tool ...
ijtsrd
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013
IRJET Journal
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
Construction Project management
Construction Project management
Anupama holla
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Ahmed Fouad, MCIArb, PMP, SP, RMP
20320130405009
20320130405009
IAEME Publication
H1303024956
H1303024956
IOSR Journals
Project Management- introduction
Project Management- introduction
Aditi Garg
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
IAEME Publication
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
IRJET Journal
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET Journal
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET Journal
Resource scheduling in Construction Project Using Microsoft Project
Resource scheduling in Construction Project Using Microsoft Project
Sagar Kaptan
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
ijtsrd
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
Sagar Kaptan
Introduction to WorksLink
Introduction to WorksLink
Andrew McGrath
What's hot
(17)
Project Planning and Scheduling
Project Planning and Scheduling
Review on Planning and Scheduling of Construction Project by Management Tool ...
Review on Planning and Scheduling of Construction Project by Management Tool ...
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
Construction Project management
Construction Project management
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
20320130405009
20320130405009
H1303024956
H1303024956
Project Management- introduction
Project Management- introduction
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
Resource scheduling in Construction Project Using Microsoft Project
Resource scheduling in Construction Project Using Microsoft Project
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
Introduction to WorksLink
Introduction to WorksLink
Similar to IRJET- Scheduling and Labour Management for Residential Building Project using Primavera
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET Journal
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
IRJET Journal
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
IRJET Journal
Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6
IRJET Journal
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET Journal
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
IRJET Journal
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET Journal
Enterprise Project Management using Primavera P6 EPPM
Enterprise Project Management using Primavera P6 EPPM
IRJET Journal
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
IRJET Journal
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IRJET Journal
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET Journal
The role of time, cost and quality in project management
The role of time, cost and quality in project management
IRJET Journal
Scheduling and Monitoring of Work Progress at Reach 2B (From Pier No. 573 to ...
Scheduling and Monitoring of Work Progress at Reach 2B (From Pier No. 573 to ...
IRJET Journal
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET Journal
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
IRJET Journal
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
ssuserb4074f
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
IRJET Journal
Primavera P6
Primavera P6
Piyush Bagade
Vocational training report l&t
Vocational training report l&t
Nishant Pandey
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET Journal
Similar to IRJET- Scheduling and Labour Management for Residential Building Project using Primavera
(20)
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Project Scheduling of a High-rise Building using Primavera P6
Project Scheduling of a High-rise Building using Primavera P6
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
Enterprise Project Management using Primavera P6 EPPM
Enterprise Project Management using Primavera P6 EPPM
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
The role of time, cost and quality in project management
The role of time, cost and quality in project management
Scheduling and Monitoring of Work Progress at Reach 2B (From Pier No. 573 to ...
Scheduling and Monitoring of Work Progress at Reach 2B (From Pier No. 573 to ...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
Primavera P6
Primavera P6
Vocational training report l&t
Vocational training report l&t
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Anamika Sarkar
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
ssuser7cb4ff
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
eptoze12
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
121011101441
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
KartikeyaDwivedi3
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
LewisJB
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
VICTOR MAESTRE RAMIREZ
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes examples
Dr. Gudipudi Nageswara Rao
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
jennyeacort
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
asadnawaz62
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
roselinkalist12
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
PoojaBan
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
null - The Open Security Community
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
ROCENODodongVILLACER
Past, Present and Future of Generative AI
Past, Present and Future of Generative AI
abhishek36461
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
Dr SOUNDIRARAJ N
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
João Esperancinha
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Dr.Costas Sachpazis
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
ShivangiSharma879191
Recently uploaded
(20)
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes examples
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
Past, Present and Future of Generative AI
Past, Present and Future of Generative AI
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
IRJET- Scheduling and Labour Management for Residential Building Project using Primavera
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1755 SCHEDULING AND LABOUR MANAGEMENT FOR RESIDENTIAL BUILDING PROJECT USING PRIMAVERA Abhishek G.B1, Dr. R.M Mahalingegowda2 1Assistant Professor, Department of Civil Engineering, P.E.S College of Engineering, Mandya, Karnataka, India 2Professor, Department of Civil Engineering, P.E.S College of Engineering, Mandya, Karnataka, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Construction industry helps in the nation’s economic growth in developing countries like India. Effective project management helps in achieving the aim of the project. Project management software’s have become a necessary tool in the construction industry. Primavera P6 is effective project management software tool used for scheduling, distributing resources, monitoring and controlling various activities involved in the project. This present study involves scheduling, assigning resources and management of labours for various activities at Foundation’s Silver Spring Residential project, Mysore. The scheduling of various tasks is done for 4 months. Labour management helps in thedistributiondifferent typesoflabourstodifferentactivities. An efficient schedule with controlling and monitoring of the project and management of labours during execution helps to complete the project within the target time and cost. Key Words: Project Management, Schedule, Labour management, Primavera P6. 1. INTRODUCTION Construction sector is the largest sector intheworld.InIndiaitisthesecondlargestafteragriculture.Constructionindustry leads to the economic growth of the country. Construction sector consumes a very wide employment opportunities for the labours. The rural areas need a development in economic, environment and land use planning to support the status of development in urban regions. Large amount of money and jobs are providedinconstructionindustrythananyotherindustry in India. Construction plays an important role in the development of agriculture, transportation, infrastructure of civil, manufacturing and communication sectors. Generally constructionsectorsaremorechallengingcomparedtootherindustries because of its unique nature and every project has its own kind. And construction projects are constrained by money, quality and time. Achieving the goalor project in timeshows the effective project management.If the project is inadequatei.e., lackof proper contract planning and management, implementation of poor planning, lack of management during execution leads to cost and time overrun. By proper skillful management, the project can be completed in time with the estimated cost. 1.1 Schedule of the Project The scheduling of construction project is a complete and powerful management tools. This process determines the work activity timings which identified in the process of planning and finally it shows in the schedule of project. “Scheduling is a sequencing and arrangement of each activities with the graphical representation required to complete the work”. Steps initiated in schedule development of the project are as follows Estimate the time required for each activity. Time required for completion of project is estimated. Defining interval of the time in each activity i.e., when to start and finish. 1.2 Labour Management It is an interacting relationship between labour and management. In construction sector, the project mainly focuses on optimum resources usage and speedy completion of the project. It isoneofthemostimportantconceptinconstructionproject management. If labour management is effective, the project will be complete in time with the quality. Labour productivity is one of the major problem in construction industry. About 30 to 50% of cost depends on labour management. 2. METHODOLOGY In the present scenario construction projects have become wideandcomplexsothecompaniesstarteddevelopingthe software for project management such as Microsoft project, primavera P3, P6 etc. The study involves scheduling and labour management. The following steps are involved in the methodology.
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1756 2.1 Schedule Development In this process the project manager or scheduler should estimatethe timeand develop the project schedule. The schedule layout is prepared for the project activities, determining the start and finish date, finalizing the durations and sequencing of activities. Activity duration and resource estimating are repeated several times to actually come up with the schedule of the project. The project schedule is developed by using Primavera software with the help of collected data. Once the project is scheduled the base line is set to track the progress. The activities are as per the calendar set by the company. To develop the schedule of Foundations Silver Springs residential building project, the following steps are carried out: Defining of activities in the project The sequencing of the activities in the project Fixing of start and finish date for the activities Estimation of the resources required Using above information schedule is developed by Primavera software. Fig -1: Schedule preparation 2.2 Planning Resources Identifying the resources required for the Foundation Silver Springs residential building project. Selecting the specific resources required for the project (Labour, Non-labour, material). Estimating the labour required for each activity and defining different types of labours in Primavera. Fig-2: Types of labours
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1757 Fig-3: Assigning of labours 2.3 Project Monitoring and Controlling As the project starts, the necessary data’s are collected at every stages and periods. Updating the progress of the project using Primavera. The required data’s for updating the progress of project are a. Actual start date and end date b. Percentage of complete of the activities c. Remaining duration to complete d. Resources used e. Remaining resources to complete the activity f. Comparison between planned and actual schedule Fig-4: Comparison between planned and actual schedule 3. RESULTS AND DISCUSSIONS Results are final product which comes from the overall process of the project. By doing the schedule of the project efficiently itleads to the success. Whilepreparingthescheduleusingprimaverasoftwaretheconstraintsshouldbementioned and delaying of project in execution by creating baseline. 3.1 Schedule of the Project Fig-5: Schedule of the structural work
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1758 Fig-6: Schedule of the structural work Fig-7: Schedule of the finishing work 3.2 Labour Assignment for Activities Calculation of labour units required for the activities in project are assigned forthe activities. The labours are assigned for the prepared schedule in Primavera software. The Figure shows the resources sheet of Primavera which contains different types of labours used in the project. Fig-8: Resource sheet 3.3 Tracking Fig-9: Shows the Comparison of Planned and Actual Work
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1759 4. CONCLUSIONS Project management software like Primavera helps to plan, schedule, monitor and control theactivitiesinvolvedin the construction project more effectively and efficiently. The graphical representation of various activities provides information about the critical path anddelayoftheproject. Labour management acts as a tool to optimize the various types of labours involved in various activities. An effective and efficient usage of labour management improves the productivity of the project so as to achieve the organization goal. REFERENCES 1. Robert .F., (2011), “Frequency of Use and Importance of Software Tools in Project Management Practice in Croatia”, Journal of construction engineering and management ©ASCE. Vol. 3. Pp 465-470. 2. Amir R, Muhammad R, Syed A.A, Huda .K and Zain .H (2012), “ Labor Management Relations”, Double Blind Peer Reviewed International Research Journal Publisher: Global JournalsInc.(USA)Online ISSN:2249-4588,mISSN:0975- 5853 Volume 12 Issue 8 Version 1.0 3. Nagaraju B, Sivakonda R and Chaudhuri R.A (2012), “Resource Management in Construction Projects – a case study”, An International Journal (ESTIJ), ISSN: 2250- 3498, Vol.2, No. 4. 4. Siddesh K.P, Satya D and Rani S. K (2013), “Human Resource Management Techniques Dealing With Deficit and Retention of Skilled Labor in Construction industry”,International Journal ofScientificandResearchPublications,ISSN 2250-3153, Volume 3, Issue 9. 5. Andrew F.T and Sachin .P (2013) “Project Monitoring and Control using Primavera”, International Journal of Innovative Research in Science, Engineering and Technology, Vol. 2,Issue 3,Pp 762. 6. Mistry .S and Bhatt .R (2013) “Critical Factors Affecting Labour Productivity in Construction Projects: Case Study of South Gujarat Region of India”, International Journal of Engineering and Advanced Technology, ISSN: 2249 – 8958, Volume-2, Issue- 4. 7. Vijay A.R and Kothai P.S (2014), “ Improving the Labour Productivity through Other ResourcesinConstructionField”, International Journal of Engineering Research and General Science, ISSN 2091-2730, Volume 2, Issue 2. 8. Satinder .C, Arvind .D (2014), “Developing an Efficient Schedule in Primavera P6: Significance of Activity ID & Descriptions”, International Journal of Innovative Research in Science, Engineering and Technology (An ISO 3297: 2007 Certified Organization) Vol. 3, Issue 7, Pp 15022. 9. Subramani .T and Chinnadurai .K (2015), “Construction Management and Scheduling of Residential Building Using Primavera”, International Journal of Application or Innovation in Engineering & Management,Volume4,Issue5,ISSN 2319 – 4847 . 10. Regina M.X and Rathinakumar .V (2015), “Reducing Construction Constraints using Primavera”, Indian Journal of Science and Technology, ISSN: 0974-6846,Vol 8(14), Pp65653. 11. Seetharaman .S, (2003). “Construction Engineering and Management”, Umesh Publications, Fourth edition. 12. Sowmya .L, (2014). “PMP Project Management Concept” CADD Centre Training Service Private Limited. 13. www.free-management-ebooks.com/faqpm/time-06.htm 14. www.free-management-ebooks.com/faqpm/time-04.htm
Download now