Project Scheduling of a High-rise Building using Primavera P6
•
0 likes
•
109 views
IRJET Journal
Follow
https://www.irjet.net/archives/V9/i2/IRJET-V9I250.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 7
Download now
Download to read offline
Recommended
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET Journal
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET Journal
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET Journal
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET Journal
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
IRJET Journal
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
IRJET Journal
IRJET- Last Planner System
IRJET- Last Planner System
IRJET Journal
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET Journal
Recommended
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET Journal
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET Journal
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET Journal
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET Journal
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
IRJET Journal
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
IRJET Journal
IRJET- Last Planner System
IRJET- Last Planner System
IRJET Journal
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET Journal
Tracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using Primavera
IRJET Journal
Conveyor Belt Project Report
Conveyor Belt Project Report
RISHABHSIINGH
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
IRJET Journal
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
IRJET Journal
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
ssuserb4074f
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET Journal
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
IRJET Journal
Stepwise planning
Stepwise planning
KavithaGowri
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET Journal
Project Plan For A Project Management Project
Project Plan For A Project Management Project
Mary Stevenson
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET Journal
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
IRJET Journal
Project scheduling
Project scheduling
Jaafer Saeed
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
Project mangement part 1
Project mangement part 1
ghulam MUSTAFA
IRJET- Analysis of Pre-Engineered Building and Conventional Building usin...
IRJET- Analysis of Pre-Engineered Building and Conventional Building usin...
IRJET Journal
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
TinotendaChivese
Enterprise Project Management using Primavera P6 EPPM
Enterprise Project Management using Primavera P6 EPPM
IRJET Journal
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
IRJET Journal
Time Management within IT Project Management
Time Management within IT Project Management
rielaantonio
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
More Related Content
Similar to Project Scheduling of a High-rise Building using Primavera P6
Tracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using Primavera
IRJET Journal
Conveyor Belt Project Report
Conveyor Belt Project Report
RISHABHSIINGH
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
IRJET Journal
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
IRJET Journal
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
ssuserb4074f
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET Journal
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
IRJET Journal
Stepwise planning
Stepwise planning
KavithaGowri
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET Journal
Project Plan For A Project Management Project
Project Plan For A Project Management Project
Mary Stevenson
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET Journal
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
IRJET Journal
Project scheduling
Project scheduling
Jaafer Saeed
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
Project mangement part 1
Project mangement part 1
ghulam MUSTAFA
IRJET- Analysis of Pre-Engineered Building and Conventional Building usin...
IRJET- Analysis of Pre-Engineered Building and Conventional Building usin...
IRJET Journal
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
TinotendaChivese
Enterprise Project Management using Primavera P6 EPPM
Enterprise Project Management using Primavera P6 EPPM
IRJET Journal
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
IRJET Journal
Time Management within IT Project Management
Time Management within IT Project Management
rielaantonio
Similar to Project Scheduling of a High-rise Building using Primavera P6
(20)
Tracking and Management of Construction Projects using Primavera
Tracking and Management of Construction Projects using Primavera
Conveyor Belt Project Report
Conveyor Belt Project Report
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
Stepwise planning
Stepwise planning
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
Project Plan For A Project Management Project
Project Plan For A Project Management Project
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Project scheduling
Project scheduling
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
Project mangement part 1
Project mangement part 1
IRJET- Analysis of Pre-Engineered Building and Conventional Building usin...
IRJET- Analysis of Pre-Engineered Building and Conventional Building usin...
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
Enterprise Project Management using Primavera P6 EPPM
Enterprise Project Management using Primavera P6 EPPM
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
Time Management within IT Project Management
Time Management within IT Project Management
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
rknatarajan
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
upamatechverse
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
RajaP95
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
Asutosh Ranjan
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
RajaP95
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
ranjana rawat
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
João Esperancinha
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
Call girls in Ahmedabad High profile
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
ranjana rawat
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Suman Mia
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Suhani Kapoor
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Suhani Kapoor
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Call Girls in Nagpur High Profile
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Recently uploaded
(20)
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Project Scheduling of a High-rise Building using Primavera P6
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 02 | Feb 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 277 Project Scheduling of a High-rise Building using Primavera P6 Yogita Awasthi1, Aruna Rawat2 1 Post Graduate Student, Department of Civil Engineering, University Institute of Technology (RGPV), Bhopal, India 2 Asst. Prof. Department of Civil Engineering, University Institute of Technology (RGPV), Bhopal, India --------------------------------------------------------------------***----------------------------------------------------------------------- Abstract - The main prospect of this study is to develop a planning approach in order to optimize the duration of construction planning and scheduling. The scheduling is carried out using Primavera P6 software and analyze the existing methods to identify the sequence and time (duration. start time, finish time, delay) of the construction project. Analyze and identify the dependencies of the tasks to track the project and update it on regular basis and to analyze the delays in the project. Suggesting the suitable and necessary methods and techniques for developing new alternative methods to optimize time and budget. Keywords: Planning, Scheduling, Construction project, Primavera 1. INTRODUCTION Due to the vast developments in the construction industry in last decades, it takes a lot of paperwork to maintain schedule, budget and resources. With the advent of various software in the construction industry, has changed the way of working. The planning and scheduling is the basic and fundamental requirement to understand the construction project. Develop and determine an adequate use of time, cost and quality Appropriate and advance planning provides alternative directions and techniques for the success of a construction project The present work guarantees a study on the G+10 residential building, where the analysis was performed using the Primavera P6 software. The efficient planning and scheduling using primavera software which controls and monitors work progress by reviewing and rebuilding under few changes so that work runs simultaneously with estimated time and budget. The need for planning is to allow predictability of activities and resources essential to the rapid completion of the project. 1.1 Planning Planning is the primary activity in the management of any construction project. There are various aspects of planning which includes: data collection from previous records, analysis of implemented activities and choosing the alternative to perform the activities. 1.2 Scheduling Scheduling is an important task because it helps to decide on the time frame within which tasks can be completed. The construction schedule can be defined as the duration of the task assigned in the project, including time, sequence, priority and level of dependencies. Planning includes: assignment of tasks, assignment of task sequence, assignment of tasks, assignment of durations, start and end times, assignment of resources, assignment and identifying dependencies. 2. METHODOLOGY Methodologies used for this study are designed in four stages: Stage 1: Pre-Data Collection: This step includes gathering data from previous locations and schedules, gathering information about various constraints, and gathering information about problems that may arise in construction projects. Data can be collected at meetings and by senior engineers in the construction company. Stage 2: Analysis-Implementation-Analysis: When the data is collected analyze and sort out the necessary data based on requirement of the project. Sort the data according to the priority of the activity or on the priority basis. Stage 3: Progress Data Collection: Collect the data from the site on regular basis compare it from the schedule which is prepared in advance in order to track the schedule and update it on regular basis. The data collection can be done through: Daily Progress Report.
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 02 | Feb 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 278 Labour work out Tasks with their time (start and finish time, duration). Stage 4: Post Data Collection: The data collected wiles tools and techniques. The software’s used in the present work are Microsoft Project 2016 and Primavera P6 Professional 17. There are certain tools which are provided in these software that are used to schedule the project and make different reports as per need. The functioning of both the software is explained below: - Step 1: Setting up the Calendar Setting up calendar is the primary task before starting the process of scheduling it includes: Define working hours along with working and non- working days Define Project Start Date and holidays. Define Calendar Shift i.e. 24 hours, night shift, standard (default). Step 2: Enter Activities name with WBS Work Breakdown Structure (WBS) enters the activities along with WBS in the task name field. WBS can be created as: Select the activities Click on indent task in task ribbon the selected activities comes under a specific WBS. Figure 2.1 Step 3: Assign Duration After Creating WBS and Activities next task is to provide the duration of the activities. It is required to collect the information from each activity duration, and then the duration is assigned to the activity. The wrong assignment of duration will affect the overall time of the project completion and resources cannot be allocated easily. Step 4: Assign Relationship Along with type of relation, constraints, lag and lead, after assigning duration to the activities define the relationship between the activities. The relationship defines the start date and finish date. The relationship between activities will be of four types these are as follows: Start to Start: it is a logical relationship in which successor activity cannot start until the predecessor activity has started. Start to Finish: It is a logical relationship in which a successor activity cannot finish until a predecessor activity has started. Finish to Finish: It is a logical relationship in which a successor activity cannot finish until a predecessor activity has finished. Finish to Start: It is a logical relationship in which a successor activity cannot start until a predecessor activity has started. Lag: To add lag time, assign a positive number; lag time create a delay between two activities. Lead: To add lead time, assign a negative number; Lead time is an overlap between two tasks that share a dependency. Primavera is the software of oracle and is used for planning, managing and executing the project and portfolios. Most of the project depends on Primavera P6 for several reasons such as: Plan, schedule and manage the project. Enhanced workflow and track the progress. Figure 2.2
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 02 | Feb 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 279 Creating OBS OBS is maintaining the data of responsible managers for the project in the company. There is only one OBS of the entire organization. To create OBS- click Enterprise > OBS. On OBS page click add Figure 2.3 Creating EPS It represents the breakdown of the project in a company. It maintains the enterprise project at various levels within the company. Maintain the phase of the project and the grouping that meet the needs of organization. To create EPS- click Enterprise > EPS. On EPS page click add Figure 2.4 Creating Calendar Creating calendar plays an important role in maintain the accuracy of the scheduling. Calendar contains various features such as working days, non-working days, working hours, non-working hours, list of holidays. We can create three type of calendar these are: - Global Calendar, Project-Specific Calendar, Resource-Specific Calendar Figure 2.5 Create Resource Sheet with unit and cost We can create resource sheet in hierarchy under three options that are: People, Material Equipment. The unit and the cost to the resource based on the requirement either it may fixed unit rate or the unit rate per hours or per day can be provided. Create WBS The work breakdown system contains the project activity group as well as the duration and start and end times of the specific activity group. WBS is useful because it divides project activities into small groups to make planning and data management easier. Create activities and assign durations with relationships and other details Specify activities, dates and durations that define activities, and other details.
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 02 | Feb 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 280 Figure 2.6 Collection of data and Specification of activities The data which is required for the plan of the project was collected from various sites. The total numbers of activities that are required for the schedule are listed out. Specifications required for each item or activity is collected from site to prepare plan and schedule. 3. Study Area Characteristics A residential building plan of MPPHIDCL has taken for planning and scheduling for the project and delay analysis. The project of this residential building is at finishing phase. Planning and Scheduling of residential building will be beneficial to the developer of this project. The construction is for a residential purpose of Constables and NGO's having G+10 and the carpet area of the construction is 80.77 pr building sq.m. The number of flats on each floor is 4 with typical floor plan for each floor except for ground floor. The ground floor includes parking. Figure 3.1 3.1 Identifying the Constraints The current architecture of the residential building will take a long time for the project to complete the project. The long-term period of a single project will increase considerably that the project costs considerably. Therefore, it is necessary to reduce the project completion time to complete the project within the time and budget time. The completion of the project and the completion of the project budget project has completed two completed factors successfully. The reason for taking a long time of this project is identified in the Primavera Calendar report. 3.2 Preparing Plan and Schedule for the Project in Primavera Actual schedule preparation process starts with the collection of data like project start date, activities involved in the construction of a G+10 residential building with activities sequences, duration taken for each and every activities, resources needed for each and every activities and its amount, cost spent for each and every activities. The collected data are entered in the software and the relations between the activities are given as per its sequence of activities collected. Project calendars are assigned to individual activities in the project. The process is started for planning and scheduling in primavera for this project. 3.3 Schedule of project with Gantt chart Schedule for project is prepared by creating the EPS (Enterprise Project Structure), Calendar with a time period of 8 working hours per day excluding Sunday's, WBS (Work Breakdown Structure) and adding the total number of 710 activities that are required for the project with their original duration. Successors and predecessor are assigned for all the activities by the use of Gantt chart. Interdependencies of various activities for simultaneous independent work are assigned.
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 02 | Feb 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 281 Finally activities are linked and ready to schedule. 3.4 Budgeting and allocation of resources For every activity of the project Budget is prepared for each and every activity by allocating the resources to the activities. Budgeted project labour, Non labour, Expense, Material and total cost of all the activities are calculated. BUGETING RESOURCE ALLOCATION Figure 3.2 4. EXPECTED OUTCOMES Reduces risk of schedule overruns and cost over runs. Optimizes management of all resource and reduces risk. Optimized Resources. Enhanced Visibility. Forecasting of Project Activities. Figure 3.3 5. RESULTS: Case study 1 considers a project network with low variability in activity time. The type of product family analyzed is TP- 140/33. The activity times are represented by triangular distribution. The effect of variability is assumed to show the multiple critical path scenarios for this experiment. The target due date for the completion of this project is 128 days. Three types of resources are utilized during every activity. The simulation model is simulated for 500 replications to determine how many paths exceed the actual due day of completion and to calculate the CI. The duration estimates used to fit all the activities are shown below in Tables. The three estimates ofthe activity duration are given by X (minimum), Y (most likely), and Z (maximum). All the durations are in days. The target completion time of project The expected time for all the activities in the critical path, is calculated to determine the target completion time of a project. The expected time is the sum of all the activity duration alongthe critical path. The target completion time of all the critical paths is calculated using the formula: Z= Ts- Te/√V where, Ts is the target completion time, Te is the sum of all the activity durations in the critical path and V is the variances of all the activity in the critical path as mentioned by Johnand Herman (2012). The target completion time determines the “highly likely” completion of theproject within the due date. In this case study, we have assumed 95% confidence interval for calculating the probability of completion.
6.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 02 | Feb 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 282 Cost associated due to the delay of the project The delay in the project completion is determined by the difference between the expectedtime of completion and the target completion time of the activities in the critical path. The total delay time in the project is calculated as shown below. The delay in project completion is given by the formula: Total delay (Ď) = Target completion – Expected time As per the scheduling done on software the outcomes are as follows: The project completion date according to the planned schedule is 26 JAN-2018. The progress of the project and the estimated total duration is to be reported and updated. Total of 348 activities are involved with this project from its initiation to delivery of the project with various steps. Planned float at some activities starting or finish is been observed to execute the activity works smoothly without overshooting the budget and resources. The variance issues with respect to the start date or finish date of the project could not be reported, if the threshold variance of start date and finish date are properly monitored. It helps in comparison of baseline schedule with the revised schedule which notifies about the added activities or deleted activities from the project schedule. The report of allocation of resources helps in cost and time saving which results in increase of economy. It provides an idea of arranging the required resources for the upcoming activity. 6. REPORTS THROUGH PRIMAVERA The reports generated through primavera p6 in this paper are: 1. Duration/ Delay Analysis 2. Cost Reports 3. Risk Scoring 4. Tracking progress with respect to baseline Figure 6.1 Figure 6.2 7. CONCLUSIONS Primavera software serves as an effective tool for generating Gantt chart for schedule of G+ 10 residential building constructions. Effectively link all the activities involved in the construction of the project. Primavera gives the total duration required for the construction of the different phases involved. It determines the Critical Path of the schedule of the project. It determines the total float generated due to interdependency of activities. It keeps a track of the scheduled and the on-site construction. The use of project management software in a proper way reduces the cost and time of construction. Use of software gives a proper scheduled path which helps in setting a track for all the activities, to check if there is deviation from planned cost and schedule. It can investigate the defects in the planning, scheduling procedure of the client organization. 7.1 Future Scope and Enhancements In the future, research could explore the possibility of integrating other knowledge areas into the development of project schedules, such as risk management and procurement management. MCPSA can be adapted to solve scheduling problems in multiple projects, thereby reducing delays and improving the completion rates of all projects in an organization.
7.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 02 | Feb 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 283 REFERENCES 1. Ahuja, H. N., Dozzi, S. P., and AbouRisk, S. M. (1994). Project Management Techniques in Planning and Controlling Construction Projects. 2nd Ed., Wiley, New York. 2. Eisner, H. (2002). Essentials of Project and Systems Engineering Management.2nd Ed., Wiley, New York. 3. Haga, W. A. (1998). Crashing PERT networks. Ph.D. Dissertation, University of Northern Colorado, Colorado. 4. Haga, W. A., and Marold, K. A. (2005). Monitoring and control of PERT networks, The Business Review, 3(2), 240-245. 5. Kerzner, H. (2003). Project management: a systems approach to planning, scheduling, and controlling. 8th Ed., Wiley, Hoboken, NJ. 6. Lu, M., and AbouRizk, S. M. (2000). Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), 219-226. 7. MacCrimmon, K. R., and Ryavec, C. A. (1964). An Analytical Study of the PERT Assumptions, Operations Research, 12(1), 16-37. 8. Mohanthy, R. P., and Siddiq M. K., (1989) Multiple projects multiple resources-constrained scheduling: Some studies. International Journal of Production Research, 27, 261–280. 9. Mohanty, R. P. (1988) An Evaluation of Project Scheduling Problems. Management Research News, MCB University Press, U.K. 10. Primavera User Manual. 11. RanjithKumar K, Sridhar N, Sakthivelu K, Saran G, and Monika N R (2017), “Planning and scheduling of commercial building using primavera p6 -case study”, International Journal of Intellectual Advancements and Research in Engineering Computations (IJIAREC),5(1). BIOGRAPHIES Yogita Awasthi, Post Graduate Student, Department of Civil Engineering, University Institute of Technology (RGPV), Bhopal, India.
Download now