Signalling : Signalling consists of the systems,
devices and means by which trains are operated
efficiently and tracks are used to maximum extent,
maintaining the safety of the passengers, the staff
and the rolling stock.
NEED OF SIGNALLING
• To provide facilities for the efficient movement of
trains.
• To provide facility for safe and efficient shunting
operations.
• To provide facility for max. utility of tracks.
• To ensure safety between two or more trains
which cross or approach each other’s path.
HISTORY OF SIGNALLING
1825: FIRST RAILWAY LINE FOR GOODS
TRAFFIC WAS OPENED BETWEEN
DARLINGTON TO STOCKTON (U.K.)
UNIFORMED MEN ON HORSES GUIDED THE
TRAIN
1830: FIRST PASSENGER TRAIN BETWEEN
LIVERPOOL AND MANCHESTER
POLICEMAN WERE POSTED AT FIXED INTERVALS
CLASSIFICATION OF SIGNALS
1. OPERATING CHARACTERISTICS
2. FUNCTIONAL CHARACTERISTICS
3. LOCATIONAL CHARACTERISTICS
4. SPECIAL CHARACTERISTICS
OPERATION CHARACTERISTICS:
BASED ON THE WAY OF THEIR OPERATION,
SIGNALS CAN BE CLASSIFIED AS:-
Signals
Detonating Hand Fixed
Operating
Detonating signals:- These are placed on the rails in
foggy and cloudy weather when hand or fixed signals are not
visible. Signals explodes with a loud sound when train passes
over them.
Detonating signals
The sound of detonator draws
attention of the driver to the proximity
of the signals.
From the safety point of view, the
detonators must be placed on the rails
atleast 400 to 500m ahead of the signal
to enable the driver to stop the train, or
to obey the signals.
These signals consists of containers
with explosive and are fixed to the rails
by means of clips.
This type of signalling is
done manually.
Hand signals are given either by
flags fixed to a wooden handle or by
bare arms when flags are not
available during the day time.
These are generally used by guards,
station masters, cabin man or any
other authorised man
HAND SIGNAL
During the night time, lamps are used in which movable glass
slides of green, red and yellow sheds are provided.
Following are the signal conventions used:-
Serial no. Colours of flag/lights Meaning of signals
1 Red flag of light STOP
2 GREEN flag of light PROCEED
3 YELLOW light PROCEED CAUTIOUSLY
Stop or
semaphore
Warner signals Shunting
signals
Coloured-light
signals
Functional characteristics
STOP OR SEMAPHORE
SIGNALS
The principle of design of semaphore signals is to
show the stop position
Of any failure that happens to be in the apparatus.
The signal mechanism is so arranged that in normal
position it indicates the
Stop position.
Serial no. OPERATING
TIME
POSITION OF
ARM
POSITION OF
SIGNAL
INDICATION
GIVEN
1 Day time 1- horizontal
arm
2-inclined arm
45to 60 degree
“ON” position
“OFF” position
“STOP”
“PROCEED”
2 Night time 1- red light
2-green light
3-yellow light
“ON” POSITION
“OFF” position
----------
“STOP”
“PROCEED”
“PROCEED
CAUTIOUSLY”
3 Day or night
time
1-no signal
2-white
--------------
-------------------
“DANGER”
“DANGER
SIGN”
WARNER SIGNAL
A semaphore signal at the entrance to station
is combined with a warner signal.
The warner signal is similar to semaphore
signal in shape except a v-notch at free end.
The warner signal is placed on the same post
of semaphore signal at 1.8 to 2.1m below the
semaphore signal., which is of yellow colour.
Shunting signal (GROUND SIGNAL)
These signals are used for shunting
operations in stations yards and therefore ,
They are called shunting signals.
They are of the shape of a circular disc with
a red band on a white background.
The disc can revolve in a vertical plane by
pulling the lever by hand.
The following indications are given by
disc or shunting signals:-
1- when the red band of disc is in horizontal position
or it shows red light at night
It indicates ‘STOP’.
2- When the red band is in inclined position or shows
green light at night, it indicates
‘PROCEED’.
COLOUR LIGHT SIGNAL
SPECIAL SIGNALS
REPEATER
SIGNAL
CALLING
SIGNAL
ROUTING
SIGNAL
POINT
INDICATOR
MODIFIED LOWER QUADRANT
SEMAPHORE SIGNAL
REPEATER SIGNAL
COLOURED LIGHT SIGNALS
DHANYAWAD

More Related Content

What's hot

Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
KHUSHBU SHAH
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
Souvik Mondal
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
Hari Krishna Velpula
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
RAMPRASAD KUMAWAT
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
srinivas2036
 
Railway signal
Railway signalRailway signal
Railway signal
krishnendu17
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
hiranrathva
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
Shanmugaraj M
 
Classification of station
Classification of stationClassification of station
Classification of station
Giri Guru
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
RAMPRASAD KUMAWAT
 
Indian Railway Signals & Systems
Indian Railway Signals & SystemsIndian Railway Signals & Systems
Indian Railway Signals & Systems
Arbaz Kazi
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
Mani Vel
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
Aaquib ansari
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
Latif Hyder Wadho
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
Vijai Krishnan V
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
gayathrysatheesan1
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
Mani Vel
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
Malyar Talash
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failures
Sunil Kumar Meena
 

What's hot (20)

Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Railway signal
Railway signalRailway signal
Railway signal
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Classification of station
Classification of stationClassification of station
Classification of station
 
Left hand turnout
Left hand turnoutLeft hand turnout
Left hand turnout
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Indian Railway Signals & Systems
Indian Railway Signals & SystemsIndian Railway Signals & Systems
Indian Railway Signals & Systems
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failures
 

Similar to Signalling in Railways

Rohit summer ppt
Rohit summer pptRohit summer ppt
Rohit summer ppt
rohit kumar
 
Railway_signalling and interlocking_.pptx
Railway_signalling and interlocking_.pptxRailway_signalling and interlocking_.pptx
Railway_signalling and interlocking_.pptx
Sadanand Sahu
 
cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)Coomarasamy Chidambaram
 
AJAY CHAUHAN ppt
AJAY CHAUHAN  pptAJAY CHAUHAN  ppt
AJAY CHAUHAN ppt
Ajay Kumar
 
AJAY CHAUHAN ppt
AJAY CHAUHAN pptAJAY CHAUHAN ppt
AJAY CHAUHAN ppt
Ajay Kumar
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
Sachin Singh
 
signalling & Interlocking.pptx
signalling & Interlocking.pptxsignalling & Interlocking.pptx
signalling & Interlocking.pptx
Anujyadav514462
 
Railway Signalling.pptx
Railway Signalling.pptxRailway Signalling.pptx
Railway Signalling.pptx
HSengupta
 
Railway Signals
Railway SignalsRailway Signals
Railway Signals
Umar Karimi
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-RajbanshRom!el Rajbansh
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
Bhaskar Kumar Dan
 
RDSO Training
RDSO TrainingRDSO Training
RDSO Training
Gagandeep Singh
 
Wire rope inspection service
Wire rope inspection serviceWire rope inspection service
Wire rope inspection service
Infrastructure Preservation Corporation
 
Indian railway kota presentation
Indian railway kota presentationIndian railway kota presentation
Indian railway kota presentation
AnuragKumar528
 
Introduction to Railway Signalling
Introduction to Railway SignallingIntroduction to Railway Signalling
Introduction to Railway Signalling
Sandeep Patalay
 
Railway interlocking
Railway interlockingRailway interlocking
Railway interlocking
MOHIT DUREJA
 
ITS of smart-Intelligent Transportation Systems
ITS of smart-Intelligent Transportation SystemsITS of smart-Intelligent Transportation Systems
ITS of smart-Intelligent Transportation Systems
behnooshbamani1
 
Station yards
Station yardsStation yards
Station yards
jagadish108
 
Interlocking System in Jaipur Metro.pptx
Interlocking System in Jaipur Metro.pptxInterlocking System in Jaipur Metro.pptx
Interlocking System in Jaipur Metro.pptx
Ashish585772
 
Signals.pptx
Signals.pptxSignals.pptx
Signals.pptx
satish sajja
 

Similar to Signalling in Railways (20)

Rohit summer ppt
Rohit summer pptRohit summer ppt
Rohit summer ppt
 
Railway_signalling and interlocking_.pptx
Railway_signalling and interlocking_.pptxRailway_signalling and interlocking_.pptx
Railway_signalling and interlocking_.pptx
 
cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)cc ppt Transportation engg poly unit 4(4)
cc ppt Transportation engg poly unit 4(4)
 
AJAY CHAUHAN ppt
AJAY CHAUHAN  pptAJAY CHAUHAN  ppt
AJAY CHAUHAN ppt
 
AJAY CHAUHAN ppt
AJAY CHAUHAN pptAJAY CHAUHAN ppt
AJAY CHAUHAN ppt
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 
signalling & Interlocking.pptx
signalling & Interlocking.pptxsignalling & Interlocking.pptx
signalling & Interlocking.pptx
 
Railway Signalling.pptx
Railway Signalling.pptxRailway Signalling.pptx
Railway Signalling.pptx
 
Railway Signals
Railway SignalsRailway Signals
Railway Signals
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-Rajbansh
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
 
RDSO Training
RDSO TrainingRDSO Training
RDSO Training
 
Wire rope inspection service
Wire rope inspection serviceWire rope inspection service
Wire rope inspection service
 
Indian railway kota presentation
Indian railway kota presentationIndian railway kota presentation
Indian railway kota presentation
 
Introduction to Railway Signalling
Introduction to Railway SignallingIntroduction to Railway Signalling
Introduction to Railway Signalling
 
Railway interlocking
Railway interlockingRailway interlocking
Railway interlocking
 
ITS of smart-Intelligent Transportation Systems
ITS of smart-Intelligent Transportation SystemsITS of smart-Intelligent Transportation Systems
ITS of smart-Intelligent Transportation Systems
 
Station yards
Station yardsStation yards
Station yards
 
Interlocking System in Jaipur Metro.pptx
Interlocking System in Jaipur Metro.pptxInterlocking System in Jaipur Metro.pptx
Interlocking System in Jaipur Metro.pptx
 
Signals.pptx
Signals.pptxSignals.pptx
Signals.pptx
 

Recently uploaded

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 

Recently uploaded (20)

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 

Signalling in Railways

  • 1.
  • 2.
  • 3. Signalling : Signalling consists of the systems, devices and means by which trains are operated efficiently and tracks are used to maximum extent, maintaining the safety of the passengers, the staff and the rolling stock.
  • 4. NEED OF SIGNALLING • To provide facilities for the efficient movement of trains. • To provide facility for safe and efficient shunting operations. • To provide facility for max. utility of tracks. • To ensure safety between two or more trains which cross or approach each other’s path.
  • 5. HISTORY OF SIGNALLING 1825: FIRST RAILWAY LINE FOR GOODS TRAFFIC WAS OPENED BETWEEN DARLINGTON TO STOCKTON (U.K.) UNIFORMED MEN ON HORSES GUIDED THE TRAIN 1830: FIRST PASSENGER TRAIN BETWEEN LIVERPOOL AND MANCHESTER POLICEMAN WERE POSTED AT FIXED INTERVALS
  • 6. CLASSIFICATION OF SIGNALS 1. OPERATING CHARACTERISTICS 2. FUNCTIONAL CHARACTERISTICS 3. LOCATIONAL CHARACTERISTICS 4. SPECIAL CHARACTERISTICS
  • 7. OPERATION CHARACTERISTICS: BASED ON THE WAY OF THEIR OPERATION, SIGNALS CAN BE CLASSIFIED AS:- Signals Detonating Hand Fixed Operating
  • 8. Detonating signals:- These are placed on the rails in foggy and cloudy weather when hand or fixed signals are not visible. Signals explodes with a loud sound when train passes over them.
  • 10. The sound of detonator draws attention of the driver to the proximity of the signals. From the safety point of view, the detonators must be placed on the rails atleast 400 to 500m ahead of the signal to enable the driver to stop the train, or to obey the signals. These signals consists of containers with explosive and are fixed to the rails by means of clips.
  • 11. This type of signalling is done manually. Hand signals are given either by flags fixed to a wooden handle or by bare arms when flags are not available during the day time. These are generally used by guards, station masters, cabin man or any other authorised man HAND SIGNAL
  • 12. During the night time, lamps are used in which movable glass slides of green, red and yellow sheds are provided. Following are the signal conventions used:- Serial no. Colours of flag/lights Meaning of signals 1 Red flag of light STOP 2 GREEN flag of light PROCEED 3 YELLOW light PROCEED CAUTIOUSLY
  • 13.
  • 14. Stop or semaphore Warner signals Shunting signals Coloured-light signals Functional characteristics
  • 15. STOP OR SEMAPHORE SIGNALS The principle of design of semaphore signals is to show the stop position Of any failure that happens to be in the apparatus. The signal mechanism is so arranged that in normal position it indicates the Stop position.
  • 16.
  • 17. Serial no. OPERATING TIME POSITION OF ARM POSITION OF SIGNAL INDICATION GIVEN 1 Day time 1- horizontal arm 2-inclined arm 45to 60 degree “ON” position “OFF” position “STOP” “PROCEED” 2 Night time 1- red light 2-green light 3-yellow light “ON” POSITION “OFF” position ---------- “STOP” “PROCEED” “PROCEED CAUTIOUSLY” 3 Day or night time 1-no signal 2-white -------------- ------------------- “DANGER” “DANGER SIGN”
  • 18.
  • 19. WARNER SIGNAL A semaphore signal at the entrance to station is combined with a warner signal. The warner signal is similar to semaphore signal in shape except a v-notch at free end. The warner signal is placed on the same post of semaphore signal at 1.8 to 2.1m below the semaphore signal., which is of yellow colour.
  • 20.
  • 21.
  • 22.
  • 23. Shunting signal (GROUND SIGNAL) These signals are used for shunting operations in stations yards and therefore , They are called shunting signals. They are of the shape of a circular disc with a red band on a white background. The disc can revolve in a vertical plane by pulling the lever by hand.
  • 24.
  • 25.
  • 26. The following indications are given by disc or shunting signals:- 1- when the red band of disc is in horizontal position or it shows red light at night It indicates ‘STOP’. 2- When the red band is in inclined position or shows green light at night, it indicates ‘PROCEED’.
  • 29.