 The combination of rails, fitted on sleepers
and resting on ballast and subgrade is called
the railway track or permanent Way
 Consists of
1. Rails
2. Sleepers
3. Ballast
4. Subgrade
Requirements of an Ideal
Permanent Way
 Gauge should be uniform and correct
 The rails should be in proper level
1. Straight track – two rails must be at the same level
2. Curves- outer rail should have proper
superelevation
 Track should have enough lateral strength
 The radii and superelevation on curves should be
properly designed and maintained
 Track should be resilient and elastic in order to
absorb shocks and vibrations of running track.
 Joints, including points and crossings which are
regarded to be weakest points of the railway track,
should be properly designed and maintained
 There should be adequate provision for easy renewals
and replacements
 Drainage system must be perfect
 The track structure should be strong, low in initial
cost as well as maintenance cost
Typical Cross-Section of a Railway
Track
Component Parts of a Railway
Track
1.Rails
 Unsymmetrical I sections made up of steel
Functions
 Provide a hard, smooth and unchanging surface for
passage of heavy moving loads with a minimum
friction between the steel rails and steel wheels
 Bear the stresses developed due to heavy vertical
loads, lateral and braking forces and thermal
stresses
 Transmit the loads to sleepers and consequently
reduce pressure on ballast and formation below
RAILS - REQUIREMENTS
 Should be of proper composition
 Vertical stiffness should be high enough to transmit the load
 Capable of withstanding lateral forces
 Head must be sufficiently deep to allow for an adequate
margin of vertical wear
 Web should be sufficiently thick to bear the load & provide
adequate flexural rigidity in horizontal plane
 Foot should be wide enough so that they are stable against
overturning, especially on curves 54 Component Parts of a
Railway Track
 Bottom of the head and top of the foot of rails should be so
shaped as to enable the fish plates to transmit the vertical
load efficiently from the head to the foot at rail joints.
 The centre of gravity of the rail section must lie
approximately at mid height so that maximum tensile and
compressive stresses are equal.
 The tensile strength of the rail piece should not be less than
72kg/m2
 The rail specimen should withstand the blow of Falling
Weight Test or Tup Test as specified by Indian Railway
Standards without fracture
Sleepers
 provide transverse ties on which rails are laid
Functions
 Hold rails at proper gauge
 Support and fix the rails in proper position
 Transfer load uniformly from rails to ballast
 Provide longitudinal & lateral stability to track
 Provide elastic medium between rail and ballast
Sleepers-Requirements
 Sufficiently strong to act as a beam under loads
 Provide sufficient bearing area for the rail
 Should have sufficient weight for stability
 Facilitate easy fixing & taking out of rails without
disturbing them
 should facilitate easy removal and replacement of ballast
 Should be able to resist impact and vibrations of moving
trains
Ballast
 granular and gritty material placed & packed below and
around sleepers (stone ballast is widely used in India)
Functions
 To hold sleepers in position, prevents lateral & longitudinal
movement
 Distribute load from sleepers to subgrade
 Impart elasticity and resilience for comfortable ride
 Provide effective drainage
 Act as a medium for provision of super elevation
Ballast-Requirements
 sufficient strength to resist crushing under heavy loads of
moving trains
 durable enough to resist abrasion and weathering action
 rough and angular surface so as to provide good lateral and
longitudinal stability to the sleepers
 good workability so that it can be easily spread of formation
 should not make the track dusty or muddy due to its crushing
to powder under wheel loads
 should not have any chemical action on metal sleepers and
rails
Subgrade/ Formation
 naturally occurring soil, prepared to support track.
 They could be in embankments, levels or cuttings
Functions
 Support railway track from beneath
Requirements
 Uniform transmission of load over large area
 Effective drainage of water
 No variation in volume and moisture under adverse load &
weather conditions
THANK YOU….

More Related Content

What's hot

Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevation
Mani Vel
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
hiranrathva
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
AkshathaBhandary
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
Ghanashyam Prajapati
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
Amit Yadav
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
Junaid Jamadar
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
Aaquib ansari
 
Unit 2
Unit 2Unit 2
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
Bathla Tuition Centre
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
srinivas2036
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
T.Naga Anusha
 
Railway Engineering: Points and crossings
Railway Engineering: Points and crossingsRailway Engineering: Points and crossings
Railway Engineering: Points and crossings
Bathla Tuition Centre
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
srinivas2036
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
Vijai Krishnan V
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway
addavidson
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
Aglaia Connect
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
KHUSHBU SHAH
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway Engineering
Irfan Nasir
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
Ghanashyam Prajapati
 
Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in Railways
Anupama Jha
 

What's hot (20)

Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevation
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
 
Unit 2
Unit 2Unit 2
Unit 2
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Railway Engineering: Points and crossings
Railway Engineering: Points and crossingsRailway Engineering: Points and crossings
Railway Engineering: Points and crossings
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway Engineering
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in Railways
 

Similar to Components of railway track

Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
KHUSHBU SHAH
 
Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
Arun G
 
Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1
AJEETH B
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
TURUMELLAVIJAYAGOWRI
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
TVijayaGowri
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
Dnyaneshwar More
 
5-180501044424.pdf
5-180501044424.pdf5-180501044424.pdf
5-180501044424.pdf
RijuDasgupta
 
Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1
GARRE RAVI KUMAR
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx
MayuriPatel90
 
steel.pptx
steel.pptxsteel.pptx
steel.pptx
gopir53
 
Sleeper
Sleeper Sleeper
Sleeper
Jayshiv Thakkar
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611
VATSAL PATEL
 
P.way
P.wayP.way
P.way
vaignan
 
Transportation engineering railway permanent way
Transportation engineering railway permanent wayTransportation engineering railway permanent way
Transportation engineering railway permanent way
Jangid Devendra
 
Unit 1 gauge creep
Unit 1 gauge creepUnit 1 gauge creep
Unit 1 gauge creep
Anuruddh Rajput
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
Prem Prakash Kumar
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
Emaan Sharma
 
3rd unit
3rd unit3rd unit
3rd unit
jagadish108
 
Chapter-2Under-carriage-of-construction-equipment.pptx
Chapter-2Under-carriage-of-construction-equipment.pptxChapter-2Under-carriage-of-construction-equipment.pptx
Chapter-2Under-carriage-of-construction-equipment.pptx
Gulshansah07
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
MuhammadAdeel269
 

Similar to Components of railway track (20)

Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
 
Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
5-180501044424.pdf
5-180501044424.pdf5-180501044424.pdf
5-180501044424.pdf
 
Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx
 
steel.pptx
steel.pptxsteel.pptx
steel.pptx
 
Sleeper
Sleeper Sleeper
Sleeper
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611
 
P.way
P.wayP.way
P.way
 
Transportation engineering railway permanent way
Transportation engineering railway permanent wayTransportation engineering railway permanent way
Transportation engineering railway permanent way
 
Unit 1 gauge creep
Unit 1 gauge creepUnit 1 gauge creep
Unit 1 gauge creep
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
 
3rd unit
3rd unit3rd unit
3rd unit
 
Chapter-2Under-carriage-of-construction-equipment.pptx
Chapter-2Under-carriage-of-construction-equipment.pptxChapter-2Under-carriage-of-construction-equipment.pptx
Chapter-2Under-carriage-of-construction-equipment.pptx
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 

More from gayathrysatheesan1

Tourist places in ooti
Tourist places in ootiTourist places in ooti
Tourist places in ooti
gayathrysatheesan1
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
gayathrysatheesan1
 
BENEFITS OF PLANING
BENEFITS OF PLANINGBENEFITS OF PLANING
BENEFITS OF PLANING
gayathrysatheesan1
 
National capital region
National capital regionNational capital region
National capital region
gayathrysatheesan1
 
CONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORYCONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORY
gayathrysatheesan1
 
Tourist places in banglore
Tourist places in bangloreTourist places in banglore
Tourist places in banglore
gayathrysatheesan1
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented development
gayathrysatheesan1
 
Kochi city as an organism
Kochi city as an organismKochi city as an organism
Kochi city as an organism
gayathrysatheesan1
 
Garden city
Garden cityGarden city
Garden city
gayathrysatheesan1
 
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTSUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
gayathrysatheesan1
 
Town development plan
Town development planTown development plan
Town development plan
gayathrysatheesan1
 
Space standards for facility areas and utilites
Space standards for facility areas and utilitesSpace standards for facility areas and utilites
Space standards for facility areas and utilites
gayathrysatheesan1
 
Precincts
PrecinctsPrecincts
Multiple nuclei theory
Multiple nuclei theoryMultiple nuclei theory
Multiple nuclei theory
gayathrysatheesan1
 
Classification of cost
Classification of costClassification of cost
Classification of cost
gayathrysatheesan1
 
Roof and roof coverings
Roof and roof coveringsRoof and roof coverings
Roof and roof coverings
gayathrysatheesan1
 
Zoning
ZoningZoning
Scaffolding and formwork ppt
Scaffolding and  formwork pptScaffolding and  formwork ppt
Scaffolding and formwork ppt
gayathrysatheesan1
 
Regional problems and their solutions ppt
Regional problems and their solutions pptRegional problems and their solutions ppt
Regional problems and their solutions ppt
gayathrysatheesan1
 
Presentation skills ppt
Presentation skills pptPresentation skills ppt
Presentation skills ppt
gayathrysatheesan1
 

More from gayathrysatheesan1 (20)

Tourist places in ooti
Tourist places in ootiTourist places in ooti
Tourist places in ooti
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
 
BENEFITS OF PLANING
BENEFITS OF PLANINGBENEFITS OF PLANING
BENEFITS OF PLANING
 
National capital region
National capital regionNational capital region
National capital region
 
CONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORYCONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORY
 
Tourist places in banglore
Tourist places in bangloreTourist places in banglore
Tourist places in banglore
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented development
 
Kochi city as an organism
Kochi city as an organismKochi city as an organism
Kochi city as an organism
 
Garden city
Garden cityGarden city
Garden city
 
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTSUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
 
Town development plan
Town development planTown development plan
Town development plan
 
Space standards for facility areas and utilites
Space standards for facility areas and utilitesSpace standards for facility areas and utilites
Space standards for facility areas and utilites
 
Precincts
PrecinctsPrecincts
Precincts
 
Multiple nuclei theory
Multiple nuclei theoryMultiple nuclei theory
Multiple nuclei theory
 
Classification of cost
Classification of costClassification of cost
Classification of cost
 
Roof and roof coverings
Roof and roof coveringsRoof and roof coverings
Roof and roof coverings
 
Zoning
ZoningZoning
Zoning
 
Scaffolding and formwork ppt
Scaffolding and  formwork pptScaffolding and  formwork ppt
Scaffolding and formwork ppt
 
Regional problems and their solutions ppt
Regional problems and their solutions pptRegional problems and their solutions ppt
Regional problems and their solutions ppt
 
Presentation skills ppt
Presentation skills pptPresentation skills ppt
Presentation skills ppt
 

Recently uploaded

Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
ramrag33
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 

Recently uploaded (20)

Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 

Components of railway track

  • 2. Railway Track/ Permanent Way  The combination of rails, fitted on sleepers and resting on ballast and subgrade is called the railway track or permanent Way  Consists of 1. Rails 2. Sleepers 3. Ballast 4. Subgrade
  • 3. Requirements of an Ideal Permanent Way  Gauge should be uniform and correct  The rails should be in proper level 1. Straight track – two rails must be at the same level 2. Curves- outer rail should have proper superelevation  Track should have enough lateral strength  The radii and superelevation on curves should be properly designed and maintained
  • 4.  Track should be resilient and elastic in order to absorb shocks and vibrations of running track.  Joints, including points and crossings which are regarded to be weakest points of the railway track, should be properly designed and maintained  There should be adequate provision for easy renewals and replacements  Drainage system must be perfect  The track structure should be strong, low in initial cost as well as maintenance cost
  • 5. Typical Cross-Section of a Railway Track
  • 6.
  • 7. Component Parts of a Railway Track 1.Rails  Unsymmetrical I sections made up of steel Functions  Provide a hard, smooth and unchanging surface for passage of heavy moving loads with a minimum friction between the steel rails and steel wheels  Bear the stresses developed due to heavy vertical loads, lateral and braking forces and thermal stresses  Transmit the loads to sleepers and consequently reduce pressure on ballast and formation below
  • 8. RAILS - REQUIREMENTS  Should be of proper composition  Vertical stiffness should be high enough to transmit the load  Capable of withstanding lateral forces  Head must be sufficiently deep to allow for an adequate margin of vertical wear  Web should be sufficiently thick to bear the load & provide adequate flexural rigidity in horizontal plane  Foot should be wide enough so that they are stable against overturning, especially on curves 54 Component Parts of a Railway Track
  • 9.  Bottom of the head and top of the foot of rails should be so shaped as to enable the fish plates to transmit the vertical load efficiently from the head to the foot at rail joints.  The centre of gravity of the rail section must lie approximately at mid height so that maximum tensile and compressive stresses are equal.  The tensile strength of the rail piece should not be less than 72kg/m2  The rail specimen should withstand the blow of Falling Weight Test or Tup Test as specified by Indian Railway Standards without fracture
  • 10. Sleepers  provide transverse ties on which rails are laid Functions  Hold rails at proper gauge  Support and fix the rails in proper position  Transfer load uniformly from rails to ballast  Provide longitudinal & lateral stability to track  Provide elastic medium between rail and ballast
  • 11. Sleepers-Requirements  Sufficiently strong to act as a beam under loads  Provide sufficient bearing area for the rail  Should have sufficient weight for stability  Facilitate easy fixing & taking out of rails without disturbing them  should facilitate easy removal and replacement of ballast  Should be able to resist impact and vibrations of moving trains
  • 12. Ballast  granular and gritty material placed & packed below and around sleepers (stone ballast is widely used in India) Functions  To hold sleepers in position, prevents lateral & longitudinal movement  Distribute load from sleepers to subgrade  Impart elasticity and resilience for comfortable ride  Provide effective drainage  Act as a medium for provision of super elevation
  • 13. Ballast-Requirements  sufficient strength to resist crushing under heavy loads of moving trains  durable enough to resist abrasion and weathering action  rough and angular surface so as to provide good lateral and longitudinal stability to the sleepers  good workability so that it can be easily spread of formation  should not make the track dusty or muddy due to its crushing to powder under wheel loads  should not have any chemical action on metal sleepers and rails
  • 14. Subgrade/ Formation  naturally occurring soil, prepared to support track.  They could be in embankments, levels or cuttings Functions  Support railway track from beneath Requirements  Uniform transmission of load over large area  Effective drainage of water  No variation in volume and moisture under adverse load & weather conditions