What is effective project management? Projects are undertaken as a way of achieving a specific objective. Effective project management is when they work well and the objectives are met.
Advanced Project Management Project Organization and Integration;
Project Proposal
Project Contract
Project Charter
Elicitation of Project Requirements and Specifications
Project Statement of Work
Project Scope Statement
Project Work Breakdown Structure
Scope Creep, Control and Verification
Project Change Management
Project Integration Management
“ANALYSIS TERJADINYA HYDRAULIC LOCK MENGGUNAKAN METODE WHY TREE ANALYSIS PADA...Heri Saputra
Melakukan analisa terhadap kemungkinan terjadinya hydraulic lock menggunakan why tree analysis pada engine 3306 dengan bantuan manual book caterpillar engine 3306
What is effective project management? Projects are undertaken as a way of achieving a specific objective. Effective project management is when they work well and the objectives are met.
Advanced Project Management Project Organization and Integration;
Project Proposal
Project Contract
Project Charter
Elicitation of Project Requirements and Specifications
Project Statement of Work
Project Scope Statement
Project Work Breakdown Structure
Scope Creep, Control and Verification
Project Change Management
Project Integration Management
“ANALYSIS TERJADINYA HYDRAULIC LOCK MENGGUNAKAN METODE WHY TREE ANALYSIS PADA...Heri Saputra
Melakukan analisa terhadap kemungkinan terjadinya hydraulic lock menggunakan why tree analysis pada engine 3306 dengan bantuan manual book caterpillar engine 3306
Documentation on PMP Risk Management Plan & Template.
If you like a downloaded version, add me to your network on Linkedin
www.linkedin.com/in/alliegentry
and in the invite, please let me know you would like a word copy of this document.
Allie Gentry
PivotLogix
Prince2 by design is a process based approach to project delivery and that means projects progress through the processes in a linear way. In this presentation I cover the objectives and activities of each of the 7 Processes. I will take each process in turn and by the end of this presentation you should have a very good overview of the 7 Processes of Prince2. By having this good overview will help you with the Prince2 exam as you will understand what happens and when on the project. With the exam being open book you will be able to look up the detail if and when you need it.
The 7 Processes of Prince2 are:
Starting up a Project
Directing a Project
Initiating a Project
Controlling a Stage
Managing Product Delivery
Managing a Stage Boundary
Closing a Project
Earned Value Management (EVM) is an effective tool for project performance measurement that, if planned properly, can play a vital role for project success. EVM is based on scope, time and cost only while risks are not accounted for in planning process. Moreover, there are difficulties in acquiring real-time Actual Cost (AC) data for continuous monitoring and control, mainly due to the communication gap between engineers and accountants. Researchers have proposed different extensions of EVM for specific projects and in general. In order to apply the proposed EVM extensions, a real-time tourism facility project with sustainable energy & water resource at Kund Malir, Baluchistan is taken as a model. Costs, schedules, scope and risks are hypothetical in the model. Planned EVM is applied to the model with and without risks. Risk Costs and Scheduled Buffers are added in Planned Value (PV) calculations basing on probability-impact matrix factors. Furthermore, task level EVM models or Task-EVMs are integrated into Project-EVM or Master-EVM in order to minimize the problems being faced in acquiring real-time data. Industry specific application and research of EVM extensions proposed in this paper can be a good area for future research. Moreover, establishment of tourism facilities at unexplored or less explored areas of Sindh and Baluchistan can be another real-time research as well as a business project.
Reinventing project management antonio nieto-rodriguez. 27th may 2021PMIUKChapter
In the next five years, the world will see more projects than ever. The reconstruction of the economy, healthcare, social care, and society at large, after the devastating global pandemic crisis, will be unprecedented in human history. According to McKinsey Governments’ have announced $10 trillion in reconstruction funds just in the first two months of the crisis, which is three times more than the response to the 2008–09 financial crisis.
We are witnessing the rise of projects as the main unit of work, as well as the essential model to deliver change and create value for individuals, organizations, and society at large. The move from a world driven by efficiency to a world driven by the change will have enormous consequences in terms of strategies, culture, organisational structure, competencies, compensations, etc.
Yet, today, about 70% of projects and strategies fail to deliver their objectives. We urgently need to step up and significantly increase the project and strategy implementation success rate. Considering that every year approximately 48 trillion US dollars are invested in projects, we fail to deliver trillions of benefits, value, and impact in organizations and society at large.
To achieve this incredible goal, project management and project managers will need to reinvent themselves into strategy implementation professionals, ... you will find out all the details during Antonio's keynote.
Proposta de Implantação de PMO em LISARB - Equipe PentaTeamMarco Coghi
Titulo: Proposta de Implantação de PMO em LISARB - Equipe PentaTeam
Alunos:Diogo Coimbra de Brito,Izabel Oenning,Maria Fernanda M. Pollnow,Paulo Zavattieri Ruiz,Sergio Luiz Brandão da Silva Moura,
Cidade: Curitiba
Disciplina: PMO
Turma: GP2/14
Data:20-12-2015
Hora:22:12
Comentarios:
Publico até ápos a correção
In deze presentatie presenteren wij het strategie executie model met de vijf bouwstenen voor succesvolle strategie executie. De succesfactoren hebben betrekking op de strategie, de executie van de strategie, de organisatie, de mensen die de strategie moeten uitvoeren en de systemen die nodig zijn om de executie te ondersteunen. Strategie executie kan alleen goed worden begrepen door deze vijf bouwstenen samen te brengen in een holistische kijk op strategie executie.
Documentation on PMP Risk Management Plan & Template.
If you like a downloaded version, add me to your network on Linkedin
www.linkedin.com/in/alliegentry
and in the invite, please let me know you would like a word copy of this document.
Allie Gentry
PivotLogix
Prince2 by design is a process based approach to project delivery and that means projects progress through the processes in a linear way. In this presentation I cover the objectives and activities of each of the 7 Processes. I will take each process in turn and by the end of this presentation you should have a very good overview of the 7 Processes of Prince2. By having this good overview will help you with the Prince2 exam as you will understand what happens and when on the project. With the exam being open book you will be able to look up the detail if and when you need it.
The 7 Processes of Prince2 are:
Starting up a Project
Directing a Project
Initiating a Project
Controlling a Stage
Managing Product Delivery
Managing a Stage Boundary
Closing a Project
Earned Value Management (EVM) is an effective tool for project performance measurement that, if planned properly, can play a vital role for project success. EVM is based on scope, time and cost only while risks are not accounted for in planning process. Moreover, there are difficulties in acquiring real-time Actual Cost (AC) data for continuous monitoring and control, mainly due to the communication gap between engineers and accountants. Researchers have proposed different extensions of EVM for specific projects and in general. In order to apply the proposed EVM extensions, a real-time tourism facility project with sustainable energy & water resource at Kund Malir, Baluchistan is taken as a model. Costs, schedules, scope and risks are hypothetical in the model. Planned EVM is applied to the model with and without risks. Risk Costs and Scheduled Buffers are added in Planned Value (PV) calculations basing on probability-impact matrix factors. Furthermore, task level EVM models or Task-EVMs are integrated into Project-EVM or Master-EVM in order to minimize the problems being faced in acquiring real-time data. Industry specific application and research of EVM extensions proposed in this paper can be a good area for future research. Moreover, establishment of tourism facilities at unexplored or less explored areas of Sindh and Baluchistan can be another real-time research as well as a business project.
Reinventing project management antonio nieto-rodriguez. 27th may 2021PMIUKChapter
In the next five years, the world will see more projects than ever. The reconstruction of the economy, healthcare, social care, and society at large, after the devastating global pandemic crisis, will be unprecedented in human history. According to McKinsey Governments’ have announced $10 trillion in reconstruction funds just in the first two months of the crisis, which is three times more than the response to the 2008–09 financial crisis.
We are witnessing the rise of projects as the main unit of work, as well as the essential model to deliver change and create value for individuals, organizations, and society at large. The move from a world driven by efficiency to a world driven by the change will have enormous consequences in terms of strategies, culture, organisational structure, competencies, compensations, etc.
Yet, today, about 70% of projects and strategies fail to deliver their objectives. We urgently need to step up and significantly increase the project and strategy implementation success rate. Considering that every year approximately 48 trillion US dollars are invested in projects, we fail to deliver trillions of benefits, value, and impact in organizations and society at large.
To achieve this incredible goal, project management and project managers will need to reinvent themselves into strategy implementation professionals, ... you will find out all the details during Antonio's keynote.
Proposta de Implantação de PMO em LISARB - Equipe PentaTeamMarco Coghi
Titulo: Proposta de Implantação de PMO em LISARB - Equipe PentaTeam
Alunos:Diogo Coimbra de Brito,Izabel Oenning,Maria Fernanda M. Pollnow,Paulo Zavattieri Ruiz,Sergio Luiz Brandão da Silva Moura,
Cidade: Curitiba
Disciplina: PMO
Turma: GP2/14
Data:20-12-2015
Hora:22:12
Comentarios:
Publico até ápos a correção
In deze presentatie presenteren wij het strategie executie model met de vijf bouwstenen voor succesvolle strategie executie. De succesfactoren hebben betrekking op de strategie, de executie van de strategie, de organisatie, de mensen die de strategie moeten uitvoeren en de systemen die nodig zijn om de executie te ondersteunen. Strategie executie kan alleen goed worden begrepen door deze vijf bouwstenen samen te brengen in een holistische kijk op strategie executie.
Автоматизация системы управления проектами в девелоперской компании при помощ...ProjectPractice2013
Доклад "Автоматизация системы управления проектами в девелоперской компании при помощи инструмента Project Server 2013" на 5-й юбилейной конференции Microsoft Project «Управляй бизнесом как проектом»
Спикеры от ГК "Проектная ПРАКТИКА":
Бочаров Глеб
Старший консультант по решениям Microsoft PPM
Миногин Андрей
Архитектор решений Microsoft PPM
Competency Model (HR API conference, Russian language) Irina Leshchuk
В докладе представлен опыт разработки, внедрения и использования модели компетенций для сотрудников компании. В нем говорится о том, как удалось подготовить решение, которое одновременно отвечает запросам со стороны бизнеса и используется для оценки и развития сотрудников в компании Grid Dynamics.
Кажется, что доклад будет интересен руководителям подразделений, менеджерам команд, HR специалистам и всем, кто интересуется вопросами оценки и развитием сотрудников внутри компании.
Целевой аудиторией, прежде всего, являются компании, в которых работает больше 100 инженеров и особенно актуально для тех, где есть распределенные команды в разных городах. Для компаний небольшого размера или стартапов содержание презентации будет интересно, скорее, с познавательной точки зрения, чем с практической.
Формирование и управление командой проекта
• Выбор партнера. Ключевые роли и люди на Проекте;
• Различия в подходах к внедрению систем;
• Мотивация персонала на достижение результата и преодоление сопротивления внутри компании.
Компания PM Expert – лидер в области управления проектами в России, оказывающий профессиональные услуги управления проектами, программами и портфелями проектов по направлениям: аутсорсинг, консалтинг, обучение, сертификация.
Услуги PM Expert нацелены на достижение стратегических целей заказчика через эффективное управление проектами, ориентированы на все уровни менеджмента – стратегический, тактический, операционный – и применимы к различным типам проектов – организационным, технологическим, производственным.
При предоставлении услуг в области управления проектами PM Expert руководствуется мировыми и российскими наци¬ональными стандартами в сфере проектного управления, а также лучшими практиками управления проектами, адаптированными к российской специфике с учетом бизнес-задач и отраслевых стандартов организаций заказчиков.
Альфа применения бизнес симуляции при управлении портфелем проектов (PMI, IPMA)ANDREY ZAKHODYAYCHENKO
Обобщена практика использования симуляторов при подготовке профессионалов в области управления портфелем проектов, выделены проблемные точки и предложены варианты решений
Similar to Компетенции менеджера проекта в современной компании_М. Дубовик (20)
PRojects IN Controlled Environments 2 (PRINCE2) - это структурированный метод управления проектами, одобренный правительством Великобритании в качестве стандарта управления проектами и признанный во всем мире. Презентация посвящена особенностям применения методологии PRINCE2 на практике в российских условиях
Практика внедрения проектного управления в исполнительных органах государстве...ProjectPractice2013
1. Текущее состояние и основные тенденции развития проектного управления в государственном секторе РФ
2. Ключевые особенности внедрения проектного управления в ИОГВ
3. Дорожная карта внедрения проектного управления на региональном уровне
4. Рассмотрение типовых проблем и способов их решения при реализации дорожной карты внедрения проектного управления на региональном уровне
Автоматизированная система управления проектами органов исполнительной власт...ProjectPractice2013
- Что нужно учитывать при реализации систем проектного управления для ОИВ
- Какие ключевые требования к средствам автоматизации проектного управления для ОИВ
- ПМ Форсайт как платформа для построения ИСУП дляОИВ
- Кейс ОИВ Республики Мордовия
- Демонстрация решения ОИВ Республики Мордовия
- Наш опыт работы с ОИВ и внедрений ИСУП для ОИВ
ПРОСТЫЕ СЛОЖНЫЕ КОММУНИКАТИВНЫЕ И ПСИХОЛОГИЧЕСКИЕ ПРИЕМЫ В УПРАВЛЕНИИ ПРОЕКТАМИProjectPractice2013
В статье рассматриваются вопросы организации коммуникаций в проекте, подходы к разрешению и предотвращению конфликтов при решении проектных задач. Особое внимание уделено взаимодействию руководителей и подчиненных, а также подходам, позволяющим мотивировать проектную команду на достижение целей проекта. Материал статьи построен на анализе извлеченных уроков, полученных в ходе выполнения проектов.
Cистема оценки сервисов проектного офиса вебинар 5.03.2015ProjectPractice2013
Одним из ключевых элементов корпоративной системы управления проектами все чаще выступает проектный офис, который решает ряд управленческих задач и обеспечивает работоспособность всей системы управления.
Как оценить качество сервисов, предоставляемых проектным офисом? Как улучшить работу Проектного офиса?