• Roadheaders were first developed for mechanized excavation
of coal in the early 50s.
• Roadheaders offer a unique capability and flexibility for the
excavation of soft to medium strength rock formations, hence
widely used in under ground coal mining.
• Advantages:
– Improved productivity.
– Improved safety.
– Reduced ground support.
– Less manpower requirement.
– Reduced costs.
 Road header is excavating equipment consisting
of a boom-mounted cutting head, a loading
device usually involving a conveyor, and a
crawler travelling track to move the entire
machine forward into the coal face.
 Road header is exclusively used for drivage of
gate roadways in Longwall panel.
ROAD HEADER
 Depending on cutting head, Roadheader are two types.
• Borer type-Transversal - rotates parallel to the cutter
boom axis-DOSCO
• Ripper type-Longitudinal - rotates perpendicular to
boom axis – AM-50
 It can work gradient flatter than 18 deg/ 1 in 3.
Neil et. al (1994) refer road headers as small size up to 30 t, midsize between 30 to
70 t and large size between 70 to120 t.
Classification of Boom Type road Header:
Cutting Action of heads:
 Milling type or Borer Type (axial head), and
 Ripping Type (Transverse head)
Fig: Cutting action of road headers
a. Ripping type, b. milling type
Road Headers introduced in SCCL:
• ALPINE MINER AM-50
• EBZ -200
• DOSCO with onboard twin bolters
• WIRTH T 1.14 with onboard twin bolters
ALPINE MINER
AM-50
Overall length of machine 7.50m
Height of machine 1.64m
Width over machine gathering apron 1.91m
Machine weight (estimated basic machine) 24T
maximum working gradient 18°
Total power 166 kW
DOSCO- LH1400 MODEL
Overall length of machine 11.18m
Height of machine (canopy) 2.25m
Width over machine gathering apron 3.56m
Machine weight (estimated basic machine) 63T
maximum working gradient 18°
Total power 362 kW
WIRTH
Overall length of machine 10.29m
Height of machine 2.57m
Width 3.6m
Machine weight 65T
maximum working gradient 18°
Total power 360 kW
Working Section Layout of Road header
Heavy Section for gate
belt conveyorBridge belt conveyor
Road header
Air duct
Side bolts
Side bolts
Track line wit h endless haulage for material
transport
COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400,
WIRTH T1.14 AND AM-50
TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50
Overall length of
machine
10.29 m 11.18 m 7.5 m
Height of machine 2.57m 2.250m 1.645 m
Width 3.6m 3.56m 2.5m
Machine weight 65 tonne 63 tonne 24 tonne
Maximum cutting
height
4.817m 4.5m 4.0 m
Maximum cutting
width
6.7m 7.02m 4.8 m
Maximum cutting
depth
260mm 330mm 100mm
Ground clearance 250mm 257mm 180mm
Max. gradient 18 degrees 18 degrees 18 degrees
Total installed power 360KW 362 KW 166KW
Total cooling water
requirement
25 l/min 40 l/min at31 bar 30 l/min
COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO
LH1400, WIRTH T1.14 AND AM-50
UNDER CARRIAGE DETAILS
TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50
Crawler track
width
600mm 550mm 370mm
Track length 2900mm 3711mm
Tramming speed 0-18m/min 2.28m/min&9.6m/min 5m/min
Floor pressure 0.18Mpa 0.15Mpa 0.13Mpa
Track tensioning
arrangement
Track should be
tensioned manually
with grease pump
Tracks are
automatically tensioned
whenever tracks are
operated
Tracks are
tensioned with
grease pump
CUTTER BOOM
Cutter motor
size
180KW 250KW 100KW
Axial thrust 200kN 542kN
Speed 35.69 rpm 53 rpm 88.7 rpm
Cooling media Water water water
COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400,
WIRTH T1.14 AND AM-50
TECHNICAL DATA T1.14 WIRTH
MINER
DOSCO LH1400 AM-50
LOADING ARRANGEMENT
Apron width 4.232m 3.560m 2.5m
Power 2x21KW hydraulic
motors
Hydraulic motors Conveyor chain
Star wheels speed 24rpm 33.4rpm Gathering arms
CHAIN CONVEYOR
Type of conveyor Twin outboard Twin outboard Single Chain
Conveyor width 740mm 694mm 370mm
power 2x25KW hydraulic 2x33.7KW hydraulic 2X11KW Electric
Conveyor chain
speed
1.15m/s 1.02m/s 0.9m/s
COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400,
WIRTH T1.14 AND AM-50
TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50
HYDRAULICS
Hydraulic fluid HFDU 68 HFDU 68 Mineral oil or FRHF
of the HSC Group (Water-
Glycol)
Power pack motor size 180KW 112KW 11KW
No of pumps 3 2 1
Type of pumps 2 variable displacement
axial piston pumps of 275
l/min and 1 vane pump of
79l/min
1 variable displacement pump of 148
l/min and 1 four section gear pump of
486 l/min
Axial thrust pump of 40
lpm
Return line filters 2 of 10 micron filters 1 of 6 micron filters 10 micron filters
Hydraulic tank capacity 800ltrs 900ltrs 260 ltrs
Standard hose fittings Threaded (37 degree JIC)
hose fittings
Staple lock fittings Staple lock fittings
Normal working pressure 250bar 140 bar 200 bar
Parking brakes Spring applied hydraulically
released brakes
Spring applied hydraulically released
brakes
Nil
Cooling Hydraulic oil temperature
is controlled
through an heat exchanger
Oil temperature is controlled with
baffles mounted
on the tank
Close or open circuit Water
cooling
TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50
HYDRAULIC TANK SAFETY FEATURES
Oil level indicators Visual level indicators Visual level indicators Visual level indicators
Thermostatic cutoff 3 position combined oil level
and temperature sensor
Thermostatic cutoff sensor, low fluid
level cutoff sensor
Nil
Pressure switch Pressure switch Pressure switch
Hydraulic system All functions main valve
bank are controlled by
solenoids ,only bolters are
operated
manually
All functions on the main valve bank are
controlled by pilot operated circuit at 30
bar
All functions on the main
valve bank are controlled by
manual operating levers
All valve segments with
spools use proximity switch
to monitor the position of
the spool and ensure correct
operation
-- --
LUBRICATION SYSTEM
All 43 grease points are
lubricated with hand grease
gun individually
For lubricating the machine is fitted
with centralized lubricating system
(WANDERLEAD) at four points on the
machine, which is powered via a
diverter valve, from the machine
hydraulic system.
Manual Greasing
COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400,
WIRTH T1.14 AND AM-50
COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400, WIRTH
T1.14 AND AM-50
TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50
ELECTRICAL
Supply voltage 1100 V/50 Hz/3ph 1100 V/50 Hz/3ph 550 V
Total power 360KW 362KW 166KW
Power junction box PK-2003 main enclosure with
FLP features
KM52/300/AW24 ENCLOSURE KEYEE300A
Display monitor 160mm display monitor with
fault finding software ----------------------- -----------------------
HEAD LIGHTS 5 OPERATED AT 24V/35W
WITH 2 AREA LIGHT FOR
ROOF BOLTING
5 OPERATED AT 24V/70W 2 OPERATED AT 24V
EMERGENCY STOPS 4NO’S 2 ON EACH SIDE 6 NOS 3 ON EACH SIDE 1No at Control panel
BOLTER SPECIFICATIONS
type 2XDHMS TYPE ABE deployed
with 2 telescopic platforms
(HYDRAMATIC)
SERIES 4200 1850 ROOF BOLTER
-----------------------
Drill Feed Two Stage Two Stage
Operation Operation of the road header
shall be carried out by
PEMPEK OBELIX RADIO
CONTROL SYSTEM, MACHINE
CAN BE OPRATEDUPTO 50 M
AWAY FROM THE MACHINE
All operations are carried out with pilot
operated joy sticks mounted on the
machine.
All operations are carried out
with operating levers
Hydraulic oil filling Oil to be filled with hand
operated oil filling pump
Oil to be filled with hydraulic power
operated oil filling pump
Oil to be filled with hand
operated oil filling pump
Bolter Miner (BM)
Bolter Miner Overview
Model 12ED30
Machine operation Sumping type miner
Cutter head Wide head machine – extendable/retractable drums
Cutting width - extended 5,500mm (5.5 meters)
Maximum cutting height 4,500mm (4.5 meters)
Coal gathering Plow type machine
Bolting rigs: Roof Four roof bolters
Bolting rigs: Rib Two rib bolters
Roof support Four temporary roof supports
Machine stabilization Front and rear stabilizing jacks
Machine length 13,175mm (13.175 meters)
Machine weight 120,400kg (120.4 ton)
Control system Joy Faceboss
Dust suppression Water sprays and dust collection system
12ED30 overview
Plow with
extendable/retractable wings
Extendable/retractable cutter
head
Bolting rigs and temporary roof
support cylinders
12ED30 overview
Dust collection
system
Main electrical
enclosure
Bolting rigs and TRS
cylinders
12ED30 overview
Rear stabilizing
jacks
Front stabilizing
jacks
Typical Twin Entry Sequence
Typical Twin Entry Sequence – Step 1
Typical Twin Entry Sequence – Step 2
Tailgate Options
X - Slit X - Slit
Tailgate roadway thirls into X-slit, which is
across (or part way across) junction.
Will have un-even roof across junction and
will have ‘triangle’ step at both sides of
junction.
Depending on roadway position, may have
un-even floor to grade out.
Tailgate roadway thirls at side of X-slit, roof
will be level in junction.
May have to cut out side of roadway to
complete thirling.
Floor will be level.
X-slit driven measure needs to be accurate.
Typical Twin Entry Sequence – Step 3
Typical Twin Entry Sequence – Step 4
Typical Twin Entry Sequence - Step 5
Typical Twin Entry Sequence – Step 6
Typical Twin Entry Sequence – Step 7
Typical Twin Entry Sequence – Step 8
Bolter Miner Vs Road header
BM RH
Gallery Shape Rectangular Square/rectangualr/other stable
shape
Cutting and bolting sequence Full face at one time Partial face
Cutting across roof and floor layers Cutting along roof layers
Cutting and bolting simultaneous Cutting and bolting not
simultaneous
Roof and sides stability Less More
Progress Can be up to 750m / month Can be up to 350m / month
Coal loading outby Shuttle cars/ flexible conveyor train Bridge belt conveyor
mobility More, can drive two parallel
drivages
Can drive crosscut galleries also
Less, can drive single drivage only
Can not drive crosscut galleries
Coal dilution more less

More Related Content

What's hot

depllaring in coal mines
depllaring in coal minesdepllaring in coal mines
depllaring in coal mines
akhilesh kumar gupta
 
Shaft sinking 1
Shaft sinking 1Shaft sinking 1
Shaft sinking 1
Er.Sunil Wasade
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
Bhaskar Naidu
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mining
gopal karmakar
 
Different Raising Techniques in mining
Different Raising Techniques in miningDifferent Raising Techniques in mining
Different Raising Techniques in mining
Rishabh Ranjan
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal mines
aashutosh chhirolya
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDL
Ankit Narain
 
Pillar design in coal mines
Pillar design in coal minesPillar design in coal mines
Pillar design in coal mines
Ulimella Siva Sankar
 
Mining Machinery Learning Material for DEegree and Diploma
Mining Machinery Learning Material for DEegree and DiplomaMining Machinery Learning Material for DEegree and Diploma
Mining Machinery Learning Material for DEegree and Diploma
Bhaskar Naidu
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Geology Department, Faculty of Science, Tanta University
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
Safdar Ali
 
LHD Load haul dump ppt
LHD Load haul dump pptLHD Load haul dump ppt
LHD Load haul dump ppt
guru brahmam
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
BrahmdevKushwaha
 
Metal Mines Blasting
Metal Mines BlastingMetal Mines Blasting
Metal Mines Blasting
partha sharma
 
Lpdt
LpdtLpdt
Mine transportation system
Mine transportation systemMine transportation system
Mine transportation system
ajeetkm
 
Applicability of hydraulic mining
Applicability of hydraulic miningApplicability of hydraulic mining
Applicability of hydraulic mining
Jayachandra Jitendra
 
Shaft sinking.
Shaft sinking.Shaft sinking.
Shaft sinking.
Safdar Ali
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
PrateekVerma111
 
Wire ropes used in mining
Wire ropes used in miningWire ropes used in mining
Wire ropes used in mining
Pankaj Kumawat
 

What's hot (20)

depllaring in coal mines
depllaring in coal minesdepllaring in coal mines
depllaring in coal mines
 
Shaft sinking 1
Shaft sinking 1Shaft sinking 1
Shaft sinking 1
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mining
 
Different Raising Techniques in mining
Different Raising Techniques in miningDifferent Raising Techniques in mining
Different Raising Techniques in mining
 
Design of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal minesDesign of Bord and Pillar method in coal mines
Design of Bord and Pillar method in coal mines
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDL
 
Pillar design in coal mines
Pillar design in coal minesPillar design in coal mines
Pillar design in coal mines
 
Mining Machinery Learning Material for DEegree and Diploma
Mining Machinery Learning Material for DEegree and DiplomaMining Machinery Learning Material for DEegree and Diploma
Mining Machinery Learning Material for DEegree and Diploma
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
LHD Load haul dump ppt
LHD Load haul dump pptLHD Load haul dump ppt
LHD Load haul dump ppt
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Metal Mines Blasting
Metal Mines BlastingMetal Mines Blasting
Metal Mines Blasting
 
Lpdt
LpdtLpdt
Lpdt
 
Mine transportation system
Mine transportation systemMine transportation system
Mine transportation system
 
Applicability of hydraulic mining
Applicability of hydraulic miningApplicability of hydraulic mining
Applicability of hydraulic mining
 
Shaft sinking.
Shaft sinking.Shaft sinking.
Shaft sinking.
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
 
Wire ropes used in mining
Wire ropes used in miningWire ropes used in mining
Wire ropes used in mining
 

Similar to Road Header and Bolter Miner

JUMBO DL420-7C.pdf
JUMBO DL420-7C.pdfJUMBO DL420-7C.pdf
JUMBO DL420-7C.pdf
Rodrigo Contreras Cerda
 
New TDS Course.ppt
New TDS Course.pptNew TDS Course.ppt
New TDS Course.ppt
AngelPerdomo20
 
Specifications Of Asphalt Mix Plant - Atlas Technologies
Specifications Of Asphalt Mix Plant - Atlas TechnologiesSpecifications Of Asphalt Mix Plant - Atlas Technologies
Specifications Of Asphalt Mix Plant - Atlas Technologies
Atlas Technologies
 
Specifications mobile asphalt mix plant - Atlas Technologies
Specifications mobile asphalt mix plant - Atlas TechnologiesSpecifications mobile asphalt mix plant - Atlas Technologies
Specifications mobile asphalt mix plant - Atlas Technologies
Atlas Technologies
 
Specifications Double Drum Asphalt Plant by Atlas Industries
Specifications Double Drum Asphalt Plant by Atlas IndustriesSpecifications Double Drum Asphalt Plant by Atlas Industries
Specifications Double Drum Asphalt Plant by Atlas Industries
Atlas Industries
 
Cable Drum Trailers Manufacturer!
Cable Drum Trailers Manufacturer!Cable Drum Trailers Manufacturer!
Cable Drum Trailers Manufacturer!
cablepullingmachines
 
Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!
cablepullingmachines
 
Specifications of double drum asphalt plant – atlas industries
Specifications of double drum asphalt plant – atlas industriesSpecifications of double drum asphalt plant – atlas industries
Specifications of double drum asphalt plant – atlas industries
atlasindustries
 
Specifications double drum plant export
Specifications double drum plant   exportSpecifications double drum plant   export
Specifications double drum plant export
Atlas Industries
 
Specifications of asphalt drum mix plant - atlas industries
Specifications of asphalt drum mix plant  - atlas industriesSpecifications of asphalt drum mix plant  - atlas industries
Specifications of asphalt drum mix plant - atlas industries
atlasindustries
 
Specifications of Counter Flow Asphalt Plant - Atlas Technologies
Specifications of Counter Flow Asphalt Plant - Atlas TechnologiesSpecifications of Counter Flow Asphalt Plant - Atlas Technologies
Specifications of Counter Flow Asphalt Plant - Atlas Technologies
Atlas Technologies
 
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
Tts Energy   Company Presentation 3108 2011 Ver B Aug2011Tts Energy   Company Presentation 3108 2011 Ver B Aug2011
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
aarshipathan
 
Specifications of double drum asphalt plant – atlas technologies
Specifications of double drum asphalt plant – atlas technologiesSpecifications of double drum asphalt plant – atlas technologies
Specifications of double drum asphalt plant – atlas technologies
Atlas Technologies
 
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMINDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
shridharthecyberdude
 
Covertura Jumbo DL 320.pdf
Covertura Jumbo DL 320.pdfCovertura Jumbo DL 320.pdf
Covertura Jumbo DL 320.pdf
Rodrigo Contreras Cerda
 
Specifications Of Portable Asphalt Drum Mix Plant - Atlas Industries
Specifications Of Portable Asphalt Drum Mix Plant - Atlas IndustriesSpecifications Of Portable Asphalt Drum Mix Plant - Atlas Industries
Specifications Of Portable Asphalt Drum Mix Plant - Atlas Industries
atlasindustries
 
Specifications drum mix plant domestic
Specifications drum mix plant   domesticSpecifications drum mix plant   domestic
Specifications drum mix plant domestic
Atlas Industries
 
Road Construction Exporter – Atlas Industries
Road Construction Exporter – Atlas IndustriesRoad Construction Exporter – Atlas Industries
Road Construction Exporter – Atlas Industries
Atlas Industries
 

Similar to Road Header and Bolter Miner (20)

Archer Modular Rigs
Archer Modular RigsArcher Modular Rigs
Archer Modular Rigs
 
JUMBO DL420-7C.pdf
JUMBO DL420-7C.pdfJUMBO DL420-7C.pdf
JUMBO DL420-7C.pdf
 
New TDS Course.ppt
New TDS Course.pptNew TDS Course.ppt
New TDS Course.ppt
 
Specifications Of Asphalt Mix Plant - Atlas Technologies
Specifications Of Asphalt Mix Plant - Atlas TechnologiesSpecifications Of Asphalt Mix Plant - Atlas Technologies
Specifications Of Asphalt Mix Plant - Atlas Technologies
 
Specifications mobile asphalt mix plant - Atlas Technologies
Specifications mobile asphalt mix plant - Atlas TechnologiesSpecifications mobile asphalt mix plant - Atlas Technologies
Specifications mobile asphalt mix plant - Atlas Technologies
 
Specifications Double Drum Asphalt Plant by Atlas Industries
Specifications Double Drum Asphalt Plant by Atlas IndustriesSpecifications Double Drum Asphalt Plant by Atlas Industries
Specifications Double Drum Asphalt Plant by Atlas Industries
 
Cable Drum Trailers Manufacturer!
Cable Drum Trailers Manufacturer!Cable Drum Trailers Manufacturer!
Cable Drum Trailers Manufacturer!
 
Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!
 
Specifications of double drum asphalt plant – atlas industries
Specifications of double drum asphalt plant – atlas industriesSpecifications of double drum asphalt plant – atlas industries
Specifications of double drum asphalt plant – atlas industries
 
Specifications double drum plant export
Specifications double drum plant   exportSpecifications double drum plant   export
Specifications double drum plant export
 
Specifications of asphalt drum mix plant - atlas industries
Specifications of asphalt drum mix plant  - atlas industriesSpecifications of asphalt drum mix plant  - atlas industries
Specifications of asphalt drum mix plant - atlas industries
 
Specifications of Counter Flow Asphalt Plant - Atlas Technologies
Specifications of Counter Flow Asphalt Plant - Atlas TechnologiesSpecifications of Counter Flow Asphalt Plant - Atlas Technologies
Specifications of Counter Flow Asphalt Plant - Atlas Technologies
 
Catalogue n° HD-E-00
Catalogue n° HD-E-00Catalogue n° HD-E-00
Catalogue n° HD-E-00
 
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
Tts Energy   Company Presentation 3108 2011 Ver B Aug2011Tts Energy   Company Presentation 3108 2011 Ver B Aug2011
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
 
Specifications of double drum asphalt plant – atlas technologies
Specifications of double drum asphalt plant – atlas technologiesSpecifications of double drum asphalt plant – atlas technologies
Specifications of double drum asphalt plant – atlas technologies
 
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMINDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
 
Covertura Jumbo DL 320.pdf
Covertura Jumbo DL 320.pdfCovertura Jumbo DL 320.pdf
Covertura Jumbo DL 320.pdf
 
Specifications Of Portable Asphalt Drum Mix Plant - Atlas Industries
Specifications Of Portable Asphalt Drum Mix Plant - Atlas IndustriesSpecifications Of Portable Asphalt Drum Mix Plant - Atlas Industries
Specifications Of Portable Asphalt Drum Mix Plant - Atlas Industries
 
Specifications drum mix plant domestic
Specifications drum mix plant   domesticSpecifications drum mix plant   domestic
Specifications drum mix plant domestic
 
Road Construction Exporter – Atlas Industries
Road Construction Exporter – Atlas IndustriesRoad Construction Exporter – Atlas Industries
Road Construction Exporter – Atlas Industries
 

More from Ulimella Siva Sankar

Tube bundle gas monitoring system
Tube bundle gas monitoring systemTube bundle gas monitoring system
Tube bundle gas monitoring system
Ulimella Siva Sankar
 
Aircooling underground coal mine
 Aircooling underground coal mine Aircooling underground coal mine
Aircooling underground coal mine
Ulimella Siva Sankar
 
Adriyala longwall paper
Adriyala  longwall  paperAdriyala  longwall  paper
Adriyala longwall paper
Ulimella Siva Sankar
 
Safety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall MineSafety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall Mine
Ulimella Siva Sankar
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visUlimella Siva Sankar
 
Pneumoconiosis
PneumoconiosisPneumoconiosis
Pneumoconiosis
Ulimella Siva Sankar
 
insitu Horizontal stress
insitu Horizontal stressinsitu Horizontal stress
insitu Horizontal stress
Ulimella Siva Sankar
 
Ug mechanical excavation
Ug mechanical excavationUg mechanical excavation
Ug mechanical excavation
Ulimella Siva Sankar
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
Ulimella Siva Sankar
 
Theories of interaction of rock cutting tools
Theories of interaction of rock cutting toolsTheories of interaction of rock cutting tools
Theories of interaction of rock cutting tools
Ulimella Siva Sankar
 
Design of openings
Design of openingsDesign of openings
Design of openings
Ulimella Siva Sankar
 
Subsidence in coal mines
Subsidence in coal minesSubsidence in coal mines
Subsidence in coal mines
Ulimella Siva Sankar
 
Slopestability
SlopestabilitySlopestability
Slopestability
Ulimella Siva Sankar
 
strata monitoring Instrumentation
strata monitoring Instrumentationstrata monitoring Instrumentation
strata monitoring Instrumentation
Ulimella Siva Sankar
 
Insitu stresses and measurement
Insitu stresses and measurementInsitu stresses and measurement
Insitu stresses and measurement
Ulimella Siva Sankar
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof support
Ulimella Siva Sankar
 
Ground control in undergound mines
Ground control in undergound minesGround control in undergound mines
Ground control in undergound mines
Ulimella Siva Sankar
 
Strike dip rise longwall panels
Strike dip rise longwall panelsStrike dip rise longwall panels
Strike dip rise longwall panels
Ulimella Siva Sankar
 
Selection of viable ug technology
Selection of viable ug technologySelection of viable ug technology
Selection of viable ug technology
Ulimella Siva Sankar
 
2leg vs4leg
2leg vs4leg2leg vs4leg

More from Ulimella Siva Sankar (20)

Tube bundle gas monitoring system
Tube bundle gas monitoring systemTube bundle gas monitoring system
Tube bundle gas monitoring system
 
Aircooling underground coal mine
 Aircooling underground coal mine Aircooling underground coal mine
Aircooling underground coal mine
 
Adriyala longwall paper
Adriyala  longwall  paperAdriyala  longwall  paper
Adriyala longwall paper
 
Safety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall MineSafety Management of Deep Mechanised Longwall Mine
Safety Management of Deep Mechanised Longwall Mine
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
 
Pneumoconiosis
PneumoconiosisPneumoconiosis
Pneumoconiosis
 
insitu Horizontal stress
insitu Horizontal stressinsitu Horizontal stress
insitu Horizontal stress
 
Ug mechanical excavation
Ug mechanical excavationUg mechanical excavation
Ug mechanical excavation
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Theories of interaction of rock cutting tools
Theories of interaction of rock cutting toolsTheories of interaction of rock cutting tools
Theories of interaction of rock cutting tools
 
Design of openings
Design of openingsDesign of openings
Design of openings
 
Subsidence in coal mines
Subsidence in coal minesSubsidence in coal mines
Subsidence in coal mines
 
Slopestability
SlopestabilitySlopestability
Slopestability
 
strata monitoring Instrumentation
strata monitoring Instrumentationstrata monitoring Instrumentation
strata monitoring Instrumentation
 
Insitu stresses and measurement
Insitu stresses and measurementInsitu stresses and measurement
Insitu stresses and measurement
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof support
 
Ground control in undergound mines
Ground control in undergound minesGround control in undergound mines
Ground control in undergound mines
 
Strike dip rise longwall panels
Strike dip rise longwall panelsStrike dip rise longwall panels
Strike dip rise longwall panels
 
Selection of viable ug technology
Selection of viable ug technologySelection of viable ug technology
Selection of viable ug technology
 
2leg vs4leg
2leg vs4leg2leg vs4leg
2leg vs4leg
 

Recently uploaded

Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 

Recently uploaded (20)

Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 

Road Header and Bolter Miner

  • 1. ROAD HEADERS & Bolter Miner By U. Siva Sankar, Deputy Manager Adriyala Longwall Project
  • 2. • Roadheaders were first developed for mechanized excavation of coal in the early 50s. • Roadheaders offer a unique capability and flexibility for the excavation of soft to medium strength rock formations, hence widely used in under ground coal mining. • Advantages: – Improved productivity. – Improved safety. – Reduced ground support. – Less manpower requirement. – Reduced costs.
  • 3.  Road header is excavating equipment consisting of a boom-mounted cutting head, a loading device usually involving a conveyor, and a crawler travelling track to move the entire machine forward into the coal face.  Road header is exclusively used for drivage of gate roadways in Longwall panel. ROAD HEADER
  • 4.  Depending on cutting head, Roadheader are two types. • Borer type-Transversal - rotates parallel to the cutter boom axis-DOSCO • Ripper type-Longitudinal - rotates perpendicular to boom axis – AM-50  It can work gradient flatter than 18 deg/ 1 in 3.
  • 5. Neil et. al (1994) refer road headers as small size up to 30 t, midsize between 30 to 70 t and large size between 70 to120 t. Classification of Boom Type road Header: Cutting Action of heads:  Milling type or Borer Type (axial head), and  Ripping Type (Transverse head) Fig: Cutting action of road headers a. Ripping type, b. milling type
  • 6. Road Headers introduced in SCCL: • ALPINE MINER AM-50 • EBZ -200 • DOSCO with onboard twin bolters • WIRTH T 1.14 with onboard twin bolters
  • 7. ALPINE MINER AM-50 Overall length of machine 7.50m Height of machine 1.64m Width over machine gathering apron 1.91m Machine weight (estimated basic machine) 24T maximum working gradient 18° Total power 166 kW
  • 8. DOSCO- LH1400 MODEL Overall length of machine 11.18m Height of machine (canopy) 2.25m Width over machine gathering apron 3.56m Machine weight (estimated basic machine) 63T maximum working gradient 18° Total power 362 kW
  • 9. WIRTH Overall length of machine 10.29m Height of machine 2.57m Width 3.6m Machine weight 65T maximum working gradient 18° Total power 360 kW
  • 10.
  • 11. Working Section Layout of Road header Heavy Section for gate belt conveyorBridge belt conveyor Road header Air duct Side bolts Side bolts Track line wit h endless haulage for material transport
  • 12.
  • 13. COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400, WIRTH T1.14 AND AM-50 TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50 Overall length of machine 10.29 m 11.18 m 7.5 m Height of machine 2.57m 2.250m 1.645 m Width 3.6m 3.56m 2.5m Machine weight 65 tonne 63 tonne 24 tonne Maximum cutting height 4.817m 4.5m 4.0 m Maximum cutting width 6.7m 7.02m 4.8 m Maximum cutting depth 260mm 330mm 100mm Ground clearance 250mm 257mm 180mm Max. gradient 18 degrees 18 degrees 18 degrees Total installed power 360KW 362 KW 166KW Total cooling water requirement 25 l/min 40 l/min at31 bar 30 l/min
  • 14. COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400, WIRTH T1.14 AND AM-50 UNDER CARRIAGE DETAILS TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50 Crawler track width 600mm 550mm 370mm Track length 2900mm 3711mm Tramming speed 0-18m/min 2.28m/min&9.6m/min 5m/min Floor pressure 0.18Mpa 0.15Mpa 0.13Mpa Track tensioning arrangement Track should be tensioned manually with grease pump Tracks are automatically tensioned whenever tracks are operated Tracks are tensioned with grease pump CUTTER BOOM Cutter motor size 180KW 250KW 100KW Axial thrust 200kN 542kN Speed 35.69 rpm 53 rpm 88.7 rpm Cooling media Water water water
  • 15. COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400, WIRTH T1.14 AND AM-50 TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50 LOADING ARRANGEMENT Apron width 4.232m 3.560m 2.5m Power 2x21KW hydraulic motors Hydraulic motors Conveyor chain Star wheels speed 24rpm 33.4rpm Gathering arms CHAIN CONVEYOR Type of conveyor Twin outboard Twin outboard Single Chain Conveyor width 740mm 694mm 370mm power 2x25KW hydraulic 2x33.7KW hydraulic 2X11KW Electric Conveyor chain speed 1.15m/s 1.02m/s 0.9m/s
  • 16. COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400, WIRTH T1.14 AND AM-50 TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50 HYDRAULICS Hydraulic fluid HFDU 68 HFDU 68 Mineral oil or FRHF of the HSC Group (Water- Glycol) Power pack motor size 180KW 112KW 11KW No of pumps 3 2 1 Type of pumps 2 variable displacement axial piston pumps of 275 l/min and 1 vane pump of 79l/min 1 variable displacement pump of 148 l/min and 1 four section gear pump of 486 l/min Axial thrust pump of 40 lpm Return line filters 2 of 10 micron filters 1 of 6 micron filters 10 micron filters Hydraulic tank capacity 800ltrs 900ltrs 260 ltrs Standard hose fittings Threaded (37 degree JIC) hose fittings Staple lock fittings Staple lock fittings Normal working pressure 250bar 140 bar 200 bar Parking brakes Spring applied hydraulically released brakes Spring applied hydraulically released brakes Nil Cooling Hydraulic oil temperature is controlled through an heat exchanger Oil temperature is controlled with baffles mounted on the tank Close or open circuit Water cooling
  • 17. TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50 HYDRAULIC TANK SAFETY FEATURES Oil level indicators Visual level indicators Visual level indicators Visual level indicators Thermostatic cutoff 3 position combined oil level and temperature sensor Thermostatic cutoff sensor, low fluid level cutoff sensor Nil Pressure switch Pressure switch Pressure switch Hydraulic system All functions main valve bank are controlled by solenoids ,only bolters are operated manually All functions on the main valve bank are controlled by pilot operated circuit at 30 bar All functions on the main valve bank are controlled by manual operating levers All valve segments with spools use proximity switch to monitor the position of the spool and ensure correct operation -- -- LUBRICATION SYSTEM All 43 grease points are lubricated with hand grease gun individually For lubricating the machine is fitted with centralized lubricating system (WANDERLEAD) at four points on the machine, which is powered via a diverter valve, from the machine hydraulic system. Manual Greasing COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400, WIRTH T1.14 AND AM-50
  • 18. COMPARISON OF TECHNICAL SPECIFICATIONS OF DOSCO LH1400, WIRTH T1.14 AND AM-50 TECHNICAL DATA T1.14 WIRTH MINER DOSCO LH1400 AM-50 ELECTRICAL Supply voltage 1100 V/50 Hz/3ph 1100 V/50 Hz/3ph 550 V Total power 360KW 362KW 166KW Power junction box PK-2003 main enclosure with FLP features KM52/300/AW24 ENCLOSURE KEYEE300A Display monitor 160mm display monitor with fault finding software ----------------------- ----------------------- HEAD LIGHTS 5 OPERATED AT 24V/35W WITH 2 AREA LIGHT FOR ROOF BOLTING 5 OPERATED AT 24V/70W 2 OPERATED AT 24V EMERGENCY STOPS 4NO’S 2 ON EACH SIDE 6 NOS 3 ON EACH SIDE 1No at Control panel BOLTER SPECIFICATIONS type 2XDHMS TYPE ABE deployed with 2 telescopic platforms (HYDRAMATIC) SERIES 4200 1850 ROOF BOLTER ----------------------- Drill Feed Two Stage Two Stage Operation Operation of the road header shall be carried out by PEMPEK OBELIX RADIO CONTROL SYSTEM, MACHINE CAN BE OPRATEDUPTO 50 M AWAY FROM THE MACHINE All operations are carried out with pilot operated joy sticks mounted on the machine. All operations are carried out with operating levers Hydraulic oil filling Oil to be filled with hand operated oil filling pump Oil to be filled with hydraulic power operated oil filling pump Oil to be filled with hand operated oil filling pump
  • 20. Bolter Miner Overview Model 12ED30 Machine operation Sumping type miner Cutter head Wide head machine – extendable/retractable drums Cutting width - extended 5,500mm (5.5 meters) Maximum cutting height 4,500mm (4.5 meters) Coal gathering Plow type machine Bolting rigs: Roof Four roof bolters Bolting rigs: Rib Two rib bolters Roof support Four temporary roof supports Machine stabilization Front and rear stabilizing jacks Machine length 13,175mm (13.175 meters) Machine weight 120,400kg (120.4 ton) Control system Joy Faceboss Dust suppression Water sprays and dust collection system
  • 21.
  • 22. 12ED30 overview Plow with extendable/retractable wings Extendable/retractable cutter head Bolting rigs and temporary roof support cylinders
  • 23. 12ED30 overview Dust collection system Main electrical enclosure Bolting rigs and TRS cylinders
  • 25. Typical Twin Entry Sequence
  • 26. Typical Twin Entry Sequence – Step 1
  • 27. Typical Twin Entry Sequence – Step 2
  • 28. Tailgate Options X - Slit X - Slit Tailgate roadway thirls into X-slit, which is across (or part way across) junction. Will have un-even roof across junction and will have ‘triangle’ step at both sides of junction. Depending on roadway position, may have un-even floor to grade out. Tailgate roadway thirls at side of X-slit, roof will be level in junction. May have to cut out side of roadway to complete thirling. Floor will be level. X-slit driven measure needs to be accurate.
  • 29. Typical Twin Entry Sequence – Step 3
  • 30. Typical Twin Entry Sequence – Step 4
  • 31. Typical Twin Entry Sequence - Step 5
  • 32. Typical Twin Entry Sequence – Step 6
  • 33. Typical Twin Entry Sequence – Step 7
  • 34. Typical Twin Entry Sequence – Step 8
  • 35. Bolter Miner Vs Road header BM RH Gallery Shape Rectangular Square/rectangualr/other stable shape Cutting and bolting sequence Full face at one time Partial face Cutting across roof and floor layers Cutting along roof layers Cutting and bolting simultaneous Cutting and bolting not simultaneous Roof and sides stability Less More Progress Can be up to 750m / month Can be up to 350m / month Coal loading outby Shuttle cars/ flexible conveyor train Bridge belt conveyor mobility More, can drive two parallel drivages Can drive crosscut galleries also Less, can drive single drivage only Can not drive crosscut galleries Coal dilution more less