Archer MDR Solutions
Private and Confidential 2
Section 1
Archer Modular Rig Solutions
The fleet.
Archer Modular Rig Solutions
Services Offered
•Drilling services
•Snubbing services
•Through tubing rotary drilling (TTRD)
•Work-over services
•Complex completions.
•Managed-pressure drilling (MPD)
•Plug-and-abandon activities (P&A)
•Through Rig Intervention support platform
for Coiled Tubing, Slickline and E-Line.
Key Features
•Low POB - 16 min based on 24 Hr Operations.
•Light Modules - Max. Lift is 12 Metric Tonnes.
•Patented Self Erect Mast System.
•400 short ton pull capability.
•100 short ton push “Snub” capability.
•Efficient Rig-up / down.
•Remote / Automated Drilling operation.
•Built in accordance with NORSOK & UK
legislation.
•Compact Footprint
Archer’s modular drilling rig (MDR) solution is a breakthrough in its field; utilising an
innovative, modular state-of-the-art design. It offers operational flexibility and cost
efficiency unrivalled by any other modular offshore drilling rigs on the market.
The MDR package can be tailored to meet well-specific requirements and provide
operators with a cost efficient alternative to both mobile offshore drilling units (MODU) and
traditional platform drilling rigs on both existing and future installations.
Archer currently own and operate two units, Archer Emerald and Topaz respectively.
• Platform operator:
Shell Todd Oil Services Ltd. (STOS)
• Location: Tasman Sea, New Zealand
• Field type: Gas field
• Start of operation: December 2012
• End of operation: 2014
• Rig operation purpose :
Drilling and Workover operations
Archer Emerald on MAUI A (NZ)
Private and Confidential 5
Archer Emerald (operational on STOS Maui A)
• Platform operator: STATOIL
• Location: North Sea, Norway
• Field type: Gas field
• Start of operation: March 2015
• End of operation: ongoing (Q3 2016)
• Rig operation purpose:
Plug and Abandonment operations
Exploration drilling
VDD400.2 Topaz on HEIMDAL (NO)
Archer Topaz (operational on Statoil Heimdal)
7Private and Confidential
• Super Single Rig (Range III)
• 400 short tons pull capability
• Modular construction
• Max. module weight of 12 t
• Two direction skidding
• Compact footprint (14 x 12 m without power supply)
• Automated pipe handling system
• Hands-Off-Technology
• Autonomous operation possible
• Rig up time: approx. 3/4 weeks
• Self-Erecting-Mast-System
• Integrated mud system
• Design according NORSOK regulations
• Certified and tested by DNV according to
standard 2.7-3 (Portable Offshore Units)
Key Features Modular Offshore Rig VDD 400
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package &
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement.
Primary
Arrangement.
12Private and Confidential
VDD 400 Series MDR Alternative arrangements
AMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position, mobilisation of a Drillfloor
Access / Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Driller‘s Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
• Welded box type mast with gear racks
• Clear working height: 19 m
• Max. hook load: 400 short tons (363 t)
• Overall height incl. substructure: 40 m
• Rack and Pinion-Hoisting System
• Modular Box-on-Box-Substructure
• 9 modules incl. Drill Floor
• Quick connectors for fast module stacking
• Footprint: 6 x 6 m
• Two direction skidding (pad drilling)
• Safety Bails, wind sensor, warning lights for airplanes
Drilling Rig
Mobilsation & rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series – Hoisting Mechanism
19
Maximum Hookload
800,000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200,000 Lbs
100 sT
90.5 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH & Co.
Model Streicher PPDM350
Maximum Hoisting Speed 45 metres/min
Maximum Pull Capacity 400sT (800,000 lbs / 362 mT)
Maximum Push Capacity 100sT (200,000 lbs / 90 mT)
Maximum Torque 85,000 Nm (62,692 ft/lbs)
Maximum rpm. 190
Maximum Circulating Pressure 5,000 psi (345 Bar G)
I-BOP 1 x 5,000 psi Remotely Operated (Driller’s Cabin)
1 x 5,000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame #4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
• 37-1/2” Rotary Table unit capable of producing 33,150 ft/lbs of torque at 10 rpm.
• Flush mounted NOV Varco PS21 power slips & Maritime Hydraulics Cathead
• Torque turn computer integrated within Driller’s cabin and via Real Time. No Tubular Running crew
required.
• Sufficient mast height available to install a casing drilling system.
• Weatherford Unitong – Automatic Thread cleaning & Doping, 150,000ft/lbs of Torque range 2-3/8” to 20”
• Unitong capable of running up to 20” Casing joints – No requirement for Casing Crew
UniTong
OEM V-Tech / Weatherford
Torque Capacity 150,000 ft/lbs
Tubular Range 2-3/8” to 20”
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Driller’s Cabin / Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) &
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access / Egress walkway
Y-Direction PCST
Drag Chain
2 x HPU Modules
660 bbl Active & Mud Treatment System
AMS – High Pressure Mud Pump Modules
• 4 Triple single acting Piston Pumps
• Rated power: each 750 hp (560 kW)
• Max. discharge capacity: 1820 l/min
• Max. working pressure: 5000 psi (345 bar)
• Driven by AC-motors (660 kW)
• Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) – Lvl. 1
Mud Pump Module #1 to #4 (Each)
OEM MAX STREICHER GmbH & Co.
Dimensions 6 x 3 x 2.9 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8”
Piston Diameter 4-1/2” to 7”
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6” ANSI 150 psi 10 BAR
Discharge Pipework 6” API 5,000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co.
Pulsation Dampner Model KB-45
Pulsation Dampner W.P 5,000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-1/16 5,000 psi Magnum Pump Saver
Pump Saver W.P 5,000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co.
Strainer Block Diameter 4-1/16”
Strainer Block Working Pressure 5,000 psi 345 BAR
Mud Pump Module
Mud Package: Tank Modules
• 5 tanks in 4 tank modules
• Overall tank capacity: 105 m3
• Automatic tank cleaning system
• Round tank bottoms providing
easy cleaning
• Valve control from Driller‘s
Cabin
• Mixing and transfer pumps
• Conveying screws in two
directions for cuttings from
Shale Shaker
• Air extraction system (HVAC)
Sand Trap 1
25,5 m3
Sand Trap 2
25,5 m3
Pill Tank
7 m3
Suction Tank 1
19 m3
Suction Tank 2
28 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) – Lvl. 2
Hydraulic Power Units
• 2 Hydraulic Power Units (HPU)
• Supply of Top Drive, Hoisting System, Rotary
Table, pipe handling, Drill Floor Crane, Auxiliary
Winch
• Max. working pressure: 350 bar (5076 psi)
• Each HPU driven by electric motor (850 kW)
• Sea water cooling system
Mud Package: Shale Shaker Modules
• 2 Shale Shakers
• Max. flow rate: each 3410 l/min
• Produced G Forces: 4.0 to 8.0 G
• Vacuum Degasser
• Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) – Lvl. 3
HPU Module #1 & #2
OEM MAX STREICHER GmbH & Co.
Dimensions 6 x 3 x 2.9 metres
Hydraulic Tank 1.7m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW @ 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2,175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litres/min
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litres/min
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litres/min
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litres/min
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litres/min
Motor Cooling and Control Hydraulic
Pump Model
PGH4-21
Motor cooling & Controls pump
Flowrate
67 litres/min
Shale Shaker Module #1
OEM MAX STREICHER GmbH & Co.
Dimensions 6 x 3 x 2.9 metres
Shale Shaker #1 OEM NOV Brandt
Shale Shaker #1 Model VSM 300
Shale Shaker G-Force 4.6 – 7.5 (6.4 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 22.5 kW @ 690V 50Hz
Capacity 1,000 GPM @ 15” of Mercury Vacuum.
Ditch Magnet Alexander GmbH Co.
Ditch Magnet Model Perm.- magn
Shale Shaker Module #2
OEM MAX STREICHER GmbH & Co.
Dimensions 6 x 3 x 2.9 metres
Shale Shaker #2 OEM NOV Brandt
Shale Shaker #2 Model VSM 300
Shale Shaker G-Force 4.6 – 7.5 (6.4 G Nominal)
Ditch Magnet OEM Alexander GmbH Co.
Ditch Magnet Model Perm.- magn
VSM300 Nominal Flow Rates
(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight, ppg
FlowRate,gpm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard.
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas. Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting, Drilling, Pipehandling and utility systems on the basic
rig package.
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU, thus providing
redundancy.
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps. Operation via 1 x HPU will be at a
reduced speed / efficiency when power demands are high.
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps, Shale
Shaker, Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Driller‘s Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series – Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse #1 to #4
Generator Sets #1 to #3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply – Power Generation – Stand alone power
• 3 Generator Sets
• Rated power: 1320 kW
• Effective power: 1200 kW
• Generator rating: 1500 kVA
• Voltage: 690 V
• Frequency: 50 Hz
• Day tank capacity: 1000 l
• Sea water cooling system
Power Supply – Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
 AC-Drive and Monitoring System
 Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
• Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
• Ventilation system within HVAC module
for overpressure generation
• Heat exchanger for heating, cooling and
dehumidification
• Redundant System
• Max flow rate: 10 000 m3/h
VDD 400 Series MDR Alternative arrangements
PGS – System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement.
Quad Stack
arrangement.
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
 Pipehandling Crane
•  Transportation of
tubulars from Pipe Deck
to Pipe Feeder
 Pipe Feeder
•  Adjustment,
separation and
intermediate
storage of tubulars
 HTV Pipehandler
•  Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
• Pipe-handling System designed in accordance with NORSOK D-001.
• Remote “Hands Free” Operation.
• Pipedeck Pipehandler Crane
• Maximum operating wind speed 30 m/s (60 Knots).
• Hookload Capacity 2.17 Te @ 14m Radius.
• Gripper Head Capacity 2-1/2” to 14” Tubulars. Used on 13 NOCS platforms.
• Gripper Head Rotational Capability of 180 Degrees.
• Crane Cab scoping capability of 2 metres.
• CCTV cameras located on gripper head. Link to Pipefeeder CCTV camera.
• Memory function.
• SIL Level 2 Sensors.
Emerald – Pipe-handling System
41
Who we are
• Pipefeeder Table
• Maximum operating wind speed 30 m/s (60 Knots).
• Maximum Storage capacity of 9 Te.
• 2-1/2” to 20” Tubulars – Rang e I, II and III
• Remote operation from Drillers Cabin
• CCTV Camera and SIL level 2 sensors.
Emerald – Pipe-handling System
42
• Horizontal to Vertical (HTV) Pipehandler
• Maximum operating wind speed 30 m/s (60 Knots).
• Maximum capacity of 3 Te.
• 2-1/2” to 20” Tubulars – Rang e I, II and III
• Remote operation from Drillers Cabin
• Non marking gripper inserts for Chrome Tubulars.
• CCTV Camera and SIL level 3 sensors.
Who we are
• Pipe-handling System designed in accordance with NORSOK D-001.
• Remote “Hands Free” Operation.
• “Failure Mode Analysis conducted on Pipehandler Crane & HTV – Verified by DNV.
• Dropped Object Prevention / Protection
• Pipe-handling equipment systems designed fail safe.
• HTV & Pipehandler Gripper head tested over period of 24 hrs with full weight.
• Drillfloor /sub-base – Impact strength tested with 3Te (9-1/2” DC) from 1.5m height.
• Wire mesh safety netting between pipedeck and Pipefeeder – use similar on Statfjord.
• Red Zone policy applied to safety critical areas.
• Rig safety features include Interlocks.
• HTV will not open until confirmation from Elevator closed
• Safety arms will not retract until Elevator latched / Gripper head opened / locked.
Emerald – Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-5/8 Inches
Pressure Rating 10,000 psi W.P
T3 7082 Annular BOP 13-5/8 Inches 5,000 psi
T3 6012 Double Ram BOP 13-5/8 Inches 10,000 psi
T3 Drilling Spool 13-5/8 Inches 10,000 psi
T3 6012 Single Ram BOP 13-5/8 Inches 10,000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3,000 psi
Normal Operating Pressure 1,500 psi
Shear Ram Operating Pressure 2,800 psi
No. of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator / BOP Hose
Connections
Quick Connect / Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
• Trolley for BOP transportation
• Electrically driven
• Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional / Support equipment
Additional / Bespoke Equipment & Solutions
• Interface components for adaption of the
modular rig to various platforms
• Realization of specific customer
requirements
• Exemplary modules and systems:
• Additional modular Pipe Deck
• Additional pipe handling equipment
• Swarf Unit for P&A operations
• Additional mud treatment components
• Additional stair towers
• Additional escape routes
• Additional gangways from platform to
rig
Private and Confidential 49
RMT – Reserve Mud/Mix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR – Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz – Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost: Heimdal platform
06 January 2015 08:36GMT
Steve Marshall
28 September 2015 09:12 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway.
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field,which has been shutdown,under the three-month extension to the charter that kicked off lastyear.
A Statoil spokesman told Upstream the time required for the 12-well P&A campaign atthe disused field had been
reduced by 50%,giving it the opportunityto use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of90 days.
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the field’s own
reservoir to facilitate accelerated start-up of the platform,which now serves as a processing hub for other fields
including Atla, Huldra,Skirne and Vale after Heimdal reached the end ofits producing life lastyear.
“This will increase recovery from the Heimdal field and also boostthe production efficiencyof the platform by
reducing downtime,” the spokesman said,adding the P&A efficiency gain was in line with Statoil’s so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdal's HMP1 drilling,production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norway’s
Petroleum Safety Authority to keep it operational until 2034.
Once the production well is drilled,the rig will then carry out plugging ofthe final 12th hole in the P&A programme
in the firsthalf of 2016 before the unit is demobilised for planned maintenance.
An Archer spokesman said plugging and abandonmentofthe 11 wells had been carried out55 days ahead of
schedule.
However, the drilling services contractor - backed by shipping and offshore billionaire John Fredriksen’s Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a marketslump.
Archer was earlier this year hit by the cancellation ofa $96 million deal for its other modular rig,Archer Emer ald,
by Talisman Sinopec EnergyUK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopmentscheme in the British sector.
The spokesman stated in an e-mail:“Both rigs are currently being actively marketed.”
The contractor is touting the modular rig conceptas a cost-efficientalternative to mobile offshore rigs and
traditional drilling platforms,stating its compactness reduces the platform size required,the size of the drilling
crew and associated construction costs.
Real life feedback
Topaz Statoil Heimdal PP&A performance
57
Well
A-06
Well
A-08
Well
A-12
Well
A-09
Well
A-07
Well
A-11
Well
A-10
Well
A-02
Well
A-03
Well
A-05
Well
A-01
Well
A-04
Actual 44.2 15 46 14.5 14.8 10 8 13 11 8.8 1.5 0
Planned 36 32 53 29 22 15 15 15 15 7 2.6 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Days
Planned vs. Actual
Rig shake-down + crew familiarisation well
“Red Well” known integrity and pressure issued
Completed ahead of plan.
Injector well PP&A to be conducted post
completion of planned A-05 drilling operation
54.8 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58

More Related Content

What's hot

Presentation 2 drilling rig systems
Presentation 2 drilling rig systemsPresentation 2 drilling rig systems
Presentation 2 drilling rig systemsAli Trichelli
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production SystemsSahyog Shishodia
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnentsRIZWAN KHAN
 
Differnt technologies in oc mines
Differnt technologies in oc minesDiffernt technologies in oc mines
Differnt technologies in oc minesSATYANARAYANA I
 
Rig types and components
Rig types and componentsRig types and components
Rig types and componentsMarwan Elaraby
 
Qazma - Drilling Azərbaycanca
Qazma - Drilling AzərbaycancaQazma - Drilling Azərbaycanca
Qazma - Drilling AzərbaycancaEngineers Change
 
Drill bit types advantages and disadvantages
Drill bit types advantages and disadvantagesDrill bit types advantages and disadvantages
Drill bit types advantages and disadvantagesJyoti Khatiwada
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
Drilling Operations
Drilling OperationsDrilling Operations
Drilling OperationsTarek Saati
 
Drilling rig operations a to z rotary drilling rig components
Drilling rig operations  a to z rotary drilling rig componentsDrilling rig operations  a to z rotary drilling rig components
Drilling rig operations a to z rotary drilling rig componentsamrhaggag
 
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...MD.Suresh Kumar
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface minesSafdar Ali
 

What's hot (20)

Presentation 2 drilling rig systems
Presentation 2 drilling rig systemsPresentation 2 drilling rig systems
Presentation 2 drilling rig systems
 
Drilling - Qazma English
Drilling - Qazma English Drilling - Qazma English
Drilling - Qazma English
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production Systems
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnents
 
Differnt technologies in oc mines
Differnt technologies in oc minesDiffernt technologies in oc mines
Differnt technologies in oc mines
 
Jack up
Jack upJack up
Jack up
 
Rig types and components
Rig types and componentsRig types and components
Rig types and components
 
Qazma - Drilling Azərbaycanca
Qazma - Drilling AzərbaycancaQazma - Drilling Azərbaycanca
Qazma - Drilling Azərbaycanca
 
Rig components
Rig componentsRig components
Rig components
 
Drill bit types advantages and disadvantages
Drill bit types advantages and disadvantagesDrill bit types advantages and disadvantages
Drill bit types advantages and disadvantages
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Drilling bits
Drilling bitsDrilling bits
Drilling bits
 
Well Workover
Well Workover Well Workover
Well Workover
 
Drilling Operations
Drilling OperationsDrilling Operations
Drilling Operations
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
Drilling rig operations a to z rotary drilling rig components
Drilling rig operations  a to z rotary drilling rig componentsDrilling rig operations  a to z rotary drilling rig components
Drilling rig operations a to z rotary drilling rig components
 
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
Longwall Mining- An experience of Longwall mining in Padmavathikhani Chinese ...
 
Longwall mining[1]
Longwall mining[1]Longwall mining[1]
Longwall mining[1]
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface mines
 
Longwall machinery
Longwall  machineryLongwall  machinery
Longwall machinery
 

Similar to Archer Modular Rigs

Auger Monster (JWC Environmental) - Modular Headworks System _ Ingles
Auger Monster (JWC Environmental) - Modular Headworks System _ InglesAuger Monster (JWC Environmental) - Modular Headworks System _ Ingles
Auger Monster (JWC Environmental) - Modular Headworks System _ InglesVibropac
 
JungPumpen_Brochure-912010
JungPumpen_Brochure-912010JungPumpen_Brochure-912010
JungPumpen_Brochure-912010Lisa Gabrish
 
2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.pptAkashM918608
 
2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.pptMUST
 
Редукторы серии U Power Jacks
Редукторы серии U Power JacksРедукторы серии U Power Jacks
Редукторы серии U Power JacksArve
 
Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!cablepullingmachines
 
Specifications double drum plant export
Specifications double drum plant   exportSpecifications double drum plant   export
Specifications double drum plant exportAtlas Industries
 
Specifications of double drum asphalt plant – atlas industries
Specifications of double drum asphalt plant – atlas industriesSpecifications of double drum asphalt plant – atlas industries
Specifications of double drum asphalt plant – atlas industriesatlasindustries
 
Continuous improvements in Mineral processing
Continuous improvements in Mineral processingContinuous improvements in Mineral processing
Continuous improvements in Mineral processingMining On Top
 
Extrusion blow molding by Pet All Manufacturing Inc
Extrusion blow molding by Pet All Manufacturing IncExtrusion blow molding by Pet All Manufacturing Inc
Extrusion blow molding by Pet All Manufacturing IncPet All Manufacturing Inc
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specificationPrabhakar Tiwari
 
Specifications Double Drum Asphalt Plant by Atlas Industries
Specifications Double Drum Asphalt Plant by Atlas IndustriesSpecifications Double Drum Asphalt Plant by Atlas Industries
Specifications Double Drum Asphalt Plant by Atlas IndustriesAtlas Industries
 
Offshore Product Reference Guide.pdf
Offshore Product Reference Guide.pdfOffshore Product Reference Guide.pdf
Offshore Product Reference Guide.pdfRuslan Zakirov
 
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
Tts Energy   Company Presentation 3108 2011 Ver B Aug2011Tts Energy   Company Presentation 3108 2011 Ver B Aug2011
Tts Energy Company Presentation 3108 2011 Ver B Aug2011aarshipathan
 
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXMrbThinh
 

Similar to Archer Modular Rigs (20)

Auger Monster (JWC Environmental) - Modular Headworks System _ Ingles
Auger Monster (JWC Environmental) - Modular Headworks System _ InglesAuger Monster (JWC Environmental) - Modular Headworks System _ Ingles
Auger Monster (JWC Environmental) - Modular Headworks System _ Ingles
 
JungPumpen_Brochure-912010
JungPumpen_Brochure-912010JungPumpen_Brochure-912010
JungPumpen_Brochure-912010
 
2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt
 
2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt
 
Редукторы серии U Power Jacks
Редукторы серии U Power JacksРедукторы серии U Power Jacks
Редукторы серии U Power Jacks
 
Cable Drum Trailers Manufacturer!
Cable Drum Trailers Manufacturer!Cable Drum Trailers Manufacturer!
Cable Drum Trailers Manufacturer!
 
Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!
 
AW3000
AW3000AW3000
AW3000
 
9863001993 l
9863001993 l9863001993 l
9863001993 l
 
Specifications double drum plant export
Specifications double drum plant   exportSpecifications double drum plant   export
Specifications double drum plant export
 
Specifications of double drum asphalt plant – atlas industries
Specifications of double drum asphalt plant – atlas industriesSpecifications of double drum asphalt plant – atlas industries
Specifications of double drum asphalt plant – atlas industries
 
Continuous improvements in Mineral processing
Continuous improvements in Mineral processingContinuous improvements in Mineral processing
Continuous improvements in Mineral processing
 
Extrusion blow molding by Pet All Manufacturing Inc
Extrusion blow molding by Pet All Manufacturing IncExtrusion blow molding by Pet All Manufacturing Inc
Extrusion blow molding by Pet All Manufacturing Inc
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specification
 
Specifications Double Drum Asphalt Plant by Atlas Industries
Specifications Double Drum Asphalt Plant by Atlas IndustriesSpecifications Double Drum Asphalt Plant by Atlas Industries
Specifications Double Drum Asphalt Plant by Atlas Industries
 
New TDS Course.ppt
New TDS Course.pptNew TDS Course.ppt
New TDS Course.ppt
 
Hydx 2
Hydx 2Hydx 2
Hydx 2
 
Offshore Product Reference Guide.pdf
Offshore Product Reference Guide.pdfOffshore Product Reference Guide.pdf
Offshore Product Reference Guide.pdf
 
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
Tts Energy   Company Presentation 3108 2011 Ver B Aug2011Tts Energy   Company Presentation 3108 2011 Ver B Aug2011
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
 
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
 

Archer Modular Rigs

  • 2. Private and Confidential 2 Section 1 Archer Modular Rig Solutions The fleet.
  • 3. Archer Modular Rig Solutions Services Offered •Drilling services •Snubbing services •Through tubing rotary drilling (TTRD) •Work-over services •Complex completions. •Managed-pressure drilling (MPD) •Plug-and-abandon activities (P&A) •Through Rig Intervention support platform for Coiled Tubing, Slickline and E-Line. Key Features •Low POB - 16 min based on 24 Hr Operations. •Light Modules - Max. Lift is 12 Metric Tonnes. •Patented Self Erect Mast System. •400 short ton pull capability. •100 short ton push “Snub” capability. •Efficient Rig-up / down. •Remote / Automated Drilling operation. •Built in accordance with NORSOK & UK legislation. •Compact Footprint Archer’s modular drilling rig (MDR) solution is a breakthrough in its field; utilising an innovative, modular state-of-the-art design. It offers operational flexibility and cost efficiency unrivalled by any other modular offshore drilling rigs on the market. The MDR package can be tailored to meet well-specific requirements and provide operators with a cost efficient alternative to both mobile offshore drilling units (MODU) and traditional platform drilling rigs on both existing and future installations. Archer currently own and operate two units, Archer Emerald and Topaz respectively.
  • 4. • Platform operator: Shell Todd Oil Services Ltd. (STOS) • Location: Tasman Sea, New Zealand • Field type: Gas field • Start of operation: December 2012 • End of operation: 2014 • Rig operation purpose : Drilling and Workover operations Archer Emerald on MAUI A (NZ)
  • 5. Private and Confidential 5 Archer Emerald (operational on STOS Maui A)
  • 6. • Platform operator: STATOIL • Location: North Sea, Norway • Field type: Gas field • Start of operation: March 2015 • End of operation: ongoing (Q3 2016) • Rig operation purpose: Plug and Abandonment operations Exploration drilling VDD400.2 Topaz on HEIMDAL (NO)
  • 7. Archer Topaz (operational on Statoil Heimdal) 7Private and Confidential
  • 8. • Super Single Rig (Range III) • 400 short tons pull capability • Modular construction • Max. module weight of 12 t • Two direction skidding • Compact footprint (14 x 12 m without power supply) • Automated pipe handling system • Hands-Off-Technology • Autonomous operation possible • Rig up time: approx. 3/4 weeks • Self-Erecting-Mast-System • Integrated mud system • Design according NORSOK regulations • Certified and tested by DNV according to standard 2.7-3 (Portable Offshore Units) Key Features Modular Offshore Rig VDD 400
  • 9. Private and Confidential 9 Section 2 Technical overview
  • 10. Power Supply Control Rooms HVAC Drilling Rig Active Mud Package & Hydraulic Unit Pipe Deck (Topaz only) Archer MDR Packages 10Private and Confidential
  • 11. Archer VDD400 Series MDR Private and Confidential 11
  • 12. Archer MDR - rig-up arrangement flexibility Secondary Arrangement. Primary Arrangement. 12Private and Confidential
  • 13. VDD 400 Series MDR Alternative arrangements AMS in Secondary location Private and Confidential 13 BRP AMSDrillfloor Stairs Drillfloor Stairs When the AMS is located in the Secondary position, mobilisation of a Drillfloor Access / Egress Stair or gangway shall be required
  • 14. Example - rig up Animation Private and Confidential 14 Click on Archer screen below for hyperlink to example rig up animation
  • 15. Private and Confidential 15 Section 3 Drilling Rig
  • 16. Mast Hoisting System and Top Drive Drag Chains Trip Tank Choke and Kill Manifold Local Electrical Room Baseframe Substructure Modules Driller‘s Cabin Drill Floor Crane HTV Pipehandler Pipe Feeder Skidding Unit BOP Trolley Poorboy Degasser VDD400 Series Drilling Rig
  • 17. • Welded box type mast with gear racks • Clear working height: 19 m • Max. hook load: 400 short tons (363 t) • Overall height incl. substructure: 40 m • Rack and Pinion-Hoisting System • Modular Box-on-Box-Substructure • 9 modules incl. Drill Floor • Quick connectors for fast module stacking • Footprint: 6 x 6 m • Two direction skidding (pad drilling) • Safety Bails, wind sensor, warning lights for airplanes Drilling Rig
  • 18. Mobilsation & rig up - Drilling Rig mast construction 18Private and Confidential
  • 19. Who we are VDD400 Series – Hoisting Mechanism 19 Maximum Hookload 800,000 Lbs 400 sT 362 MTe Maximum Push Capacity 200,000 Lbs 100 sT 90.5 MTe Racks 6 x Pinion Motors 3 each side Pinion Rack 6 x Pinion Motors Mounted in Top-Drive Hoisting Unit Rack located either side of drillfloor face of mast
  • 20. Who we are VDD400 series Top-Drive 20 Top-Drive System OEM MAX STREICHER GmbH & Co. Model Streicher PPDM350 Maximum Hoisting Speed 45 metres/min Maximum Pull Capacity 400sT (800,000 lbs / 362 mT) Maximum Push Capacity 100sT (200,000 lbs / 90 mT) Maximum Torque 85,000 Nm (62,692 ft/lbs) Maximum rpm. 190 Maximum Circulating Pressure 5,000 psi (345 Bar G) I-BOP 1 x 5,000 psi Remotely Operated (Driller’s Cabin) 1 x 5,000 psi Manually Operated Wireline Entry Yes Elevator Varco BJ BX Frame #4 500sT Standard Bail Load Capacity 350 sT
  • 21. Who we are Drillfloor Equipment Key Features 21 • 37-1/2” Rotary Table unit capable of producing 33,150 ft/lbs of torque at 10 rpm. • Flush mounted NOV Varco PS21 power slips & Maritime Hydraulics Cathead • Torque turn computer integrated within Driller’s cabin and via Real Time. No Tubular Running crew required. • Sufficient mast height available to install a casing drilling system. • Weatherford Unitong – Automatic Thread cleaning & Doping, 150,000ft/lbs of Torque range 2-3/8” to 20” • Unitong capable of running up to 20” Casing joints – No requirement for Casing Crew UniTong OEM V-Tech / Weatherford Torque Capacity 150,000 ft/lbs Tubular Range 2-3/8” to 20” Features Torque Turn Computer Integrated Mud Bucket Remote Thread Dope Remote Thread Clean Safety Clamp Bit Breaker Pipe guide Remote Stabbing Pin in Box Running intelligent completion (Cable guide) Make up of link threads Stabbing whilst rotating pin side Thread compensator Utility Lift capacity 5 Tonnes
  • 22. Who we are VDD 400 Series - Driller’s Cabin / Cyber Based System 22
  • 23. Private and Confidential 23 Section 4 Active Mud System (AMS) & Hydraulic Package
  • 24. Who we are VDD 400 Series - Active Mud System (AMS) 24 Sub-base Access Stairs (can be mounted either side of package depending on requirements 4 x NOV D750 LA Mud Pump Modules 2 x Shale Shaker Module 2 x Shale Shakers 1 x Vacuum Degasser Drillfloor Main Access / Egress walkway Y-Direction PCST Drag Chain 2 x HPU Modules 660 bbl Active & Mud Treatment System
  • 25. AMS – High Pressure Mud Pump Modules • 4 Triple single acting Piston Pumps • Rated power: each 750 hp (560 kW) • Max. discharge capacity: 1820 l/min • Max. working pressure: 5000 psi (345 bar) • Driven by AC-motors (660 kW) • Sea water cooling system
  • 26. Private and Confidential 26 VDD 400 Series - Active Mud System (AMS) – Lvl. 1 Mud Pump Module #1 to #4 (Each) OEM MAX STREICHER GmbH & Co. Dimensions 6 x 3 x 2.9 metres Mud Pump OEM National Oilwell Mud Pump Model D-750L Triplex Piston Pump Maximum Input Horsepower 750 Horsepower (continuous) Stroke Length 8” Piston Diameter 4-1/2” to 7” Piston Liners Chrome or Ceramic Sleeved Suction Pipework 6” ANSI 150 psi 10 BAR Discharge Pipework 6” API 5,000 psi 345 BAR Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co. Pulsation Dampner Model KB-45 Pulsation Dampner W.P 5,000 psi 345 BAR Pump Saver OEM Worldwide Oilfield Machine (WOM) Pump Saver Model 3-1/16 5,000 psi Magnum Pump Saver Pump Saver W.P 5,000 psi 345 BAR Strainer Block OEM Max Streicher GmbH Co. Strainer Block Diameter 4-1/16” Strainer Block Working Pressure 5,000 psi 345 BAR Mud Pump Module
  • 27. Mud Package: Tank Modules • 5 tanks in 4 tank modules • Overall tank capacity: 105 m3 • Automatic tank cleaning system • Round tank bottoms providing easy cleaning • Valve control from Driller‘s Cabin • Mixing and transfer pumps • Conveying screws in two directions for cuttings from Shale Shaker • Air extraction system (HVAC) Sand Trap 1 25,5 m3 Sand Trap 2 25,5 m3 Pill Tank 7 m3 Suction Tank 1 19 m3 Suction Tank 2 28 m3
  • 28. Private and Confidential 28 VDD 400 Series - Active Mud System (AMS) – Lvl. 2
  • 29. Hydraulic Power Units • 2 Hydraulic Power Units (HPU) • Supply of Top Drive, Hoisting System, Rotary Table, pipe handling, Drill Floor Crane, Auxiliary Winch • Max. working pressure: 350 bar (5076 psi) • Each HPU driven by electric motor (850 kW) • Sea water cooling system
  • 30. Mud Package: Shale Shaker Modules • 2 Shale Shakers • Max. flow rate: each 3410 l/min • Produced G Forces: 4.0 to 8.0 G • Vacuum Degasser • Air extraction system (HVAC)
  • 31. Private and Confidential 31 VDD 400 Series - Active Mud System (AMS) – Lvl. 3 HPU Module #1 & #2 OEM MAX STREICHER GmbH & Co. Dimensions 6 x 3 x 2.9 metres Hydraulic Tank 1.7m3 Filtration NAS 7 Soundproofed Enclosure 75 db Power Requirement 850 kW @ 690V 50Hz Hydraulic Pump OEM Bosch Rexroth Hydraulic Pressure 2,175 psi 350 BAR Hoisting Hydraulic Pump Model A4CSG 355 Hoisting Flowrate 710 litres/min Rotational Hydraulic Pump Model A4CSG 355 Rotation Flowrate 710 litres/min Unitong Hydraulic Pump Model A4VSO 125 Unitong Flowrate 210 litres/min Pipehandler Hydraulic Pump Model A4VSO 125 Pipehandler Flowrate 210 litres/min Hydraulic Charge Pump Model PGH5-21 Charge Pump Flowrate 67 litres/min Motor Cooling and Control Hydraulic Pump Model PGH4-21 Motor cooling & Controls pump Flowrate 67 litres/min Shale Shaker Module #1 OEM MAX STREICHER GmbH & Co. Dimensions 6 x 3 x 2.9 metres Shale Shaker #1 OEM NOV Brandt Shale Shaker #1 Model VSM 300 Shale Shaker G-Force 4.6 – 7.5 (6.4 G Nominal) Vacuum Degasser OEM Burgess Manufacturing Limited Model Model 1500 Burgess Magna-Vac Degasser Power Requirement 22.5 kW @ 690V 50Hz Capacity 1,000 GPM @ 15” of Mercury Vacuum. Ditch Magnet Alexander GmbH Co. Ditch Magnet Model Perm.- magn Shale Shaker Module #2 OEM MAX STREICHER GmbH & Co. Dimensions 6 x 3 x 2.9 metres Shale Shaker #2 OEM NOV Brandt Shale Shaker #2 Model VSM 300 Shale Shaker G-Force 4.6 – 7.5 (6.4 G Nominal) Ditch Magnet OEM Alexander GmbH Co. Ditch Magnet Model Perm.- magn VSM300 Nominal Flow Rates (For Information Only) 50M 70M 84M 110M 140M 175M 210M 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 9 10 11 12 13 14 15 16 17 Mud Weight, ppg FlowRate,gpm The VDD400 Series MDR is supplied with 2 x HPU modules as standard. The HPU Modules are Electro hydraulic and are rated for operation within Zone 2 areas. Each HPU has a total of 6 x hydraulic pumps located within that provide fluid power to the Hoisting, Drilling, Pipehandling and utility systems on the basic rig package. Each HPU is identical and designed so that all operational functions can be conducted via 1 x HPU, thus providing redundancy. Operations are generally conducted utilising both HPU units to reduce load on HPU pumps. Operation via 1 x HPU will be at a reduced speed / efficiency when power demands are high.
  • 32. Private and Confidential 32 Section 5 Power Generation System (PGS)
  • 33. Power Supply and System Control Power Distribution AC-Drive and Monitoring System (ACDM) Power Generation (Generator Sets) Power supply from platform Transformer Local Electrical RoomsHydraulic Power Units (HPU) Mud system (Mud Pumps, Shale Shaker, Tanks) Hoisting System Top Drive Pipe Handling Rotary Table or Safety and Automation System Control Center (SAS CC) Driller‘s Cabin Autonomous operation Auxiliary Equipment Uninterruptible Power Supply (UPS) BOP Control Unit
  • 34. Private and Confidential 34 VDD 400 Series – Power Generation System (PGS) SAS UPS SAS CC Powerhouse #1 to #4 Generator Sets #1 to #3 NOTE Configuration can be altered to suit platform location
  • 35. Power Supply – Power Generation – Stand alone power • 3 Generator Sets • Rated power: 1320 kW • Effective power: 1200 kW • Generator rating: 1500 kVA • Voltage: 690 V • Frequency: 50 Hz • Day tank capacity: 1000 l • Sea water cooling system
  • 36. Power Supply – Transformers and Powerhouses 2 Transformers (each 1750 kVA) 4 Powerhouse Modules  AC-Drive and Monitoring System  Power Distribution HVAC Channels (Overpressure encapsulation)
  • 37. HVAC Module • Overpressure encapsulation of all control rooms for operations in Ex-zone 2 • Ventilation system within HVAC module for overpressure generation • Heat exchanger for heating, cooling and dehumidification • Redundant System • Max flow rate: 10 000 m3/h
  • 38. VDD 400 Series MDR Alternative arrangements PGS – System potential configurations Private and Confidential 38 Triple Stacked Generator Set arrangement. Quad Stack arrangement. Typically places HVAC and SAS modules clear of Zone 2 Hazardous Area boundaries
  • 39. Private and Confidential 39 Section 6 Pipe-handling System
  • 40. Pipehandling  Pipehandling Crane •  Transportation of tubulars from Pipe Deck to Pipe Feeder  Pipe Feeder •  Adjustment, separation and intermediate storage of tubulars  HTV Pipehandler •  Transportation of tubulars from horizontal Pipe Feeder to vertical position at well centre
  • 41. Who we are • Pipe-handling System designed in accordance with NORSOK D-001. • Remote “Hands Free” Operation. • Pipedeck Pipehandler Crane • Maximum operating wind speed 30 m/s (60 Knots). • Hookload Capacity 2.17 Te @ 14m Radius. • Gripper Head Capacity 2-1/2” to 14” Tubulars. Used on 13 NOCS platforms. • Gripper Head Rotational Capability of 180 Degrees. • Crane Cab scoping capability of 2 metres. • CCTV cameras located on gripper head. Link to Pipefeeder CCTV camera. • Memory function. • SIL Level 2 Sensors. Emerald – Pipe-handling System 41
  • 42. Who we are • Pipefeeder Table • Maximum operating wind speed 30 m/s (60 Knots). • Maximum Storage capacity of 9 Te. • 2-1/2” to 20” Tubulars – Rang e I, II and III • Remote operation from Drillers Cabin • CCTV Camera and SIL level 2 sensors. Emerald – Pipe-handling System 42 • Horizontal to Vertical (HTV) Pipehandler • Maximum operating wind speed 30 m/s (60 Knots). • Maximum capacity of 3 Te. • 2-1/2” to 20” Tubulars – Rang e I, II and III • Remote operation from Drillers Cabin • Non marking gripper inserts for Chrome Tubulars. • CCTV Camera and SIL level 3 sensors.
  • 43. Who we are • Pipe-handling System designed in accordance with NORSOK D-001. • Remote “Hands Free” Operation. • “Failure Mode Analysis conducted on Pipehandler Crane & HTV – Verified by DNV. • Dropped Object Prevention / Protection • Pipe-handling equipment systems designed fail safe. • HTV & Pipehandler Gripper head tested over period of 24 hrs with full weight. • Drillfloor /sub-base – Impact strength tested with 3Te (9-1/2” DC) from 1.5m height. • Wire mesh safety netting between pipedeck and Pipefeeder – use similar on Statfjord. • Red Zone policy applied to safety critical areas. • Rig safety features include Interlocks. • HTV will not open until confirmation from Elevator closed • Safety arms will not retract until Elevator latched / Gripper head opened / locked. Emerald – Pipe-handling Safety Considerations 43
  • 44. Private and Confidential 44 Section 7 Well Control
  • 45. Who we are VDD400 Series - Well Control 45 BOP Stack OEM T3 Energy Size 13-5/8 Inches Pressure Rating 10,000 psi W.P T3 7082 Annular BOP 13-5/8 Inches 5,000 psi T3 6012 Double Ram BOP 13-5/8 Inches 10,000 psi T3 Drilling Spool 13-5/8 Inches 10,000 psi T3 6012 Single Ram BOP 13-5/8 Inches 10,000 psi BOP Accumulator Unit OEM T3 Energy Design Code NORSOK D-001 Design Pressure 3,000 psi Normal Operating Pressure 1,500 psi Shear Ram Operating Pressure 2,800 psi No. of Accumulator Bottles 24 Accumulator Bottle Capacity 15 US Gallons Accumulator / BOP Hose Connections Quick Connect / Fast Lock Remote Panels (Zone 1 compliant) 2
  • 46. BOP Handling System • Trolley for BOP transportation • Electrically driven • Extendable for mast segment transportation
  • 47. Private and Confidential 47 Section 8 Additional / Support equipment
  • 48. Additional / Bespoke Equipment & Solutions • Interface components for adaption of the modular rig to various platforms • Realization of specific customer requirements • Exemplary modules and systems: • Additional modular Pipe Deck • Additional pipe handling equipment • Swarf Unit for P&A operations • Additional mud treatment components • Additional stair towers • Additional escape routes • Additional gangways from platform to rig
  • 49. Private and Confidential 49 RMT – Reserve Mud/Mix Tanks
  • 50. Private and Confidential 50 Section 9 Operating animation
  • 51. Archer MDR – Example operation animation Private and Confidential 51 Click on Archer screen below for hyperlink to example rig up animation
  • 52. Private and Confidential 52 Section 10 Real life feedback
  • 53. Archer Emerald - Real life feedback Private and Confidential 53 Click on Archer screen below for hyperlink to video
  • 54. Archer Emerald - Real life feedback Private and Confidential 54
  • 55. Archer Emerald - Real life feedback Private and Confidential 55
  • 56. Topaz – Real life feedback Private and Confidential 56 Statoil extends modular rig deal Efficiency boost: Heimdal platform 06 January 2015 08:36GMT Steve Marshall 28 September 2015 09:12 GMT Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz after achieving a significant efficiency gain in plug-and-abandonment work with the unit at the Heimdal field off Norway. The state-owned operator now intends to use the platform -based rig to drill a new production well at the North Sea gas field,which has been shutdown,under the three-month extension to the charter that kicked off lastyear. A Statoil spokesman told Upstream the time required for the 12-well P&A campaign atthe disused field had been reduced by 50%,giving it the opportunityto use the rig for the production well that will start drilling in the fourth quarter and has an estimated duration of90 days. He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the field’s own reservoir to facilitate accelerated start-up of the platform,which now serves as a processing hub for other fields including Atla, Huldra,Skirne and Vale after Heimdal reached the end ofits producing life lastyear. “This will increase recovery from the Heimdal field and also boostthe production efficiencyof the platform by reducing downtime,” the spokesman said,adding the P&A efficiency gain was in line with Statoil’s so-called Step (Statoil Technical Efficiency Programme) initiative Heimdal's HMP1 drilling,production and accommodation platform is meanwhile being upgraded to serve as a gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norway’s Petroleum Safety Authority to keep it operational until 2034. Once the production well is drilled,the rig will then carry out plugging ofthe final 12th hole in the P&A programme in the firsthalf of 2016 before the unit is demobilised for planned maintenance. An Archer spokesman said plugging and abandonmentofthe 11 wells had been carried out55 days ahead of schedule. However, the drilling services contractor - backed by shipping and offshore billionaire John Fredriksen’s Seadrill - has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a marketslump. Archer was earlier this year hit by the cancellation ofa $96 million deal for its other modular rig,Archer Emer ald, by Talisman Sinopec EnergyUK that had intended to use it for drilling work starting in the first quarter of next year on the Montrose Area redevelopmentscheme in the British sector. The spokesman stated in an e-mail:“Both rigs are currently being actively marketed.” The contractor is touting the modular rig conceptas a cost-efficientalternative to mobile offshore rigs and traditional drilling platforms,stating its compactness reduces the platform size required,the size of the drilling crew and associated construction costs.
  • 57. Real life feedback Topaz Statoil Heimdal PP&A performance 57 Well A-06 Well A-08 Well A-12 Well A-09 Well A-07 Well A-11 Well A-10 Well A-02 Well A-03 Well A-05 Well A-01 Well A-04 Actual 44.2 15 46 14.5 14.8 10 8 13 11 8.8 1.5 0 Planned 36 32 53 29 22 15 15 15 15 7 2.6 0 0 5 10 15 20 25 30 35 40 45 50 55 60 Days Planned vs. Actual Rig shake-down + crew familiarisation well “Red Well” known integrity and pressure issued Completed ahead of plan. Injector well PP&A to be conducted post completion of planned A-05 drilling operation 54.8 days ahead Two section side-track production well planned Private and Confidential