SlideShare a Scribd company logo
1
PETE 411
Well Drilling
Lesson 3
The Rig - Drilling Equipment
2
Contents
 Rig Pumps
 Solids Control Equipment
 Air Drilling
 The Rotary System
 The Swivel
 The Well Control System
 The Well Monitoring System
 Offshore Drilling
3
Assignments:
READ: ADE Ch. 1, to p.30
HW #1: ADE 1.1, 1.2, 1.3
Due Monday, Sept. 9, 2002
at the beginning of class
NOTE: Answers in book are not
always correct...
4
Schematic of
Rig
Circulating
System for
liquid
drilling fluid
5
6
Example 1.3
Compute the pump factor in units of
barrels per stroke for a double-acting
duplex pump having:
6.5-inch liners (dL)
2.5 inch rods (dr)
18-inch strokes (LS)
and a volumetric efficiency of 90%. (EV)
7
Solution:
The pump factor for a duplex pump can
be determined using Equation 1.10
( )
( )( ) ( ) ( )[ ]
stroke/in1991
5.25.629.018
2
dd2EL
2
F
3
22
2
r
2
LVSp
=
−
π
=
−
π
=
8
Recall:
There are 231 in.3
inan U. S. gallon and
42 U.S. gallons in a U.S. barrel. Thus
converting to the desired field units
yields:
1991 in.3
/stroke * gal/231 in.3
* bbl/42 gal.
= 0.2052 bbl/stroke.
Thus: Pump Factor = 0.2052 bbl/stroke
9
Pump Factor = 3 * π/4 dL
2
LS EV/(231 * 42)
10
Example:
Pump Factor for Triplex Pump
( )( )
bbl/stroke09442.0
.in
42231
bbl
stroke
in
90.0126
4
3
ELd
4
3
3
2
VS
2
L
=
∗





π
=
∗




π
∗=
11
Example: Pump Rate
= Pump Factor * Strokes/min
= 0.09442
= 7.554 bbl/min
= 317.3 gal/min
min
stks
80
stk
bbl
∗
Pump Rate = 317 gal/min
12
Hydrocyclone
• desander
• desilter
* No moving parts
* Low cost* Pressure drop
* Diameter
13
Decanting Centrifuge Use?
14
l
l
Use?
15
Fig. 1.33
Schematic
of Rotary
System
16
Fig. 1.34
Cutaway
View of
Swivel
ROTATING
* Seals
* Bearings
17
Fig. 1.38
Cutaway View and
Dimensions for
Example Tool Joint
PIN
BOX
TJ
Shoulder
18
Fig. 1.39
Stabilizer
* Keeps pipe in center of hole
* Aids in drilling straight hole
* Prolongs bit life
19
Fig. 1.41
Kick Detection
During Drilling
Operations
1
2
3
KICK
GAIN IN PIT
VOLUME EQUAL
TO KICK VOLUME
20
Fig. 1.46
Remote
Control
Panel for
operating
Blowout
PreventersCHOKE
What to do if KICK occurs?
21
Fig. 1.44 Annular Blowout Preventer
DP
TJ
DC
OH
Press
22
Ram Blowout Preventer
23
Ram Blowout Preventer - cont’d
SHEAR / BLIND
RAM ASSEMBLY
24
Fig. 1.48 Rotating Blowout Preventer
25
Fig. 1.51
High-
Pressure
Circulating
System for
Well
Control
Operations
Keep BHP const.
Kick
26
Fig. 1.56
Subsurface
Well
Monitoring
System
MWD
27
Fig. 1.57 Spread Mooring Systems
OFFSHORE DRILLING
28
Fig. 1.58
Schematic of
Equipment
for Marine
Drilling
29
Fig. 1.59 Operation of a
Heave Compensator
30
Fig. 1.60
Subsea
BOP
Stack
31
Fig. 1.63 Subsea Equipment
Installation Procedure
32
Typical Casing Strings
Water Level
Depth
Seafloor Below ML
Conductor pile 36” 30” 200’
Conductor Casing 26” 20” 1000’
Surface Casing 17 1/2” 13 3/8” 4000’
33
Some Typical Casing Strings
Depth
Below ML
Conductor pile 36” 30” 200’
Conductor Casing 26” 20” 1000’
Surface Casing 17 1/2” 13 3/8” 4000’
Hole Csg. Depth
34
Capacity = Area * Length
35
What is the capacity of 10,000 ft of 5”
OD, 19.50 lb/ft drillpipe?
Capacity = Area * Length
Area = π/4 d2
= π/4 * 4.2762
= 14.36 in2
Length = 10,000 ft = 120,000 in
Capacity = 14.36 *120,000 in3
/(231*42 in3
/bbl)
Capacity = 177.6 bbls
36
What is the displacement of 10,000 ft
of 5” OD, 19.50 lb/ft drillpipe?
Capacity = Area * Length
Area = π /4 (od2
- id2
) = π /4 * (52
- 4.2762
)
= 5.275 in2
Length = 10,000 ft = 120,000 in
Displ. = 5.276 * 120,000 in3
/(231 * 42 in3
/bbl)
Displacement = ? Bbls

More Related Content

What's hot

Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
Elsayed Amer
 
Drill string
Drill stringDrill string
Drill string
Bhavya Sri Jarugula
 
Reservoir Geomechanics
Reservoir GeomechanicsReservoir Geomechanics
Reservoir Geomechanics
Assem Elbakly
 
Introduction to Well Testing.pdf
Introduction to Well Testing.pdfIntroduction to Well Testing.pdf
Introduction to Well Testing.pdf
ssuser2fc67e
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig components
Elsayed Amer
 
Packers
PackersPackers
Directional drilling Introduction
Directional drilling IntroductionDirectional drilling Introduction
Directional drilling Introduction
GEx OliNesia
 
Well Control
Well ControlWell Control
Well Control
AAPG SU SC
 
Drilling operations
Drilling operationsDrilling operations
Drilling operations
Andi Anriansyah
 
well control (1)
 well control (1) well control (1)
well control (1)
Dr. Arzu Javadova
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
Elsayed Amer
 
Drilling Mud Laboratory
Drilling Mud LaboratoryDrilling Mud Laboratory
Drilling Mud Laboratory
James Craig
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
TinaMarey
 
Wellheads Training .pdf
Wellheads Training .pdfWellheads Training .pdf
Wellheads Training .pdf
MUHAMMADakram840755
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
Elsayed Amer
 
Managed Pressure Drilling
Managed Pressure DrillingManaged Pressure Drilling
Managed Pressure Drilling
petroEDGE
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
amrhaggag
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
AFATous
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
Ogbarode Napoleon Ogbon
 
Casing design
Casing designCasing design

What's hot (20)

Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Drill string
Drill stringDrill string
Drill string
 
Reservoir Geomechanics
Reservoir GeomechanicsReservoir Geomechanics
Reservoir Geomechanics
 
Introduction to Well Testing.pdf
Introduction to Well Testing.pdfIntroduction to Well Testing.pdf
Introduction to Well Testing.pdf
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig components
 
Packers
PackersPackers
Packers
 
Directional drilling Introduction
Directional drilling IntroductionDirectional drilling Introduction
Directional drilling Introduction
 
Well Control
Well ControlWell Control
Well Control
 
Drilling operations
Drilling operationsDrilling operations
Drilling operations
 
well control (1)
 well control (1) well control (1)
well control (1)
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Drilling Mud Laboratory
Drilling Mud LaboratoryDrilling Mud Laboratory
Drilling Mud Laboratory
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Wellheads Training .pdf
Wellheads Training .pdfWellheads Training .pdf
Wellheads Training .pdf
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
 
Managed Pressure Drilling
Managed Pressure DrillingManaged Pressure Drilling
Managed Pressure Drilling
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Casing design
Casing designCasing design
Casing design
 

Similar to rig drilling_equipment

chiller system by Mr.Seng Sunhor
chiller system by Mr.Seng Sunhorchiller system by Mr.Seng Sunhor
chiller system by Mr.Seng Sunhor
Student at ITC
 
Assistant driller ojt module
Assistant driller ojt moduleAssistant driller ojt module
Assistant driller ojt module
Hamid Abdollahi
 
Design Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingDesign Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve Sizing
Vijay Sarathy
 
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
FLUID  MECHANICS LAB  MANUAL BSc Civil Technology 3rd Semster FLUID  MECHANICS LAB  MANUAL BSc Civil Technology 3rd Semster
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
Bsc Civil Engineering Technology
 
Rusdy_Lecture 15.pdf
Rusdy_Lecture 15.pdfRusdy_Lecture 15.pdf
Rusdy_Lecture 15.pdf
Matta PapaRaju
 
Duct design st
Duct design stDuct design st
Duct design st
kellies sambondu
 
Post development storm EmpireEng FINAL REPORT
Post development storm EmpireEng FINAL REPORTPost development storm EmpireEng FINAL REPORT
Post development storm EmpireEng FINAL REPORTShawn Austin Smyth
 
2003 TOYOTA CELICA Service Repair Manual
2003 TOYOTA CELICA Service Repair Manual2003 TOYOTA CELICA Service Repair Manual
2003 TOYOTA CELICA Service Repair Manual
jsemd suekd
 
2002 TOYOTA CELICA Service Repair Manual
2002 TOYOTA CELICA Service Repair Manual2002 TOYOTA CELICA Service Repair Manual
2002 TOYOTA CELICA Service Repair Manual
jksmttemmd
 
2000 TOYOTA CELICA Service Repair Manual
2000 TOYOTA CELICA Service Repair Manual2000 TOYOTA CELICA Service Repair Manual
2000 TOYOTA CELICA Service Repair Manual
jksemndmm
 
2001 TOYOTA CELICA Service Repair Manual
2001 TOYOTA CELICA Service Repair Manual2001 TOYOTA CELICA Service Repair Manual
2001 TOYOTA CELICA Service Repair Manual
jkmsrremmd
 
pump system and curves
pump system and curvespump system and curves
pump system and curves
Sourav Jana
 
Experiment 7.pptx
Experiment 7.pptxExperiment 7.pptx
Experiment 7.pptx
SemaAlhyasat
 
2 delugevalve a
2 delugevalve a2 delugevalve a
2 delugevalve a
Ngyen Sadrain
 
Deluge valve angel 6 inch merk viking
Deluge valve angel 6 inch merk vikingDeluge valve angel 6 inch merk viking
Deluge valve angel 6 inch merk viking
Abdul Jalil
 
Emission Control.pdf
Emission Control.pdfEmission Control.pdf
Emission Control.pdf
Uriel Fernando Rodriguez
 
CLAAS NECTIS VE 217 2+4WD (Type T14) Tractor Service Repair Manual.pdf
CLAAS NECTIS VE 217 2+4WD (Type T14) Tractor Service Repair Manual.pdfCLAAS NECTIS VE 217 2+4WD (Type T14) Tractor Service Repair Manual.pdf
CLAAS NECTIS VE 217 2+4WD (Type T14) Tractor Service Repair Manual.pdf
pingdun24363384
 

Similar to rig drilling_equipment (20)

chiller system by Mr.Seng Sunhor
chiller system by Mr.Seng Sunhorchiller system by Mr.Seng Sunhor
chiller system by Mr.Seng Sunhor
 
Assistant driller ojt module
Assistant driller ojt moduleAssistant driller ojt module
Assistant driller ojt module
 
Design Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingDesign Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve Sizing
 
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
FLUID  MECHANICS LAB  MANUAL BSc Civil Technology 3rd Semster FLUID  MECHANICS LAB  MANUAL BSc Civil Technology 3rd Semster
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
 
Thermo fluids lab key
Thermo fluids lab keyThermo fluids lab key
Thermo fluids lab key
 
Rusdy_Lecture 15.pdf
Rusdy_Lecture 15.pdfRusdy_Lecture 15.pdf
Rusdy_Lecture 15.pdf
 
Duct design st
Duct design stDuct design st
Duct design st
 
Post development storm EmpireEng FINAL REPORT
Post development storm EmpireEng FINAL REPORTPost development storm EmpireEng FINAL REPORT
Post development storm EmpireEng FINAL REPORT
 
2003 TOYOTA CELICA Service Repair Manual
2003 TOYOTA CELICA Service Repair Manual2003 TOYOTA CELICA Service Repair Manual
2003 TOYOTA CELICA Service Repair Manual
 
2002 TOYOTA CELICA Service Repair Manual
2002 TOYOTA CELICA Service Repair Manual2002 TOYOTA CELICA Service Repair Manual
2002 TOYOTA CELICA Service Repair Manual
 
2000 TOYOTA CELICA Service Repair Manual
2000 TOYOTA CELICA Service Repair Manual2000 TOYOTA CELICA Service Repair Manual
2000 TOYOTA CELICA Service Repair Manual
 
2001 TOYOTA CELICA Service Repair Manual
2001 TOYOTA CELICA Service Repair Manual2001 TOYOTA CELICA Service Repair Manual
2001 TOYOTA CELICA Service Repair Manual
 
Power2010_27048_Final
Power2010_27048_FinalPower2010_27048_Final
Power2010_27048_Final
 
pump system and curves
pump system and curvespump system and curves
pump system and curves
 
Experiment 7.pptx
Experiment 7.pptxExperiment 7.pptx
Experiment 7.pptx
 
2 delugevalve a
2 delugevalve a2 delugevalve a
2 delugevalve a
 
Deluge valve angel 6 inch merk viking
Deluge valve angel 6 inch merk vikingDeluge valve angel 6 inch merk viking
Deluge valve angel 6 inch merk viking
 
Emission Control.pdf
Emission Control.pdfEmission Control.pdf
Emission Control.pdf
 
knife cutter
knife cutterknife cutter
knife cutter
 
CLAAS NECTIS VE 217 2+4WD (Type T14) Tractor Service Repair Manual.pdf
CLAAS NECTIS VE 217 2+4WD (Type T14) Tractor Service Repair Manual.pdfCLAAS NECTIS VE 217 2+4WD (Type T14) Tractor Service Repair Manual.pdf
CLAAS NECTIS VE 217 2+4WD (Type T14) Tractor Service Repair Manual.pdf
 

More from amrhaggag

بنعمل ايه على الصفحة والجروب - أزاى نتعامل مع السكر 1 و 2 من واقع التجربة
بنعمل ايه على الصفحة والجروب - أزاى نتعامل مع السكر 1 و 2 من واقع التجربةبنعمل ايه على الصفحة والجروب - أزاى نتعامل مع السكر 1 و 2 من واقع التجربة
بنعمل ايه على الصفحة والجروب - أزاى نتعامل مع السكر 1 و 2 من واقع التجربة
amrhaggag
 
Drilling rig operations a to z rotary drilling rig components
Drilling rig operations  a to z rotary drilling rig componentsDrilling rig operations  a to z rotary drilling rig components
Drilling rig operations a to z rotary drilling rig components
amrhaggag
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )
amrhaggag
 
Directional drilling
Directional drillingDirectional drilling
Directional drilling
amrhaggag
 
Wild well wc formulas and graphas
Wild well wc formulas and graphasWild well wc formulas and graphas
Wild well wc formulas and graphas
amrhaggag
 
Tubing standard
Tubing standardTubing standard
Tubing standard
amrhaggag
 
Sysdrill.pdf
Sysdrill.pdfSysdrill.pdf
Sysdrill.pdf
amrhaggag
 
DDMS
DDMSDDMS
DDMS
amrhaggag
 
Check list for drilling new well
Check list for drilling new wellCheck list for drilling new well
Check list for drilling new well
amrhaggag
 
Wait and weight vs. driller
Wait and weight vs. drillerWait and weight vs. driller
Wait and weight vs. driller
amrhaggag
 
Kill sheet
Kill sheetKill sheet
Kill sheet
amrhaggag
 
Directional survey hand book
Directional survey hand book Directional survey hand book
Directional survey hand book
amrhaggag
 
Wellhead
WellheadWellhead
Wellhead
amrhaggag
 
Wellhead specifications
Wellhead specificationsWellhead specifications
Wellhead specifications
amrhaggag
 
Oilfield glossary
Oilfield glossaryOilfield glossary
Oilfield glossary
amrhaggag
 
Land rig handbook
Land rig handbookLand rig handbook
Land rig handbook
amrhaggag
 
Intro to petroleum geology
Intro to petroleum geologyIntro to petroleum geology
Intro to petroleum geology
amrhaggag
 
Intro to oil well drilling ops pt 4
Intro to oil well drilling ops pt 4Intro to oil well drilling ops pt 4
Intro to oil well drilling ops pt 4
amrhaggag
 
Intro to oil well drilling ops pt 3
Intro to oil well drilling ops pt 3Intro to oil well drilling ops pt 3
Intro to oil well drilling ops pt 3
amrhaggag
 
Intro to oil well drilling ops pt 2
Intro to oil well drilling ops pt 2 Intro to oil well drilling ops pt 2
Intro to oil well drilling ops pt 2
amrhaggag
 

More from amrhaggag (20)

بنعمل ايه على الصفحة والجروب - أزاى نتعامل مع السكر 1 و 2 من واقع التجربة
بنعمل ايه على الصفحة والجروب - أزاى نتعامل مع السكر 1 و 2 من واقع التجربةبنعمل ايه على الصفحة والجروب - أزاى نتعامل مع السكر 1 و 2 من واقع التجربة
بنعمل ايه على الصفحة والجروب - أزاى نتعامل مع السكر 1 و 2 من واقع التجربة
 
Drilling rig operations a to z rotary drilling rig components
Drilling rig operations  a to z rotary drilling rig componentsDrilling rig operations  a to z rotary drilling rig components
Drilling rig operations a to z rotary drilling rig components
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )
 
Directional drilling
Directional drillingDirectional drilling
Directional drilling
 
Wild well wc formulas and graphas
Wild well wc formulas and graphasWild well wc formulas and graphas
Wild well wc formulas and graphas
 
Tubing standard
Tubing standardTubing standard
Tubing standard
 
Sysdrill.pdf
Sysdrill.pdfSysdrill.pdf
Sysdrill.pdf
 
DDMS
DDMSDDMS
DDMS
 
Check list for drilling new well
Check list for drilling new wellCheck list for drilling new well
Check list for drilling new well
 
Wait and weight vs. driller
Wait and weight vs. drillerWait and weight vs. driller
Wait and weight vs. driller
 
Kill sheet
Kill sheetKill sheet
Kill sheet
 
Directional survey hand book
Directional survey hand book Directional survey hand book
Directional survey hand book
 
Wellhead
WellheadWellhead
Wellhead
 
Wellhead specifications
Wellhead specificationsWellhead specifications
Wellhead specifications
 
Oilfield glossary
Oilfield glossaryOilfield glossary
Oilfield glossary
 
Land rig handbook
Land rig handbookLand rig handbook
Land rig handbook
 
Intro to petroleum geology
Intro to petroleum geologyIntro to petroleum geology
Intro to petroleum geology
 
Intro to oil well drilling ops pt 4
Intro to oil well drilling ops pt 4Intro to oil well drilling ops pt 4
Intro to oil well drilling ops pt 4
 
Intro to oil well drilling ops pt 3
Intro to oil well drilling ops pt 3Intro to oil well drilling ops pt 3
Intro to oil well drilling ops pt 3
 
Intro to oil well drilling ops pt 2
Intro to oil well drilling ops pt 2 Intro to oil well drilling ops pt 2
Intro to oil well drilling ops pt 2
 

Recently uploaded

Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 

rig drilling_equipment

Editor's Notes

  1. Displ. = 65.26 bbls