Process Design
and Facility Layout
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
DMA Kulasooriya
ISL- Certified Six Sigma Black Belt
Cellular Layouts
 Cellular Manufacturing
 Group Technology
 Flexible Manufacturing Systems
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
A Flow Line for Production or
Service
Flow Shop or Assembly Line Work Flow
Raw
materials
or customer
Finished
item
Station
2
Station
3
Station
4
Material
and/or
labor
Statio
n
1
Material
and/or
labor
Material
and/or
labor
Material
and/or
labor
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
A U-Shaped Production Line
1 2 3 4
5
6
78910
In
Out
Workers
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Cellular Manufacturing Layout
-1111 -1111
222222222 - 2222
Assembly
3333333333 - 3333
44444444444444 - 4444
Lathe
Lathe
Mill
Mill
Mill
Mill
Drill
Drill
Drill
Heat
treat
Heat
treat
Heat
treat
Gear
cut
Gear
cut
Grind
Grind
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Design Product Layouts: Line
Balancing
Line Balancing is the process of
assigning tasks to workstations in such
a way that the workstations have
approximately equal time requirements.
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Cycle Time
Cycle time is the maximum time
allowed at each workstation to
complete its set of tasks on a unit.
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Line Balancing
Assembly line balancing operates under two constraints,
precedence requirements and cycle time restrictions’
Precedence requirements are expressed in the form of a
precedence diagram- network
Cycle time is calculated by dividing the time available for
production by the number of units to be produced – time
taken to completed item rolling off the assembly line.
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Determine Maximum Output
O utput capacity =
O T
CT
O T operating tim e per day
D = Desired output rate
CT = cycle tim e =
O T
D

6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Determine the Minimum Number
of Workstations Required:
Efficiency
stask timeofsum=t
CTDesired
t)(
=N


6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Real fruit Snack are made from a mixture
of dried fruits and packaged. To meet
demand real fruit needs to produce 6000
fruit strips every 40-hour week. Design an
assembly line with fewest number of
workstations that will achieve the
production quota without violating
precedence constraints
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Work Element Precedence Time (Min)
A Press out sheet of
fruits
----- 0.1
B Cut into strips A 0.2
C Outline Fun Shapes A 0.4
D Roll up and package B,C 0.3
Total 1.0
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Precedence Diagram
Precedence diagram: Tool used in line
balancing to display elemental tasks and
sequence requirements
A Simple Precedence
Diagram
A
B
C
D
0.1 min. 0.2 min.
0.4 min.
0.3 min.
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Calculate the desired CT (Takt
Time)
TT = 40 h * 60 m/ h = 2400
6000 units 6000
= 0.4 minute
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Calculate the theoretical minimum
number of workstations
N = 0.1 + 0.2 + 0.3 + 0.4 = 1.0 = 2.5
0.4 0.4
N= 2.5 = 3 workstations
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Assembly Line Balancing
 Arrange tasks shown in the previous
slide into workstations.
◦ Use a cycle time of 0.4 minute
◦ Assign tasks in order of the most number of
followers
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Work
Station
Work
Element
Remaining
time
Remaining
Elements
1 A 0.3 B C
B 0.1 C D
2 C 00 D
3 D 0.1 None
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
A
B
C
D
0.1 min.
0.2 min.
0.4 min.
0.3 min.
Assembly line with three workstations
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
A B C D
Workstation -01 Workstation -02 Workstation -03
0.3 m 0.4 m 0.3 m
Assembly Line
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Calculate Percent Idle Time
Percent idle time =
Idle time per cycle
(N)(CT)
PIT = 0.2/ 3 (0.4) = 16.6 %
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Determine the Efficiency
stask timeofsum=t
actual)(CTn
t)(
=E


E = 0.1 +0.2+0.3+0.4 = 1.0/ 1.2 = 83.3%
3 (0.4)
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
Requirements:
◦ List of departments
◦ Projection of work flows
◦ Distance between locations
◦ Amount of money to be invested
◦ List of special considerations
Designing Process Layouts
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)

More Related Content

What's hot

Scheduling and controlling production activities
Scheduling and controlling production activitiesScheduling and controlling production activities
Scheduling and controlling production activities
Rizwan Shah
 
Linear programming 1
Linear programming 1Linear programming 1
Linear programming 1
Rezaul Karim
 
Ppc
PpcPpc
Work Sampling
Work Sampling Work Sampling
Work Sampling
Mayank Agarwal
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
Abhishek Thakur
 
Module 5 Computerized Layout Planning
Module 5 Computerized Layout PlanningModule 5 Computerized Layout Planning
Module 5 Computerized Layout Planning
Rashmi Srinivas
 
Product Oriented Layouts
Product Oriented LayoutsProduct Oriented Layouts
Product Oriented Layouts
Georgian Court University
 
Material and capacity requirements planning (mrp and crp) part 1
Material and capacity requirements planning (mrp and crp) part  1Material and capacity requirements planning (mrp and crp) part  1
Material and capacity requirements planning (mrp and crp) part 1
Dr. Mahmoud Al-Naimi
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
Dr. Bhimsen Soragaon
 
7. scheduling
7. scheduling7. scheduling
7. scheduling
Sudipta Saha
 
Material and capacity requirements planning (mrp and crp) part 2
Material and capacity requirements planning (mrp and crp) part  2Material and capacity requirements planning (mrp and crp) part  2
Material and capacity requirements planning (mrp and crp) part 2
Dr. Mahmoud Al-Naimi
 
Inventory management
Inventory managementInventory management
Inventory management
Hriday Bora
 
Work sampling
Work samplingWork sampling
heizer jay operations management Ch14pp
 heizer jay operations management Ch14pp heizer jay operations management Ch14pp
heizer jay operations management Ch14pp
Taliya Hemanth
 
Methods Engineering
Methods EngineeringMethods Engineering
Methods Engineering
miguelaep
 
Work factor-Anant Patel
Work factor-Anant PatelWork factor-Anant Patel
Work factor-Anant Patel
Anant Patel
 
Method study
Method studyMethod study
Method study
sparsh maheshwari
 
Chain Drives Selection - Solved Problem
Chain Drives Selection - Solved ProblemChain Drives Selection - Solved Problem
Chain Drives Selection - Solved Problem
VARUN BABUNELSON
 
Job Design and Work Measurement
Job Design and Work Measurement Job Design and Work Measurement
Job Design and Work Measurement
Joshua Miranda
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Laxmikant Deshmukh
 

What's hot (20)

Scheduling and controlling production activities
Scheduling and controlling production activitiesScheduling and controlling production activities
Scheduling and controlling production activities
 
Linear programming 1
Linear programming 1Linear programming 1
Linear programming 1
 
Ppc
PpcPpc
Ppc
 
Work Sampling
Work Sampling Work Sampling
Work Sampling
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
 
Module 5 Computerized Layout Planning
Module 5 Computerized Layout PlanningModule 5 Computerized Layout Planning
Module 5 Computerized Layout Planning
 
Product Oriented Layouts
Product Oriented LayoutsProduct Oriented Layouts
Product Oriented Layouts
 
Material and capacity requirements planning (mrp and crp) part 1
Material and capacity requirements planning (mrp and crp) part  1Material and capacity requirements planning (mrp and crp) part  1
Material and capacity requirements planning (mrp and crp) part 1
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
 
7. scheduling
7. scheduling7. scheduling
7. scheduling
 
Material and capacity requirements planning (mrp and crp) part 2
Material and capacity requirements planning (mrp and crp) part  2Material and capacity requirements planning (mrp and crp) part  2
Material and capacity requirements planning (mrp and crp) part 2
 
Inventory management
Inventory managementInventory management
Inventory management
 
Work sampling
Work samplingWork sampling
Work sampling
 
heizer jay operations management Ch14pp
 heizer jay operations management Ch14pp heizer jay operations management Ch14pp
heizer jay operations management Ch14pp
 
Methods Engineering
Methods EngineeringMethods Engineering
Methods Engineering
 
Work factor-Anant Patel
Work factor-Anant PatelWork factor-Anant Patel
Work factor-Anant Patel
 
Method study
Method studyMethod study
Method study
 
Chain Drives Selection - Solved Problem
Chain Drives Selection - Solved ProblemChain Drives Selection - Solved Problem
Chain Drives Selection - Solved Problem
 
Job Design and Work Measurement
Job Design and Work Measurement Job Design and Work Measurement
Job Design and Work Measurement
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 

Similar to Process dsign line balancing

Process dsign and facility layout
Process dsign and facility layoutProcess dsign and facility layout
Process dsign and facility layout
NsbmUcd
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
Praveen S R
 
CIM Report
CIM ReportCIM Report
CIM Report
Deepak Chandran
 
Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185
Editor IJARCET
 
vignesh conference
vignesh conferencevignesh conference
vignesh conference
Vignesh Venugopal
 
GTDMC Company Profile
GTDMC Company ProfileGTDMC Company Profile
GTDMC Company Profile
Muhammad Awais
 
Bachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docxBachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docx
UIET,KUK
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET Journal
 
Sustainable Manufacturing: Optimization of single pass Turning machining oper...
Sustainable Manufacturing: Optimization of single pass Turning machining oper...Sustainable Manufacturing: Optimization of single pass Turning machining oper...
Sustainable Manufacturing: Optimization of single pass Turning machining oper...
sajal dixit
 
BRACKET_PARAMETERS.ppt
BRACKET_PARAMETERS.pptBRACKET_PARAMETERS.ppt
BRACKET_PARAMETERS.ppt
SSIVAKUMAR19
 
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET Journal
 
FYP Structure.pdf
FYP Structure.pdfFYP Structure.pdf
FYP Structure.pdf
Sushrut Gautam
 
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEOPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
yosefhadiwibowo
 
CE 352 Lecture 6-Week 8 Project Costs and Valuations.pdf
CE 352 Lecture 6-Week 8 Project Costs and Valuations.pdfCE 352 Lecture 6-Week 8 Project Costs and Valuations.pdf
CE 352 Lecture 6-Week 8 Project Costs and Valuations.pdf
HerodMalo1
 
An unconventional approach for ETL of historized data
An unconventional approach for ETL of historized dataAn unconventional approach for ETL of historized data
An unconventional approach for ETL of historized data
Andrej Pashchenko
 
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
udfjjsekkemm
 
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
fujskksemmk
 
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
fksuekdjsekmmd
 
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
ujsefksmemtyu
 
computer_science_engineering
computer_science_engineeringcomputer_science_engineering
computer_science_engineering
Salman Siddiqui
 

Similar to Process dsign line balancing (20)

Process dsign and facility layout
Process dsign and facility layoutProcess dsign and facility layout
Process dsign and facility layout
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM Report
CIM ReportCIM Report
CIM Report
 
Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185
 
vignesh conference
vignesh conferencevignesh conference
vignesh conference
 
GTDMC Company Profile
GTDMC Company ProfileGTDMC Company Profile
GTDMC Company Profile
 
Bachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docxBachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docx
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
Sustainable Manufacturing: Optimization of single pass Turning machining oper...
Sustainable Manufacturing: Optimization of single pass Turning machining oper...Sustainable Manufacturing: Optimization of single pass Turning machining oper...
Sustainable Manufacturing: Optimization of single pass Turning machining oper...
 
BRACKET_PARAMETERS.ppt
BRACKET_PARAMETERS.pptBRACKET_PARAMETERS.ppt
BRACKET_PARAMETERS.ppt
 
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
 
FYP Structure.pdf
FYP Structure.pdfFYP Structure.pdf
FYP Structure.pdf
 
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEOPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
 
CE 352 Lecture 6-Week 8 Project Costs and Valuations.pdf
CE 352 Lecture 6-Week 8 Project Costs and Valuations.pdfCE 352 Lecture 6-Week 8 Project Costs and Valuations.pdf
CE 352 Lecture 6-Week 8 Project Costs and Valuations.pdf
 
An unconventional approach for ETL of historized data
An unconventional approach for ETL of historized dataAn unconventional approach for ETL of historized data
An unconventional approach for ETL of historized data
 
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
 
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
 
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
 
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
Caterpillar cat 289 c2 compact track loader (prefix rtd) service repair manua...
 
computer_science_engineering
computer_science_engineeringcomputer_science_engineering
computer_science_engineering
 

More from NsbmUcd

Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
NsbmUcd
 
Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
NsbmUcd
 
Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
NsbmUcd
 
Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
NsbmUcd
 
Lean knowledge
Lean knowledgeLean knowledge
Lean knowledge
NsbmUcd
 
Maintenance
Maintenance Maintenance
Maintenance
NsbmUcd
 
MRP Systems
MRP SystemsMRP Systems
MRP Systems
NsbmUcd
 
Operations strategy
Operations strategyOperations strategy
Operations strategy
NsbmUcd
 
Product design
Product designProduct design
Product design
NsbmUcd
 
Productivity management
Productivity management Productivity management
Productivity management
NsbmUcd
 
Sheduling
Sheduling Sheduling
Sheduling
NsbmUcd
 
Waiting line system
Waiting line systemWaiting line system
Waiting line system
NsbmUcd
 
Introduction to operations
Introduction to operationsIntroduction to operations
Introduction to operations
NsbmUcd
 
Management of organizations MCQs
Management of organizations MCQsManagement of organizations MCQs
Management of organizations MCQs
NsbmUcd
 
Management of Organization
Management of OrganizationManagement of Organization
Management of Organization
NsbmUcd
 
management of organisations
management of organisationsmanagement of organisations
management of organisations
NsbmUcd
 
managment of organisations Past paper
managment of organisations Past papermanagment of organisations Past paper
managment of organisations Past paper
NsbmUcd
 

More from NsbmUcd (17)

Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
 
Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
 
Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
 
Operation Management Question paper
Operation Management Question paper  Operation Management Question paper
Operation Management Question paper
 
Lean knowledge
Lean knowledgeLean knowledge
Lean knowledge
 
Maintenance
Maintenance Maintenance
Maintenance
 
MRP Systems
MRP SystemsMRP Systems
MRP Systems
 
Operations strategy
Operations strategyOperations strategy
Operations strategy
 
Product design
Product designProduct design
Product design
 
Productivity management
Productivity management Productivity management
Productivity management
 
Sheduling
Sheduling Sheduling
Sheduling
 
Waiting line system
Waiting line systemWaiting line system
Waiting line system
 
Introduction to operations
Introduction to operationsIntroduction to operations
Introduction to operations
 
Management of organizations MCQs
Management of organizations MCQsManagement of organizations MCQs
Management of organizations MCQs
 
Management of Organization
Management of OrganizationManagement of Organization
Management of Organization
 
management of organisations
management of organisationsmanagement of organisations
management of organisations
 
managment of organisations Past paper
managment of organisations Past papermanagment of organisations Past paper
managment of organisations Past paper
 

Recently uploaded

Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
SabaaSudozai
 
How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...
How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...
How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...
Aleksey Savkin
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
MJ Global
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Neil Horowitz
 

Recently uploaded (20)

Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
 
How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...
How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...
How to Implement a Strategy: Transform Your Strategy with BSC Designer's Comp...
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
 

Process dsign line balancing

  • 1. Process Design and Facility Layout 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011) DMA Kulasooriya ISL- Certified Six Sigma Black Belt
  • 2. Cellular Layouts  Cellular Manufacturing  Group Technology  Flexible Manufacturing Systems 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 3. A Flow Line for Production or Service Flow Shop or Assembly Line Work Flow Raw materials or customer Finished item Station 2 Station 3 Station 4 Material and/or labor Statio n 1 Material and/or labor Material and/or labor Material and/or labor 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 4. A U-Shaped Production Line 1 2 3 4 5 6 78910 In Out Workers 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 5. Cellular Manufacturing Layout -1111 -1111 222222222 - 2222 Assembly 3333333333 - 3333 44444444444444 - 4444 Lathe Lathe Mill Mill Mill Mill Drill Drill Drill Heat treat Heat treat Heat treat Gear cut Gear cut Grind Grind 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 6. Design Product Layouts: Line Balancing Line Balancing is the process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements. 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 7. Cycle Time Cycle time is the maximum time allowed at each workstation to complete its set of tasks on a unit. 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 8. Line Balancing Assembly line balancing operates under two constraints, precedence requirements and cycle time restrictions’ Precedence requirements are expressed in the form of a precedence diagram- network Cycle time is calculated by dividing the time available for production by the number of units to be produced – time taken to completed item rolling off the assembly line. 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 9. Determine Maximum Output O utput capacity = O T CT O T operating tim e per day D = Desired output rate CT = cycle tim e = O T D  6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 10. Determine the Minimum Number of Workstations Required: Efficiency stask timeofsum=t CTDesired t)( =N   6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 11. Real fruit Snack are made from a mixture of dried fruits and packaged. To meet demand real fruit needs to produce 6000 fruit strips every 40-hour week. Design an assembly line with fewest number of workstations that will achieve the production quota without violating precedence constraints 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 12. Work Element Precedence Time (Min) A Press out sheet of fruits ----- 0.1 B Cut into strips A 0.2 C Outline Fun Shapes A 0.4 D Roll up and package B,C 0.3 Total 1.0 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 13. Precedence Diagram Precedence diagram: Tool used in line balancing to display elemental tasks and sequence requirements A Simple Precedence Diagram A B C D 0.1 min. 0.2 min. 0.4 min. 0.3 min. 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 14. Calculate the desired CT (Takt Time) TT = 40 h * 60 m/ h = 2400 6000 units 6000 = 0.4 minute 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 15. Calculate the theoretical minimum number of workstations N = 0.1 + 0.2 + 0.3 + 0.4 = 1.0 = 2.5 0.4 0.4 N= 2.5 = 3 workstations 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 16. Assembly Line Balancing  Arrange tasks shown in the previous slide into workstations. ◦ Use a cycle time of 0.4 minute ◦ Assign tasks in order of the most number of followers 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 17. Work Station Work Element Remaining time Remaining Elements 1 A 0.3 B C B 0.1 C D 2 C 00 D 3 D 0.1 None 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 18. A B C D 0.1 min. 0.2 min. 0.4 min. 0.3 min. Assembly line with three workstations 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 19. A B C D Workstation -01 Workstation -02 Workstation -03 0.3 m 0.4 m 0.3 m Assembly Line 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 20. Calculate Percent Idle Time Percent idle time = Idle time per cycle (N)(CT) PIT = 0.2/ 3 (0.4) = 16.6 % 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 21. Determine the Efficiency stask timeofsum=t actual)(CTn t)( =E   E = 0.1 +0.2+0.3+0.4 = 1.0/ 1.2 = 83.3% 3 (0.4) 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)
  • 22. Requirements: ◦ List of departments ◦ Projection of work flows ◦ Distance between locations ◦ Amount of money to be invested ◦ List of special considerations Designing Process Layouts 6/28/2015 DMAKulasooriya, NIBM (UCD -BSc-2011)