1) The document provides disassembly and assembly instructions for removing and installing the piston pump (hydrostatic) on a 289C2 Compact Track Loader.
2) The removal procedure requires disconnecting hoses and harness assemblies, removing mounting bolts, and using special tools to lift the pump assembly from the machine.
3) The disassembly procedure details over 30 individual steps to fully disassemble the pump components, including removing valves, cartridges, seals, and bearings.
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Learn why monitoring your Mercedes' Exhaust Back Pressure (EBP) sensor is crucial. Understand its role in engine performance and emission reduction. Discover five warning signs of EBP sensor failure, from loss of power to increased emissions. Take action promptly to avoid costly repairs and maintain your Mercedes' reliability and efficiency.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
Your VW's camshaft position sensor is crucial for engine performance. Signs of failure include engine misfires, difficulty starting, stalling at low speeds, reduced fuel efficiency, and the check engine light. Prompt inspection and replacement can prevent further damage and keep your VW running smoothly.
How To Fix The Key Not Detected Issue In Mercedes CarsIntegrity Motorcar
Experiencing a "Key Not Detected" problem in your Mercedes? Don’t take it for granted. Go through this presentation to find out the exact nature of the issue you are dealing with. Have your vehicle checked by a certified professional if necessary.
2. Shutdown SIS
Previous Screen
Product: COMPACT TRACK LOADER
Model: 289C2 COMPACT TRACK LOADER RTD
Configuration: 289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Engine
Disassembly and Assembly
279C, 279C2, 289C, 289C2 and 299C Compact Track Loaders Power Train
Media Number -KENR8831-06 Publication Date -01/01/2016 Date Updated -06/01/2016
i07466126
Piston Pump (Hydrostatic) - Remove
SMCS - 5070-011-H7
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
247-4296 Pump Removal Handle As 1
FT-2999 Weight 2
FT-2998 Lock Collar 2
138-7575 Link Bracket 1
B
159-3327 Wrench Adapter(1)
1
387-9124 Wrench Adapter(2)
1
C 1P-1857 Retaining Ring Pliers 1
(1)
For use on 21 mm head bolts.
(2)
For use on 14 mm head bolts.
Start By:
a. Remove the hydraulic tank. Refer to Disassembly and Assembly, "Hydraulic Tank -
Remove".
b. Remove the implement pump. Refer to Disassembly and Assembly, "Piston Pump -
Remove".
NOTICE
1/4289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
Note: Cleanliness is an important factor. Before you begin the removal procedure, the exterior of
the components should be thoroughly cleaned. This will help to prevent dirt from entering the
internal mechanism.
Note: Put identification marks on all hoses, on all hose assemblies, on all harness assemblies, and
on all tube assemblies for installation purposes. Plug all hose assemblies and all tube assemblies.
This helps to prevent fluid loss, and this helps to keep contaminants from entering the system.
Illustration 1 g01342576
1. Disconnect hose assembly (2).
2. Disconnect hose (4).
3. Disconnect hose assemblies (3).
4. Disconnect hose assembly (1).
5. Disconnect tube assembly (5).
2/4289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 6. Remove bolts (7) and reposition plate assembly (6).
Illustration 2 g01342634
Illustration 3 g01342641
7. Disconnect harness assemblies (8).
8. Attach Tooling (A) and a suitable lifting device to piston pump (9). The weight of piston
pump (9) is approximately 73 kg (160 lb).
9. Use Tooling (B) to remove bolts (10).
10. Use Tooling (A) and the suitable lifting device to remove piston pump (9).
3/4289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 4 g01342687
Illustration 5 g01342689
11. Loosen bolts (11). Use Tooling (C) to remove retaining ring (12). Remove coupling (13).
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Oct 21 21:05:32 UTC+0800 2019
4/4289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Shutdown SIS
Previous Screen
Product: COMPACT TRACK LOADER
Model: 289C2 COMPACT TRACK LOADER RTD
Configuration: 289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Engine
Disassembly and Assembly
279C, 279C2, 289C, 289C2 and 299C Compact Track Loaders Power Train
Media Number -KENR8831-06 Publication Date -01/01/2016 Date Updated -06/01/2016
i06659865
Piston Pump (Hydrostatic) - Disassemble
SMCS - 5070-015-H7
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-0510 Driver Gp 1
B 9S-9152 Puller Attachment As. 1
C
0S-1527 Bolt 1
2J-3506 Full Nut 1
8T-4122 Hard Washer 2
D 1P-1859 Retaining Ring Pliers 1
Start By:
a. Remove the pump. Refer to Disassembly and Assembly, "Piston Pump (Hydrostatic) -
Remove".
1/10289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. 31. Remove O-ring seal (45).
32. Remove seal (44) and shaft assembly (41).
33. Use Tooling (D) to remove retaining ring (43).
34. Use Tooling (B) and a suitable press to remove bearing (42).
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Oct 21 21:06:28 UTC+0800 2019
10/10289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 E...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Shutdown SIS
Previous Screen
Product: COMPACT TRACK LOADER
Model: 289C2 COMPACT TRACK LOADER RTD
Configuration: 289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Engine
Disassembly and Assembly
279C, 279C2, 289C, 289C2 and 299C Compact Track Loaders Power Train
Media Number -KENR8831-06 Publication Date -01/01/2016 Date Updated -06/01/2016
i06660138
Piston Pump (Hydrostatic) - Assemble
SMCS - 5070-016-H7
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
D 1P-1859 Retaining Ring Pliers 1
E 9S-3263 Thread Lock Compound 1
1/10289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 1 g06063261
1. Raise the temperature of bearing (42).
2. Install bearing (42).
3. Use Tooling (D) to install retaining ring (43).
4. Install shaft assembly (40) and seal (44).
5. Install O-ring seal (45).
6. Install plate (46).
7. Install retaining ring (47).
2/10289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
21. 15. Install set screw (23). Apply slight pressure to the piston assembly.
16. Repeat Step 15 for the opposite side.
17. Use a suitable measuring device to center the swashplate. Measure the distance that is from
the machined face of the housing to both sides of the swashplate. Adjust setscrews (23) to
achieve the same distance to the swashplate.
18. Install retainer (24), and bolts (25).
Illustration 9 g06063253
19. Install barrel assembly (40).
Illustration 10 g06063248
5/10289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 11 g06063242
20. Install bearings (39).
21. Install port plate (36) and gasket (35).
22. Install head (38).
23. Install coupling (37).
Illustration 12 g01325564
24. Repeat Steps16 through Steps 23 for barrel assembly (34).
25. Install barrel assembly (34).
Illustration 13 g01325541
26. Install housing (22) and bolts (21). Tighten bolts (21) to a torque of 110 ± 10 N·m
(81 ± 7 lb ft).
6/10289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 14 g01377507
Illustration 15 g01377504
27. Install crossover relief valves (14B), backup ring (14D), O-ring seal (14C), O-ring seal
(14E) and plugs (14A) into the head.
Illustration 16 g01325540
28. Install O-ring seal (20), backup ring (19), and O-ring seal (18).
7/10289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Illustration 17 g01325538
29. Install O-ring seals (17), backup rings (16), and O-ring seal (15).
Illustration 18 g01325536
30. Install valve (11). Tighten valve (11) to a torque of 44 ± 3 N·m (32 ± 2 lb ft).
31. Install cartridge (14), coil (12), and nut (13). Tighten nut (13) to a torque of 80 ± 10 N·m
(59 ± 7 lb ft).
32. Install the cross over relief valves and the plugs into the head. Tighten plugs (21) to a torque
of 110 ± 10 N·m (81 ± 7 lb ft).
Illustration 19 g01377500
8/10289C2 Compact Track Loader RTD00001-UP (MACHINE) POWERED BY C3.4 Eng...
2019/10/21https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...