INTRODUCTION
RETROFITTING: Modifying existing equipment or structures
with additional or new components or members.
SPLICING: Connection of existing broken re-bar with
additional rebar by coupler.
COUPLER: A Mechanical device that connects two thing.
EPOXY-TIE ADHESIVE: Epoxy-Tie (ET) is a two-component,
100% solid system for uses as a high strength, non-shrink
anchor grouting material.
TERMINOLOGIES
A CASE STUDY
ON
SIKDERKANDI BRIDGE PILE
INCIDENT
 At Sikderkandi Bridge 48 numbers (4x12) of pile under 4
piers and 36 numbers (18x2) of pile under 2 abutments
were designed.
 For the pier piles 16 numbers of 32 mm and for abutment
piles 23 numbers of 32 mm re-bars were used.
 500 grade Anwar Ispat bars were used in the construction
work. All procedure had been followed for source approval.
The 500 grade Anwar Ispat bars were tested from BUET.
The test result was satisfactory.
 After curing period pile heads were broken at the cut off
level for onward construction of pile cap.
 Pile heads were broken by using concrete breaker
(Pneumatic Drill) and then upper concrete portion were
removed by crane.
 During breaking of pile heads some of the re-bars in
number of piles were broken.
INCIDENT
Sl.
No
Structures Pile no
of
Broken
Bars
Total
Bars
per pile
No of
Bars
broken
per pile
% of
broken bars
per pile
No of
Piles per
cap
No of
bars per
cap
% of
broken
bars for
cap
Rmks
1
Abutment-1
Pile-2
23
1 4.35
2.17
Narrow
Bridge
2 Pile-5 3 13.04
Wide
bridge
3 Pile-10 3 13.04 18 414
4 Pile-12 1 4.35
5 Pile-13 1 4.35
Total Numbers of Broken Bars, AB-1= 9
6
Abutment-2
Pile-1
23
1 4.35
7.49
Narrow
Bridge7 Pile-2 2 8.70
8 Pile-10 5 21.74 18 414
Wide
bridge
9 Pile-12 5 21.74
10 Pile-13 6 26.09
11 Pile-14 10 43.48
12 Pile-15 2 8.70
Narrow
Bridge
Total Numbers of Broken Bars, AB-2= 32
STATISTICS OF BROKEN BARS
ABUTMENT
STATISTICS OF BROKEN BARS
Sl.
No
Structures Pile no
of
Broken
Bars
Total
Bars
per pile
No of
Bars
broken
per pile
% of
broken bars
per pile
No of
Piles per
cap
No of
bars per
cap
% of
broken
bars for
cap
Rmks
13 Pier-1 Pile-10 16 1 6.25 12 192 0.52
Narrow
Bridge
Total Numbers of Broken Bars, Pier-1= 1
14 Pier-2 Pile-4 16 3 18.75 12 192 1.56
Narrow
Bridge
Total Numbers of Broken Bars, Pier-2= 3
15
Pier-3
Pile-1
16
4 25.00 Narrow
Bridge
16 Pile-2 2 12.50
17 Pile-3 3 18.75 12 192 5.21 Wide
Bridge18 Pile-4 1 6.25
Total Numbers of Broken Bars, Pier-3= 10
19 Pier-4 Pile-1 16 1 6.25 12 192 0.52
Narrow
Bridge
Total Numbers of Broken Bars, Pier-4= 1
 Total no of Bars for the Bridge - 1596 nos
 Total no of Bars Broken for the Bridge - 55 nos
 % of Broken Bars for the Bridge - 3.45 %
 No of Pile for bars Broken - 19 nos
PIER
Sl.
No
Structure
Name
Total Piles
per
Structure
Total Bars
per
Structure
Numbers
of Bar
Broken
% of
Broken
Bars
Rmks
1. Aboutment-1 18 414 9 2.17
2.
Aboutment-2
18 414 31 7.49
3. Pire-1 12 192 1 0.52
4. Pire-2 12 192 3 1.56
5. Pire-3 12 192 10 5.21
6. Pire-4 12 192 1 0.52
Total 84 1596 55 3.45
STATISTICS OF BROKEN BARS
EXPLANATION OF CONTRACTOR
Likely Reason for Breaking of Re-bar
About 1.0 m long segment of pile head was broken by
removing skin concrete from the pile re-bar above the cut-off
level and further about 50 mm thick concrete was taken out
inside the core of every individual re-bar at 100 mm above
the cut-off level. Electric drill was used for breaking the
concrete.
Likely Reason for Breaking of Re-bar
Single piece of concrete (approx 4.0 ton) was taken out from
the pile head by Crane. During the process of removal of the
broken concrete from pile head, few main 32 mm diameter
re-bar were broken at cut-off level due to lateral pressure
which may be called Cold Shear Cut of bar.
EXPLANATION OF CONTRACTOR
Contractor’s Proposal to Prevent Breaking of
Re-Bar in Future
Previously minimum 1.0 m length of pile head used to be
broken by removing skin concrete from the pile above
the cut-off level. In future pile head shall be broken 300
mm above the cut-off level by removing skin first and
then 50 mm thick concrete will be broken out from inside
the core of the pile. Thus the core concrete will get
free which will be broken by electric drill.
EXPLANATION OF CONTRACTOR
Contractor’s Proposal to Prevent Breaking of
Re-Bar in Future
Then the single piece of concrete will be taken out from
the pile head. Removal of rest 300 mm will be done by
using chisel upto the cut-off level with care.
EXPLANATION OF CONTRACTOR
1. Extension of broken re-bar will be done by mechanical
splicing system (DEXTRA’s Unitec co-axial) consisting of a
sleeve that is fitted with one longitudinal row of redial bolts
through its wall thickness and 2 longitudinal saddles insides
its inner cavity.
2. Existing broken re-bar will be exposed by removing the
concrete around the broken re-bar upto 150 mm depth over
which the coupler of the splicing system is inserted until
contact with centre pin.
CONTRACTOR’S PROPOSED
RETROFICATION SYSTEM
3. The end of the other reinforcing bar is inserted into the
sleeve until contact with a centre pin.
4. The bolts are first hand-tightened with an L-wrench for
pre-locking, and then tightened with a pneumatic ¾’’ power
drive until the heads of the screws shear off.
5. In addition re-bars of same diameter (32 mm) to be
anchored chemically with a 40 mm dia hole, at depth of 350
mm @ 150 mm spacing as technically specified in the
manual of Simpson ET-HP Epoxy.
CONTRACTOR’S PROPOSED
RETROFICATION SYSTEM
COMMENTS OF CSC DESIGN
CONSULTANT
The comments and recommendations of CSC design
consultant were as follows:
 The damages were caused by heavy and hard impact
from pile head concrete mass during removal process.
 All other secondary reasons might weaken the re-
bars but not adequate for breaking 32 mm dia re-
bars.
 Replenishment of re-bars by DEXTRA’s Unitec co-
axial mechanical splicing is OK.
 Retrofitting with 16-32 mm re-bars as inner core is
OK both for abutment and pier piles. The depth of
insertion shall be 400 mm in place of 350 mm as
shown on the drawing for SIMPSON ET22 Epoxy-Tie
Adhesive.
 After fixing inner core re-bars, 4 numbers of Stiffener
Rings shall be provided as inner ring along the 1.0 m
extended bars. Spiral of 12 mm bar at 75 mm pitch
shall be provided as outer ring around the existing re-
bars.
COMMENTS OF CSC DESIGN
CONSULTANT
PICTORIAL VIEW OF PILE HEAD WITH
BROKEN BARS AFTER RECTIFICATION
PLAN OF THE PILE WITH
BROKEN BARS
CONCLUSION

More Related Content

What's hot

WIND LOAD ON BUILDING AND STR.pdf
WIND LOAD ON BUILDING AND STR.pdfWIND LOAD ON BUILDING AND STR.pdf
WIND LOAD ON BUILDING AND STR.pdf
Sachin Kumbhar
 
Is 456 2000
Is 456 2000Is 456 2000
Is 456 2000
Sandesh Shetty
 
89505650 concrete-beam-and-slab-design-using-prokon
89505650 concrete-beam-and-slab-design-using-prokon89505650 concrete-beam-and-slab-design-using-prokon
89505650 concrete-beam-and-slab-design-using-prokon
OscarKonzult
 
Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8 Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8
Eur Ing Valentinos Neophytou BEng (Hons), MSc, CEng MICE
 
seismic ubc -97
seismic ubc -97seismic ubc -97
seismic ubc -97
CADCONEngineers
 
Lec 1-2-3-introduction
Lec 1-2-3-introductionLec 1-2-3-introduction
Lec 1-2-3-introduction
MuhammadWaqas911
 
Lec.3 working stress 1
Lec.3   working stress 1Lec.3   working stress 1
Lec.3 working stress 1
Muthanna Abbu
 
M2 cv-rc-d-005(anchor bolt details)
M2 cv-rc-d-005(anchor bolt details)M2 cv-rc-d-005(anchor bolt details)
M2 cv-rc-d-005(anchor bolt details)
neeraj dubey
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABS
Yousuf Dinar
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-
Bhaskar Alapati
 
Column Interaction Diagram construction
Column Interaction Diagram constructionColumn Interaction Diagram construction
Column Interaction Diagram construction
Pritesh Parmar
 
Torsion in beam
Torsion in beamTorsion in beam
Torsion in beam
Vikas Mehta
 
Bs8110 design notes
Bs8110 design notesBs8110 design notes
Bs8110 design notes
Lawrence Omai
 
STRUCTURAL DESIGN OF PIPE CULVERT TO BS EN 1295-1
STRUCTURAL DESIGN OF PIPE CULVERT TO BS EN 1295-1STRUCTURAL DESIGN OF PIPE CULVERT TO BS EN 1295-1
STRUCTURAL DESIGN OF PIPE CULVERT TO BS EN 1295-1
Eur Ing Valentinos Neophytou BEng (Hons), MSc, CEng MICE
 
Lec.7 strength design method rectangular sections 3
Lec.7   strength design method rectangular sections  3Lec.7   strength design method rectangular sections  3
Lec.7 strength design method rectangular sections 3
Muthanna Abbu
 
Soil pressure in etabs
Soil pressure in etabsSoil pressure in etabs
Soil pressure in etabs
Jacob shah
 
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8 ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
Eur Ing Valentinos Neophytou BEng (Hons), MSc, CEng MICE
 
Bs 1881-part-116-83
Bs 1881-part-116-83Bs 1881-part-116-83
Bs 1881-part-116-83
adrianafarniza
 
Analysis of T-Beam
Analysis of T-BeamAnalysis of T-Beam
Analysis of T-Beam
01008828934
 
EC3 design
EC3 designEC3 design
EC3 design
Maria João Espada
 

What's hot (20)

WIND LOAD ON BUILDING AND STR.pdf
WIND LOAD ON BUILDING AND STR.pdfWIND LOAD ON BUILDING AND STR.pdf
WIND LOAD ON BUILDING AND STR.pdf
 
Is 456 2000
Is 456 2000Is 456 2000
Is 456 2000
 
89505650 concrete-beam-and-slab-design-using-prokon
89505650 concrete-beam-and-slab-design-using-prokon89505650 concrete-beam-and-slab-design-using-prokon
89505650 concrete-beam-and-slab-design-using-prokon
 
Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8 Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8
 
seismic ubc -97
seismic ubc -97seismic ubc -97
seismic ubc -97
 
Lec 1-2-3-introduction
Lec 1-2-3-introductionLec 1-2-3-introduction
Lec 1-2-3-introduction
 
Lec.3 working stress 1
Lec.3   working stress 1Lec.3   working stress 1
Lec.3 working stress 1
 
M2 cv-rc-d-005(anchor bolt details)
M2 cv-rc-d-005(anchor bolt details)M2 cv-rc-d-005(anchor bolt details)
M2 cv-rc-d-005(anchor bolt details)
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABS
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-
 
Column Interaction Diagram construction
Column Interaction Diagram constructionColumn Interaction Diagram construction
Column Interaction Diagram construction
 
Torsion in beam
Torsion in beamTorsion in beam
Torsion in beam
 
Bs8110 design notes
Bs8110 design notesBs8110 design notes
Bs8110 design notes
 
STRUCTURAL DESIGN OF PIPE CULVERT TO BS EN 1295-1
STRUCTURAL DESIGN OF PIPE CULVERT TO BS EN 1295-1STRUCTURAL DESIGN OF PIPE CULVERT TO BS EN 1295-1
STRUCTURAL DESIGN OF PIPE CULVERT TO BS EN 1295-1
 
Lec.7 strength design method rectangular sections 3
Lec.7   strength design method rectangular sections  3Lec.7   strength design method rectangular sections  3
Lec.7 strength design method rectangular sections 3
 
Soil pressure in etabs
Soil pressure in etabsSoil pressure in etabs
Soil pressure in etabs
 
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8 ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
 
Bs 1881-part-116-83
Bs 1881-part-116-83Bs 1881-part-116-83
Bs 1881-part-116-83
 
Analysis of T-Beam
Analysis of T-BeamAnalysis of T-Beam
Analysis of T-Beam
 
EC3 design
EC3 designEC3 design
EC3 design
 

Viewers also liked

Presentation on Prestressing prepared by Rais Uddin
Presentation on Prestressing prepared by Rais UddinPresentation on Prestressing prepared by Rais Uddin
Presentation on Prestressing prepared by Rais Uddin
Rais Uddin
 
CSC-PMBP
CSC-PMBPCSC-PMBP
Reinforced earth wall and its design parameters
Reinforced earth wall and its design parametersReinforced earth wall and its design parameters
Reinforced earth wall and its design parameters
Amir nazir paray
 
Retrofitting the well foundation of a railway bridge subjected to scour
Retrofitting the well foundation of a railway bridge subjected to scourRetrofitting the well foundation of a railway bridge subjected to scour
Retrofitting the well foundation of a railway bridge subjected to scour
Sushil Dhungana
 
Prestress loss
Prestress lossPrestress loss
Prestress loss
Imran Islam
 
Presentation on Expansion Joint
Presentation on Expansion JointPresentation on Expansion Joint
Presentation on Expansion Joint
Rais Uddin
 
Sheet pile presentation
Sheet pile presentationSheet pile presentation
Sheet pile presentation
Jahangirnagar University
 
Geotextiles
Geotextiles Geotextiles
Geotextiles
Seminar Links
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
Ankit Patel
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
Dhaval Jadhav
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concrete
MAHFUZUR RAHMAN
 
Repair and Rehabilitation
Repair and RehabilitationRepair and Rehabilitation
Repair and Rehabilitation
GAURAV. H .TANDON
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting Techniques
Aritra Banerjee
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
Rithika Ravishankar
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
Rizwan Samor
 

Viewers also liked (15)

Presentation on Prestressing prepared by Rais Uddin
Presentation on Prestressing prepared by Rais UddinPresentation on Prestressing prepared by Rais Uddin
Presentation on Prestressing prepared by Rais Uddin
 
CSC-PMBP
CSC-PMBPCSC-PMBP
CSC-PMBP
 
Reinforced earth wall and its design parameters
Reinforced earth wall and its design parametersReinforced earth wall and its design parameters
Reinforced earth wall and its design parameters
 
Retrofitting the well foundation of a railway bridge subjected to scour
Retrofitting the well foundation of a railway bridge subjected to scourRetrofitting the well foundation of a railway bridge subjected to scour
Retrofitting the well foundation of a railway bridge subjected to scour
 
Prestress loss
Prestress lossPrestress loss
Prestress loss
 
Presentation on Expansion Joint
Presentation on Expansion JointPresentation on Expansion Joint
Presentation on Expansion Joint
 
Sheet pile presentation
Sheet pile presentationSheet pile presentation
Sheet pile presentation
 
Geotextiles
Geotextiles Geotextiles
Geotextiles
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concrete
 
Repair and Rehabilitation
Repair and RehabilitationRepair and Rehabilitation
Repair and Rehabilitation
 
Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting Techniques
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 

Similar to Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.

Prestressed pipes,tanks,poles
Prestressed pipes,tanks,polesPrestressed pipes,tanks,poles
Prestressed pipes,tanks,poles
PraveenKumar Shanmugam
 
Formwork
FormworkFormwork
Formwork
Lavanya Singh
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
Khiem Vo Duy
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converter
Prem Baboo
 
Dos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdfDos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdf
vhjadhav
 
EIM SHS MODULE.pptx
EIM SHS MODULE.pptxEIM SHS MODULE.pptx
EIM SHS MODULE.pptx
LeoLuga1
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
ssuserea7ebc
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
ShuBham RaNa
 
S966 magnesium anode
S966 magnesium anodeS966 magnesium anode
S966 magnesium anode
Hedi Mohamed
 
Casing
CasingCasing
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
IRJET Journal
 
B.tech admission in india
B.tech admission in indiaB.tech admission in india
B.tech admission in india
Edhole.com
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
atchitect and design
 
B.tech admission in india
B.tech admission in indiaB.tech admission in india
B.tech admission in india
Edhole.com
 
MoRT&H section for quality assurance Section 900.pptx
MoRT&H section for quality assurance Section 900.pptxMoRT&H section for quality assurance Section 900.pptx
MoRT&H section for quality assurance Section 900.pptx
aegdrnh53vup01
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERING
JAPJEETSINGH13
 
Stucture Design of various Watre tank
 Stucture Design of various Watre tank Stucture Design of various Watre tank
Stucture Design of various Watre tank
Nagma Modi
 
Production of tubes and pipes
Production of tubes and pipesProduction of tubes and pipes
Production of tubes and pipes
Mahesh Bang
 
Beam Design and Drawing of RCC Structures
Beam Design and Drawing of RCC StructuresBeam Design and Drawing of RCC Structures
Beam Design and Drawing of RCC Structures
Shubham .
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
Todd Mordoh
 

Similar to Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level. (20)

Prestressed pipes,tanks,poles
Prestressed pipes,tanks,polesPrestressed pipes,tanks,poles
Prestressed pipes,tanks,poles
 
Formwork
FormworkFormwork
Formwork
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converter
 
Dos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdfDos & Donts in Civil Engg-converted.pdf
Dos & Donts in Civil Engg-converted.pdf
 
EIM SHS MODULE.pptx
EIM SHS MODULE.pptxEIM SHS MODULE.pptx
EIM SHS MODULE.pptx
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
S966 magnesium anode
S966 magnesium anodeS966 magnesium anode
S966 magnesium anode
 
Casing
CasingCasing
Casing
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
B.tech admission in india
B.tech admission in indiaB.tech admission in india
B.tech admission in india
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
B.tech admission in india
B.tech admission in indiaB.tech admission in india
B.tech admission in india
 
MoRT&H section for quality assurance Section 900.pptx
MoRT&H section for quality assurance Section 900.pptxMoRT&H section for quality assurance Section 900.pptx
MoRT&H section for quality assurance Section 900.pptx
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERING
 
Stucture Design of various Watre tank
 Stucture Design of various Watre tank Stucture Design of various Watre tank
Stucture Design of various Watre tank
 
Production of tubes and pipes
Production of tubes and pipesProduction of tubes and pipes
Production of tubes and pipes
 
Beam Design and Drawing of RCC Structures
Beam Design and Drawing of RCC StructuresBeam Design and Drawing of RCC Structures
Beam Design and Drawing of RCC Structures
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
 

Recently uploaded

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 

Recently uploaded (20)

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 

Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.

  • 2. RETROFITTING OF BROKEN RE-BARS DURING CONSTRUCTION OF PILES FOR BRIDGE FOUNDATION
  • 4. RETROFITTING: Modifying existing equipment or structures with additional or new components or members. SPLICING: Connection of existing broken re-bar with additional rebar by coupler. COUPLER: A Mechanical device that connects two thing. EPOXY-TIE ADHESIVE: Epoxy-Tie (ET) is a two-component, 100% solid system for uses as a high strength, non-shrink anchor grouting material. TERMINOLOGIES
  • 6. INCIDENT  At Sikderkandi Bridge 48 numbers (4x12) of pile under 4 piers and 36 numbers (18x2) of pile under 2 abutments were designed.  For the pier piles 16 numbers of 32 mm and for abutment piles 23 numbers of 32 mm re-bars were used.  500 grade Anwar Ispat bars were used in the construction work. All procedure had been followed for source approval. The 500 grade Anwar Ispat bars were tested from BUET. The test result was satisfactory.
  • 7.  After curing period pile heads were broken at the cut off level for onward construction of pile cap.  Pile heads were broken by using concrete breaker (Pneumatic Drill) and then upper concrete portion were removed by crane.  During breaking of pile heads some of the re-bars in number of piles were broken. INCIDENT
  • 8.
  • 9.
  • 10.
  • 11. Sl. No Structures Pile no of Broken Bars Total Bars per pile No of Bars broken per pile % of broken bars per pile No of Piles per cap No of bars per cap % of broken bars for cap Rmks 1 Abutment-1 Pile-2 23 1 4.35 2.17 Narrow Bridge 2 Pile-5 3 13.04 Wide bridge 3 Pile-10 3 13.04 18 414 4 Pile-12 1 4.35 5 Pile-13 1 4.35 Total Numbers of Broken Bars, AB-1= 9 6 Abutment-2 Pile-1 23 1 4.35 7.49 Narrow Bridge7 Pile-2 2 8.70 8 Pile-10 5 21.74 18 414 Wide bridge 9 Pile-12 5 21.74 10 Pile-13 6 26.09 11 Pile-14 10 43.48 12 Pile-15 2 8.70 Narrow Bridge Total Numbers of Broken Bars, AB-2= 32 STATISTICS OF BROKEN BARS ABUTMENT
  • 12. STATISTICS OF BROKEN BARS Sl. No Structures Pile no of Broken Bars Total Bars per pile No of Bars broken per pile % of broken bars per pile No of Piles per cap No of bars per cap % of broken bars for cap Rmks 13 Pier-1 Pile-10 16 1 6.25 12 192 0.52 Narrow Bridge Total Numbers of Broken Bars, Pier-1= 1 14 Pier-2 Pile-4 16 3 18.75 12 192 1.56 Narrow Bridge Total Numbers of Broken Bars, Pier-2= 3 15 Pier-3 Pile-1 16 4 25.00 Narrow Bridge 16 Pile-2 2 12.50 17 Pile-3 3 18.75 12 192 5.21 Wide Bridge18 Pile-4 1 6.25 Total Numbers of Broken Bars, Pier-3= 10 19 Pier-4 Pile-1 16 1 6.25 12 192 0.52 Narrow Bridge Total Numbers of Broken Bars, Pier-4= 1  Total no of Bars for the Bridge - 1596 nos  Total no of Bars Broken for the Bridge - 55 nos  % of Broken Bars for the Bridge - 3.45 %  No of Pile for bars Broken - 19 nos PIER
  • 13. Sl. No Structure Name Total Piles per Structure Total Bars per Structure Numbers of Bar Broken % of Broken Bars Rmks 1. Aboutment-1 18 414 9 2.17 2. Aboutment-2 18 414 31 7.49 3. Pire-1 12 192 1 0.52 4. Pire-2 12 192 3 1.56 5. Pire-3 12 192 10 5.21 6. Pire-4 12 192 1 0.52 Total 84 1596 55 3.45 STATISTICS OF BROKEN BARS
  • 14. EXPLANATION OF CONTRACTOR Likely Reason for Breaking of Re-bar About 1.0 m long segment of pile head was broken by removing skin concrete from the pile re-bar above the cut-off level and further about 50 mm thick concrete was taken out inside the core of every individual re-bar at 100 mm above the cut-off level. Electric drill was used for breaking the concrete.
  • 15. Likely Reason for Breaking of Re-bar Single piece of concrete (approx 4.0 ton) was taken out from the pile head by Crane. During the process of removal of the broken concrete from pile head, few main 32 mm diameter re-bar were broken at cut-off level due to lateral pressure which may be called Cold Shear Cut of bar. EXPLANATION OF CONTRACTOR
  • 16. Contractor’s Proposal to Prevent Breaking of Re-Bar in Future Previously minimum 1.0 m length of pile head used to be broken by removing skin concrete from the pile above the cut-off level. In future pile head shall be broken 300 mm above the cut-off level by removing skin first and then 50 mm thick concrete will be broken out from inside the core of the pile. Thus the core concrete will get free which will be broken by electric drill. EXPLANATION OF CONTRACTOR
  • 17. Contractor’s Proposal to Prevent Breaking of Re-Bar in Future Then the single piece of concrete will be taken out from the pile head. Removal of rest 300 mm will be done by using chisel upto the cut-off level with care. EXPLANATION OF CONTRACTOR
  • 18. 1. Extension of broken re-bar will be done by mechanical splicing system (DEXTRA’s Unitec co-axial) consisting of a sleeve that is fitted with one longitudinal row of redial bolts through its wall thickness and 2 longitudinal saddles insides its inner cavity. 2. Existing broken re-bar will be exposed by removing the concrete around the broken re-bar upto 150 mm depth over which the coupler of the splicing system is inserted until contact with centre pin. CONTRACTOR’S PROPOSED RETROFICATION SYSTEM
  • 19. 3. The end of the other reinforcing bar is inserted into the sleeve until contact with a centre pin. 4. The bolts are first hand-tightened with an L-wrench for pre-locking, and then tightened with a pneumatic ¾’’ power drive until the heads of the screws shear off. 5. In addition re-bars of same diameter (32 mm) to be anchored chemically with a 40 mm dia hole, at depth of 350 mm @ 150 mm spacing as technically specified in the manual of Simpson ET-HP Epoxy. CONTRACTOR’S PROPOSED RETROFICATION SYSTEM
  • 20. COMMENTS OF CSC DESIGN CONSULTANT The comments and recommendations of CSC design consultant were as follows:  The damages were caused by heavy and hard impact from pile head concrete mass during removal process.  All other secondary reasons might weaken the re- bars but not adequate for breaking 32 mm dia re- bars.  Replenishment of re-bars by DEXTRA’s Unitec co- axial mechanical splicing is OK.
  • 21.  Retrofitting with 16-32 mm re-bars as inner core is OK both for abutment and pier piles. The depth of insertion shall be 400 mm in place of 350 mm as shown on the drawing for SIMPSON ET22 Epoxy-Tie Adhesive.  After fixing inner core re-bars, 4 numbers of Stiffener Rings shall be provided as inner ring along the 1.0 m extended bars. Spiral of 12 mm bar at 75 mm pitch shall be provided as outer ring around the existing re- bars. COMMENTS OF CSC DESIGN CONSULTANT
  • 22. PICTORIAL VIEW OF PILE HEAD WITH BROKEN BARS AFTER RECTIFICATION
  • 23. PLAN OF THE PILE WITH BROKEN BARS
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.