FAILURE IN SYNTHESIS CONVERTER
Prem Baboo
Sr. Manager (Prod)
National Fertilizers Ltd. India
PREFACE
National Fertilizer Limited operates two number Ammonia plants at Vijaipur
each having installed capacity of 1520 MTPD. Ammonia line-1 plant was
commissioned in 1987 & employs Haldor Topsoe design featuring steam reforming
of Natural gas in Primary reformer, hot potassium carbonate (Benfield) system for
carbon dioxide removal and synthesis loop with operating pressure of 220Kg/cm2.
The plant is running successfully without major breakdowns.
This article describes the failure of second bed outlet pipe in Synthesis
converter, problem associated with catalyst carry over and subsequent repair by
installing Johnson screen in the converter.
CONSTRUCTIONAL DETAILS OF SYNTHESIS CONVERTER
Synthesis Converter, R-1501 supplied by M/s Kobe Steel, Japan contains
Haldor Topsoe patented axial and radial flow catalytic basket of S-200 series has
heat exchanger in first bed. The basket has two beds filled with iron promoted
catalyst. Synthesis gas enters via annular space between inner and intermediate
shell radially into the catalyst bed and leaves the bed radially after reaction through
axially placed perforated center pipe. To prevent high temperature hydrogen attack
& nitriding complete basket and its internals are made up of Austenitic Stainless
steel grade 304 material.
Center pipe of second bed is made out of 22mm thick rolled plate having
approximately 24,000 holes of 9.5 mm diameter on its periphery. Test certificate of
the manufacturer revealed that after fabrication & drilling of holes complete
perforated pipe was solution annealed. Upper & lower ends of center pipe have no
perforations such that the bottom end is welded to catalyst support plate and the
upper end passes through glands connected to tween deck plate top. The perforated
portion of the center plate was covered with two layers of Incoloy wire mesh of size
16 and 18 gauge to prevent escape of catalyst along with outgoing gas. The wire
meshes were clamped to the center pipe with bands & buckles.
EVENTS OF FAILURE
Problem first surfaced in 1993 when level in Ammonia Separator, B1501
started hunting and subsequently its outlet flow decreased. Level in separator is
maintained through outlet control valves 15LV-22 A & B. Both control valves are
meant for parallel operation and have ball type isolation valves at upstream and
downstream.
Fig. – Schematic Diagram of Synthesis loop
On dismantling & inspection of control valves catalyst dust was found in its
cage, which probably resulted in lesser flow through control valves. The cage of the
control valve was of spiral design having 3 mm openings. These were replaced by
concentric type cage with 4mm opening fabricated in local workshop.
It was suspected that catalyst was escaping from converter second bed and
the same was possible only after damage to second bed outlet pipe and its wire
mesh. M/s Haldor Topsoe, designer & OEM of basket, suggested replacing the center
pipe with Johnson Screen.
Regular problem of catalyst carryover was faced every time the plant
stopped and the separator & its level gauge stand pipe required thorough flushing.
Catalyst & its dust used to get accumulated in Let down vessel, B1502 and was
removed regularly during shutdowns. In year 2001 the catalyst was found in
Ammonia Receiver, V1 in Urea plant and two stainless steel pieces belonging to
converter second bed outlet pipe were found inside Synthesis Loop Boiler during
inspection.
PREPARATION & PLANNING
During plant turnaround in May 2002 the job of replacement of second bed
center pipe with Johnson screen in Ammonia Converter was undertaken. Elaborate
arrangements with two number 4500 Nm3/ hr capacity blower, filter and separators
were made for unloading of catalyst from Converter Basket.
REPAIR OF CONVERTER
Dismantling and Catalyst removal:-
Synthesis Converter was depressurized, cooled and purged with nitrogen
and top cover was removed after opening holding bolts with chain blocks. First bed
cover was removed & False-lid was installed
in its place. Outlet header to catalyst
unloading blower was connected to the false-
lid with two number 6” pipe.
Catalyst unloading was carried out in
Nitrogen atmosphere by outside agency M/s
Contract Resources. Blower suction pressure
was maintained at 0.6 ata absolute
throughout catalyst unloading activity to
achieve satisfactory performance of the
system.
After unloading catalyst from first bed
top cover was reassembled and the first bed
was taken out. It was placed vertically on
stools and firmly held with converter
structure. Catalyst of second bed was
unloaded from basket similarly through
manholes of Tween-deck.
Fig. : Second Bed of the Basket
Inspection of First Bed :-
First bed of converter basket was inspected from inside and following
observations were made.
• Wire-mesh of the center pipe was found loose and its clamping bands
were found fallen down.
• One of the thermocouples was found damaged.
• Condition of wire-mesh at outer screen was good.
• No defects were found in weld joints inside the first bed and the
hardness on bottom support plate was in the range of 600 to 650 HV.
Inspection of Second Bed :-
Complete scaffolding was erected inside second bed for thorough inspection
and following observations were made.
• Center pipe was found broken at 150mm from the bottom almost in
complete circumference and its wire mesh was in damaged condition.
• Wire mesh of the second bed inner shell was found slightly damage in
two number bottom segments as plug weld joints with the screen
were found broken at a number of places.
Fig. – Broken Center pipe of second bed
Fig. – Another view of Center pipe
Removal of the old center pipe of second bed :-
Removal of center pipe and assembly of Johnson screen was carried out
as per procedure given below.
• The expansion bellow was removed by grinding off the fillet welds
at cold-shot pipe and Tween-deck.
• Original center hole in the tween deck was increased from 540mm
to 640 mm with the help of plasma machine and the uneven
surface of hole was smoothened by grinding.
• Stuffing box below the tween deck was removed with plasma
cutting.
• Finally when the center pipe was removed with crane cold-shot
pipe also came out with it. Weld joints between brackets of cold-
shot pipe & the bottom portion of center pipe got broken resulting
in removal of cold-shot pipe along with center pipe.
Installation of new center screen in second bed :-
• HTA’s procedure for installation of Johnson screen required
welding of base ring with 30 mm long portion of existing center
pipe. Accordingly, 30mm long pipe piece was left on catalyst
supporting plate and the remaining portion was grinded off.
Fig. : Welding details of Johnson Screen with Catalyst support plate
• Weld joint between left over center pipe piece and second bed
supporting plate was checked by D.P test and found all right.
• Hardness of catalyst supporting plate and tween deck were
checked and found in the range of 700~800 HV and 600~750 HV
respectively. Hard nitride layer on top portion of catalyst
supporting plate and tween deck plate were removed by grinding
to achieve required hardness of 180~200 HV suitable for welding.
• Height of the guide brackets on the cold shot pipe were
maintained as 12 mm and 95 mm on 10” and 12” pipe portions of
cold-shot pipe respectively.
• Cold shot pipe was reinstalled in position and its guide brackets
were welded with remaining portion of center pipe.
• New Johnson screen was received in two parts. Both parts were
welded together maintaining the straightness of the assembly.
• Base ring, supplied along with
Johnson screen, was placed on
the remaining 50mm portion
of center pipe, aligned, leveled
and welded. The base ring
was then welded with catalyst
supporting plate.
• Johnson screen was placed,
leveled and welded with the
base ring.
• To repair broken weld joints of inner shell wire-mesh 5mm thick,
2”x2” size Inconel-600 plates having 10mm center hole were used.
These plates were plug
welded to fix the wire mesh
with in position. Bottom weld
joint of wire-mesh with
catalyst support plate was
found broken at two places
and was repaired by welding
Inconel-600 plates to the shell
such that the wire mesh
remains in pressed condition.
• New stuffing box was installed
and welded on the tween deck.
• The expansion bellow was installed around the cold shot pipe and
inside the new center screen as per modified drawing received
along with Johnson screen. After installation of expansion bellow it
was observed that i) the radial clearance between cold shot pipe
and expansion bellow
shell was 28.4mm
whereas originally it
was only 3.2mm, ii)
the height of
expansion bellow
above tween-deck was
found 338mm against
original dimension of
190mm. It was
apprehended that
expanded bellow
might touch the inlet
scrolls of exchanger in
the first bed bottom during thermal expansion.
• Matter was discussed with M/S Haldor Topsoe and accordingly
radial clearance between cold shot pipe and sleeve of expansion
bellow was reduced from 28.4 mm to 3.2 mm by welding an
additional ring with the sleeve of expansion bellow. In addition
position of expansion bellow was shifted down by 148.0mm to
bring it back to original position and welded with Johnson screen.
• Root run of all weld joint were checked by D.P. test. Filler wire of
AWS Class ERNICR3 was used for welding all Inconel 600 joints
and AWS Class ER308L was used for stainless steel AISI304 weld
joints.
Repair of Bottom cover:-
Bottom cover of converter was opened for inspection and replacement of
glands. Cracks were observed in tapped holes in Inconel overlay portion of the
stuffing box. Radial cracks were starting at the threads and propagating towards the
center of outlet pipe. Holes of 4mm were made at the end of cracks and welding was
carried out.
New studs were installed in place of 8 no. missing studs. Glands were
repacked with new gland packing. All studs and nuts were tack welded to prevent
their loosening during operation.
Catalyst loading & final box-up :-
Catalyst loading was carried out with hoppers and crane. All gaskets and
glands in the basket were replaced and Converter top & bottom covers were
boxed up.
CONCLUSION
Failure of second bed center pipe in Ammonia Converter resulted in carry
over of catalyst in successive downstream equipments & vessels in Synthesis section
even upto Urea plant. Though no problem was faced with respect to reaction
chemistry in Converter, catalyst carryover resulted in frequent problems in
downstream equipments.
Failure of center pipe was attributed to nitriding and subsequent hardening
of stainless steel in high temperature nitrogen atmosphere that exists in Ammonia
Converter. The damage was further aggravated by high temperature hydrogen
attack after initial nitriding of protective layer. Though center pipe was solution
annealed after drilling of holes during manufacturing but it failed after 6 years of
operation. New Johnson screen is made up of Inconel-600 material that has superior
resistance against nitriding. There are incidences of failure of Johnson screen also in
Ammonia Converters but after sufficient strengthening in design by Haldor Topsoe
these are expected to perform well.
Converter basket repair was completed in 25 days and catalysts carry over
successfully arrested thereafter.

More Related Content

What's hot

Energy saving in urea plant by modification in heat exchanger and process
Energy saving in urea plant by modification in heat exchanger and processEnergy saving in urea plant by modification in heat exchanger and process
Energy saving in urea plant by modification in heat exchanger and processPrem Baboo
 
Principles of Pre-reforming Technology
Principles of Pre-reforming TechnologyPrinciples of Pre-reforming Technology
Principles of Pre-reforming TechnologyGerard B. Hawkins
 
Shift Conversion Catalysts - Operating Manual
Shift Conversion Catalysts - Operating ManualShift Conversion Catalysts - Operating Manual
Shift Conversion Catalysts - Operating ManualGerard B. Hawkins
 
Steam Reforming - Catalyst Loading
Steam Reforming - Catalyst LoadingSteam Reforming - Catalyst Loading
Steam Reforming - Catalyst LoadingGerard B. Hawkins
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valvesAmol Dudhate
 
Pre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementPre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementGerard B. Hawkins
 
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)Chemical Engineering Guy
 
Ammonia plant fundamentals
Ammonia plant fundamentalsAmmonia plant fundamentals
Ammonia plant fundamentalsPrem Baboo
 
Theory and Practice of Steam Reforming
Theory and Practice of Steam ReformingTheory and Practice of Steam Reforming
Theory and Practice of Steam ReformingGerard B. Hawkins
 
Steam Reforming - Tube Design
Steam Reforming - Tube DesignSteam Reforming - Tube Design
Steam Reforming - Tube DesignGerard B. Hawkins
 
Steam Reforming - Practical Operations
Steam Reforming - Practical OperationsSteam Reforming - Practical Operations
Steam Reforming - Practical OperationsGerard B. Hawkins
 
Urea product quality
Urea product qualityUrea product quality
Urea product qualityPrem Baboo
 
Flow assurance using AspenHYSYS Hydraulics
Flow assurance using AspenHYSYS HydraulicsFlow assurance using AspenHYSYS Hydraulics
Flow assurance using AspenHYSYS HydraulicsProcess Ecology Inc
 
(HTS) High Temperature Shift Catalyst (VSG-F101) - Comprehensiev Overview
(HTS) High Temperature Shift Catalyst (VSG-F101) - Comprehensiev Overview(HTS) High Temperature Shift Catalyst (VSG-F101) - Comprehensiev Overview
(HTS) High Temperature Shift Catalyst (VSG-F101) - Comprehensiev OverviewGerard B. Hawkins
 
Primary Reforming Flowsheets
Primary Reforming FlowsheetsPrimary Reforming Flowsheets
Primary Reforming FlowsheetsGerard B. Hawkins
 

What's hot (20)

GBH Enterprises Overview
GBH Enterprises OverviewGBH Enterprises Overview
GBH Enterprises Overview
 
Energy saving in urea plant by modification in heat exchanger and process
Energy saving in urea plant by modification in heat exchanger and processEnergy saving in urea plant by modification in heat exchanger and process
Energy saving in urea plant by modification in heat exchanger and process
 
Principles of Pre-reforming Technology
Principles of Pre-reforming TechnologyPrinciples of Pre-reforming Technology
Principles of Pre-reforming Technology
 
Shift Conversion Catalysts - Operating Manual
Shift Conversion Catalysts - Operating ManualShift Conversion Catalysts - Operating Manual
Shift Conversion Catalysts - Operating Manual
 
Ammonia converter
Ammonia converterAmmonia converter
Ammonia converter
 
Catalyst unloading details
Catalyst unloading detailsCatalyst unloading details
Catalyst unloading details
 
Steam Reforming - Catalyst Loading
Steam Reforming - Catalyst LoadingSteam Reforming - Catalyst Loading
Steam Reforming - Catalyst Loading
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
Introduction of Fired heaters
Introduction of Fired heatersIntroduction of Fired heaters
Introduction of Fired heaters
 
Pre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementPre-reformer Operations Technical Supplement
Pre-reformer Operations Technical Supplement
 
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
 
Ammonia plant fundamentals
Ammonia plant fundamentalsAmmonia plant fundamentals
Ammonia plant fundamentals
 
Theory and Practice of Steam Reforming
Theory and Practice of Steam ReformingTheory and Practice of Steam Reforming
Theory and Practice of Steam Reforming
 
Steam Reforming - Tube Design
Steam Reforming - Tube DesignSteam Reforming - Tube Design
Steam Reforming - Tube Design
 
Steam Reforming - Practical Operations
Steam Reforming - Practical OperationsSteam Reforming - Practical Operations
Steam Reforming - Practical Operations
 
Urea product quality
Urea product qualityUrea product quality
Urea product quality
 
Flow assurance using AspenHYSYS Hydraulics
Flow assurance using AspenHYSYS HydraulicsFlow assurance using AspenHYSYS Hydraulics
Flow assurance using AspenHYSYS Hydraulics
 
(HTS) High Temperature Shift Catalyst (VSG-F101) - Comprehensiev Overview
(HTS) High Temperature Shift Catalyst (VSG-F101) - Comprehensiev Overview(HTS) High Temperature Shift Catalyst (VSG-F101) - Comprehensiev Overview
(HTS) High Temperature Shift Catalyst (VSG-F101) - Comprehensiev Overview
 
FR MULTIPLE EFFECT EVAPORATION
FR MULTIPLE EFFECT EVAPORATIONFR MULTIPLE EFFECT EVAPORATION
FR MULTIPLE EFFECT EVAPORATION
 
Primary Reforming Flowsheets
Primary Reforming FlowsheetsPrimary Reforming Flowsheets
Primary Reforming Flowsheets
 

Similar to Failure in synthesis converter

PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARABHISHEK SINGH
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptssuserea7ebc
 
Est group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishEst group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishJim Novak (吉因龙)
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expandingUjwal Joshi
 
Critical observations during a shut down audit of a pf boiler final
Critical observations during a shut down audit of a pf boiler  finalCritical observations during a shut down audit of a pf boiler  final
Critical observations during a shut down audit of a pf boiler finalparthi2006
 
Pipe Extrusion Line
Pipe Extrusion LinePipe Extrusion Line
Pipe Extrusion LineWali Khan
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
BIMETALLIC STRIPPER&PRE-CONC.
BIMETALLIC STRIPPER&PRE-CONC.BIMETALLIC STRIPPER&PRE-CONC.
BIMETALLIC STRIPPER&PRE-CONC.vipul srivastava
 
Inspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdfInspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdfTusharNayak32
 
Inspection of heat exchanger during manufacturing
Inspection of heat exchanger  during manufacturingInspection of heat exchanger  during manufacturing
Inspection of heat exchanger during manufacturingKhurramYousaf7
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyMEL3360
 
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.Rais Uddin
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Ashutosh Sachan
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training ProgramArul Balan
 
S966 magnesium anode
S966 magnesium anodeS966 magnesium anode
S966 magnesium anodeHedi Mohamed
 
Machine Catalouge
Machine Catalouge Machine Catalouge
Machine Catalouge angelochintu
 

Similar to Failure in synthesis converter (20)

PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWAR
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
Est group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishEst group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 english
 
GNFC problems.pdf
GNFC problems.pdfGNFC problems.pdf
GNFC problems.pdf
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expanding
 
Critical observations during a shut down audit of a pf boiler final
Critical observations during a shut down audit of a pf boiler  finalCritical observations during a shut down audit of a pf boiler  final
Critical observations during a shut down audit of a pf boiler final
 
Pipe Extrusion Line
Pipe Extrusion LinePipe Extrusion Line
Pipe Extrusion Line
 
Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
BIMETALLIC STRIPPER&PRE-CONC.
BIMETALLIC STRIPPER&PRE-CONC.BIMETALLIC STRIPPER&PRE-CONC.
BIMETALLIC STRIPPER&PRE-CONC.
 
2004 0930 Ca
2004 0930 Ca2004 0930 Ca
2004 0930 Ca
 
Thermoplastic Liners
Thermoplastic LinersThermoplastic Liners
Thermoplastic Liners
 
Inspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdfInspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdf
 
Inspection of heat exchanger during manufacturing
Inspection of heat exchanger  during manufacturingInspection of heat exchanger  during manufacturing
Inspection of heat exchanger during manufacturing
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
 
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training Program
 
S966 magnesium anode
S966 magnesium anodeS966 magnesium anode
S966 magnesium anode
 
Machine Catalouge
Machine Catalouge Machine Catalouge
Machine Catalouge
 

More from Prem Baboo

The explosion hazard in urea process (1)
The explosion hazard in urea process (1)The explosion hazard in urea process (1)
The explosion hazard in urea process (1)Prem Baboo
 
Urea process flow diagram
Urea process flow diagramUrea process flow diagram
Urea process flow diagramPrem Baboo
 
Materialtechnologyforfertilizersindustries
MaterialtechnologyforfertilizersindustriesMaterialtechnologyforfertilizersindustries
MaterialtechnologyforfertilizersindustriesPrem Baboo
 
Neemcoatedureaaphilosophyforenvironment
NeemcoatedureaaphilosophyforenvironmentNeemcoatedureaaphilosophyforenvironment
NeemcoatedureaaphilosophyforenvironmentPrem Baboo
 
Nano ureathephilosophyoffuture
Nano ureathephilosophyoffutureNano ureathephilosophyoffuture
Nano ureathephilosophyoffuturePrem Baboo
 
Installation of s 50 in ammonia plants
Installation of s 50 in ammonia plantsInstallation of s 50 in ammonia plants
Installation of s 50 in ammonia plantsPrem Baboo
 
Super conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency traysSuper conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency traysPrem Baboo
 
Ammonia plant material balance
Ammonia plant material balanceAmmonia plant material balance
Ammonia plant material balancePrem Baboo
 
Sswi april may-2021_lowres
Sswi april may-2021_lowresSswi april may-2021_lowres
Sswi april may-2021_lowresPrem Baboo
 
Sweet and sour experience of commissioning 1
Sweet and sour experience of commissioning 1Sweet and sour experience of commissioning 1
Sweet and sour experience of commissioning 1Prem Baboo
 
How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...Prem Baboo
 
Experience of material in fertilizers industries
Experience of material in fertilizers industriesExperience of material in fertilizers industries
Experience of material in fertilizers industriesPrem Baboo
 
Fertilizers technology book
Fertilizers technology bookFertilizers technology book
Fertilizers technology bookPrem Baboo
 
High pressure vessel_leakage_in_urea_plants (1)
High pressure vessel_leakage_in_urea_plants (1)High pressure vessel_leakage_in_urea_plants (1)
High pressure vessel_leakage_in_urea_plants (1)Prem Baboo
 
High pressure vessel leakage in urea plants
High pressure vessel leakage in urea plantsHigh pressure vessel leakage in urea plants
High pressure vessel leakage in urea plantsPrem Baboo
 
P & i diagram and tagging philosphy for
P & i diagram and tagging philosphy forP & i diagram and tagging philosphy for
P & i diagram and tagging philosphy forPrem Baboo
 
Ureaplantenergysavingbyselectionoflinermaterialandinernals
UreaplantenergysavingbyselectionoflinermaterialandinernalsUreaplantenergysavingbyselectionoflinermaterialandinernals
UreaplantenergysavingbyselectionoflinermaterialandinernalsPrem Baboo
 
5000 tpd urea mega plants design
5000 tpd urea  mega plants design5000 tpd urea  mega plants design
5000 tpd urea mega plants designPrem Baboo
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practicesPrem Baboo
 

More from Prem Baboo (20)

The explosion hazard in urea process (1)
The explosion hazard in urea process (1)The explosion hazard in urea process (1)
The explosion hazard in urea process (1)
 
Urea process flow diagram
Urea process flow diagramUrea process flow diagram
Urea process flow diagram
 
Materialtechnologyforfertilizersindustries
MaterialtechnologyforfertilizersindustriesMaterialtechnologyforfertilizersindustries
Materialtechnologyforfertilizersindustries
 
Neemcoatedureaaphilosophyforenvironment
NeemcoatedureaaphilosophyforenvironmentNeemcoatedureaaphilosophyforenvironment
Neemcoatedureaaphilosophyforenvironment
 
Nano ureathephilosophyoffuture
Nano ureathephilosophyoffutureNano ureathephilosophyoffuture
Nano ureathephilosophyoffuture
 
Installation of s 50 in ammonia plants
Installation of s 50 in ammonia plantsInstallation of s 50 in ammonia plants
Installation of s 50 in ammonia plants
 
Super conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency traysSuper conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency trays
 
Ammonia plant material balance
Ammonia plant material balanceAmmonia plant material balance
Ammonia plant material balance
 
Sswi april may-2021_lowres
Sswi april may-2021_lowresSswi april may-2021_lowres
Sswi april may-2021_lowres
 
Sweet and sour experience of commissioning 1
Sweet and sour experience of commissioning 1Sweet and sour experience of commissioning 1
Sweet and sour experience of commissioning 1
 
How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...
 
Experience of material in fertilizers industries
Experience of material in fertilizers industriesExperience of material in fertilizers industries
Experience of material in fertilizers industries
 
Fertilizers technology book
Fertilizers technology bookFertilizers technology book
Fertilizers technology book
 
High pressure vessel_leakage_in_urea_plants (1)
High pressure vessel_leakage_in_urea_plants (1)High pressure vessel_leakage_in_urea_plants (1)
High pressure vessel_leakage_in_urea_plants (1)
 
High pressure vessel leakage in urea plants
High pressure vessel leakage in urea plantsHigh pressure vessel leakage in urea plants
High pressure vessel leakage in urea plants
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
P & i diagram and tagging philosphy for
P & i diagram and tagging philosphy forP & i diagram and tagging philosphy for
P & i diagram and tagging philosphy for
 
Ureaplantenergysavingbyselectionoflinermaterialandinernals
UreaplantenergysavingbyselectionoflinermaterialandinernalsUreaplantenergysavingbyselectionoflinermaterialandinernals
Ureaplantenergysavingbyselectionoflinermaterialandinernals
 
5000 tpd urea mega plants design
5000 tpd urea  mega plants design5000 tpd urea  mega plants design
5000 tpd urea mega plants design
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 

Failure in synthesis converter

  • 1. FAILURE IN SYNTHESIS CONVERTER Prem Baboo Sr. Manager (Prod) National Fertilizers Ltd. India PREFACE National Fertilizer Limited operates two number Ammonia plants at Vijaipur each having installed capacity of 1520 MTPD. Ammonia line-1 plant was commissioned in 1987 & employs Haldor Topsoe design featuring steam reforming of Natural gas in Primary reformer, hot potassium carbonate (Benfield) system for carbon dioxide removal and synthesis loop with operating pressure of 220Kg/cm2. The plant is running successfully without major breakdowns. This article describes the failure of second bed outlet pipe in Synthesis converter, problem associated with catalyst carry over and subsequent repair by installing Johnson screen in the converter. CONSTRUCTIONAL DETAILS OF SYNTHESIS CONVERTER Synthesis Converter, R-1501 supplied by M/s Kobe Steel, Japan contains Haldor Topsoe patented axial and radial flow catalytic basket of S-200 series has heat exchanger in first bed. The basket has two beds filled with iron promoted catalyst. Synthesis gas enters via annular space between inner and intermediate shell radially into the catalyst bed and leaves the bed radially after reaction through axially placed perforated center pipe. To prevent high temperature hydrogen attack & nitriding complete basket and its internals are made up of Austenitic Stainless steel grade 304 material. Center pipe of second bed is made out of 22mm thick rolled plate having approximately 24,000 holes of 9.5 mm diameter on its periphery. Test certificate of the manufacturer revealed that after fabrication & drilling of holes complete perforated pipe was solution annealed. Upper & lower ends of center pipe have no perforations such that the bottom end is welded to catalyst support plate and the upper end passes through glands connected to tween deck plate top. The perforated portion of the center plate was covered with two layers of Incoloy wire mesh of size 16 and 18 gauge to prevent escape of catalyst along with outgoing gas. The wire meshes were clamped to the center pipe with bands & buckles.
  • 2. EVENTS OF FAILURE Problem first surfaced in 1993 when level in Ammonia Separator, B1501 started hunting and subsequently its outlet flow decreased. Level in separator is maintained through outlet control valves 15LV-22 A & B. Both control valves are meant for parallel operation and have ball type isolation valves at upstream and downstream. Fig. – Schematic Diagram of Synthesis loop On dismantling & inspection of control valves catalyst dust was found in its cage, which probably resulted in lesser flow through control valves. The cage of the control valve was of spiral design having 3 mm openings. These were replaced by concentric type cage with 4mm opening fabricated in local workshop. It was suspected that catalyst was escaping from converter second bed and the same was possible only after damage to second bed outlet pipe and its wire mesh. M/s Haldor Topsoe, designer & OEM of basket, suggested replacing the center pipe with Johnson Screen.
  • 3. Regular problem of catalyst carryover was faced every time the plant stopped and the separator & its level gauge stand pipe required thorough flushing. Catalyst & its dust used to get accumulated in Let down vessel, B1502 and was removed regularly during shutdowns. In year 2001 the catalyst was found in Ammonia Receiver, V1 in Urea plant and two stainless steel pieces belonging to converter second bed outlet pipe were found inside Synthesis Loop Boiler during inspection. PREPARATION & PLANNING During plant turnaround in May 2002 the job of replacement of second bed center pipe with Johnson screen in Ammonia Converter was undertaken. Elaborate arrangements with two number 4500 Nm3/ hr capacity blower, filter and separators were made for unloading of catalyst from Converter Basket. REPAIR OF CONVERTER Dismantling and Catalyst removal:- Synthesis Converter was depressurized, cooled and purged with nitrogen and top cover was removed after opening holding bolts with chain blocks. First bed cover was removed & False-lid was installed in its place. Outlet header to catalyst unloading blower was connected to the false- lid with two number 6” pipe. Catalyst unloading was carried out in Nitrogen atmosphere by outside agency M/s Contract Resources. Blower suction pressure was maintained at 0.6 ata absolute throughout catalyst unloading activity to achieve satisfactory performance of the system. After unloading catalyst from first bed top cover was reassembled and the first bed was taken out. It was placed vertically on stools and firmly held with converter structure. Catalyst of second bed was unloaded from basket similarly through manholes of Tween-deck.
  • 4. Fig. : Second Bed of the Basket Inspection of First Bed :- First bed of converter basket was inspected from inside and following observations were made. • Wire-mesh of the center pipe was found loose and its clamping bands were found fallen down. • One of the thermocouples was found damaged. • Condition of wire-mesh at outer screen was good. • No defects were found in weld joints inside the first bed and the hardness on bottom support plate was in the range of 600 to 650 HV. Inspection of Second Bed :- Complete scaffolding was erected inside second bed for thorough inspection and following observations were made. • Center pipe was found broken at 150mm from the bottom almost in complete circumference and its wire mesh was in damaged condition. • Wire mesh of the second bed inner shell was found slightly damage in two number bottom segments as plug weld joints with the screen were found broken at a number of places.
  • 5. Fig. – Broken Center pipe of second bed Fig. – Another view of Center pipe Removal of the old center pipe of second bed :- Removal of center pipe and assembly of Johnson screen was carried out as per procedure given below. • The expansion bellow was removed by grinding off the fillet welds at cold-shot pipe and Tween-deck. • Original center hole in the tween deck was increased from 540mm to 640 mm with the help of plasma machine and the uneven surface of hole was smoothened by grinding. • Stuffing box below the tween deck was removed with plasma cutting. • Finally when the center pipe was removed with crane cold-shot pipe also came out with it. Weld joints between brackets of cold- shot pipe & the bottom portion of center pipe got broken resulting in removal of cold-shot pipe along with center pipe.
  • 6. Installation of new center screen in second bed :- • HTA’s procedure for installation of Johnson screen required welding of base ring with 30 mm long portion of existing center pipe. Accordingly, 30mm long pipe piece was left on catalyst supporting plate and the remaining portion was grinded off. Fig. : Welding details of Johnson Screen with Catalyst support plate • Weld joint between left over center pipe piece and second bed supporting plate was checked by D.P test and found all right. • Hardness of catalyst supporting plate and tween deck were checked and found in the range of 700~800 HV and 600~750 HV respectively. Hard nitride layer on top portion of catalyst supporting plate and tween deck plate were removed by grinding to achieve required hardness of 180~200 HV suitable for welding. • Height of the guide brackets on the cold shot pipe were maintained as 12 mm and 95 mm on 10” and 12” pipe portions of cold-shot pipe respectively.
  • 7. • Cold shot pipe was reinstalled in position and its guide brackets were welded with remaining portion of center pipe. • New Johnson screen was received in two parts. Both parts were welded together maintaining the straightness of the assembly. • Base ring, supplied along with Johnson screen, was placed on the remaining 50mm portion of center pipe, aligned, leveled and welded. The base ring was then welded with catalyst supporting plate. • Johnson screen was placed, leveled and welded with the base ring. • To repair broken weld joints of inner shell wire-mesh 5mm thick, 2”x2” size Inconel-600 plates having 10mm center hole were used. These plates were plug welded to fix the wire mesh with in position. Bottom weld joint of wire-mesh with catalyst support plate was found broken at two places and was repaired by welding Inconel-600 plates to the shell such that the wire mesh remains in pressed condition. • New stuffing box was installed
  • 8. and welded on the tween deck. • The expansion bellow was installed around the cold shot pipe and inside the new center screen as per modified drawing received along with Johnson screen. After installation of expansion bellow it was observed that i) the radial clearance between cold shot pipe and expansion bellow shell was 28.4mm whereas originally it was only 3.2mm, ii) the height of expansion bellow above tween-deck was found 338mm against original dimension of 190mm. It was apprehended that expanded bellow might touch the inlet scrolls of exchanger in the first bed bottom during thermal expansion. • Matter was discussed with M/S Haldor Topsoe and accordingly radial clearance between cold shot pipe and sleeve of expansion bellow was reduced from 28.4 mm to 3.2 mm by welding an additional ring with the sleeve of expansion bellow. In addition position of expansion bellow was shifted down by 148.0mm to bring it back to original position and welded with Johnson screen. • Root run of all weld joint were checked by D.P. test. Filler wire of AWS Class ERNICR3 was used for welding all Inconel 600 joints and AWS Class ER308L was used for stainless steel AISI304 weld joints. Repair of Bottom cover:- Bottom cover of converter was opened for inspection and replacement of glands. Cracks were observed in tapped holes in Inconel overlay portion of the stuffing box. Radial cracks were starting at the threads and propagating towards the center of outlet pipe. Holes of 4mm were made at the end of cracks and welding was carried out.
  • 9. New studs were installed in place of 8 no. missing studs. Glands were repacked with new gland packing. All studs and nuts were tack welded to prevent their loosening during operation. Catalyst loading & final box-up :- Catalyst loading was carried out with hoppers and crane. All gaskets and glands in the basket were replaced and Converter top & bottom covers were boxed up. CONCLUSION Failure of second bed center pipe in Ammonia Converter resulted in carry over of catalyst in successive downstream equipments & vessels in Synthesis section even upto Urea plant. Though no problem was faced with respect to reaction chemistry in Converter, catalyst carryover resulted in frequent problems in downstream equipments. Failure of center pipe was attributed to nitriding and subsequent hardening of stainless steel in high temperature nitrogen atmosphere that exists in Ammonia Converter. The damage was further aggravated by high temperature hydrogen attack after initial nitriding of protective layer. Though center pipe was solution annealed after drilling of holes during manufacturing but it failed after 6 years of
  • 10. operation. New Johnson screen is made up of Inconel-600 material that has superior resistance against nitriding. There are incidences of failure of Johnson screen also in Ammonia Converters but after sufficient strengthening in design by Haldor Topsoe these are expected to perform well. Converter basket repair was completed in 25 days and catalysts carry over successfully arrested thereafter.