SECTION S966 - MAGNESIUM ANODE
S966-1 DESCRIPTION
Work consists of installing prepackaged magnesium anodes, to cathodically protect a portion of new or
existing cast or ductile iron water main, service or hydrant branch pipe and new ductile iron fittings and
copper water services on new or existing PVC, PVCO and HDPE water main pipe, as required in the
Contract Documents and as directed by the Project Manager.
Work is to be in conformance with the requirements of Section S900 General Water Provisions.
S966-2 MATERIALS
S966-2.01 Magnesium Anode
Anodes shall be high potential magnesium anode ingots with packaged backfill. Anode ingot shall meet or
exceed ASTM B843, GRADE M1C for high-potential magnesium anodes, with the following chemical
composition:
ELEMENT PERCENT BY WEIGHT
Aluminum 0.01 maximum
Manganese 0.5 – 1.3
Zinc 0.05 maximum
Copper 0.02 maximum
Silicon 0.05 maximum
Iron 0.03 maximum
Nickel 0.001 maximum
Other metallic elements 0.05 maximum or 0.3 total
Magnesium Remainder
Laboratory tests of magnesium anodes shall be conducted by a third party, in accordance to ASTM G97
(Laboratory Evaluation of Magnesium Anode Test Specimens for Underground Application) requirements.
Test results shall demonstrate a minimum open circuit potential of -1.70 volts with respect to a saturated
Calomel electrode (-1.774 volts with respect to a copper/copper sulfate electrode) and a minimum current
efficiency of 50% or 500 amp-hours per pound.
Anode shall come furnished with minimum 10 feet of coiled #12 AWG solid copper lead wire with TW,
THHN or THWN insulation, firmly attached to the galvanized steel core of the anode. The core cavity shall
be filled with electrical sealing compound to assure a fully insulated and protected connection.
Magnesium anode and backfill shall be pre-packaged into a single unit in a permeable cloth bag.
Each magnesium anode shall meet or exceed the nominal bare weight as shown in the following table
(length, height and width dimensions and packaged weights may vary slightly by manufacturer):
Length Width Height
Bare
Weight
Packaged
Weight
8 inch 3-1/2 inch 3-3/4 inch 5 pound 17 pound
13-3/4 inch 3-1/2 inch 3-3/4 inch 9 pound 24 pound
25-1/4 inch 3-1/2 inch 3-3/4 inch 17 pound 45 pound
19-7/8 inch 5-1/2 inch 5-3/4 inch 32 pound 70 pound
30-1/4 inch 5-1/2 inch 5-3/4 inch 48 pound 96 pound
S966 –2 of 4
S966-2.02 Backfill Packaging
Each anode shall be packaged in a permeable cloth bag containing backfill having the following
composition, in percent by weight:
! 75 percent Hydrated Gypsum
! 20 percent Bentonite
! 5 percent Sodium Sulfate
S966-2.03 Thermite Weld Equipment
Connection of anode lead wire to cast iron or ductile iron pipe or fittings shall be made by the thermite
weld method. Thermite weld materials shall consist of wire sleeves, weld mold and weld cartridges
according to the weld manufacturer’s recommendations for the specific wire and pipe sizes and materials.
Weld materials from different manufacturers shall not be interchanged. Weld molds shall be graphite
molds. Ceramic "one -shot" molds will not be acceptable.
S966-3 CONSTRUCTION DETAILS
S966-3.01 General
Spacing and size of magnesium anodes will be as specified in Contract Documents. Each anode shall be
placed in a horizontal position parallel with the pipe, with centerline axis of the anode at least 6 inches
below the bottom of the water pipe. The centerline axis of the anode shall also be placed at least 2 feet
from the exterior wall of the water pipe. Care shall be taken to ensure that the cloth bag is not damaged
and no backfill lost during installation. Each anode shall be centered in the cloth bag. It may be
necessary to re-center the anode in the cloth bag by rolling it on the ground prior to installation. Each
prepackaged anode shall be lowered into the trench using a sling or rope. The anode shall not be
lowered, transported, handled or lifted by the lead wire. The anode lead wire shall be long enough to
reach from the pipe to the anode without a splice. The anode lead wire shall be attached to the pipe
using the thermite weld process.
Anodes that are installed at cathodic protection test stations are not to be directly connected to the water
pipe or fitting. When the anode lead wire is not long enough to reach the test station terminal board with
sufficient slack, the lead wire may be lengthened by splicing on an additional length of lead wire. Splice
shall be made using an approved splice connector suitable for buried applications.
To connect anode lead wire to ductile iron pipes that are encased in a polyethylene tube, the Contractor
shall first cut back the polyethylene tubing to expose the pipe. The Contractor shall make an “X” shaped
cut in the polyethylene and temporarily fold back the polyethylene at the point where the anode lead wire
will be connected to the pipe.
Using a mechanical grinder, remove the minimum area of coating from pipe or fitting surface required for
placement of weld mold, creating a bright, shiny surface. Prepare the anode lead wire and pipe surface
for thermite welding by assuring that they are dry. Wire and pipe surface shall be free of dirt, grease and
other foreign products. Remove insulation at end to be welded in a manner that will avoid damage to
wire. Install adapter sleeves for anode lead wire as recommended by thermite weld manufacturer prior to
welding. Hold wire at an approximate 30 degree angle to pipe surface when welding.
When weld has cooled, remove weld slag and test weld for strength by striking a sharp blow to the weld
with a hammer while pulling firmly on the wire. Re-weld unsound welds and retest weld. Thoroughly
clean mold and mold covers after completion of each weld to remove all excess slag. After soundness of
weld has been verified, thoroughly clean with a stiff wire brush and brush with an approved bitumastic
coating over entire weld area. Lift wire away from pipe and apply bitumastic coating completely around
and underneath the wire. Push wire back down on the pipe. Apply a protective bitumastic coating where
any original pipe coatings have been disturbed.
S966 –3 of 4
After the anode lead wire is connected to the pipe, the Contractor shall repair the polyethylene tubing
using polyethylene compatible adhesive tape. The polyethylene tubing shall be folded back against the
pipe and the repair tape shall be applied on anode lead wire. The repair tape shall completely cover the
area of the polyethylene tubing that was cut and shall completely cover all exposed ductile iron pipe.
Extra anode lead wire for each anode shall be coiled. The wire shall have sufficient slack to allow for pipe
and anode movement and to protect against undue stress during backfilling. Prior to backfilling the
anode, water shall be applied to the anode to moisten its pre-packed backfill.
The area immediately surrounding the anode shall be backfilled with native soil. Cushion sand shall be
backfilled around the water pipe or fitting so that the sand covers the pipe or fitting to a minimum depth of
12 inches on top, and along both sides of the pipe or fitting. The excavation shall be backfilled in stages
using select granular backfill (water) material free from stone, rocks, roots, organic material, trash or other
debris, and carefully tamped to ensure that no voids exist around the bag and that the bag and wire are
not damaged.
S966-3.02 Anodes on Copper Water Services on PVC, PVCO and HDPE Water Mains
One 5 pound anode shall be connected to new copper water services on PVC, PVCO and HDPE water
mains, For copper services 1 inch diameter and less, anode lead wire shall be attached to thaw wire type
copper tube nut at outlet end of corporation stop. For copper services larger than 1 inch diameter, anode
lead wire is to be attached to copper service using bronze ground clamp.
S966-3.03 Anodes on Existing Ductile and Cast Iron Water Mains
Magnesium anodes shall be installed at every pipe joint or every other pipe joint, as designated in the
Contract Documents or directed by the Project Manager, on existing cast and ductile iron water main pipe
to cathodically protect both pipes on either side of the joint. Two or more anodes will be installed at pipe
joint locations, with one or more anodes connected to each pipe on either side of the joint. Pipe joints
shall be located by the Contractor utilizing field notes from the original pipe installation records. These
notes may be obtained from the Rochester Water Bureau Maps & Records office located at 10 Felix
Street, Rochester, New York 14608. A test pit shall be excavated to verify the location of the first pipe
joint. The Contractor shall layout the location of remaining joints to be excavated using the record field
notes. At each excavated joint, an area shall be excavated that is large enough to expose top and one or
both sides of existing water main pipe and safely install both anodes in one operation. Basic general size
of the area to be excavated will be as noted in Contract Documents and will be dependent on the depth
and location of the water main.
Magnesium anodes are not required to be installed on existing water main fittings or valves encountered
in an excavation, unless otherwise required in the Contract Documents or directed by the Project
Manager.
S966-3.04 Anodes on Existing Ductile and Cast Iron Hydrant Branches and Water Services
Hydrant branches shall be excavated along the branch pipe with the branch gate valve centered in the
trench. One 17 pound anode shall be attached to the branch pipe between the water main and the gate
valve and one 17 pound anode on the branch pipe between the gate valve and the hydrant.
Water services 4 inch diameter and larger shall be excavated along the service pipe with the curb shut off
valve centered in the excavation. One anode shall be connected to the service pipe between the water
main and the curb valve and a second anode shall be connected to the service pipe between the curb
valve and the customer’s property. For services with no curb valve, one anode shall be connected to the
service pipe in the vicinity of the curb. Anode sizes shall be based on the service diameter, with 17 pound
anodes installed on 4 and 6 inch diameter services; 32 pound anodes installed on 8 and 10 inch diameter
services and 48 pound anodes installed on services 12 inch diameter and larger.
S966 –4 of 4
S966-4 METHOD OF MEASUREMENT
The quantity to be measured for payment shall be by the number of prepackaged magnesium anodes
installed. Size of magnesium anode is as described by bare weight.
S966-5 BASIS OF PAYMENT
The unit price bid shall include the cost of: furnishing and installing the prepackaged magnesium anode;
all thermite weld equipment and materials; attaching the anode lead wire to the pipe or fitting; splicing the
lead wire at test stations, bitumastic coating; repairing the polyethylene tubing; locating joints on existing
pipe and furnishing all labor, material and equipment necessary to complete the work.
Excavation, rock excavation, furnishing and placing of bedding and select granular backfill, temporary
pavement, and final paving and surface restoration will be paid for under separate items.
Payment will be made under:
ITEM NO. ITEM PAY UNIT
S966.0305 5 Pound Magnesium Anode Each
S966.0309 9 Pound Magnesium Anode Each
S966.0317 17 Pound Magnesium Anode Each
S966.0332 32 Pound Magnesium Anode Each
S966.0348 48 Pound Magnesium Anode Each
REVISED December 9, 2010

More Related Content

What's hot

Knife Edge Gate Valve
Knife Edge Gate ValveKnife Edge Gate Valve
Knife Edge Gate Valve
KEROMIYONS INTECH PRIVATE LIMITED
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
Elsayed Amer
 
Aircraft hoses
Aircraft hosesAircraft hoses
Aircraft hoses
Yadav Khagendra Kumar
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
Elsayed Amer
 
1600 knife edge gate valve with elect & pneu actuator
1600 knife edge gate valve with elect & pneu actuator1600 knife edge gate valve with elect & pneu actuator
1600 knife edge gate valve with elect & pneu actuator
Chaitannya Mahatme
 
Knife gate valve catalogue
Knife gate valve catalogueKnife gate valve catalogue
Knife gate valve catalogue
Daisy Yang(Skype,Daisyinhiton)
 
MEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPESMEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPES
Crislyn Monterde
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valve
Elsayed Amer
 
VISUAL INSPECTION pt 2
VISUAL INSPECTION   pt 2VISUAL INSPECTION   pt 2
VISUAL INSPECTION pt 2
Mogekwu Chinye
 
Silambarasan
SilambarasanSilambarasan
Dry type RIF(RIP) condenser transformer bushing advantages
Dry type RIF(RIP) condenser transformer bushing advantagesDry type RIF(RIP) condenser transformer bushing advantages
Dry type RIF(RIP) condenser transformer bushing advantages
Shandong Chinsun Electrical Equipment Co.,Ltd.
 
Anmol bhargava casing basics
Anmol bhargava   casing basicsAnmol bhargava   casing basics
Anmol bhargava casing basics
PresidencyUniversity
 
Quadrupled life expectancy for water filters
Quadrupled life expectancy for water filtersQuadrupled life expectancy for water filters
Quadrupled life expectancy for water filters
Rob Cole
 
Analysis of Casing Connections Subjected to Thermal Cycle Loading
Analysis of Casing Connections Subjected to Thermal Cycle LoadingAnalysis of Casing Connections Subjected to Thermal Cycle Loading
Analysis of Casing Connections Subjected to Thermal Cycle Loading
SIMULIA
 
US Bellows 101
US Bellows 101US Bellows 101
Branch connections
Branch connectionsBranch connections
Branch connections
Nazar Abdul Kareem Hussein
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
Elsayed Amer
 
Productbl_GAR alu_Teekay
Productbl_GAR alu_TeekayProductbl_GAR alu_Teekay
Productbl_GAR alu_Teekay
Marieke Lucas (Baarda)
 
Copper tube handbook
Copper tube handbookCopper tube handbook
Copper tube handbook
Khiem Vo Duy
 

What's hot (19)

Knife Edge Gate Valve
Knife Edge Gate ValveKnife Edge Gate Valve
Knife Edge Gate Valve
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
 
Aircraft hoses
Aircraft hosesAircraft hoses
Aircraft hoses
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
1600 knife edge gate valve with elect & pneu actuator
1600 knife edge gate valve with elect & pneu actuator1600 knife edge gate valve with elect & pneu actuator
1600 knife edge gate valve with elect & pneu actuator
 
Knife gate valve catalogue
Knife gate valve catalogueKnife gate valve catalogue
Knife gate valve catalogue
 
MEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPESMEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPES
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valve
 
VISUAL INSPECTION pt 2
VISUAL INSPECTION   pt 2VISUAL INSPECTION   pt 2
VISUAL INSPECTION pt 2
 
Silambarasan
SilambarasanSilambarasan
Silambarasan
 
Dry type RIF(RIP) condenser transformer bushing advantages
Dry type RIF(RIP) condenser transformer bushing advantagesDry type RIF(RIP) condenser transformer bushing advantages
Dry type RIF(RIP) condenser transformer bushing advantages
 
Anmol bhargava casing basics
Anmol bhargava   casing basicsAnmol bhargava   casing basics
Anmol bhargava casing basics
 
Quadrupled life expectancy for water filters
Quadrupled life expectancy for water filtersQuadrupled life expectancy for water filters
Quadrupled life expectancy for water filters
 
Analysis of Casing Connections Subjected to Thermal Cycle Loading
Analysis of Casing Connections Subjected to Thermal Cycle LoadingAnalysis of Casing Connections Subjected to Thermal Cycle Loading
Analysis of Casing Connections Subjected to Thermal Cycle Loading
 
US Bellows 101
US Bellows 101US Bellows 101
US Bellows 101
 
Branch connections
Branch connectionsBranch connections
Branch connections
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Productbl_GAR alu_Teekay
Productbl_GAR alu_TeekayProductbl_GAR alu_Teekay
Productbl_GAR alu_Teekay
 
Copper tube handbook
Copper tube handbookCopper tube handbook
Copper tube handbook
 

Similar to S966 magnesium anode

Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
Khiem Vo Duy
 
Welding of pipelines
Welding of pipelinesWelding of pipelines
Welding of pipelines
kannanrajagopal
 
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptxSPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
AbhiSharma727808
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
ssuserea7ebc
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
Alexander Decker
 
Field welding and cutting ductile iron pipe
Field welding and cutting ductile iron pipeField welding and cutting ductile iron pipe
Field welding and cutting ductile iron pipe
Ludi Lunar
 
Valvespiping 150416183623-conversion-gate01
Valvespiping 150416183623-conversion-gate01Valvespiping 150416183623-conversion-gate01
Valvespiping 150416183623-conversion-gate01
majid asgary
 
Pigging Pipelines.pdf
Pigging Pipelines.pdfPigging Pipelines.pdf
Pigging Pipelines.pdf
Fast name Last name
 
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh RajputPigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Casing
CasingCasing
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
Thorne & Derrick International
 
Steel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industrySteel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industry
Akshay Toraskar
 
Safety for wiring methods
Safety for wiring methodsSafety for wiring methods
Safety for wiring methods
Komarul Fausiyah
 
Dlamini Pipelines Integrity Solutions .pdf
Dlamini Pipelines Integrity Solutions .pdfDlamini Pipelines Integrity Solutions .pdf
Dlamini Pipelines Integrity Solutions .pdf
SkhaloMokati
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converter
Prem Baboo
 
HA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_ValdezHA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_Valdez
PrudenceDaet
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
Southern Railway
 
KNPC Volume 3B.pdf
KNPC Volume 3B.pdfKNPC Volume 3B.pdf
KNPC Volume 3B.pdf
MohamedElAyoutti
 
Platinflex water and solar hoses
Platinflex water and solar hosesPlatinflex water and solar hoses
Platinflex water and solar hoses
PlatinFlex
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expanding
Ujwal Joshi
 

Similar to S966 magnesium anode (20)

Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Welding of pipelines
Welding of pipelinesWelding of pipelines
Welding of pipelines
 
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptxSPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
 
Field welding and cutting ductile iron pipe
Field welding and cutting ductile iron pipeField welding and cutting ductile iron pipe
Field welding and cutting ductile iron pipe
 
Valvespiping 150416183623-conversion-gate01
Valvespiping 150416183623-conversion-gate01Valvespiping 150416183623-conversion-gate01
Valvespiping 150416183623-conversion-gate01
 
Pigging Pipelines.pdf
Pigging Pipelines.pdfPigging Pipelines.pdf
Pigging Pipelines.pdf
 
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh RajputPigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
 
Casing
CasingCasing
Casing
 
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
 
Steel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industrySteel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industry
 
Safety for wiring methods
Safety for wiring methodsSafety for wiring methods
Safety for wiring methods
 
Dlamini Pipelines Integrity Solutions .pdf
Dlamini Pipelines Integrity Solutions .pdfDlamini Pipelines Integrity Solutions .pdf
Dlamini Pipelines Integrity Solutions .pdf
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converter
 
HA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_ValdezHA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_Valdez
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
KNPC Volume 3B.pdf
KNPC Volume 3B.pdfKNPC Volume 3B.pdf
KNPC Volume 3B.pdf
 
Platinflex water and solar hoses
Platinflex water and solar hosesPlatinflex water and solar hoses
Platinflex water and solar hoses
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expanding
 

More from Hedi Mohamed

steel structure optimisation
steel structure optimisationsteel structure optimisation
steel structure optimisation
Hedi Mohamed
 
h2 s-training-slides-english
 h2 s-training-slides-english h2 s-training-slides-english
h2 s-training-slides-english
Hedi Mohamed
 
expose étude sécurité
expose étude sécuritéexpose étude sécurité
expose étude sécurité
Hedi Mohamed
 
Directive de protection incendie
Directive de protection incendieDirective de protection incendie
Directive de protection incendie
Hedi Mohamed
 
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
Hedi Mohamed
 
M 503 cathodic protection
M 503 cathodic protectionM 503 cathodic protection
M 503 cathodic protection
Hedi Mohamed
 
Brochure cp 25 09_20008
Brochure cp 25 09_20008Brochure cp 25 09_20008
Brochure cp 25 09_20008
Hedi Mohamed
 
Design
DesignDesign
Design
Hedi Mohamed
 
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comte
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comtePresentation soc etiquetage_legal_nov_2012_ccir_franche_comte
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comte
Hedi Mohamed
 
Arrêté du 3 octobre 2010..
Arrêté du 3 octobre 2010..Arrêté du 3 octobre 2010..
Arrêté du 3 octobre 2010..
Hedi Mohamed
 
04099
0409904099

More from Hedi Mohamed (13)

steel structure optimisation
steel structure optimisationsteel structure optimisation
steel structure optimisation
 
h2 s-training-slides-english
 h2 s-training-slides-english h2 s-training-slides-english
h2 s-training-slides-english
 
expose étude sécurité
expose étude sécuritéexpose étude sécurité
expose étude sécurité
 
Directive de protection incendie
Directive de protection incendieDirective de protection incendie
Directive de protection incendie
 
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
 
M 503 cathodic protection
M 503 cathodic protectionM 503 cathodic protection
M 503 cathodic protection
 
Brochure cp 25 09_20008
Brochure cp 25 09_20008Brochure cp 25 09_20008
Brochure cp 25 09_20008
 
Design
DesignDesign
Design
 
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comte
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comtePresentation soc etiquetage_legal_nov_2012_ccir_franche_comte
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comte
 
Arrêté du 3 octobre 2010..
Arrêté du 3 octobre 2010..Arrêté du 3 octobre 2010..
Arrêté du 3 octobre 2010..
 
04099
0409904099
04099
 
Bts blanc02 rep
Bts blanc02 repBts blanc02 rep
Bts blanc02 rep
 
Vapeur d'eau
Vapeur d'eauVapeur d'eau
Vapeur d'eau
 

Recently uploaded

Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 

Recently uploaded (20)

Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 

S966 magnesium anode

  • 1. S966 –1 of 4 SECTION S966 - MAGNESIUM ANODE S966-1 DESCRIPTION Work consists of installing prepackaged magnesium anodes, to cathodically protect a portion of new or existing cast or ductile iron water main, service or hydrant branch pipe and new ductile iron fittings and copper water services on new or existing PVC, PVCO and HDPE water main pipe, as required in the Contract Documents and as directed by the Project Manager. Work is to be in conformance with the requirements of Section S900 General Water Provisions. S966-2 MATERIALS S966-2.01 Magnesium Anode Anodes shall be high potential magnesium anode ingots with packaged backfill. Anode ingot shall meet or exceed ASTM B843, GRADE M1C for high-potential magnesium anodes, with the following chemical composition: ELEMENT PERCENT BY WEIGHT Aluminum 0.01 maximum Manganese 0.5 – 1.3 Zinc 0.05 maximum Copper 0.02 maximum Silicon 0.05 maximum Iron 0.03 maximum Nickel 0.001 maximum Other metallic elements 0.05 maximum or 0.3 total Magnesium Remainder Laboratory tests of magnesium anodes shall be conducted by a third party, in accordance to ASTM G97 (Laboratory Evaluation of Magnesium Anode Test Specimens for Underground Application) requirements. Test results shall demonstrate a minimum open circuit potential of -1.70 volts with respect to a saturated Calomel electrode (-1.774 volts with respect to a copper/copper sulfate electrode) and a minimum current efficiency of 50% or 500 amp-hours per pound. Anode shall come furnished with minimum 10 feet of coiled #12 AWG solid copper lead wire with TW, THHN or THWN insulation, firmly attached to the galvanized steel core of the anode. The core cavity shall be filled with electrical sealing compound to assure a fully insulated and protected connection. Magnesium anode and backfill shall be pre-packaged into a single unit in a permeable cloth bag. Each magnesium anode shall meet or exceed the nominal bare weight as shown in the following table (length, height and width dimensions and packaged weights may vary slightly by manufacturer): Length Width Height Bare Weight Packaged Weight 8 inch 3-1/2 inch 3-3/4 inch 5 pound 17 pound 13-3/4 inch 3-1/2 inch 3-3/4 inch 9 pound 24 pound 25-1/4 inch 3-1/2 inch 3-3/4 inch 17 pound 45 pound 19-7/8 inch 5-1/2 inch 5-3/4 inch 32 pound 70 pound 30-1/4 inch 5-1/2 inch 5-3/4 inch 48 pound 96 pound
  • 2. S966 –2 of 4 S966-2.02 Backfill Packaging Each anode shall be packaged in a permeable cloth bag containing backfill having the following composition, in percent by weight: ! 75 percent Hydrated Gypsum ! 20 percent Bentonite ! 5 percent Sodium Sulfate S966-2.03 Thermite Weld Equipment Connection of anode lead wire to cast iron or ductile iron pipe or fittings shall be made by the thermite weld method. Thermite weld materials shall consist of wire sleeves, weld mold and weld cartridges according to the weld manufacturer’s recommendations for the specific wire and pipe sizes and materials. Weld materials from different manufacturers shall not be interchanged. Weld molds shall be graphite molds. Ceramic "one -shot" molds will not be acceptable. S966-3 CONSTRUCTION DETAILS S966-3.01 General Spacing and size of magnesium anodes will be as specified in Contract Documents. Each anode shall be placed in a horizontal position parallel with the pipe, with centerline axis of the anode at least 6 inches below the bottom of the water pipe. The centerline axis of the anode shall also be placed at least 2 feet from the exterior wall of the water pipe. Care shall be taken to ensure that the cloth bag is not damaged and no backfill lost during installation. Each anode shall be centered in the cloth bag. It may be necessary to re-center the anode in the cloth bag by rolling it on the ground prior to installation. Each prepackaged anode shall be lowered into the trench using a sling or rope. The anode shall not be lowered, transported, handled or lifted by the lead wire. The anode lead wire shall be long enough to reach from the pipe to the anode without a splice. The anode lead wire shall be attached to the pipe using the thermite weld process. Anodes that are installed at cathodic protection test stations are not to be directly connected to the water pipe or fitting. When the anode lead wire is not long enough to reach the test station terminal board with sufficient slack, the lead wire may be lengthened by splicing on an additional length of lead wire. Splice shall be made using an approved splice connector suitable for buried applications. To connect anode lead wire to ductile iron pipes that are encased in a polyethylene tube, the Contractor shall first cut back the polyethylene tubing to expose the pipe. The Contractor shall make an “X” shaped cut in the polyethylene and temporarily fold back the polyethylene at the point where the anode lead wire will be connected to the pipe. Using a mechanical grinder, remove the minimum area of coating from pipe or fitting surface required for placement of weld mold, creating a bright, shiny surface. Prepare the anode lead wire and pipe surface for thermite welding by assuring that they are dry. Wire and pipe surface shall be free of dirt, grease and other foreign products. Remove insulation at end to be welded in a manner that will avoid damage to wire. Install adapter sleeves for anode lead wire as recommended by thermite weld manufacturer prior to welding. Hold wire at an approximate 30 degree angle to pipe surface when welding. When weld has cooled, remove weld slag and test weld for strength by striking a sharp blow to the weld with a hammer while pulling firmly on the wire. Re-weld unsound welds and retest weld. Thoroughly clean mold and mold covers after completion of each weld to remove all excess slag. After soundness of weld has been verified, thoroughly clean with a stiff wire brush and brush with an approved bitumastic coating over entire weld area. Lift wire away from pipe and apply bitumastic coating completely around and underneath the wire. Push wire back down on the pipe. Apply a protective bitumastic coating where any original pipe coatings have been disturbed.
  • 3. S966 –3 of 4 After the anode lead wire is connected to the pipe, the Contractor shall repair the polyethylene tubing using polyethylene compatible adhesive tape. The polyethylene tubing shall be folded back against the pipe and the repair tape shall be applied on anode lead wire. The repair tape shall completely cover the area of the polyethylene tubing that was cut and shall completely cover all exposed ductile iron pipe. Extra anode lead wire for each anode shall be coiled. The wire shall have sufficient slack to allow for pipe and anode movement and to protect against undue stress during backfilling. Prior to backfilling the anode, water shall be applied to the anode to moisten its pre-packed backfill. The area immediately surrounding the anode shall be backfilled with native soil. Cushion sand shall be backfilled around the water pipe or fitting so that the sand covers the pipe or fitting to a minimum depth of 12 inches on top, and along both sides of the pipe or fitting. The excavation shall be backfilled in stages using select granular backfill (water) material free from stone, rocks, roots, organic material, trash or other debris, and carefully tamped to ensure that no voids exist around the bag and that the bag and wire are not damaged. S966-3.02 Anodes on Copper Water Services on PVC, PVCO and HDPE Water Mains One 5 pound anode shall be connected to new copper water services on PVC, PVCO and HDPE water mains, For copper services 1 inch diameter and less, anode lead wire shall be attached to thaw wire type copper tube nut at outlet end of corporation stop. For copper services larger than 1 inch diameter, anode lead wire is to be attached to copper service using bronze ground clamp. S966-3.03 Anodes on Existing Ductile and Cast Iron Water Mains Magnesium anodes shall be installed at every pipe joint or every other pipe joint, as designated in the Contract Documents or directed by the Project Manager, on existing cast and ductile iron water main pipe to cathodically protect both pipes on either side of the joint. Two or more anodes will be installed at pipe joint locations, with one or more anodes connected to each pipe on either side of the joint. Pipe joints shall be located by the Contractor utilizing field notes from the original pipe installation records. These notes may be obtained from the Rochester Water Bureau Maps & Records office located at 10 Felix Street, Rochester, New York 14608. A test pit shall be excavated to verify the location of the first pipe joint. The Contractor shall layout the location of remaining joints to be excavated using the record field notes. At each excavated joint, an area shall be excavated that is large enough to expose top and one or both sides of existing water main pipe and safely install both anodes in one operation. Basic general size of the area to be excavated will be as noted in Contract Documents and will be dependent on the depth and location of the water main. Magnesium anodes are not required to be installed on existing water main fittings or valves encountered in an excavation, unless otherwise required in the Contract Documents or directed by the Project Manager. S966-3.04 Anodes on Existing Ductile and Cast Iron Hydrant Branches and Water Services Hydrant branches shall be excavated along the branch pipe with the branch gate valve centered in the trench. One 17 pound anode shall be attached to the branch pipe between the water main and the gate valve and one 17 pound anode on the branch pipe between the gate valve and the hydrant. Water services 4 inch diameter and larger shall be excavated along the service pipe with the curb shut off valve centered in the excavation. One anode shall be connected to the service pipe between the water main and the curb valve and a second anode shall be connected to the service pipe between the curb valve and the customer’s property. For services with no curb valve, one anode shall be connected to the service pipe in the vicinity of the curb. Anode sizes shall be based on the service diameter, with 17 pound anodes installed on 4 and 6 inch diameter services; 32 pound anodes installed on 8 and 10 inch diameter services and 48 pound anodes installed on services 12 inch diameter and larger.
  • 4. S966 –4 of 4 S966-4 METHOD OF MEASUREMENT The quantity to be measured for payment shall be by the number of prepackaged magnesium anodes installed. Size of magnesium anode is as described by bare weight. S966-5 BASIS OF PAYMENT The unit price bid shall include the cost of: furnishing and installing the prepackaged magnesium anode; all thermite weld equipment and materials; attaching the anode lead wire to the pipe or fitting; splicing the lead wire at test stations, bitumastic coating; repairing the polyethylene tubing; locating joints on existing pipe and furnishing all labor, material and equipment necessary to complete the work. Excavation, rock excavation, furnishing and placing of bedding and select granular backfill, temporary pavement, and final paving and surface restoration will be paid for under separate items. Payment will be made under: ITEM NO. ITEM PAY UNIT S966.0305 5 Pound Magnesium Anode Each S966.0309 9 Pound Magnesium Anode Each S966.0317 17 Pound Magnesium Anode Each S966.0332 32 Pound Magnesium Anode Each S966.0348 48 Pound Magnesium Anode Each REVISED December 9, 2010