SlideShare a Scribd company logo
ENGINEERING MANAGEMENT
MS-322
Lec # 10
Program Evaluation & Review Technique
(PERT)
Introduction
A management tool for defining and integrating events; a process which must be
accomplished in time to assure completing project objectives on schedule.
Initially PERT was developed to manage the Polaris missile project. It Helps to
forecast the project completion date or one may use this technique to calculate the
expected time or to handle uncertain activity times for a task.
PERT is a technique that uses Optimistic time (O), Pessimistic time (P) and
Most likely/ Realistic Time (R) estimates to calculate the Expected Time (ET)
or a particular task.
The Optimistic time (to) reflects the maximum possible periods of time for an
activity to be completed OR it is a duration of the activity when everything goes
well. It is assumed that such performance can be improved only in about 1% of
the cases. While the Pessimistic time (tp) is the longest duration expected under
the assumption that every thing goes wrong. There is only 1 % chance that the
activity will extend beyond this value.
Introduction
The Realistic time (R) OR the Most likely time (tm) reflects the Project
manager’s Best Guess of the amount of time required for a task completion.
It is a normal time for the activity which would occur most often if the activity
was to be repeated several times under the same conditions.
The result of analysis are expressed in terms of events. PERT is hence said to be
Event oriented.
PERT Network
 Events must take place in a logical order.
 Activities represent the time and the work it takes to get from one event to
another.
 No event can be considered reached until all activities leading to the event are
completed.
 No activity may be begun until the event preceding it has been reached.
Compute Expected Completion Time (ET)/ Mean Completion Time
The expected Completion time should be closer to the realistic time (r), it is
typically weighed Four times more than the Optimistic time (o) and the
Pessimistic time (p). Once these values are added together , it must be divided by
6 to determine the Expected Time for a task.
ET = O + 4r + p
6
Compute Expected Completion Time (ET)/ Mean Completion Time
The above equation is a weighted average where the Most Likely/ Realistic Time
estimate is weighted 4 times more heavily than the optimistic and pessimistic
estimations.
Example:
A project manager estimate that the most likely time to complete a project is 12
days, where as the optimistic duration is 10 days, and pessimistic duration is 17
days.
ET = O + 4r + p
6
ET = 10 + 4(12) + 17
6
= 12.5 days
Variance (σ ) and Standard Deviation
Variance
In order to measure the degree of uncertainty, need to calculate the variance. The
variance is a descriptive measure of the uncertainty associated with an activity
time distribution.
It is also known as the Estimation of the Probability of Completion Dates.
i.e. a large variance indicates great uncertainty, a small variance indicates a more
accurate estimate. The symbol used to denote variance is σ (sigma) and its value
is compiled as….
Variance (σ ) and Standard Deviation
Standard Deviation
The standard deviation is the square root of the variance given as….
Where N is the quantity of the numbers
μ is the mean
xi is the individual numbers
Steps to calculate the variance
1. First find the mean of given numbers
2. For each number subtract the mean and square the result
3. Go for the average of those squared differences
4. Finally go for SD
Variance (σ ) and Standard Deviation
Example: 1
There is a group of flowers having specific numbers like
9, 2, 5, 4, 12, 7, 8, 11, 9, 3, 7, 4, 12, 5, 4, 10, 9, 6, 9, 4
Find the standard deviation…
Sol:
Step 1: Find the mean.
(9+2+5+4+12+7+8+11+9+3+7+4+12+5+4+10+9+6+9+4) 140
20 20
Step 2: Subtract the mean from each number and square the results
(9 - 7)2 = (2)2 = 4
(2 - 7)2 = (-5)2 = 25 and so on
Step 3: now go for average/ mean of those squared difference values
(4+25+4+9+25+0+1+16+4+16+0+9+25+4+9+9+4+1+4+9) = 178
= = 7
Variance (σ ) and Standard Deviation
Example: 1 Cont…
Now 178 x 1/N or 1/20 = 8.9 Hence the variance has obtained
Step 4: Now go for standard deviation, just take the square root of obtained value
σ = √(8.9) = 2.983
Variance (σ ) and Standard Deviation
Example: 2 In below fig. just consider the height of pets in mm
as 600mm, 470mm, 170mm, 430mm and 300mm
Now find out the Mean, the Variance, and the Standard Deviation.
Variance (σ ) and Standard Deviation
Example: 2 as the mean (average) height is 394 mm as shown in below fig.
Now calculate the each pets difference from the mean
It is obtained as 206, 76, -224, 36 and -94
Variance (σ ) and Standard Deviation
Example: 2
Now for variance take each difference, square it, and then average the result
Now the SD is computed as
Hence the variance has obtained
Variance (σ ) and Standard Deviation
Example: 2
It shows which heights are within one Standard Deviation (147mm) of the Mean
Here the Standard Deviation shows having a "standard" way of knowing what is
normal, and what is extra large or extra small.
Working project example
Activity predecessor Optimistic Most Likely Pessimistic
A -- 4 6 8
B -- 1 4.5 5
C A 3 3 3
D A 4 5 6
E A 0.5 1 1.5
F B, C 3 4 5
G B, C 1 1.5 5
H E, F 5 6 7
I E, F 2 5 8
J D, H 2.5 2.75 4.5
K G, I 3 5 7
Working project example Cont…
• What is the expected time to complete the project..?
• Compute the variance.
• Go for ES, EF and LS, LF time for each activity.
• Determine the critical path and project completion time..?
• If the management has set a completion deadline for 24 days, what is the
probability that they will meet this deadline…?
Working project example Cont…
Sol: 1. The expected time
2. The variance
ET = O + 4r + p
6
Activity ET Variance (σ2)
A 6 4/9
B 4 4/9
C 3 0
D 5 1/9
E 1 1/36
F 4 1/9
G 2 4/9
H 6 1/9
I 5 1
J 3 1/9
K 5 4/9
3. The ES, EF and LS, LF with slack
Activity ES EF LS LF Slack
A 0 6 0 6 0
B 0 4 5 9 5
C 6 9 6 9 0
D 6 11 15 20 9
E 6 7 12 13 6
F 9 13 9 13 0
G 9 11 16 18 7
H 13 19 14 20 1
I 13 18 13 18 0
J 19 22 20 23 1
K 18 23 18 23 0
Working project example Cont…
4. The Critical path and project completion time
5. As the given deadline is 24 days so the variance or the mean completion
time is
2 = 2
A + 2
C + 2
F + 2
I + 2
K
= 4/9 + 0 + 1/9 + 1 + 4/9
= 2
 = 1.414
Hence A – C – F – I – K is a critical path and the project completion
Time will be 6+3+4+5+5 = 23 Days
Working project example Cont…
5. According to the central limit theorem, which indicates that the sum of
independent random variables can be approximately represented by a nor-
mal distribution as the number of random variables becomes larger, the
project completion is approximated by a normal distribution. So it is given
as
Now from Standard Normal Distribution table it is given as
= 0.76115
Thus there is a 76.12% chance that the project will meet its deadline
z
T E T
=

=

=
( )
.
.

24 23
1414
071
The End

More Related Content

What's hot

Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
Naveed Salman
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
El Moro
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
S.Vijaya Bhaskar
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Zulfiquer Ahmed Amin
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
Ajeesh Mk
 
Network Techniques
Network TechniquesNetwork Techniques
Network Techniques
upendar aavula
 
Project networks
Project networksProject networks
Project networks
J. Scott Christianson
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
Asif Sultan Razu
 
Project Management - Critical path method
Project Management - Critical path methodProject Management - Critical path method
Project Management - Critical path method
NR Computer Learning Center
 
crashing of project
crashing of project crashing of project
crashing of project
Mir Zafarullah
 
Pert and CPM
Pert and CPMPert and CPM
Pert and CPM
Sachin Kapoor
 
Critical Path Method(CPM)
Critical Path Method(CPM)Critical Path Method(CPM)
(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...
Dr. Mahmoud Al-Naimi
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
sushantvwaghmare
 
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementCPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource management
Amit Kumbar
 
Pert Analysis
Pert AnalysisPert Analysis
Pert Analysis
Kaizer Dave
 
Monte Carlo and Schedule Risk Analysis
Monte Carlo and Schedule Risk AnalysisMonte Carlo and Schedule Risk Analysis
Monte Carlo and Schedule Risk Analysis
Intaver Insititute
 
Pert & Cpm
Pert & CpmPert & Cpm
Pert & Cpm
Vikram Thadeshvar
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/Slacks
Prasad Thanthratey
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
Mr. Ramesh Nayaka
 

What's hot (20)

Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Network Techniques
Network TechniquesNetwork Techniques
Network Techniques
 
Project networks
Project networksProject networks
Project networks
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 
Project Management - Critical path method
Project Management - Critical path methodProject Management - Critical path method
Project Management - Critical path method
 
crashing of project
crashing of project crashing of project
crashing of project
 
Pert and CPM
Pert and CPMPert and CPM
Pert and CPM
 
Critical Path Method(CPM)
Critical Path Method(CPM)Critical Path Method(CPM)
Critical Path Method(CPM)
 
(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
 
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementCPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource management
 
Pert Analysis
Pert AnalysisPert Analysis
Pert Analysis
 
Monte Carlo and Schedule Risk Analysis
Monte Carlo and Schedule Risk AnalysisMonte Carlo and Schedule Risk Analysis
Monte Carlo and Schedule Risk Analysis
 
Pert & Cpm
Pert & CpmPert & Cpm
Pert & Cpm
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/Slacks
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 

Viewers also liked

Pert Analysis in Projects
Pert Analysis in ProjectsPert Analysis in Projects
Pert Analysis in Projects
Ricardo Viana Vargas
 
Program evaluation review technique (pert)
Program evaluation review technique (pert)Program evaluation review technique (pert)
Program evaluation review technique (pert)
tomeh
 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review Technique
Raymund Sanchez
 
Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)
Abhishek Pachisia
 
Critical path and pert
Critical path and pertCritical path and pert
Critical path and pert
djoufack
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERT
Pulchowk Campus
 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)
Debanjan15
 
Organizational Development Process
Organizational Development  ProcessOrganizational Development  Process
Organizational Development Process
hidayahperlis
 
Pert cpm
Pert cpmPert cpm
Pert cpm
Jyoti Mamtani
 
Organizational Development
Organizational DevelopmentOrganizational Development
Organizational Development
Ashit Jain
 
Tqm power point
Tqm power pointTqm power point
Tqm power point
Karen Morales
 

Viewers also liked (11)

Pert Analysis in Projects
Pert Analysis in ProjectsPert Analysis in Projects
Pert Analysis in Projects
 
Program evaluation review technique (pert)
Program evaluation review technique (pert)Program evaluation review technique (pert)
Program evaluation review technique (pert)
 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review Technique
 
Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)Program Evaluation and Review Technique (PERT)
Program Evaluation and Review Technique (PERT)
 
Critical path and pert
Critical path and pertCritical path and pert
Critical path and pert
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERT
 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)
 
Organizational Development Process
Organizational Development  ProcessOrganizational Development  Process
Organizational Development Process
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Organizational Development
Organizational DevelopmentOrganizational Development
Organizational Development
 
Tqm power point
Tqm power pointTqm power point
Tqm power point
 

Similar to PERT

Pearson1e ch14 appendix_14_1
Pearson1e ch14 appendix_14_1Pearson1e ch14 appendix_14_1
Pearson1e ch14 appendix_14_1
M.D.Giri Reddy
 
Cpm module iii reference
Cpm module iii referenceCpm module iii reference
Cpm module iii reference
ahsanrabbani
 
Ch 06 - CPM PERT (1).pptx
Ch 06 - CPM  PERT (1).pptxCh 06 - CPM  PERT (1).pptx
Ch 06 - CPM PERT (1).pptx
sitinorhafizabintiab1
 
PROJECT-ANALYSIS-TOOL-PPT.pptx
PROJECT-ANALYSIS-TOOL-PPT.pptxPROJECT-ANALYSIS-TOOL-PPT.pptx
PROJECT-ANALYSIS-TOOL-PPT.pptx
PHOEBEANNEARTECHE1
 
Pert cpm
Pert cpmPert cpm
Pert cpm
Ann vasquez
 
Pert cpm
Pert cpmPert cpm
Pert cpm
Ann vasquez
 
Lec 10 pert estimating techniques
Lec 10 pert estimating techniquesLec 10 pert estimating techniques
Lec 10 pert estimating techniques
SAJID ALI RUK
 
PERT.pptx
PERT.pptxPERT.pptx
PERT.pptx
Snehal Athawale
 
Per tand project crashing
Per tand project crashingPer tand project crashing
Per tand project crashing
Harinadh Karimikonda
 
Pert
PertPert
Cpm pert
Cpm pertCpm pert
Cpm pert
Ashutosh Rai
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
Chandi Mohanty
 
Lecture - Project, Planning and Control.pdf
Lecture - Project, Planning and Control.pdfLecture - Project, Planning and Control.pdf
Lecture - Project, Planning and Control.pdf
lucky141651
 
Introduction to Project Management
Introduction to Project Management Introduction to Project Management
Introduction to Project Management
Joshua Miranda
 
Project management
Project managementProject management
Project management
Arun Kandukuri
 
3 pm3 t_2%20-%20activity%20duration%20estimating
3 pm3 t_2%20-%20activity%20duration%20estimating3 pm3 t_2%20-%20activity%20duration%20estimating
3 pm3 t_2%20-%20activity%20duration%20estimating
harwoodr
 
Quantitative analysis for business decision- Program Evaluation and Review Te...
Quantitative analysis for business decision- Program Evaluation and Review Te...Quantitative analysis for business decision- Program Evaluation and Review Te...
Quantitative analysis for business decision- Program Evaluation and Review Te...
Chandra Shekar Immani
 
Writing for computer science: Fourteen steps to a clearly written technical p...
Writing for computer science: Fourteen steps to a clearly written technical p...Writing for computer science: Fourteen steps to a clearly written technical p...
Writing for computer science: Fourteen steps to a clearly written technical p...
aftab alam
 
Chap003
Chap003Chap003
Chap003
soumya.parhi
 
Project management
Project managementProject management
Project management
Kwesi Kissiedu
 

Similar to PERT (20)

Pearson1e ch14 appendix_14_1
Pearson1e ch14 appendix_14_1Pearson1e ch14 appendix_14_1
Pearson1e ch14 appendix_14_1
 
Cpm module iii reference
Cpm module iii referenceCpm module iii reference
Cpm module iii reference
 
Ch 06 - CPM PERT (1).pptx
Ch 06 - CPM  PERT (1).pptxCh 06 - CPM  PERT (1).pptx
Ch 06 - CPM PERT (1).pptx
 
PROJECT-ANALYSIS-TOOL-PPT.pptx
PROJECT-ANALYSIS-TOOL-PPT.pptxPROJECT-ANALYSIS-TOOL-PPT.pptx
PROJECT-ANALYSIS-TOOL-PPT.pptx
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Lec 10 pert estimating techniques
Lec 10 pert estimating techniquesLec 10 pert estimating techniques
Lec 10 pert estimating techniques
 
PERT.pptx
PERT.pptxPERT.pptx
PERT.pptx
 
Per tand project crashing
Per tand project crashingPer tand project crashing
Per tand project crashing
 
Pert
PertPert
Pert
 
Cpm pert
Cpm pertCpm pert
Cpm pert
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Lecture - Project, Planning and Control.pdf
Lecture - Project, Planning and Control.pdfLecture - Project, Planning and Control.pdf
Lecture - Project, Planning and Control.pdf
 
Introduction to Project Management
Introduction to Project Management Introduction to Project Management
Introduction to Project Management
 
Project management
Project managementProject management
Project management
 
3 pm3 t_2%20-%20activity%20duration%20estimating
3 pm3 t_2%20-%20activity%20duration%20estimating3 pm3 t_2%20-%20activity%20duration%20estimating
3 pm3 t_2%20-%20activity%20duration%20estimating
 
Quantitative analysis for business decision- Program Evaluation and Review Te...
Quantitative analysis for business decision- Program Evaluation and Review Te...Quantitative analysis for business decision- Program Evaluation and Review Te...
Quantitative analysis for business decision- Program Evaluation and Review Te...
 
Writing for computer science: Fourteen steps to a clearly written technical p...
Writing for computer science: Fourteen steps to a clearly written technical p...Writing for computer science: Fourteen steps to a clearly written technical p...
Writing for computer science: Fourteen steps to a clearly written technical p...
 
Chap003
Chap003Chap003
Chap003
 
Project management
Project managementProject management
Project management
 

Recently uploaded

Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
สมใจ จันสุกสี
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
S. Raj Kumar
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
Wahiba Chair Training & Consulting
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
spdendr
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
BoudhayanBhattachari
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
Amin Marwan
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
Chevonnese Chevers Whyte, MBA, B.Sc.
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
imrankhan141184
 

Recently uploaded (20)

Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
 

PERT

  • 1. ENGINEERING MANAGEMENT MS-322 Lec # 10 Program Evaluation & Review Technique (PERT)
  • 2. Introduction A management tool for defining and integrating events; a process which must be accomplished in time to assure completing project objectives on schedule. Initially PERT was developed to manage the Polaris missile project. It Helps to forecast the project completion date or one may use this technique to calculate the expected time or to handle uncertain activity times for a task. PERT is a technique that uses Optimistic time (O), Pessimistic time (P) and Most likely/ Realistic Time (R) estimates to calculate the Expected Time (ET) or a particular task. The Optimistic time (to) reflects the maximum possible periods of time for an activity to be completed OR it is a duration of the activity when everything goes well. It is assumed that such performance can be improved only in about 1% of the cases. While the Pessimistic time (tp) is the longest duration expected under the assumption that every thing goes wrong. There is only 1 % chance that the activity will extend beyond this value.
  • 3. Introduction The Realistic time (R) OR the Most likely time (tm) reflects the Project manager’s Best Guess of the amount of time required for a task completion. It is a normal time for the activity which would occur most often if the activity was to be repeated several times under the same conditions. The result of analysis are expressed in terms of events. PERT is hence said to be Event oriented.
  • 4. PERT Network  Events must take place in a logical order.  Activities represent the time and the work it takes to get from one event to another.  No event can be considered reached until all activities leading to the event are completed.  No activity may be begun until the event preceding it has been reached.
  • 5. Compute Expected Completion Time (ET)/ Mean Completion Time The expected Completion time should be closer to the realistic time (r), it is typically weighed Four times more than the Optimistic time (o) and the Pessimistic time (p). Once these values are added together , it must be divided by 6 to determine the Expected Time for a task. ET = O + 4r + p 6
  • 6. Compute Expected Completion Time (ET)/ Mean Completion Time The above equation is a weighted average where the Most Likely/ Realistic Time estimate is weighted 4 times more heavily than the optimistic and pessimistic estimations. Example: A project manager estimate that the most likely time to complete a project is 12 days, where as the optimistic duration is 10 days, and pessimistic duration is 17 days. ET = O + 4r + p 6 ET = 10 + 4(12) + 17 6 = 12.5 days
  • 7. Variance (σ ) and Standard Deviation Variance In order to measure the degree of uncertainty, need to calculate the variance. The variance is a descriptive measure of the uncertainty associated with an activity time distribution. It is also known as the Estimation of the Probability of Completion Dates. i.e. a large variance indicates great uncertainty, a small variance indicates a more accurate estimate. The symbol used to denote variance is σ (sigma) and its value is compiled as….
  • 8. Variance (σ ) and Standard Deviation Standard Deviation The standard deviation is the square root of the variance given as…. Where N is the quantity of the numbers μ is the mean xi is the individual numbers Steps to calculate the variance 1. First find the mean of given numbers 2. For each number subtract the mean and square the result 3. Go for the average of those squared differences 4. Finally go for SD
  • 9. Variance (σ ) and Standard Deviation Example: 1 There is a group of flowers having specific numbers like 9, 2, 5, 4, 12, 7, 8, 11, 9, 3, 7, 4, 12, 5, 4, 10, 9, 6, 9, 4 Find the standard deviation… Sol: Step 1: Find the mean. (9+2+5+4+12+7+8+11+9+3+7+4+12+5+4+10+9+6+9+4) 140 20 20 Step 2: Subtract the mean from each number and square the results (9 - 7)2 = (2)2 = 4 (2 - 7)2 = (-5)2 = 25 and so on Step 3: now go for average/ mean of those squared difference values (4+25+4+9+25+0+1+16+4+16+0+9+25+4+9+9+4+1+4+9) = 178 = = 7
  • 10. Variance (σ ) and Standard Deviation Example: 1 Cont… Now 178 x 1/N or 1/20 = 8.9 Hence the variance has obtained Step 4: Now go for standard deviation, just take the square root of obtained value σ = √(8.9) = 2.983
  • 11. Variance (σ ) and Standard Deviation Example: 2 In below fig. just consider the height of pets in mm as 600mm, 470mm, 170mm, 430mm and 300mm Now find out the Mean, the Variance, and the Standard Deviation.
  • 12. Variance (σ ) and Standard Deviation Example: 2 as the mean (average) height is 394 mm as shown in below fig. Now calculate the each pets difference from the mean It is obtained as 206, 76, -224, 36 and -94
  • 13. Variance (σ ) and Standard Deviation Example: 2 Now for variance take each difference, square it, and then average the result Now the SD is computed as Hence the variance has obtained
  • 14. Variance (σ ) and Standard Deviation Example: 2 It shows which heights are within one Standard Deviation (147mm) of the Mean Here the Standard Deviation shows having a "standard" way of knowing what is normal, and what is extra large or extra small.
  • 15. Working project example Activity predecessor Optimistic Most Likely Pessimistic A -- 4 6 8 B -- 1 4.5 5 C A 3 3 3 D A 4 5 6 E A 0.5 1 1.5 F B, C 3 4 5 G B, C 1 1.5 5 H E, F 5 6 7 I E, F 2 5 8 J D, H 2.5 2.75 4.5 K G, I 3 5 7
  • 16. Working project example Cont… • What is the expected time to complete the project..? • Compute the variance. • Go for ES, EF and LS, LF time for each activity. • Determine the critical path and project completion time..? • If the management has set a completion deadline for 24 days, what is the probability that they will meet this deadline…?
  • 17. Working project example Cont… Sol: 1. The expected time 2. The variance ET = O + 4r + p 6 Activity ET Variance (σ2) A 6 4/9 B 4 4/9 C 3 0 D 5 1/9 E 1 1/36 F 4 1/9 G 2 4/9 H 6 1/9 I 5 1 J 3 1/9 K 5 4/9 3. The ES, EF and LS, LF with slack Activity ES EF LS LF Slack A 0 6 0 6 0 B 0 4 5 9 5 C 6 9 6 9 0 D 6 11 15 20 9 E 6 7 12 13 6 F 9 13 9 13 0 G 9 11 16 18 7 H 13 19 14 20 1 I 13 18 13 18 0 J 19 22 20 23 1 K 18 23 18 23 0
  • 18. Working project example Cont… 4. The Critical path and project completion time 5. As the given deadline is 24 days so the variance or the mean completion time is 2 = 2 A + 2 C + 2 F + 2 I + 2 K = 4/9 + 0 + 1/9 + 1 + 4/9 = 2  = 1.414 Hence A – C – F – I – K is a critical path and the project completion Time will be 6+3+4+5+5 = 23 Days
  • 19. Working project example Cont… 5. According to the central limit theorem, which indicates that the sum of independent random variables can be approximately represented by a nor- mal distribution as the number of random variables becomes larger, the project completion is approximated by a normal distribution. So it is given as Now from Standard Normal Distribution table it is given as = 0.76115 Thus there is a 76.12% chance that the project will meet its deadline z T E T =  =  = ( ) . .  24 23 1414 071