QUICK CHANGE OVER
PROCESS_LEAN DEPT
PT. GREENTEX INDONESIA
UTAMA
ONTARGET
CHANGEOVER/LAYOUT PROGRESS
2012
2013
ONTARGET
CHANGEOVER LOSS SCHEME 2012
ONTARGET
Potential Changeover Loss 2012
• Huge Potential Loss From 1st Ouput
– Average first output GREENTEX = 3.44 Hours
– Average Changeover per Line = 1.3 Times
– Average Output GREENTEX per Hours = 105 pcs
– Total Line = 16 Line
– Average CM 2012 = $ 1.56
– Loss pcs because NO OUTPUT for 3.44 Hours (3.44 Hours x 105 pcs)
= 361 pcs
– Total Loss per year from 1st output :
• = 361 pcs x 1.3 times C/O x 16 Line x 12 Months x $ 1.56
• = $ 140,565x Rp 12,000
•= Rp 1,686,780,000
Potential Changeover Loss 2012
• Huge Potential Loss from Ramp Up (Average Ramp Up = 79.8 hrs = 10 Days)
 TOTAL PRODUCTION 1 DAY = 105 pcs X 8Hrs = 840 pcs
 Production rate 1st day 25% from normal target = 210 pcs ~ Loss Pcs 1st day = 840-210 = 630
 Production rate 2nd day 35% from normal target = 294 pcs ~ Loss Pcs 2nd day = 840-294 = 546
 Production rate 3rd day 45% from normal target = 378pcs ~ Loss Pcs 3rd day = 840-378 = 462
 Production rate 4th day 55% from normal target = 462pcs ~ Loss Pcs 4th day = 840-462 = 378
 Production rate 5th day 60% from normal target = 504 pcs ~ Loss Pcs 5th day = 840-504 = 336
 Production rate 6th day 65% from normal target = 546 pcs ~ Loss Pcs 6th day = 840-546 = 294
 Production rate 7th day 75% from normal target = 630 pcs ~ Loss Pcs 7th day = 840-630 = 210
 Production rate 8th day 85% from normal target = 714 pcs ~ Loss Pcs 8th day = 840-714 = 126
 Production rate 9th day 90% from normal target = 756 pcs ~ Loss Pcs 9th day = 840-756 = 84
 Total Loss pcs for Ramp Up = 630+546+462+378+336+294+210+126+84 = 3,066 pcs
 Total Loss per year from Ramp Up :
• = 1680 pcs x 1.3 times C/O x 16Line x 12Months x $ 1.56
• = $ 654,152 x Rp 12,000
• = Rp 7,849,824,000
POTENTIAL LOSS BECAUSE OF
CHANGEOVER/ LAYOUT =
1. 1ST OUTPUT = Rp 3,493,324,800
2. RAMP UP = Rp 29,669,068,800
3. TOTAL = Rp 33,162,393,600
ONTARGET
CHANGEOVER LOSS SCHEME 2013
ONTARGET
Potential Changeover Loss 2013
• Huge Potential Loss From 1st Ouput
– Average first output GREENTEX = 1.1 Hours
– Average Changeover per Line = 2 Times
– Average Output GREENTEX per Hours = 120 pcs
– Total Line = 16 Line
– Average CM 2013 = $ 2.55
– Loss pcs because NO OUTPUT for 1.1 Hours (1.1 Hours x 120 pcs)
= 132 pcs
– Total Loss per year from 1st output :
• = 132 pcs x 2times C/O x 16 Line x 12 Months x $ 2.55
• = $ 129,254 x Rp 12,000
•= Rp. 1,551,052,800
Potential Changeover Loss 2013
• Huge Potential Loss from Ramp Up (Average Ramp Up = 34.6 hrs = 4.4 Days)
 TOTAL PRODUCTION 1 DAY = 120 pcs X 8Hrs = 960 pcs
 Production rate 1st day 35% from normal target = 336 pcs ~ Loss Pcs 1st day = 960-336 = 624
 Production rate 2nd day 55% from normal target = 528 pcs ~ Loss Pcs 2nd day = 960-528 = 432
 Production rate 3rd day 75% from normal target = 720pcs ~ Loss Pcs 3rd day = 960-720 = 240
 Production rate 4th day 90% from normal target = 864 pcs ~ Loss Pcs 4th day = 960-864 = 96
 Total Loss pcs for Ramp Up = 624+432+240+96 = 1,392 pcs
 Total Loss per year from Ramp Up :
• = 1392 pcs x 2times C/O x 16Line x 12Months x $ 2,55
• = $ 1,363,046 x Rp 12,000
• = Rp 16,356,552,000
POTENTIAL LOSS BECAUSE OF
CHANGEOVER/ LAYOUT =
1. 1ST OUTPUT = Rp 1,551,052,800
2. RAMP UP = Rp 16,356,552,000
3. TOTAL = Rp 17,907,604,800
ONTARGET
TEAMLEADER
(MR.CSRYU/FACTMGR)
MS.LEE
(SEWING MGR)
IDA/SYARIF/TONI/KOMAR
(SEWING CHIEF)
SEWING SPV
ACHMAD
(CUTTING CHIEF)
TAMI
(LOADING SPV)
RIRIS
(QC CHIEF)
BUDI
(MECHANIC SPV)
NETI/YATI
(FCA)
SEWING ADM
Teach & lead sewing process w. high
difficulties together w/ Chief
1. Make layout
2. Teach & lead sewing process
1. Meeting w/ all operator on new style
2. Operator plan position
3. Calculate machine requirement based on layout
4. 1st output ,meeting
1. Reject replacement on cutting panel, reject mati
2. Prepare real fabric for machine setting
1. Update changeover board
2. Prepare complete material to load to sewing
1. Make sure inline QC/QA standby during changeover
2. Make sure inline make mock up on critical process
3. Held 1st output meeting
1. Prepare machine based on layout
2. All machine have can be used directly
3. Instruct mechanic helper & mechanic standby during layout
1. Set critical to quality point
1. Prepare loading accs & thread
2. Supply panel for 1st process
3. Collecting unused thread & accs
1. Inform changeover
schedule to TAMI,
SEWING CHIEF,
MECHANIC
2. Held meeting
before layout
3. Evaluate QCO
procedure
effectiveness
FACTORY
MGR
Preparing
layout
SEWING
CHIEF
Update
changeover
visual board
& ACCS
LOADING
SPV & ACCS
Preparing
complete
panel/set
CUTTING
CHIEF
Complete all
reject
replacement
Preparing real
fabric to
mechanic
MECHANIC
SPV
Prepare
machine need
based on
layout
Machine
setting before
layout
SEWING
SPV
Prepare
operators
planning
Finished all
reject
garment
Meeting w/
all operators
INLINE
QC/QA/FCA
Standby in
sewing line
during
changeover
Make sure every
process OK
before go to
next process
Teach & lead
sewing
process
SEWING
MGR
Standby during
changeover for
machine
arrangement
First Output
Meeting &
Comment
Mock up for
critical point
based on FCA &
1st output
FCA
Evaluate
CHANGEOVER/LAYOUT
PERFORMANCE :
1. CHANGEOVER TIME
2. 1ST OUTPUT
3. RAMP UP
Inform
changeover
schedule &
MEETING
BEFORE
LAYOUT
Quick Changeover Activities
Focus On
Preparation
Quick Changeover Form
Line Balancing & Layout
QCO Checklist
QC File
First Output Comment
Changeover Record Form
QCO/LAYOUT TARGET
• CHANGEOVER TIME =
– REPEAT STYLE = 2 HRS
– NEW STYLE = 3 HRS
• FIRST OUTPUT
– REPEAT STYLE = 30 MIN
– NEW STYLE = 1 HRS
• RAMP UP
– REPEAT STYLE = 30 HRS
– NEW STYLE = 60 HRS
ONTARGET
CHANGEOVER TARGET 2014
ONTARGET
• Huge Potential Loss From 1st Ouput
– Average first output GREENTEX = 45 Minute = 0.75 Hours
– Average Changeover per Line = 2 Times
– Average Output GREENTEX per Hours = 120 pcs
– Total Line = 16 Line
– Average CM 2013 = $ 2.55
– Loss pcs because NO OUTPUT for 0.5 Hours (0.75 Hours x 120 pcs)
= 90 pcs
– Total Loss per year from 1st output :
• = 90 pcs x 2times C/O x 16 Line x 12 Months x $ 2.55
• = $ 88,128 x Rp 12,000
•= Rp 1,057,536,000
Target Potential Changeover Loss 2014
Target Potential Changeover Loss 2014
• Huge Potential Loss from Ramp Up (Average Ramp Up = 30 hrs = 3.75 Days)
 TOTAL PRODUCTION 1 DAY = 120 pcs X 8Hrs = 960 pcs
 Production rate 1st day 45% from normal target = 432 pcs ~ Loss Pcs 1st day = 960-432 = 528
 Production rate 2nd day 75% from normal target = 720 pcs ~ Loss Pcs 2nd day = 960-720 = 240
 Production rate 3rd day 90% from normal target = 864 pcs ~ Loss Pcs 3rd day = 960-864 = 96
 Total Loss pcs for Ramp Up = 528+240+96 = 864 pcs
 Total Loss per year from Ramp Up :
• = 864 pcs x 2times C/O x 16Line x 12Months x $ 2,55
• = $ 846,029 x Rp 12,000
• = Rp 10,152,345,600
TARGET POTENTIAL LOSS BECAUSE
OF CHANGEOVER/ LAYOUT 2014 =
1. 1ST OUTPUT = Rp 1,057,536,000
2. RAMP UP = Rp 10,152,345,600
3. TOTAL = Rp 11,209,881,600
ONTARGET
ONTARGET
PROCESS PIC VISUAL
Update visual changeover
board
LOADING SPV,
because she is
the one who
know actual
sewing
schedule
Update changeover
information (style, date
and layout) IN MECHANIC
LAYOUT PLAN
MECHANIC ADM
Update changover
information (style, date, &
trimcard/accessories
status) in ACCESSORIES
ROOM to prepare all
accessories need
ACCESSORIES
ADM
Update CHANGEOVER
TARGET (CHANGEOVER
TIME, 1ST OUTPUT and
RAMP UP) in sewing line as
REMINDER
SEWING CHIEF
Trimcard Label Drawcord Logo Piping
Neck
tape
2 24-Feb
5 25-Feb
6 26-Feb
OK
NOT OK
Sewing Line
Accessories Status
Layout date
STYLE
CHANGEOVER
TIME
FIRST
OUTPUT
RAMP UP
REPEAT 2HOURS 30MIN 30HOURS ~3.75DAYS
CHANGEOVER TARGET

More Related Content

What's hot

Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
Tanuj Kujur
 
IE working procedure
IE working procedureIE working procedure
IE working procedure
Safayet Dishan
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
Frank-G. Adler
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
Mizan Rahman
 
How calculate Man to Machine Ratio in Garments Industries
How calculate Man to Machine Ratio in Garments IndustriesHow calculate Man to Machine Ratio in Garments Industries
How calculate Man to Machine Ratio in Garments Industries
Mozahidul Islam
 
Lean management in textile processing
Lean management in textile processingLean management in textile processing
Lean management in textile processing
IEI GSC
 
Work study
Work studyWork study
Work study
Saifur Rahman
 
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
K.K.T Madhusanka
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
Alan Wei Teck
 
Introduction to SAM
Introduction to SAMIntroduction to SAM
Introduction to SAM
jamshaidAslam1
 
Line balancing
Line balancing Line balancing
Line balancing
Md. Mazadul Hasan Shishir
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by Lean
ANITHA BALA
 
LEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYLEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRY
JAGADISH REDDY KP
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industry
Azmir Latif Beg
 
Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
Pradeep Poornishankar
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
avijit biswas
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
Julian Kalac P.Eng
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
Khairul Bashar
 
How to reduce changeover loss
How to reduce changeover lossHow to reduce changeover loss
How to reduce changeover loss
Winning Minds Solutions
 
T-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant LayoutT-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant Layout
Abhishek Raj
 

What's hot (20)

Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
 
IE working procedure
IE working procedureIE working procedure
IE working procedure
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
 
How calculate Man to Machine Ratio in Garments Industries
How calculate Man to Machine Ratio in Garments IndustriesHow calculate Man to Machine Ratio in Garments Industries
How calculate Man to Machine Ratio in Garments Industries
 
Lean management in textile processing
Lean management in textile processingLean management in textile processing
Lean management in textile processing
 
Work study
Work studyWork study
Work study
 
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Introduction to SAM
Introduction to SAMIntroduction to SAM
Introduction to SAM
 
Line balancing
Line balancing Line balancing
Line balancing
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by Lean
 
LEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYLEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRY
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industry
 
Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
How to reduce changeover loss
How to reduce changeover lossHow to reduce changeover loss
How to reduce changeover loss
 
T-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant LayoutT-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant Layout
 

Similar to New qco project greentex

Operation management problems
Operation management problemsOperation management problems
Operation management problems
venkataramanan Thiru
 
Cost accounting (Hypothetical problems of labor costing and solution of these...
Cost accounting (Hypothetical problems of labor costing and solution of these...Cost accounting (Hypothetical problems of labor costing and solution of these...
Cost accounting (Hypothetical problems of labor costing and solution of these...
Md. Shamim Ahmed
 
Industrial Engineering Training
Industrial Engineering TrainingIndustrial Engineering Training
Industrial Engineering Training
babu947412
 
Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planning
nickoleaaronlinog
 
Log11 uitwerking opdrachten
Log11 uitwerking opdrachtenLog11 uitwerking opdrachten
Log11 uitwerking opdrachten
Arthur van der Molen
 
Practice topic 9 - answers (1)
Practice   topic 9 - answers (1)Practice   topic 9 - answers (1)
Practice topic 9 - answers (1)
IrfanKhan679364
 
Operation bulletin of dungaree
Operation bulletin of dungareeOperation bulletin of dungaree
Operation bulletin of dungaree
ShamimaAkter41
 
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Eylül Ceren Altın
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Inventory management
Inventory managementInventory management
Inventory management
APOORVNIGAM2
 
Design improvements and costing analysis
Design improvements and costing analysisDesign improvements and costing analysis
Design improvements and costing analysis
ASHISH MENKUDALE
 
Ch10 Managerial accounting aiou mba mcom 8508
Ch10 Managerial accounting aiou mba mcom 8508Ch10 Managerial accounting aiou mba mcom 8508
Ch10 Managerial accounting aiou mba mcom 8508
Ali Imran Awan MBA (IT)
 
Supply chain - project
Supply chain - projectSupply chain - project
Supply chain - project
szrehman
 
OR_L03.pdf
OR_L03.pdfOR_L03.pdf
OR_L03.pdf
AbdiMuceeTube
 
Act 333
Act 333Act 333
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
Karl Suni Vatnhamar
 
Fold rite furniture v1.7
Fold rite furniture v1.7Fold rite furniture v1.7
Fold rite furniture v1.7
Frisca Listyaningtyas
 
OEE
OEEOEE
Piston ring kuldeep agrawal
Piston ring  kuldeep agrawalPiston ring  kuldeep agrawal
Piston ring kuldeep agrawal
ANIKET KULKARNI
 
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMANDForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
aliyudhi_h
 

Similar to New qco project greentex (20)

Operation management problems
Operation management problemsOperation management problems
Operation management problems
 
Cost accounting (Hypothetical problems of labor costing and solution of these...
Cost accounting (Hypothetical problems of labor costing and solution of these...Cost accounting (Hypothetical problems of labor costing and solution of these...
Cost accounting (Hypothetical problems of labor costing and solution of these...
 
Industrial Engineering Training
Industrial Engineering TrainingIndustrial Engineering Training
Industrial Engineering Training
 
Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planning
 
Log11 uitwerking opdrachten
Log11 uitwerking opdrachtenLog11 uitwerking opdrachten
Log11 uitwerking opdrachten
 
Practice topic 9 - answers (1)
Practice   topic 9 - answers (1)Practice   topic 9 - answers (1)
Practice topic 9 - answers (1)
 
Operation bulletin of dungaree
Operation bulletin of dungareeOperation bulletin of dungaree
Operation bulletin of dungaree
 
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Inventory management
Inventory managementInventory management
Inventory management
 
Design improvements and costing analysis
Design improvements and costing analysisDesign improvements and costing analysis
Design improvements and costing analysis
 
Ch10 Managerial accounting aiou mba mcom 8508
Ch10 Managerial accounting aiou mba mcom 8508Ch10 Managerial accounting aiou mba mcom 8508
Ch10 Managerial accounting aiou mba mcom 8508
 
Supply chain - project
Supply chain - projectSupply chain - project
Supply chain - project
 
OR_L03.pdf
OR_L03.pdfOR_L03.pdf
OR_L03.pdf
 
Act 333
Act 333Act 333
Act 333
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Fold rite furniture v1.7
Fold rite furniture v1.7Fold rite furniture v1.7
Fold rite furniture v1.7
 
OEE
OEEOEE
OEE
 
Piston ring kuldeep agrawal
Piston ring  kuldeep agrawalPiston ring  kuldeep agrawal
Piston ring kuldeep agrawal
 
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMANDForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
 

More from Aji Wijaya Kusuma

Kaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptxKaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptx
Aji Wijaya Kusuma
 
16_QCO.pdf
16_QCO.pdf16_QCO.pdf
16_QCO.pdf
Aji Wijaya Kusuma
 
4_5S & Visual Management.pdf
4_5S & Visual Management.pdf4_5S & Visual Management.pdf
4_5S & Visual Management.pdf
Aji Wijaya Kusuma
 
14_PULL SYSTEM.pdf
14_PULL SYSTEM.pdf14_PULL SYSTEM.pdf
14_PULL SYSTEM.pdf
Aji Wijaya Kusuma
 
12_Standar Kerja.pdf
12_Standar Kerja.pdf12_Standar Kerja.pdf
12_Standar Kerja.pdf
Aji Wijaya Kusuma
 
15_One Piece Flow.pdf
15_One Piece Flow.pdf15_One Piece Flow.pdf
15_One Piece Flow.pdf
Aji Wijaya Kusuma
 
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
Aji Wijaya Kusuma
 
2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf
Aji Wijaya Kusuma
 
11_Skill Matrix_Multiskill Development & Training plan.pdf
11_Skill Matrix_Multiskill Development & Training plan.pdf11_Skill Matrix_Multiskill Development & Training plan.pdf
11_Skill Matrix_Multiskill Development & Training plan.pdf
Aji Wijaya Kusuma
 
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
Aji Wijaya Kusuma
 
3_Kaizen & Culture of Empowerment.pdf
3_Kaizen & Culture of Empowerment.pdf3_Kaizen & Culture of Empowerment.pdf
3_Kaizen & Culture of Empowerment.pdf
Aji Wijaya Kusuma
 
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
Aji Wijaya Kusuma
 
7_Problem solving using PDCA thinking (A3 Report).pdf
7_Problem solving using PDCA thinking (A3 Report).pdf7_Problem solving using PDCA thinking (A3 Report).pdf
7_Problem solving using PDCA thinking (A3 Report).pdf
Aji Wijaya Kusuma
 
8_TPM.pdf
8_TPM.pdf8_TPM.pdf
Rft real implementation korean fty
Rft real implementation korean ftyRft real implementation korean fty
Rft real implementation korean fty
Aji Wijaya Kusuma
 
Rft project real implementation
Rft project real implementationRft project real implementation
Rft project real implementation
Aji Wijaya Kusuma
 
RFT Workshop
RFT WorkshopRFT Workshop
RFT Workshop
Aji Wijaya Kusuma
 
Creating speed with 5 s
Creating speed with 5 sCreating speed with 5 s
Creating speed with 5 s
Aji Wijaya Kusuma
 
Greentex indonesia utama lean implementation
Greentex indonesia utama lean implementationGreentex indonesia utama lean implementation
Greentex indonesia utama lean implementation
Aji Wijaya Kusuma
 
BEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADINGBEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADING
Aji Wijaya Kusuma
 

More from Aji Wijaya Kusuma (20)

Kaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptxKaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptx
 
16_QCO.pdf
16_QCO.pdf16_QCO.pdf
16_QCO.pdf
 
4_5S & Visual Management.pdf
4_5S & Visual Management.pdf4_5S & Visual Management.pdf
4_5S & Visual Management.pdf
 
14_PULL SYSTEM.pdf
14_PULL SYSTEM.pdf14_PULL SYSTEM.pdf
14_PULL SYSTEM.pdf
 
12_Standar Kerja.pdf
12_Standar Kerja.pdf12_Standar Kerja.pdf
12_Standar Kerja.pdf
 
15_One Piece Flow.pdf
15_One Piece Flow.pdf15_One Piece Flow.pdf
15_One Piece Flow.pdf
 
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
 
2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf
 
11_Skill Matrix_Multiskill Development & Training plan.pdf
11_Skill Matrix_Multiskill Development & Training plan.pdf11_Skill Matrix_Multiskill Development & Training plan.pdf
11_Skill Matrix_Multiskill Development & Training plan.pdf
 
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
 
3_Kaizen & Culture of Empowerment.pdf
3_Kaizen & Culture of Empowerment.pdf3_Kaizen & Culture of Empowerment.pdf
3_Kaizen & Culture of Empowerment.pdf
 
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
 
7_Problem solving using PDCA thinking (A3 Report).pdf
7_Problem solving using PDCA thinking (A3 Report).pdf7_Problem solving using PDCA thinking (A3 Report).pdf
7_Problem solving using PDCA thinking (A3 Report).pdf
 
8_TPM.pdf
8_TPM.pdf8_TPM.pdf
8_TPM.pdf
 
Rft real implementation korean fty
Rft real implementation korean ftyRft real implementation korean fty
Rft real implementation korean fty
 
Rft project real implementation
Rft project real implementationRft project real implementation
Rft project real implementation
 
RFT Workshop
RFT WorkshopRFT Workshop
RFT Workshop
 
Creating speed with 5 s
Creating speed with 5 sCreating speed with 5 s
Creating speed with 5 s
 
Greentex indonesia utama lean implementation
Greentex indonesia utama lean implementationGreentex indonesia utama lean implementation
Greentex indonesia utama lean implementation
 
BEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADINGBEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADING
 

Recently uploaded

Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 

Recently uploaded (20)

Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 

New qco project greentex

  • 1. QUICK CHANGE OVER PROCESS_LEAN DEPT PT. GREENTEX INDONESIA UTAMA
  • 7. Potential Changeover Loss 2012 • Huge Potential Loss From 1st Ouput – Average first output GREENTEX = 3.44 Hours – Average Changeover per Line = 1.3 Times – Average Output GREENTEX per Hours = 105 pcs – Total Line = 16 Line – Average CM 2012 = $ 1.56 – Loss pcs because NO OUTPUT for 3.44 Hours (3.44 Hours x 105 pcs) = 361 pcs – Total Loss per year from 1st output : • = 361 pcs x 1.3 times C/O x 16 Line x 12 Months x $ 1.56 • = $ 140,565x Rp 12,000 •= Rp 1,686,780,000
  • 8. Potential Changeover Loss 2012 • Huge Potential Loss from Ramp Up (Average Ramp Up = 79.8 hrs = 10 Days)  TOTAL PRODUCTION 1 DAY = 105 pcs X 8Hrs = 840 pcs  Production rate 1st day 25% from normal target = 210 pcs ~ Loss Pcs 1st day = 840-210 = 630  Production rate 2nd day 35% from normal target = 294 pcs ~ Loss Pcs 2nd day = 840-294 = 546  Production rate 3rd day 45% from normal target = 378pcs ~ Loss Pcs 3rd day = 840-378 = 462  Production rate 4th day 55% from normal target = 462pcs ~ Loss Pcs 4th day = 840-462 = 378  Production rate 5th day 60% from normal target = 504 pcs ~ Loss Pcs 5th day = 840-504 = 336  Production rate 6th day 65% from normal target = 546 pcs ~ Loss Pcs 6th day = 840-546 = 294  Production rate 7th day 75% from normal target = 630 pcs ~ Loss Pcs 7th day = 840-630 = 210  Production rate 8th day 85% from normal target = 714 pcs ~ Loss Pcs 8th day = 840-714 = 126  Production rate 9th day 90% from normal target = 756 pcs ~ Loss Pcs 9th day = 840-756 = 84  Total Loss pcs for Ramp Up = 630+546+462+378+336+294+210+126+84 = 3,066 pcs  Total Loss per year from Ramp Up : • = 1680 pcs x 1.3 times C/O x 16Line x 12Months x $ 1.56 • = $ 654,152 x Rp 12,000 • = Rp 7,849,824,000
  • 9. POTENTIAL LOSS BECAUSE OF CHANGEOVER/ LAYOUT = 1. 1ST OUTPUT = Rp 3,493,324,800 2. RAMP UP = Rp 29,669,068,800 3. TOTAL = Rp 33,162,393,600
  • 12. Potential Changeover Loss 2013 • Huge Potential Loss From 1st Ouput – Average first output GREENTEX = 1.1 Hours – Average Changeover per Line = 2 Times – Average Output GREENTEX per Hours = 120 pcs – Total Line = 16 Line – Average CM 2013 = $ 2.55 – Loss pcs because NO OUTPUT for 1.1 Hours (1.1 Hours x 120 pcs) = 132 pcs – Total Loss per year from 1st output : • = 132 pcs x 2times C/O x 16 Line x 12 Months x $ 2.55 • = $ 129,254 x Rp 12,000 •= Rp. 1,551,052,800
  • 13. Potential Changeover Loss 2013 • Huge Potential Loss from Ramp Up (Average Ramp Up = 34.6 hrs = 4.4 Days)  TOTAL PRODUCTION 1 DAY = 120 pcs X 8Hrs = 960 pcs  Production rate 1st day 35% from normal target = 336 pcs ~ Loss Pcs 1st day = 960-336 = 624  Production rate 2nd day 55% from normal target = 528 pcs ~ Loss Pcs 2nd day = 960-528 = 432  Production rate 3rd day 75% from normal target = 720pcs ~ Loss Pcs 3rd day = 960-720 = 240  Production rate 4th day 90% from normal target = 864 pcs ~ Loss Pcs 4th day = 960-864 = 96  Total Loss pcs for Ramp Up = 624+432+240+96 = 1,392 pcs  Total Loss per year from Ramp Up : • = 1392 pcs x 2times C/O x 16Line x 12Months x $ 2,55 • = $ 1,363,046 x Rp 12,000 • = Rp 16,356,552,000
  • 14. POTENTIAL LOSS BECAUSE OF CHANGEOVER/ LAYOUT = 1. 1ST OUTPUT = Rp 1,551,052,800 2. RAMP UP = Rp 16,356,552,000 3. TOTAL = Rp 17,907,604,800
  • 16. TEAMLEADER (MR.CSRYU/FACTMGR) MS.LEE (SEWING MGR) IDA/SYARIF/TONI/KOMAR (SEWING CHIEF) SEWING SPV ACHMAD (CUTTING CHIEF) TAMI (LOADING SPV) RIRIS (QC CHIEF) BUDI (MECHANIC SPV) NETI/YATI (FCA) SEWING ADM Teach & lead sewing process w. high difficulties together w/ Chief 1. Make layout 2. Teach & lead sewing process 1. Meeting w/ all operator on new style 2. Operator plan position 3. Calculate machine requirement based on layout 4. 1st output ,meeting 1. Reject replacement on cutting panel, reject mati 2. Prepare real fabric for machine setting 1. Update changeover board 2. Prepare complete material to load to sewing 1. Make sure inline QC/QA standby during changeover 2. Make sure inline make mock up on critical process 3. Held 1st output meeting 1. Prepare machine based on layout 2. All machine have can be used directly 3. Instruct mechanic helper & mechanic standby during layout 1. Set critical to quality point 1. Prepare loading accs & thread 2. Supply panel for 1st process 3. Collecting unused thread & accs 1. Inform changeover schedule to TAMI, SEWING CHIEF, MECHANIC 2. Held meeting before layout 3. Evaluate QCO procedure effectiveness
  • 17. FACTORY MGR Preparing layout SEWING CHIEF Update changeover visual board & ACCS LOADING SPV & ACCS Preparing complete panel/set CUTTING CHIEF Complete all reject replacement Preparing real fabric to mechanic MECHANIC SPV Prepare machine need based on layout Machine setting before layout SEWING SPV Prepare operators planning Finished all reject garment Meeting w/ all operators INLINE QC/QA/FCA Standby in sewing line during changeover Make sure every process OK before go to next process Teach & lead sewing process SEWING MGR Standby during changeover for machine arrangement First Output Meeting & Comment Mock up for critical point based on FCA & 1st output FCA Evaluate CHANGEOVER/LAYOUT PERFORMANCE : 1. CHANGEOVER TIME 2. 1ST OUTPUT 3. RAMP UP Inform changeover schedule & MEETING BEFORE LAYOUT
  • 19. Quick Changeover Form Line Balancing & Layout QCO Checklist QC File First Output Comment Changeover Record Form
  • 20. QCO/LAYOUT TARGET • CHANGEOVER TIME = – REPEAT STYLE = 2 HRS – NEW STYLE = 3 HRS • FIRST OUTPUT – REPEAT STYLE = 30 MIN – NEW STYLE = 1 HRS • RAMP UP – REPEAT STYLE = 30 HRS – NEW STYLE = 60 HRS
  • 23. • Huge Potential Loss From 1st Ouput – Average first output GREENTEX = 45 Minute = 0.75 Hours – Average Changeover per Line = 2 Times – Average Output GREENTEX per Hours = 120 pcs – Total Line = 16 Line – Average CM 2013 = $ 2.55 – Loss pcs because NO OUTPUT for 0.5 Hours (0.75 Hours x 120 pcs) = 90 pcs – Total Loss per year from 1st output : • = 90 pcs x 2times C/O x 16 Line x 12 Months x $ 2.55 • = $ 88,128 x Rp 12,000 •= Rp 1,057,536,000 Target Potential Changeover Loss 2014
  • 24. Target Potential Changeover Loss 2014 • Huge Potential Loss from Ramp Up (Average Ramp Up = 30 hrs = 3.75 Days)  TOTAL PRODUCTION 1 DAY = 120 pcs X 8Hrs = 960 pcs  Production rate 1st day 45% from normal target = 432 pcs ~ Loss Pcs 1st day = 960-432 = 528  Production rate 2nd day 75% from normal target = 720 pcs ~ Loss Pcs 2nd day = 960-720 = 240  Production rate 3rd day 90% from normal target = 864 pcs ~ Loss Pcs 3rd day = 960-864 = 96  Total Loss pcs for Ramp Up = 528+240+96 = 864 pcs  Total Loss per year from Ramp Up : • = 864 pcs x 2times C/O x 16Line x 12Months x $ 2,55 • = $ 846,029 x Rp 12,000 • = Rp 10,152,345,600
  • 25. TARGET POTENTIAL LOSS BECAUSE OF CHANGEOVER/ LAYOUT 2014 = 1. 1ST OUTPUT = Rp 1,057,536,000 2. RAMP UP = Rp 10,152,345,600 3. TOTAL = Rp 11,209,881,600
  • 27. ONTARGET PROCESS PIC VISUAL Update visual changeover board LOADING SPV, because she is the one who know actual sewing schedule Update changeover information (style, date and layout) IN MECHANIC LAYOUT PLAN MECHANIC ADM Update changover information (style, date, & trimcard/accessories status) in ACCESSORIES ROOM to prepare all accessories need ACCESSORIES ADM Update CHANGEOVER TARGET (CHANGEOVER TIME, 1ST OUTPUT and RAMP UP) in sewing line as REMINDER SEWING CHIEF Trimcard Label Drawcord Logo Piping Neck tape 2 24-Feb 5 25-Feb 6 26-Feb OK NOT OK Sewing Line Accessories Status Layout date STYLE CHANGEOVER TIME FIRST OUTPUT RAMP UP REPEAT 2HOURS 30MIN 30HOURS ~3.75DAYS CHANGEOVER TARGET