SlideShare a Scribd company logo
Ali TURAN
Berkay MANDAL
Ekin YILDIRIM
Eylül Ceren ALTIN
Yüksel YALÇIN
Advisor: Assist. Prof. Dr. Zeynep Doğruöz Gergin
39th Operations Research / Industrial Engineering National Congress
June 12-14, 2019
PERFORMANCE AND EFFICIENCY ANALYSIS WITH VALUE STREAM
MAPPING FOR INCREASING PRODUCTION CAPACITY
CONTENT
Company Information
Motivation & Objectives
Methodology
Implementation & Results
Conclusion & Recommendations
COMPANY INFORMATION
• Öztiryakiler was established in 1958
as one of the first manufacturing
companies of Turkey in
kitchen equipment sector.
• 5 continents, over 100 countries
• 10 group companies with 1300
employees
• 149.500 m² in 5 different production
plants
MOTIVATION OF THE
STUDY
• Improvement needs on the current
efficiency and capacity of
dishwashing machine’s production
line.
• Non-value adding processes in the
system.
• Requirements for identifying the
wastes in production line, in order to
eliminate them.
OBJECTIVES
❑ Analyzing the performance and
efficiency of the production
processes of dishwashers.
❑ Increasing the production capacity.
METHODOLOGY
Observing The Process Steps
Time Studies (Data Collection)
Developing Current State VSM
Analyzing Current Effective Capacity
Discussing İmprovement Scenarios With A Simulation Model
Developing Future State VSM Based On İmprovement Scenarios
IMPLEMENTATION
Assembly 1
19 Work
Elements
Assembly 2
15 Work
Elements
Assembly 3
Operation 1
6 Work
Elements
Assembly 3
Operation 2
9 Work
Elements
Electrical
Components
Assembly
21 Work
Elements
Packaging
16 Work
Elements
TIME STUDY
Figure 1. Production flow
IMPLEMENTATION
TIME STUDY
Figure 2. Current Processes Durations
Table 1. Process Time Study Results
CURRENT STATE VSM
NVA ∑ 28040 sec 0,83 NVA
VA ∑ 5555 sec 0,17 VA
Lead Time 33595 sec
896
324
903 1360
1315440 8250 70 163 4480 4084 116
1021972403
1224860
Assembly 1 Electrical Components
Assembly
Assembly 3Assembly 2 Packaging
I
Scheduler
SupplierSupplier Customer
C/T = 903sec
C/O = 324 sec
1 Shift
C/T = 1360 sec
C/O = 131 sec
1 Shift
C/T = 896 sec
C/O = 122 sec
1 Shift
C/T = 1375 sec
C/O = 233 sec
1 Shift
C/T = 1021 sec
C/O = 116 sec
1 Shift
Operation 1 for
Assembly 3
C/T = 403 sec
C/O = 70 sec
1 Shift
Operation 2 for
Assembly 3
C/T = 972 sec
C/O = 163 sec
1 Shift
PURCHASING SALES & MARKETING
1 2 2 2 1
I I I
I
4 units 6 units 4 units5 units
5 unitsof
dishwashing
machine's
upperpart
Daily
Weekly WeeklyWeekly
WeeklyWeekly
Daily
I
WeeklyMonthly
Weekly
Monthly
Kaizen 1Kaizen 3Kaizen 2
Figure 4. Current State VSM
KAIZEN PROPOSALS
Assembly 3
C/T = 1375 sec
C/O = 233 sec
1 Shift
Operation 1 for
Assembly 3
C/T = 403 sec
C/O = 70 sec
1 Shift
Operation 2 for
Assembly 3
C/T = 972 sec
C/O = 163 sec
1 Shift
2
I I
I
units 5 units
5 unitsof
dishwashing
machine's
upperpart
Kaizen 1
Assembly 1
IC/T = 903sec
C/O = 324 sec
1 Shift
1
4 units
Weekly
Kaizen 2
Assembly 2
I C/T = 1360 sec
C/O = 131 sec
1 Shift
2
I
4 units 6 units
Kaizen 3
SIMULATION MODELING_Current values
Total Work Hours in a Day 24 hours 24x60x60 86400 sec
Total Shift Hours in a Day 8 hours 8x60x60 28800 sec
Total Cycle Time + Total
Changeover Time
6481
Current VSM Bottleneck 1608
Table 2. Production Line Durations (Current VSM)
DESIGN CAPACITY
EFFECTIVE CAPACITY
ARENA SIMULATION MODELLING
ESTIMATIONS OF NEW PROCESS DURATIONS
Process Name Set Up Process Time
Total Process
Time
Rezistans İşaretleme ve Çakma 30.12 93.24 123.36
Process Name Set Up Process Time
Total Process
Time
Rezistans İşaretleme ve Çakma 24.12 93.24 117.36
Table 3. Current Time Study Example
Table 4. Future Time Study Example
Table 5. Production Line Durations (Future VSM)
Total Work Hours in a Day 24 hours 24x60x60 86400 sec
Total Shift Hours in a Day 8 hours 8x60x60 28800 sec
Total Cycle Time + Total
Changeover Time
5944
Current VSM Bottleneck 1343
CURRENT STATE
FUTURE STATE
SIMULATION MODELING_Future values
DESIGN CAPACITY
EFFECTIVE CAPACITY
FUTURE STATE VSM
NVA ∑ 9573 sec 0,65
VA ∑ 5164 sec 0,35
Lead Time 14737 sec
116
1021
122
896
1132 1792 10214848
903
248
1212
163
1132
131
Assembly 1 Electrical Components
Assembly
Assembly 3Assembly 2 Packaging
I
Scheduler
SupplierSupplier
Customer
C/T = 903sec
C/O = 248sec
1 Shift
C/T = 1212 sec
C/O = 131 sec
1 Shift
C/T = 896 sec
C/O = 122 sec
1 Shift
C/T = 1132 sec
C/O = 163 sec
1 Shift
C/T = 1021 sec
C/O = 116 sec
1 Shift
PURCHASING SALES & MARKETING
1 2 2 2 1
4 units
Daily
Weekly WeeklyWeekly
WeeklyWeekly
Daily
I
WeeklyMonthly
Weekly
Monthly
I
1 units
I
2 units
I
1 units
Figure 5. Future State VSM
COMPARATIVE RESULTS
Effective
Capacity
Design
Capacity
Current State
VSM
15 51
Future State
VSM
18 61
Figure 3. Current State Process Durations Figure 4. Future State Process Durations
CONCLUSION & RECOMMENDATIONS
Current CSM Future VSM Change % 
Change over time 926 sec 780 sec 15.80 % 
Total Non value adding times 28,040 sec 9573 sec 65.85 % 
Cycle time (VA) 5555 sec 5164 sec 7.04 % 
Lead time 0.39 days 0.17 days 56.41 % 
VA / Lead time 16.54 % 35.04 % 112 % 
Effective capacity 15 units 18 units 20.00 % 
Design capacity 51 units 61 units 19.61 % 
Table 6. Comparative Results and Improvements
THANK YOU FOR YOUR
ATTENTION!

More Related Content

Similar to Performance and Efficiency Analysis with Value Stream Mapping for Increasing Production Capacity

SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
Parth Patel
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
MohammedLahssaini1
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study Challenge
Nikhil Kejriwal
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
Julian Kalac P.Eng
 
Quality analysis of hmc
Quality analysis of hmcQuality analysis of hmc
Quality analysis of hmc
Abu Bakar Siddique
 
Quality analysis of hmc
Quality analysis of hmcQuality analysis of hmc
Quality analysis of hmc
Abu Bakar Siddique
 
Mechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kilnMechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kiln
mkpq pasha
 
OMP presentation
OMP presentationOMP presentation
OMP presentationbuhle keto
 
Production - Reducing Machine Setup Time - IEM
Production - Reducing Machine Setup Time - IEMProduction - Reducing Machine Setup Time - IEM
Production - Reducing Machine Setup Time - IEMGan Chun Chet
 
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
Shubhangi Gurway
 
Project Reportof Velocity Apparelz Nort Africa
Project Reportof Velocity Apparelz  Nort AfricaProject Reportof Velocity Apparelz  Nort Africa
Project Reportof Velocity Apparelz Nort Africa
Amethia Export (Director- P K Sahab)
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
eSAT Publishing House
 
Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planning
nickoleaaronlinog
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
Naveen K
 
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMANDForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
aliyudhi_h
 

Similar to Performance and Efficiency Analysis with Value Stream Mapping for Increasing Production Capacity (20)

SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study Challenge
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
Quality analysis of hmc
Quality analysis of hmcQuality analysis of hmc
Quality analysis of hmc
 
Quality analysis of hmc
Quality analysis of hmcQuality analysis of hmc
Quality analysis of hmc
 
Mechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kilnMechanical maintenance-of-cement-rotary-kiln
Mechanical maintenance-of-cement-rotary-kiln
 
OMP presentation
OMP presentationOMP presentation
OMP presentation
 
Operation management problems
Operation management problemsOperation management problems
Operation management problems
 
om
omom
om
 
TTP
TTPTTP
TTP
 
SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.
 
Production - Reducing Machine Setup Time - IEM
Production - Reducing Machine Setup Time - IEMProduction - Reducing Machine Setup Time - IEM
Production - Reducing Machine Setup Time - IEM
 
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
 
Project Reportof Velocity Apparelz Nort Africa
Project Reportof Velocity Apparelz  Nort AfricaProject Reportof Velocity Apparelz  Nort Africa
Project Reportof Velocity Apparelz Nort Africa
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 
TPCIL VIVEK
TPCIL VIVEKTPCIL VIVEK
TPCIL VIVEK
 
Product1 [4] capacity planning
Product1 [4]   capacity planningProduct1 [4]   capacity planning
Product1 [4] capacity planning
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMANDForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 

Performance and Efficiency Analysis with Value Stream Mapping for Increasing Production Capacity

  • 1. Ali TURAN Berkay MANDAL Ekin YILDIRIM Eylül Ceren ALTIN Yüksel YALÇIN Advisor: Assist. Prof. Dr. Zeynep Doğruöz Gergin 39th Operations Research / Industrial Engineering National Congress June 12-14, 2019 PERFORMANCE AND EFFICIENCY ANALYSIS WITH VALUE STREAM MAPPING FOR INCREASING PRODUCTION CAPACITY
  • 2. CONTENT Company Information Motivation & Objectives Methodology Implementation & Results Conclusion & Recommendations
  • 3. COMPANY INFORMATION • Öztiryakiler was established in 1958 as one of the first manufacturing companies of Turkey in kitchen equipment sector. • 5 continents, over 100 countries • 10 group companies with 1300 employees • 149.500 m² in 5 different production plants
  • 4. MOTIVATION OF THE STUDY • Improvement needs on the current efficiency and capacity of dishwashing machine’s production line. • Non-value adding processes in the system. • Requirements for identifying the wastes in production line, in order to eliminate them.
  • 5. OBJECTIVES ❑ Analyzing the performance and efficiency of the production processes of dishwashers. ❑ Increasing the production capacity.
  • 6. METHODOLOGY Observing The Process Steps Time Studies (Data Collection) Developing Current State VSM Analyzing Current Effective Capacity Discussing İmprovement Scenarios With A Simulation Model Developing Future State VSM Based On İmprovement Scenarios
  • 7. IMPLEMENTATION Assembly 1 19 Work Elements Assembly 2 15 Work Elements Assembly 3 Operation 1 6 Work Elements Assembly 3 Operation 2 9 Work Elements Electrical Components Assembly 21 Work Elements Packaging 16 Work Elements TIME STUDY Figure 1. Production flow
  • 8. IMPLEMENTATION TIME STUDY Figure 2. Current Processes Durations Table 1. Process Time Study Results
  • 9. CURRENT STATE VSM NVA ∑ 28040 sec 0,83 NVA VA ∑ 5555 sec 0,17 VA Lead Time 33595 sec 896 324 903 1360 1315440 8250 70 163 4480 4084 116 1021972403 1224860 Assembly 1 Electrical Components Assembly Assembly 3Assembly 2 Packaging I Scheduler SupplierSupplier Customer C/T = 903sec C/O = 324 sec 1 Shift C/T = 1360 sec C/O = 131 sec 1 Shift C/T = 896 sec C/O = 122 sec 1 Shift C/T = 1375 sec C/O = 233 sec 1 Shift C/T = 1021 sec C/O = 116 sec 1 Shift Operation 1 for Assembly 3 C/T = 403 sec C/O = 70 sec 1 Shift Operation 2 for Assembly 3 C/T = 972 sec C/O = 163 sec 1 Shift PURCHASING SALES & MARKETING 1 2 2 2 1 I I I I 4 units 6 units 4 units5 units 5 unitsof dishwashing machine's upperpart Daily Weekly WeeklyWeekly WeeklyWeekly Daily I WeeklyMonthly Weekly Monthly Kaizen 1Kaizen 3Kaizen 2 Figure 4. Current State VSM
  • 10. KAIZEN PROPOSALS Assembly 3 C/T = 1375 sec C/O = 233 sec 1 Shift Operation 1 for Assembly 3 C/T = 403 sec C/O = 70 sec 1 Shift Operation 2 for Assembly 3 C/T = 972 sec C/O = 163 sec 1 Shift 2 I I I units 5 units 5 unitsof dishwashing machine's upperpart Kaizen 1 Assembly 1 IC/T = 903sec C/O = 324 sec 1 Shift 1 4 units Weekly Kaizen 2 Assembly 2 I C/T = 1360 sec C/O = 131 sec 1 Shift 2 I 4 units 6 units Kaizen 3
  • 11. SIMULATION MODELING_Current values Total Work Hours in a Day 24 hours 24x60x60 86400 sec Total Shift Hours in a Day 8 hours 8x60x60 28800 sec Total Cycle Time + Total Changeover Time 6481 Current VSM Bottleneck 1608 Table 2. Production Line Durations (Current VSM) DESIGN CAPACITY EFFECTIVE CAPACITY
  • 13. ESTIMATIONS OF NEW PROCESS DURATIONS Process Name Set Up Process Time Total Process Time Rezistans İşaretleme ve Çakma 30.12 93.24 123.36 Process Name Set Up Process Time Total Process Time Rezistans İşaretleme ve Çakma 24.12 93.24 117.36 Table 3. Current Time Study Example Table 4. Future Time Study Example Table 5. Production Line Durations (Future VSM) Total Work Hours in a Day 24 hours 24x60x60 86400 sec Total Shift Hours in a Day 8 hours 8x60x60 28800 sec Total Cycle Time + Total Changeover Time 5944 Current VSM Bottleneck 1343 CURRENT STATE FUTURE STATE
  • 14. SIMULATION MODELING_Future values DESIGN CAPACITY EFFECTIVE CAPACITY
  • 15. FUTURE STATE VSM NVA ∑ 9573 sec 0,65 VA ∑ 5164 sec 0,35 Lead Time 14737 sec 116 1021 122 896 1132 1792 10214848 903 248 1212 163 1132 131 Assembly 1 Electrical Components Assembly Assembly 3Assembly 2 Packaging I Scheduler SupplierSupplier Customer C/T = 903sec C/O = 248sec 1 Shift C/T = 1212 sec C/O = 131 sec 1 Shift C/T = 896 sec C/O = 122 sec 1 Shift C/T = 1132 sec C/O = 163 sec 1 Shift C/T = 1021 sec C/O = 116 sec 1 Shift PURCHASING SALES & MARKETING 1 2 2 2 1 4 units Daily Weekly WeeklyWeekly WeeklyWeekly Daily I WeeklyMonthly Weekly Monthly I 1 units I 2 units I 1 units Figure 5. Future State VSM
  • 16. COMPARATIVE RESULTS Effective Capacity Design Capacity Current State VSM 15 51 Future State VSM 18 61 Figure 3. Current State Process Durations Figure 4. Future State Process Durations
  • 17. CONCLUSION & RECOMMENDATIONS Current CSM Future VSM Change %  Change over time 926 sec 780 sec 15.80 %  Total Non value adding times 28,040 sec 9573 sec 65.85 %  Cycle time (VA) 5555 sec 5164 sec 7.04 %  Lead time 0.39 days 0.17 days 56.41 %  VA / Lead time 16.54 % 35.04 % 112 %  Effective capacity 15 units 18 units 20.00 %  Design capacity 51 units 61 units 19.61 %  Table 6. Comparative Results and Improvements
  • 18. THANK YOU FOR YOUR ATTENTION!