CHAPTER -1
INTRODUCTION
3
At present garments is the main industry of Bangladesh. This sector have developed here
rapidly because of it is a labor intensive industry, ordinary technology, cheap labor and small
capital. Before liberation in 1970, in Bangladesh there was only one garments factory. In 1977,
the number rise to 8. In 1984, the number was 587. In 1998, the number stood at 2650 and now
the number of garments in Bangladesh is 3300. In Bangladesh garments are situated in Dhaka,
Chittagong narayangong Saver and Tongi-Gazipur. The number of garments workers in
Bangladesh is 1.6 million. Number of women workers is 13,20,000 and men workers 2,80,000.
76% of total export of Bangladesh is garments oriented. Mainly Bangladeshi garments products
are exported to the USA, Canada, China and European union and Caribbean countries. Recently
Bangladesh started export to Japan, Australia and some others countries in small scale.
Bangladesh 63 items of garments products. Main raw materials of garments mainly fabrics
comes from others countries. Bangladesh country of world famous muslin fabric and the great
royal Bangle Tiger has now emerged as a child labor free in the world textile and apparel market.
The country exports its apparel products worth nearly 5 billion us dollar per year to the USA,
EU, Canada and others countries of the world. At present the country is the 6th largest apparel
supplies to the USA and EU countries. The major products are knit and woven shirt, blouses,
trousers, skirts, shorts, jackets, sweaters, sportswear and many more casual and fashion apparels.
4
CHAPTER -2
LITERATURE REVIEW
5
Industrial Engineering (IE)
Industrial engineering is a branch of engineering which deals with the optimization of
complex processes, systems or organizations. Industrial engineers work to eliminate waste of
time, money, materials, man-hours, machine time, energy and other resources that do not
generate value. According to the Institute of Industrial and Systems Engineers, they figure out
how to do things better, they engineer processes and systems that improve quality and
productivity.
Activities of Industrial Engineering
 Selection of processes and assembling methods.
 Selection and design of tools and equipment.
 Design of facilities including plant location, layout of building, machine and equipment.
 Design and improvement of planning and control system for production, inventory,
quality and plant maintenance and distribution systems.
 Development of time standards, costing and performance standards.
 Installation of wage incentive schemes.
 Design and installation of value engineering and analysis system.
 Operation research including mathematical and statistical analysis.
 Performance evaluation.
 Supplier selection and evaluation.
Objectives of Industrial Engineering:
 To establish methods for improving the operations and controlling the production costs
 To develop programmers for reducing costs.
Techniques of Industrial Engineering:
Method study: To establish a standard method of performing a job or an operation after
thorough analysis of the jobs and to establish the layout of production facilities to have a uniform
flow of material without back tracking.
Time study (work measurement): This is a technique used to establish a standard time for a job
or for an operation.
Motion Economy: This is used to analyses the motions employed by the operators do the work.
The principles of motion economy and motion analysis are very useful in mass production or for
short cycle repetitive jobs.
6
Value Analysis: It ensures that no unnecessary costs are built into the product and it tries to
provide the required functions at the minimum cost. Hence, helps to enhance the worth of the
product.
Financial and non-financial Incentives: These helps to evolve at a rational compensation for
the efforts of the workers.
Production, Planning and Control: This includes the planning for the resources (like men,
materials and machine) proper scheduling and controlling production activities to ensure the
right quantity, quality of product at predetermined time and pre established cost.
Inventory Control: To find the economic lot size and the reorder levels for the items so that the
item should be made available to the production at the right time and quantity to avoid stock out
situation and with minimum capital lock-up.
Work study
Work study is a systematic technique of method analysis work measurement and setting of time
standard that can be ensure the highest productivity by the optimum use of man power,
equipment and material.
Objects of Work Study
 To analyse the present method of doing a job, systematically in order to develop a new
and better method
 To measure the work content of a job by measuring the time required to do the job for a
qualified worker and hence to establish standard time.
 To increase the productivity by ensuring the best possible use of human, machine and
material resources and to achieve best quality product/ service at minimum possible cost
 To improve operational efficiency
Benefits of work study
 Increased productivity and operational efficiency
 Reduced manufacturing costs
7
 Improved work place layout
 Better manpower planning and capacity planning
 Fair wages to employees
 Better working conditions to employees
 Improved work flow
 Reduced material handling costs
Motion study
Motion study is the study of the body motions used in performing an operation, to improve the
operation by eliminating unnecessary motions, simplifying necessary motions, and then
establishing the most favorable motion sequence for maximum efficiency.
Time Study
Time study is a work measurement technique for recording the time of performing a certain
specific job or its element carried out under specific condition and for analyzing the data so as to
obtain the time necessary for an operator to carry out at a defined rate of performance.
Time study is a method of direct observation. A trained observer watches the job and records
data as the job is being performed over a number of cycles.
Objectives of time study
 To identify the efficiency and productivity of the company
 To set the standard time for each job.
 To set daily, monthly production target.
 To identify the efficiency of the worker.
 To evaluate a process cycle.
 To identify the qualified worker for the advanced process.
 To set basic time at a standard performance.
8
Time Study Tools
To do time study you need to arrange following tools
 A stop watch
 Time study format
 One pen or pencil
 Time Study board
Time study equipment
Stop
watch
Time
study
ContinuousFly back
9
The Important and Uses of Time Study
Generally this technique is used to determine the time required by a qualified and well trained
person working at a normal pace to do a specified task. The result of time study is the time that a
person suited to the job and fully trained in the specific method. The job needs to be performed if
he or she works at a normal or standard tempo. This time is called the standard time for
operation. This means the principle objectives of stop watch time study are to increase
productivity and product reliability and lower unit cost, thus allowing more quality goods or
services to be produced for more people.
The importance and uses of stop watch time study can be stated as under:
1. Determining schedules and planning work
2. Determining standard costs and as an aid in preparing budgets
3. Estimating the costs of a product before manufacturing it. Such information is of value in
preparing bids and determining selling price.
4. Determining machine effectiveness, the number of machines which one person can
operate, and as an aid in balancing assembly lines and work done on a conveyor.
5. Determining time standards to be used as a basis for labor cost control.
6. Helps to know the Labour productivity, Labour efficiency, Labour Performance
and overall time required to perform the task.
7. Helps to improve the process of operation.
Selectionofthe job
 The job in question is a new one, not previously carried out (new product, component,
operation or set of activities)
 A change in material or method of working has been made and a new time standard is
required.
10
 A complaint has been received from a worker or worker’s representative about the time
standard for an operation.
 A particular operation appears to be a “bottleneck” holding up subsequent operations and
possibly previous operations.
Before starting the study, there are a number of points to be observed in relation to
the approach to the worker and the job he is doing:
 Make sure the job has been method studied. Especially where the standard time is to be
used for incentive purposes.
 In an organization where time study has never been used before, supervision and worker
representatives should be told the reasons for the study program and given and insight
into tie study procedure.
 It is good policy to ask the supervisor or workers representatives to be studied. The
worker should be a competent steady person with an average rate of working.
 The worker should be told the reasons for the study. Why he has been selected and asked
to work at his normal pace explaining any problems that may arise during the time the
study is taken.
 Workers should be allowed plenty of time to settle down to new methods.
 When making the study the observer should take a position where he can see the whole of
the job being performed. This is generally to the side of the operator, slightly to the rear
and approximately 6 feet away. No attempt should be made to carry out timing from a
concealed position, without the operators knowledge or with the watch in the pocket.
11
Aaccurate is rating
Rating is subjective and relies on the skill of the observer carrying out the rating exercise and the
observer’s concept of the rate of working relative to a standard of 100%.
Element
An element is a distinct part of a specified job selected for convenient of observation.
Measurement and analysis.
Operation breakdown the job in to elements
 Elements should be easily identified, with definite beginnings and endings so that, once
established. They can be repeatedly recognized. The point at which one element ends and
another begins is called break point. Breakpoints must be decided by the work study
officer when he divides the work cycle into elements.
 All breakpoints can be recognized by a sound or by a change of direction of a hand or
arm.
 Elements should be as short as can be conveniently timed by a trained observer, but
should not be less than 0.10 minutes and more than 0.50 minutes.
 Manual elements should be separated from machine elements for future use as synthetic
data.
 Short elements should be next to long elements.
Reasonsfor breaking down the job into elements
 Variations in speed, pace and effort which an operator works can be more accurately
recorded over short periods of time. There could be some parts of the work-cycle with the
operator performs better than others.
 The more clear-cut the item of work which is timed, separately, the more readily can an
appropriate fatigue allowance be arrived at for incorporation with the element.
 To ensure that productive work is separated form unproductive work.
12
 To enable a detailed job specification to be produced.
Standard time
Standard time – time that is allowed to perform the job satisfactory.
Basic Time
The basic time for the operation is found by applying concept of rating to relate the observed to
that of a standard place of working.
Standard
time Basic time Allowances
Basic
time
Observed
time
Observed
rating
13
Types of allowances
RelaxationAllowances
Relaxation allowance is an addition to the basic time intended to provide the worker with the opportunity
to recover from the physiological and psychological effects of carrying out specified work under specified
conditions and to allow attention to personal needs. The amount of allowance will depend on the nature
of the job.
There are 2 type of relaxation allowance
Personalneeds
• This allowance provides for the necessity to leave the workplace to attend to personal
needs such as washing, going to the lavatory or fetching a drink
• Common figures are from 5 to 7 percent of basic time.
Basic fatigue
• This allowance, always a constant is given to take account of the energy expended while
carrying out work and to alleviate monotony.
• A common figure is 4 percent of basic time.
Contingencyallowances
A contingency allowance is a small allowance of time which may be included in a standard time
to meet legitimate and expected items of work or delays, the precise measurement of which is
uneconomical because of their infrequent or irregular occurrence.
14
Various other types of allowanceare
• Policy allowance
• Special allowance
Various allowance to build standard time:
Steps in making a time study
 Obtaining and recording all the information available about the job, the operative and the
surrounding conditions , which is likely to affects the carrying out the work.
 Recording a complete description of the method, breaking down the operation into
elements.
 Examination the detailed breakdown to ensure that the most effective method and
motions are being used, and determining sample size.
 Measuring with timing device and recording the time taken by the operative to perform
each element of operation
 At the same time, assessing the effective speed of working of the operative relative to the
observer’s concept of the rate corresponding to standard rating.
Personal
Allowance
Relaxation
Allowance
Normal
Time
Constant Fatigue
Allowance
Variable Fatigue
Allowance
Contingency
Allowance
Total
Allowance
Policy Allowance
Applicable
Standard
Time
Fatigue
Allowance
15
 Extending the observed time to basic time.
 Determining the allowances to be made over and above the basic time for the operation.
 Determining the standard time for the operation.
Stop-watchtime study of a core-making operation
 Operation studied was the making of a dry sand core in a wood core box, taking shape of
half a cylinder.
 Before recording stop watch reading the back of the observation sheet was filled out , a
drawing of the layout of the work place was made, and a sketch of the core was placed in
the lower right hand corner of the sheet.
Condenseddescription recordedon observationsheet, with end points for
reading stop watch
 Fill core box with 3 handful of sand. Press down each time. End of element as right hand
begin to grasp trowel.
 Press sand down with one trowel stroke. Strike off with one trowel stroke. End of
element as trowel is dropped on bench.
 Get and place plate on core box, turn over, rap, and remove box. End of element as core
box is placed on bench.
 Carry plate with core 4 feet. Dispose on oven truck. End of element as plate as placed on
shelf of core oven truck.
Time study summary
• Standard time is determined for each and every element in following manner:
Standard time= normal time x (100/(100-allwance in % ))
• For each and every element standard time is determined and then these are added together
to give the standard time for a cycle. Because one piece is produced per cycle.
16
Preparing to Measure Process Work with a Time Study:
When first introduced in the 19th and early 20th centuries, time studies established rules of
motion that guaranteed optimal performance during a given time period and reduced the number
of movements needed to get work accomplished. Over the years, time and motion studies have
been done in many industries both to ascertain how long it takes to do a given job and to improve
it through setting production goals and reducing unnecessary steps in a process. Today, time
studies are entirely focused on the time aspect of work, or how long it takes to do a job, and are
critical in getting fundamental information on how a process is working.
A time study can establish a baseline from which to drive improvement efforts, or set a standard
to control performance. Without basic time study measures, it is impossible to know whether
work has improved or whether there are differences in performance in a unit.
Studying Work as a Process:
When practitioners conduct a time study, it is essential that they know what they want to study.
Work is not strictly a set of disconnected tasks, it is a process. These processes have names, such
as maintenance or transfers, and begin with inputs, move on to processes in which inputs are
modified, and conclude with outputs.
While engaged in these input, process, output (IPO) chains, other things may intrude: mulling
things over, asking a question, taking a phone call, going to lunch and so on. In addition, people
have different work styles – some are fast and diligent; others take their time. There are many
opportunities for variation in conducting a task. The result: Time measurements are not precise,
but estimates of how long a task takes. Over time, or by measuring the work of several people, it
is possible to come to a general understanding of how long the work takes, which is good enough
to get started.
Plan Ahead to Save Costs
Because time studies are costly in terms of both lost work time and the harnessing of employee
trust and engagement, care must be taken in planning them. Follow eight simple steps in thinking
through a time study to avoid potential potholes.
1. Know Why the Study Is Being Conducted
Articulate the reasons for doing a time study in writing before beginning. This is important for
setting goals and for communicating to employees. Without a strong rationale for doing the time
study, it will be hard to answer employee concerns. The following exchanges may help
practitioners prepare for some basic questions:
17
Employee: Is there some concern that we are not doing our work?
Practitioner: No. A time study measures how long things take, not how fast you do them.
Employee: What if I have distractions during the day and I can’t work at my best level?
Practitioner: Our time study procedures allow for you to take breaks, ask questions, attend
meetings and so forth. Remember, we are interested in how long transactions take, not how fast
you are.
Employee: What are you going to do with the results?
Practitioner: We hope to use them, in part, to set standards to measure performance against.
These standards are important because without them, overall performance cannot be evaluated
fairly.
2. Understand and Articulate the Different Types of Work to Measure
In planning the time study, think through the kinds of work the job entails. Ask associates: What
kinds of things constitute 80 percent of work on a given day? Seek examples, write them down
and estimate the average time an employee spends processing each item. It is not definitive, but
it will be interesting to compare estimates and assumptions about where the time goes to the
actual measurement.
3. Measure Work Elements Down to a Level of Desired Complexity
It is also important for the time study team to consider how detailed they want to get. Should
they measure the time it takes to complete a spreadsheet of adjustments from a client, or should
they break down each individual task on that spreadsheet by the type of transaction and measure
every one? In making the choice, consider the “unit” of work – the lowest common denominator
task that associates in the team undertake. For example, all maintenance transactions are
individual units, the same with transfers and most transactions. They all take about the same
amount of time and the only unique factors are their frequency relative to each other.
4. Ensure the Study Takes Place During a Representative Time Period
Most processes are subject to variations in volume, resulting from seasonal factors, and are
predictable within limits. For example, consider tax preparers: They usually have an influx of
work at the end of the year and again in March and April, and then work falls off over the
summer.
Decide in advance when to conduct the time study. If it is during a light season, people may have
more time on their hands and thus show results that emphasize non-work time. If it is a high
18
season, associates will be under pressure to get the work out, perhaps put in overtime and avoid
backlogs. In general, work standard times go up during times of low volume and down during
times of high volume. It may be best to conduct studies during both periods and average the
results.
5. Allow the Process to ‘Settle Down’ Before Recording Results
In time studies, practitioners may want to toss out the results from the first one or two days.
Although this may seem wasteful, these early results often show missed on/off times, excessive
times for tasks that represent failure to close an activity and long periods of no activity when the
associate forgot to enter data. It is important to look at these results and let associates know what
they are missing. In time they will become proficient and the process will settle down.
6. Use Good Sampling Procedures for Reliable Results
There are two factors to consider when deciding how to handle the problem of a work sample:
sample size and population characteristics.
Sample size is determined by a formula based on the power of the sample or its ability to
represent the population with a predictable margin of error. To reduce the margin of error, it is
necessary to increase sample size. Margins of error of around 5 percent are common and only
require a small sample proportionate to the size of the population.
7. Understand the Basic Measures of Central Tendency
All the data collected in a time study can be displayed in the form of a distribution, often a
histogram showing the frequency of various sets of scores and resembling a distribution curve of
tall boxes.
A normal or bell shaped distribution is common in processes free from bias. Over time, most
distributions will look like the normal distribution, but when a short-term sample is taken, the
distribution may be skewed to one end or the other. Such a distribution may prevent a team from
settling on a fair time standard. In order to get a better understanding of “average” performance,
unusually high or low numbers must be thrown out to make the distribution more normal.
8. Learn Some Common Terms
Before an organization can manage productivity based on standard times, it is critical is to
understand the interplay between demand, capacity and utilization, and to know how to pull the
various levers to ensure that demand is anticipated, capacity managed and utilization driven to
the highest levels.
Demand refers to inputs such as customer requirements and numbers of transactions. Without a
time standard, it is difficult or impossible to quantify demand.
19
Capacity refers to the amount of work a team can do in a given amount of time.
Utilization is the efficiency with which capacity is applied based on demand. It is one measure of
productivity. An organization is 100 percent utilized when everyone in the team is working to
capacity. But, for example, if the team is capable of processing 1,000 transactions per week and
is actually processing 600 transactions, utilization will be .60, or 60 percent.
Demand management is the ability to use measures of capacity to adjust the workforce to
changing demand. This can be done only with an understanding of the capacity of the team.
Type of Timing:
1. Fly back time
2. Cumulative time
Fly back Time:
The hand of the stopwatch is returned to zero at the end of each element and are allowed to start
immediately, the time for each element being obtained directly.
Cumulative time
 The watch runs continuously throughout the study.
 At the end of the each element the watch reading is recorded.
 The individual element time are obtained by subsequent subtraction.
 The purpose of this procedure is to ensure that all the time during which the job is
observed is recorded in the study.
 Typically most work study persons attain fair degree of accuracy quickly when using the
cumulative method.
20
CHAPTER -3
METHODOLOGY
21
Methods
An operation cycle consists of material handling, positioning and aligning parts, sewing garment
parts, trimming threads and tying and untying a bundle. So in the time study format, divide
whole task into various elements according to the motion sequences of the operation. For
example, in operation ‘collar run stitch’, task elements may be
i) pick up panel to sew first seam,
ii) turn collar to sew second seam,
iii) turn collar to sew third seam
iv) check work and dispose and
v) waiting for next pieces.
In this article I will show you filled time study format for Collar run stitch. I did this study during
my internship at Tex port Syndicate.
Step 1: Preparation
 Arrange stationery like time study format, stop watch (digital one) and pencil
 Select one operation for Time study
 Tell the operator that we are going measure time he/she taking to do the job.
 Observe the operation carefully and break down operation into elements.
 Fill the basic information in the time study format. Like machine category, guide or
attachment used.
Step 2: RecordTime
Now measure the time taken for completing each elements of the operation cycle by the operator. Time
should be captured in seconds. Similarly, capture element timing for consecutive 5 operation cycles.
During data capturing only note down reading (see following Table-1) of the stop watch and later
calculate element timing. If you found any abnormal time in any elements record time during time study
and later discard that reading. Or you can capture time for one more cycle (10 operation cycles).
Abnormal time may be occurred due to bobbin change, thread break, power cut or quality issues. Ignore
those from the calculation of standard time.
22
Table-1: Time Study sheet
Step 3: Calculation of Basic Time
From the Reading (R) calculate time taken for each element for all five cycles just by deducting
previous Reading from elemental reading. Sum up times of five cycles for each element. Note, if
you discard any reading than in that case no. of cycles will be four. Calculate average element
times. This average time is called basic time. (in the following Table-2 it is noted as average
time)
23
Table-2: Time Study sheet with calculation
Step 4: Calculationof Standard Time
To convert basic time (cycle time) into normal time you have to multiply it with operator performance
rating. Here for calculation rating is considered as 100%. So, Cycle time and normal is same in this
example.
Add allowances to normal time (machine allowances, fatigue and personal needs etc). Add machine
allowance only to those elements where machine is running and fatigue and personal needs to all elements
(approx 20%). machine allowances are shown in the time study sheet. (I have used these allowance
percentage as seen seniors to use them. I don't know the source of these allowance)
The calculated time (Normal time + Allowance time) is standard time for each element in seconds. Sum
up all elemental time and convert seconds into minutes. This is standard minutes or SAM (Standard
Allowed Minute).
24
CHAPTER-4
DATA ANALYSIS
&
RESULT
25
Target calculation
Capacity= 60/Average of the time + Allowance%
Target= No. of worker ×work hours ×60 /SMV ×Efficiency
Efficiency Calculation
Overall Efficiency = Production minute × 100/ Used minutes
On Standard Efficiency= Productionminute × 100/ (Used minutes- Non productive
time)
Capacity= 3600/Avg. Time
Basic Time = Observed Time × Performance Rating
Standard Time = Basic Time +Allowance%
26
Item: Men’s Boxers TIME STUDYSHEET
Sl.
No. Operation
Description
Machine
Type
Cycle Time(Sec)
Average
Cycle Capacity
Total
Capacity1st 2nd 3rd 4th 5th
1 Stay stitch at
front pouch
Plain
Machine 48 72 54 54 48 55.2 65
218
2 Stay stitch at
front pouch
Plain
Machine 44 50 48 42 42 45.2 80
3 Stay stitch at
front pouch
Plain
Machine 47 54 50 48 45 48.8 73
4 Making Front
Pouch
Flat Bed
Machine 7 11 12 9 9 9.6 400 400
5
Join Back Rise
Flat Bed
Machine 11 9 11 10 9 10 300 300
6
Join Side Seam
Flat Bed
Machine 8 8 10 9 11 9.2 400
7007
Join Side Seam
Flat Bed
Machine 14 16 12 10 10 12.4 300
8 Attach Front
Pouch
Flat Bed
Machine 8 9 11 8 9 9 400 400
9
Join Gussed
Flat Bed
Machine 9 11 8 9 8 9 400 400
10
Attach Piping
Over lock
machine 7 7 7 8 6 7 514
91411
Attach Piping
Over lock
machine 10 11 9 8 8 9.2 400
12
Top Stitch
Flat Lock
Machine 8 10 9 8 9 8.8 400
85013
Top Stitch
Flat Lock
Machine 8 9 8 9 7 8.2 450
14
Making West
Elastic
Bar Tack
Machine 18 14 14 15 18 15.8 240 240
15
Elastic Join
Bar Tack
Machine 24 23 22 24 26 23.8 150
321
16
Elastic Join
Flat Lock
Machine 22 20 23 22 20 21.4 171
17
Close inseam
Flat Bed
Machine 11 9 10 8 9 9.4 400 400
18
Tack at Latch
Plain
Machine 10 13 14 12 17 13.2 321 277
27
Operation
Description
Average
Cycle Time Rating %
Basic
Time SMV Target
Total
Capacity
Stay stitch at
front pouch 55.2 62 34.22 44.49
230 218
Stay stitch at
front pouch 45.2 68 30.74 39.96
Stay stitch at
front pouch 48.8 65 31.72 41.24
Making
Front Pouch 9.6 70 6.72 8.74 420 400
Join Back
Rise 10 69 6.9 8.97 330 300
Join Side
Seam 9.2 71 6.53 8.49
740 700Join Side
Seam 12.4 63 7.81 10.15
Attach Front
Pouch 9 64 5.75 7.48 420 400
Join Gussed 9 65 5.76 7.49 420 400
Attach
Piping 7 70 4.9 6.37
940 914Attach
Piping 9.2 60 5.52 7.18
Top Stitch 8.8 68 6 7.8
900
850
Top Stitch 8.2 68 5.58 7.25
Making
West Elastic 15.8 60 9.48 12.32 260 240
Elastic Join 23.8 61 14.52 18.88
340
321
Elastic Join 21.4 62 13.27 17.25
Close
inseam 9.4 64 6 7.8 430 400
Tack at
Latch 13.2 63 8.32 10.82 300 277
28
Line Diagramof Capacity,TotalCapacity& Average cycle time
Fig. Line Diagram
Results:
After analysis of sewing section efficiency by time study technique the production
per hour 220 pieces.
Discussion:
After analysis of sewing section efficiency by time study technique the production
capacity increase.
0
200
400
600
800
1000
1200
1400
1600
Staystitchatfrontpouch
Staystitchatfrontpouch
Staystitchatfrontpouch
MakingFrontPouch
JoinBackRise
JoinSideSeam
JoinSideSeam
AttachFrontPouch
JoinGussed
AttatchPiping
AttatchPiping
TopStitch
TopStitch
MakingWestElastic
ElasticJoin
ElasticJoin
Closeinseam
TackatLatch
Total Capacity
Capacity
Avg. Cycle Time
29
CHAPTER-5
CONCLUSION
30
Conclusion
Industrial engineering is an important and essential part of any Garments Industry. One of the
aims of any production system is to make total production time as minimum as possible. This
automatically reduces inventory cost to a minimum. Sub-assembly system provides many
opportunities to economies on temporary storage and transportation space and time. No definite
answer can be given as to which is the best, as it depends on garment style, specifications,
machinery and manpower and manufacturing policies. It gives us an opportunity to compare the
theoretical knowledge with practical facts and thus develop our knowledge and skills. This
project also gives an opportunity to enlarge knowledge of textile administration, production
planning, procurement system, production process etc. to adjust with the industrial life.
31
Reference:
1. Data Collected By Liz Fashions ltd.
2. http://www.slideshare.net/lavg1/time-study-41361819
3. http://www.onlineclothingstudy.com/2011/03/how-to-do-time-study-for-
garment.html
4. http://www.slideshare.net/TanmoyAntu/presentation-38605832
5. https://www.isixsigma.com/methodology/business-process-management-
bpm/preparing-measure-process-work-time-study/
6. http://www.ijset.net/journal/212.pdf
7. http://www.slideshare.net/sheshir/work-study-line-balancing
8. http://www.slideshare.net/vishakeb/work-study-presentation-650617
9. http://www.slideshare.net/Roni640/application-of-industrial-engineering-in-
garments-sewing-floor

More Related Content

What's hot

Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorRakibul Hasan
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments productionMd.Abdur Rahim Al Bahar
 
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceStandard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceMazharul Islam
 
industrial engineering in sewing department
industrial engineering in sewing department industrial engineering in sewing department
industrial engineering in sewing department ShivamSagar13
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSRabiul Hasan
 
21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdownvikram kumar
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Mahibur Rahman
 
Clockwise inspection
Clockwise inspectionClockwise inspection
Clockwise inspectionlatifaslam
 
Sewing machine needle a to z
Sewing machine needle a to zSewing machine needle a to z
Sewing machine needle a to zMd Masudur Rahman
 
Garments production system
Garments production systemGarments production system
Garments production systemamnapervaiz14
 

What's hot (20)

IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floor
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments production
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceStandard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
 
Work study presentation
Work study presentationWork study presentation
Work study presentation
 
industrial engineering in sewing department
industrial engineering in sewing department industrial engineering in sewing department
industrial engineering in sewing department
 
Introduction to SAM
Introduction to SAMIntroduction to SAM
Introduction to SAM
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLS
 
21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
QCO presentation
QCO presentationQCO presentation
QCO presentation
 
Cutting department
Cutting departmentCutting department
Cutting department
 
Clockwise inspection
Clockwise inspectionClockwise inspection
Clockwise inspection
 
Work study
Work studyWork study
Work study
 
Quality control
Quality controlQuality control
Quality control
 
Garment production and productivity
Garment production and productivityGarment production and productivity
Garment production and productivity
 
Sewing machine needle a to z
Sewing machine needle a to zSewing machine needle a to z
Sewing machine needle a to z
 
Garments production system
Garments production systemGarments production system
Garments production system
 

Viewers also liked

Calculation of standard minute value of T shirt
Calculation of standard minute value of T shirtCalculation of standard minute value of T shirt
Calculation of standard minute value of T shirtAzmir Latif Beg
 
E4 e machinery_im_tx_assembly-final
E4 e machinery_im_tx_assembly-finalE4 e machinery_im_tx_assembly-final
E4 e machinery_im_tx_assembly-finalAIMFirst
 
Internal combustion (ic) engines
Internal combustion (ic) enginesInternal combustion (ic) engines
Internal combustion (ic) enginesAnowar Hossain Rana
 
Effect of time and motion study
Effect of time and motion studyEffect of time and motion study
Effect of time and motion studyAnkur Shukla
 
Frc in industrial flooring
Frc in industrial flooringFrc in industrial flooring
Frc in industrial flooringAMAL THANKACHAN
 
Importance of Industrial Training for an Employee
Importance of Industrial Training for an EmployeeImportance of Industrial Training for an Employee
Importance of Industrial Training for an EmployeeVirendra Uppalwar
 
Assembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyAssembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyMd Abu Bakar Siddique
 
Apparel Manufacturing Methodology
Apparel Manufacturing MethodologyApparel Manufacturing Methodology
Apparel Manufacturing Methodologymustafa hussain
 
Environmental issues in textile industry of pakistan
Environmental issues in textile industry of pakistanEnvironmental issues in textile industry of pakistan
Environmental issues in textile industry of pakistanSohail AD
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancingJoseph Konnully
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurementJoseph Konnully
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and qualityMd. Mazadul Hasan Shishir
 

Viewers also liked (20)

Calculation of standard minute value of T shirt
Calculation of standard minute value of T shirtCalculation of standard minute value of T shirt
Calculation of standard minute value of T shirt
 
Work study - production and operations management
Work study - production and operations managementWork study - production and operations management
Work study - production and operations management
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
Roman house
Roman houseRoman house
Roman house
 
Review presentation
Review presentationReview presentation
Review presentation
 
Training Review
Training ReviewTraining Review
Training Review
 
E4 e machinery_im_tx_assembly-final
E4 e machinery_im_tx_assembly-finalE4 e machinery_im_tx_assembly-final
E4 e machinery_im_tx_assembly-final
 
Internal combustion (ic) engines
Internal combustion (ic) enginesInternal combustion (ic) engines
Internal combustion (ic) engines
 
Effect of time and motion study
Effect of time and motion studyEffect of time and motion study
Effect of time and motion study
 
Frc in industrial flooring
Frc in industrial flooringFrc in industrial flooring
Frc in industrial flooring
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Izgen Engineering Ltd
Izgen Engineering LtdIzgen Engineering Ltd
Izgen Engineering Ltd
 
Marker efficiency
Marker efficiencyMarker efficiency
Marker efficiency
 
Importance of Industrial Training for an Employee
Importance of Industrial Training for an EmployeeImportance of Industrial Training for an Employee
Importance of Industrial Training for an Employee
 
Assembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyAssembly Line Balancing | Case Study
Assembly Line Balancing | Case Study
 
Apparel Manufacturing Methodology
Apparel Manufacturing MethodologyApparel Manufacturing Methodology
Apparel Manufacturing Methodology
 
Environmental issues in textile industry of pakistan
Environmental issues in textile industry of pakistanEnvironmental issues in textile industry of pakistan
Environmental issues in textile industry of pakistan
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
 

Similar to Analysis of sewing section efficiency by time study technique in apparel industry

195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layouthomeworkping3
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Studyjosy2108
 
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...viveksangwan007
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction ProjectIRJET Journal
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods StudyJoseph Konnully
 
Presentation on work study
Presentation on work studyPresentation on work study
Presentation on work studysourov17
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLAttiMurugan
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdfNittamallik216
 
02 Work study -Part_1.pdf
02 Work study -Part_1.pdf02 Work study -Part_1.pdf
02 Work study -Part_1.pdfSugumarSarDurai
 

Similar to Analysis of sewing section efficiency by time study technique in apparel industry (20)

Garments
Garments Garments
Garments
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Study
 
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
Work motion study
Work motion studyWork motion study
Work motion study
 
PPC 114.pptx
PPC 114.pptxPPC 114.pptx
PPC 114.pptx
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
 
Management tools
Management toolsManagement tools
Management tools
 
Work study
Work studyWork study
Work study
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Presentation on work study
Presentation on work studyPresentation on work study
Presentation on work study
 
Jivan work study
Jivan work studyJivan work study
Jivan work study
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
 
Scientific management
Scientific  managementScientific  management
Scientific management
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
 
02 Work study -Part_1.pdf
02 Work study -Part_1.pdf02 Work study -Part_1.pdf
02 Work study -Part_1.pdf
 

More from Khairul Bashar

Study on Merchandising Activities of Garments Sector
Study on Merchandising Activities of Garments SectorStudy on Merchandising Activities of Garments Sector
Study on Merchandising Activities of Garments SectorKhairul Bashar
 
Relation between gsm and yarn count for different
Relation between gsm and yarn count for differentRelation between gsm and yarn count for different
Relation between gsm and yarn count for differentKhairul Bashar
 
Introduction to apparel industries and history
Introduction to apparel industries and historyIntroduction to apparel industries and history
Introduction to apparel industries and historyKhairul Bashar
 
Top 10 of the Most Famous Fashion Events in the World
Top 10 of the Most Famous Fashion Events in the WorldTop 10 of the Most Famous Fashion Events in the World
Top 10 of the Most Famous Fashion Events in the WorldKhairul Bashar
 
Ready made garments of bangladesh
Ready made garments of bangladeshReady made garments of bangladesh
Ready made garments of bangladeshKhairul Bashar
 
Introduction to Textile Engineering
Introduction to Textile EngineeringIntroduction to Textile Engineering
Introduction to Textile EngineeringKhairul Bashar
 
List of major garments buyer’s in bangladesh
List of major garments buyer’s in bangladeshList of major garments buyer’s in bangladesh
List of major garments buyer’s in bangladeshKhairul Bashar
 
Lubrication oil, grease and others
Lubrication oil, grease and othersLubrication oil, grease and others
Lubrication oil, grease and othersKhairul Bashar
 

More from Khairul Bashar (14)

Study on Merchandising Activities of Garments Sector
Study on Merchandising Activities of Garments SectorStudy on Merchandising Activities of Garments Sector
Study on Merchandising Activities of Garments Sector
 
Sample CV
Sample CVSample CV
Sample CV
 
Relation between gsm and yarn count for different
Relation between gsm and yarn count for differentRelation between gsm and yarn count for different
Relation between gsm and yarn count for different
 
Garments costing
Garments costingGarments costing
Garments costing
 
Dyeing lab
Dyeing labDyeing lab
Dyeing lab
 
Principles of BSCI
Principles of BSCIPrinciples of BSCI
Principles of BSCI
 
Introduction to apparel industries and history
Introduction to apparel industries and historyIntroduction to apparel industries and history
Introduction to apparel industries and history
 
Top 10 of the Most Famous Fashion Events in the World
Top 10 of the Most Famous Fashion Events in the WorldTop 10 of the Most Famous Fashion Events in the World
Top 10 of the Most Famous Fashion Events in the World
 
Ready made garments of bangladesh
Ready made garments of bangladeshReady made garments of bangladesh
Ready made garments of bangladesh
 
Sportswear
SportswearSportswear
Sportswear
 
Introduction to Textile Engineering
Introduction to Textile EngineeringIntroduction to Textile Engineering
Introduction to Textile Engineering
 
TTQC-ii presentation
TTQC-ii presentationTTQC-ii presentation
TTQC-ii presentation
 
List of major garments buyer’s in bangladesh
List of major garments buyer’s in bangladeshList of major garments buyer’s in bangladesh
List of major garments buyer’s in bangladesh
 
Lubrication oil, grease and others
Lubrication oil, grease and othersLubrication oil, grease and others
Lubrication oil, grease and others
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 

Analysis of sewing section efficiency by time study technique in apparel industry

  • 1. 1 BANGLADESH UNIVERSITY OF BUSINESS & TECHNOLOGY (BUBT) DEPARTMENT OF TEXTILE ENGINEERING PROJECT ON “Analysis of sewing section efficiency by time study technique in Apparel Industry” SUBMITTED BY INTAKE NAME ID 7th Md. Khairul Bashar 12131107011 SUPERVISOR: Farhatun Nabi Lecturer Department of Textile Engineering. September, 2016
  • 3. 3 At present garments is the main industry of Bangladesh. This sector have developed here rapidly because of it is a labor intensive industry, ordinary technology, cheap labor and small capital. Before liberation in 1970, in Bangladesh there was only one garments factory. In 1977, the number rise to 8. In 1984, the number was 587. In 1998, the number stood at 2650 and now the number of garments in Bangladesh is 3300. In Bangladesh garments are situated in Dhaka, Chittagong narayangong Saver and Tongi-Gazipur. The number of garments workers in Bangladesh is 1.6 million. Number of women workers is 13,20,000 and men workers 2,80,000. 76% of total export of Bangladesh is garments oriented. Mainly Bangladeshi garments products are exported to the USA, Canada, China and European union and Caribbean countries. Recently Bangladesh started export to Japan, Australia and some others countries in small scale. Bangladesh 63 items of garments products. Main raw materials of garments mainly fabrics comes from others countries. Bangladesh country of world famous muslin fabric and the great royal Bangle Tiger has now emerged as a child labor free in the world textile and apparel market. The country exports its apparel products worth nearly 5 billion us dollar per year to the USA, EU, Canada and others countries of the world. At present the country is the 6th largest apparel supplies to the USA and EU countries. The major products are knit and woven shirt, blouses, trousers, skirts, shorts, jackets, sweaters, sportswear and many more casual and fashion apparels.
  • 5. 5 Industrial Engineering (IE) Industrial engineering is a branch of engineering which deals with the optimization of complex processes, systems or organizations. Industrial engineers work to eliminate waste of time, money, materials, man-hours, machine time, energy and other resources that do not generate value. According to the Institute of Industrial and Systems Engineers, they figure out how to do things better, they engineer processes and systems that improve quality and productivity. Activities of Industrial Engineering  Selection of processes and assembling methods.  Selection and design of tools and equipment.  Design of facilities including plant location, layout of building, machine and equipment.  Design and improvement of planning and control system for production, inventory, quality and plant maintenance and distribution systems.  Development of time standards, costing and performance standards.  Installation of wage incentive schemes.  Design and installation of value engineering and analysis system.  Operation research including mathematical and statistical analysis.  Performance evaluation.  Supplier selection and evaluation. Objectives of Industrial Engineering:  To establish methods for improving the operations and controlling the production costs  To develop programmers for reducing costs. Techniques of Industrial Engineering: Method study: To establish a standard method of performing a job or an operation after thorough analysis of the jobs and to establish the layout of production facilities to have a uniform flow of material without back tracking. Time study (work measurement): This is a technique used to establish a standard time for a job or for an operation. Motion Economy: This is used to analyses the motions employed by the operators do the work. The principles of motion economy and motion analysis are very useful in mass production or for short cycle repetitive jobs.
  • 6. 6 Value Analysis: It ensures that no unnecessary costs are built into the product and it tries to provide the required functions at the minimum cost. Hence, helps to enhance the worth of the product. Financial and non-financial Incentives: These helps to evolve at a rational compensation for the efforts of the workers. Production, Planning and Control: This includes the planning for the resources (like men, materials and machine) proper scheduling and controlling production activities to ensure the right quantity, quality of product at predetermined time and pre established cost. Inventory Control: To find the economic lot size and the reorder levels for the items so that the item should be made available to the production at the right time and quantity to avoid stock out situation and with minimum capital lock-up. Work study Work study is a systematic technique of method analysis work measurement and setting of time standard that can be ensure the highest productivity by the optimum use of man power, equipment and material. Objects of Work Study  To analyse the present method of doing a job, systematically in order to develop a new and better method  To measure the work content of a job by measuring the time required to do the job for a qualified worker and hence to establish standard time.  To increase the productivity by ensuring the best possible use of human, machine and material resources and to achieve best quality product/ service at minimum possible cost  To improve operational efficiency Benefits of work study  Increased productivity and operational efficiency  Reduced manufacturing costs
  • 7. 7  Improved work place layout  Better manpower planning and capacity planning  Fair wages to employees  Better working conditions to employees  Improved work flow  Reduced material handling costs Motion study Motion study is the study of the body motions used in performing an operation, to improve the operation by eliminating unnecessary motions, simplifying necessary motions, and then establishing the most favorable motion sequence for maximum efficiency. Time Study Time study is a work measurement technique for recording the time of performing a certain specific job or its element carried out under specific condition and for analyzing the data so as to obtain the time necessary for an operator to carry out at a defined rate of performance. Time study is a method of direct observation. A trained observer watches the job and records data as the job is being performed over a number of cycles. Objectives of time study  To identify the efficiency and productivity of the company  To set the standard time for each job.  To set daily, monthly production target.  To identify the efficiency of the worker.  To evaluate a process cycle.  To identify the qualified worker for the advanced process.  To set basic time at a standard performance.
  • 8. 8 Time Study Tools To do time study you need to arrange following tools  A stop watch  Time study format  One pen or pencil  Time Study board Time study equipment Stop watch Time study ContinuousFly back
  • 9. 9 The Important and Uses of Time Study Generally this technique is used to determine the time required by a qualified and well trained person working at a normal pace to do a specified task. The result of time study is the time that a person suited to the job and fully trained in the specific method. The job needs to be performed if he or she works at a normal or standard tempo. This time is called the standard time for operation. This means the principle objectives of stop watch time study are to increase productivity and product reliability and lower unit cost, thus allowing more quality goods or services to be produced for more people. The importance and uses of stop watch time study can be stated as under: 1. Determining schedules and planning work 2. Determining standard costs and as an aid in preparing budgets 3. Estimating the costs of a product before manufacturing it. Such information is of value in preparing bids and determining selling price. 4. Determining machine effectiveness, the number of machines which one person can operate, and as an aid in balancing assembly lines and work done on a conveyor. 5. Determining time standards to be used as a basis for labor cost control. 6. Helps to know the Labour productivity, Labour efficiency, Labour Performance and overall time required to perform the task. 7. Helps to improve the process of operation. Selectionofthe job  The job in question is a new one, not previously carried out (new product, component, operation or set of activities)  A change in material or method of working has been made and a new time standard is required.
  • 10. 10  A complaint has been received from a worker or worker’s representative about the time standard for an operation.  A particular operation appears to be a “bottleneck” holding up subsequent operations and possibly previous operations. Before starting the study, there are a number of points to be observed in relation to the approach to the worker and the job he is doing:  Make sure the job has been method studied. Especially where the standard time is to be used for incentive purposes.  In an organization where time study has never been used before, supervision and worker representatives should be told the reasons for the study program and given and insight into tie study procedure.  It is good policy to ask the supervisor or workers representatives to be studied. The worker should be a competent steady person with an average rate of working.  The worker should be told the reasons for the study. Why he has been selected and asked to work at his normal pace explaining any problems that may arise during the time the study is taken.  Workers should be allowed plenty of time to settle down to new methods.  When making the study the observer should take a position where he can see the whole of the job being performed. This is generally to the side of the operator, slightly to the rear and approximately 6 feet away. No attempt should be made to carry out timing from a concealed position, without the operators knowledge or with the watch in the pocket.
  • 11. 11 Aaccurate is rating Rating is subjective and relies on the skill of the observer carrying out the rating exercise and the observer’s concept of the rate of working relative to a standard of 100%. Element An element is a distinct part of a specified job selected for convenient of observation. Measurement and analysis. Operation breakdown the job in to elements  Elements should be easily identified, with definite beginnings and endings so that, once established. They can be repeatedly recognized. The point at which one element ends and another begins is called break point. Breakpoints must be decided by the work study officer when he divides the work cycle into elements.  All breakpoints can be recognized by a sound or by a change of direction of a hand or arm.  Elements should be as short as can be conveniently timed by a trained observer, but should not be less than 0.10 minutes and more than 0.50 minutes.  Manual elements should be separated from machine elements for future use as synthetic data.  Short elements should be next to long elements. Reasonsfor breaking down the job into elements  Variations in speed, pace and effort which an operator works can be more accurately recorded over short periods of time. There could be some parts of the work-cycle with the operator performs better than others.  The more clear-cut the item of work which is timed, separately, the more readily can an appropriate fatigue allowance be arrived at for incorporation with the element.  To ensure that productive work is separated form unproductive work.
  • 12. 12  To enable a detailed job specification to be produced. Standard time Standard time – time that is allowed to perform the job satisfactory. Basic Time The basic time for the operation is found by applying concept of rating to relate the observed to that of a standard place of working. Standard time Basic time Allowances Basic time Observed time Observed rating
  • 13. 13 Types of allowances RelaxationAllowances Relaxation allowance is an addition to the basic time intended to provide the worker with the opportunity to recover from the physiological and psychological effects of carrying out specified work under specified conditions and to allow attention to personal needs. The amount of allowance will depend on the nature of the job. There are 2 type of relaxation allowance Personalneeds • This allowance provides for the necessity to leave the workplace to attend to personal needs such as washing, going to the lavatory or fetching a drink • Common figures are from 5 to 7 percent of basic time. Basic fatigue • This allowance, always a constant is given to take account of the energy expended while carrying out work and to alleviate monotony. • A common figure is 4 percent of basic time. Contingencyallowances A contingency allowance is a small allowance of time which may be included in a standard time to meet legitimate and expected items of work or delays, the precise measurement of which is uneconomical because of their infrequent or irregular occurrence.
  • 14. 14 Various other types of allowanceare • Policy allowance • Special allowance Various allowance to build standard time: Steps in making a time study  Obtaining and recording all the information available about the job, the operative and the surrounding conditions , which is likely to affects the carrying out the work.  Recording a complete description of the method, breaking down the operation into elements.  Examination the detailed breakdown to ensure that the most effective method and motions are being used, and determining sample size.  Measuring with timing device and recording the time taken by the operative to perform each element of operation  At the same time, assessing the effective speed of working of the operative relative to the observer’s concept of the rate corresponding to standard rating. Personal Allowance Relaxation Allowance Normal Time Constant Fatigue Allowance Variable Fatigue Allowance Contingency Allowance Total Allowance Policy Allowance Applicable Standard Time Fatigue Allowance
  • 15. 15  Extending the observed time to basic time.  Determining the allowances to be made over and above the basic time for the operation.  Determining the standard time for the operation. Stop-watchtime study of a core-making operation  Operation studied was the making of a dry sand core in a wood core box, taking shape of half a cylinder.  Before recording stop watch reading the back of the observation sheet was filled out , a drawing of the layout of the work place was made, and a sketch of the core was placed in the lower right hand corner of the sheet. Condenseddescription recordedon observationsheet, with end points for reading stop watch  Fill core box with 3 handful of sand. Press down each time. End of element as right hand begin to grasp trowel.  Press sand down with one trowel stroke. Strike off with one trowel stroke. End of element as trowel is dropped on bench.  Get and place plate on core box, turn over, rap, and remove box. End of element as core box is placed on bench.  Carry plate with core 4 feet. Dispose on oven truck. End of element as plate as placed on shelf of core oven truck. Time study summary • Standard time is determined for each and every element in following manner: Standard time= normal time x (100/(100-allwance in % )) • For each and every element standard time is determined and then these are added together to give the standard time for a cycle. Because one piece is produced per cycle.
  • 16. 16 Preparing to Measure Process Work with a Time Study: When first introduced in the 19th and early 20th centuries, time studies established rules of motion that guaranteed optimal performance during a given time period and reduced the number of movements needed to get work accomplished. Over the years, time and motion studies have been done in many industries both to ascertain how long it takes to do a given job and to improve it through setting production goals and reducing unnecessary steps in a process. Today, time studies are entirely focused on the time aspect of work, or how long it takes to do a job, and are critical in getting fundamental information on how a process is working. A time study can establish a baseline from which to drive improvement efforts, or set a standard to control performance. Without basic time study measures, it is impossible to know whether work has improved or whether there are differences in performance in a unit. Studying Work as a Process: When practitioners conduct a time study, it is essential that they know what they want to study. Work is not strictly a set of disconnected tasks, it is a process. These processes have names, such as maintenance or transfers, and begin with inputs, move on to processes in which inputs are modified, and conclude with outputs. While engaged in these input, process, output (IPO) chains, other things may intrude: mulling things over, asking a question, taking a phone call, going to lunch and so on. In addition, people have different work styles – some are fast and diligent; others take their time. There are many opportunities for variation in conducting a task. The result: Time measurements are not precise, but estimates of how long a task takes. Over time, or by measuring the work of several people, it is possible to come to a general understanding of how long the work takes, which is good enough to get started. Plan Ahead to Save Costs Because time studies are costly in terms of both lost work time and the harnessing of employee trust and engagement, care must be taken in planning them. Follow eight simple steps in thinking through a time study to avoid potential potholes. 1. Know Why the Study Is Being Conducted Articulate the reasons for doing a time study in writing before beginning. This is important for setting goals and for communicating to employees. Without a strong rationale for doing the time study, it will be hard to answer employee concerns. The following exchanges may help practitioners prepare for some basic questions:
  • 17. 17 Employee: Is there some concern that we are not doing our work? Practitioner: No. A time study measures how long things take, not how fast you do them. Employee: What if I have distractions during the day and I can’t work at my best level? Practitioner: Our time study procedures allow for you to take breaks, ask questions, attend meetings and so forth. Remember, we are interested in how long transactions take, not how fast you are. Employee: What are you going to do with the results? Practitioner: We hope to use them, in part, to set standards to measure performance against. These standards are important because without them, overall performance cannot be evaluated fairly. 2. Understand and Articulate the Different Types of Work to Measure In planning the time study, think through the kinds of work the job entails. Ask associates: What kinds of things constitute 80 percent of work on a given day? Seek examples, write them down and estimate the average time an employee spends processing each item. It is not definitive, but it will be interesting to compare estimates and assumptions about where the time goes to the actual measurement. 3. Measure Work Elements Down to a Level of Desired Complexity It is also important for the time study team to consider how detailed they want to get. Should they measure the time it takes to complete a spreadsheet of adjustments from a client, or should they break down each individual task on that spreadsheet by the type of transaction and measure every one? In making the choice, consider the “unit” of work – the lowest common denominator task that associates in the team undertake. For example, all maintenance transactions are individual units, the same with transfers and most transactions. They all take about the same amount of time and the only unique factors are their frequency relative to each other. 4. Ensure the Study Takes Place During a Representative Time Period Most processes are subject to variations in volume, resulting from seasonal factors, and are predictable within limits. For example, consider tax preparers: They usually have an influx of work at the end of the year and again in March and April, and then work falls off over the summer. Decide in advance when to conduct the time study. If it is during a light season, people may have more time on their hands and thus show results that emphasize non-work time. If it is a high
  • 18. 18 season, associates will be under pressure to get the work out, perhaps put in overtime and avoid backlogs. In general, work standard times go up during times of low volume and down during times of high volume. It may be best to conduct studies during both periods and average the results. 5. Allow the Process to ‘Settle Down’ Before Recording Results In time studies, practitioners may want to toss out the results from the first one or two days. Although this may seem wasteful, these early results often show missed on/off times, excessive times for tasks that represent failure to close an activity and long periods of no activity when the associate forgot to enter data. It is important to look at these results and let associates know what they are missing. In time they will become proficient and the process will settle down. 6. Use Good Sampling Procedures for Reliable Results There are two factors to consider when deciding how to handle the problem of a work sample: sample size and population characteristics. Sample size is determined by a formula based on the power of the sample or its ability to represent the population with a predictable margin of error. To reduce the margin of error, it is necessary to increase sample size. Margins of error of around 5 percent are common and only require a small sample proportionate to the size of the population. 7. Understand the Basic Measures of Central Tendency All the data collected in a time study can be displayed in the form of a distribution, often a histogram showing the frequency of various sets of scores and resembling a distribution curve of tall boxes. A normal or bell shaped distribution is common in processes free from bias. Over time, most distributions will look like the normal distribution, but when a short-term sample is taken, the distribution may be skewed to one end or the other. Such a distribution may prevent a team from settling on a fair time standard. In order to get a better understanding of “average” performance, unusually high or low numbers must be thrown out to make the distribution more normal. 8. Learn Some Common Terms Before an organization can manage productivity based on standard times, it is critical is to understand the interplay between demand, capacity and utilization, and to know how to pull the various levers to ensure that demand is anticipated, capacity managed and utilization driven to the highest levels. Demand refers to inputs such as customer requirements and numbers of transactions. Without a time standard, it is difficult or impossible to quantify demand.
  • 19. 19 Capacity refers to the amount of work a team can do in a given amount of time. Utilization is the efficiency with which capacity is applied based on demand. It is one measure of productivity. An organization is 100 percent utilized when everyone in the team is working to capacity. But, for example, if the team is capable of processing 1,000 transactions per week and is actually processing 600 transactions, utilization will be .60, or 60 percent. Demand management is the ability to use measures of capacity to adjust the workforce to changing demand. This can be done only with an understanding of the capacity of the team. Type of Timing: 1. Fly back time 2. Cumulative time Fly back Time: The hand of the stopwatch is returned to zero at the end of each element and are allowed to start immediately, the time for each element being obtained directly. Cumulative time  The watch runs continuously throughout the study.  At the end of the each element the watch reading is recorded.  The individual element time are obtained by subsequent subtraction.  The purpose of this procedure is to ensure that all the time during which the job is observed is recorded in the study.  Typically most work study persons attain fair degree of accuracy quickly when using the cumulative method.
  • 21. 21 Methods An operation cycle consists of material handling, positioning and aligning parts, sewing garment parts, trimming threads and tying and untying a bundle. So in the time study format, divide whole task into various elements according to the motion sequences of the operation. For example, in operation ‘collar run stitch’, task elements may be i) pick up panel to sew first seam, ii) turn collar to sew second seam, iii) turn collar to sew third seam iv) check work and dispose and v) waiting for next pieces. In this article I will show you filled time study format for Collar run stitch. I did this study during my internship at Tex port Syndicate. Step 1: Preparation  Arrange stationery like time study format, stop watch (digital one) and pencil  Select one operation for Time study  Tell the operator that we are going measure time he/she taking to do the job.  Observe the operation carefully and break down operation into elements.  Fill the basic information in the time study format. Like machine category, guide or attachment used. Step 2: RecordTime Now measure the time taken for completing each elements of the operation cycle by the operator. Time should be captured in seconds. Similarly, capture element timing for consecutive 5 operation cycles. During data capturing only note down reading (see following Table-1) of the stop watch and later calculate element timing. If you found any abnormal time in any elements record time during time study and later discard that reading. Or you can capture time for one more cycle (10 operation cycles). Abnormal time may be occurred due to bobbin change, thread break, power cut or quality issues. Ignore those from the calculation of standard time.
  • 22. 22 Table-1: Time Study sheet Step 3: Calculation of Basic Time From the Reading (R) calculate time taken for each element for all five cycles just by deducting previous Reading from elemental reading. Sum up times of five cycles for each element. Note, if you discard any reading than in that case no. of cycles will be four. Calculate average element times. This average time is called basic time. (in the following Table-2 it is noted as average time)
  • 23. 23 Table-2: Time Study sheet with calculation Step 4: Calculationof Standard Time To convert basic time (cycle time) into normal time you have to multiply it with operator performance rating. Here for calculation rating is considered as 100%. So, Cycle time and normal is same in this example. Add allowances to normal time (machine allowances, fatigue and personal needs etc). Add machine allowance only to those elements where machine is running and fatigue and personal needs to all elements (approx 20%). machine allowances are shown in the time study sheet. (I have used these allowance percentage as seen seniors to use them. I don't know the source of these allowance) The calculated time (Normal time + Allowance time) is standard time for each element in seconds. Sum up all elemental time and convert seconds into minutes. This is standard minutes or SAM (Standard Allowed Minute).
  • 25. 25 Target calculation Capacity= 60/Average of the time + Allowance% Target= No. of worker ×work hours ×60 /SMV ×Efficiency Efficiency Calculation Overall Efficiency = Production minute × 100/ Used minutes On Standard Efficiency= Productionminute × 100/ (Used minutes- Non productive time) Capacity= 3600/Avg. Time Basic Time = Observed Time × Performance Rating Standard Time = Basic Time +Allowance%
  • 26. 26 Item: Men’s Boxers TIME STUDYSHEET Sl. No. Operation Description Machine Type Cycle Time(Sec) Average Cycle Capacity Total Capacity1st 2nd 3rd 4th 5th 1 Stay stitch at front pouch Plain Machine 48 72 54 54 48 55.2 65 218 2 Stay stitch at front pouch Plain Machine 44 50 48 42 42 45.2 80 3 Stay stitch at front pouch Plain Machine 47 54 50 48 45 48.8 73 4 Making Front Pouch Flat Bed Machine 7 11 12 9 9 9.6 400 400 5 Join Back Rise Flat Bed Machine 11 9 11 10 9 10 300 300 6 Join Side Seam Flat Bed Machine 8 8 10 9 11 9.2 400 7007 Join Side Seam Flat Bed Machine 14 16 12 10 10 12.4 300 8 Attach Front Pouch Flat Bed Machine 8 9 11 8 9 9 400 400 9 Join Gussed Flat Bed Machine 9 11 8 9 8 9 400 400 10 Attach Piping Over lock machine 7 7 7 8 6 7 514 91411 Attach Piping Over lock machine 10 11 9 8 8 9.2 400 12 Top Stitch Flat Lock Machine 8 10 9 8 9 8.8 400 85013 Top Stitch Flat Lock Machine 8 9 8 9 7 8.2 450 14 Making West Elastic Bar Tack Machine 18 14 14 15 18 15.8 240 240 15 Elastic Join Bar Tack Machine 24 23 22 24 26 23.8 150 321 16 Elastic Join Flat Lock Machine 22 20 23 22 20 21.4 171 17 Close inseam Flat Bed Machine 11 9 10 8 9 9.4 400 400 18 Tack at Latch Plain Machine 10 13 14 12 17 13.2 321 277
  • 27. 27 Operation Description Average Cycle Time Rating % Basic Time SMV Target Total Capacity Stay stitch at front pouch 55.2 62 34.22 44.49 230 218 Stay stitch at front pouch 45.2 68 30.74 39.96 Stay stitch at front pouch 48.8 65 31.72 41.24 Making Front Pouch 9.6 70 6.72 8.74 420 400 Join Back Rise 10 69 6.9 8.97 330 300 Join Side Seam 9.2 71 6.53 8.49 740 700Join Side Seam 12.4 63 7.81 10.15 Attach Front Pouch 9 64 5.75 7.48 420 400 Join Gussed 9 65 5.76 7.49 420 400 Attach Piping 7 70 4.9 6.37 940 914Attach Piping 9.2 60 5.52 7.18 Top Stitch 8.8 68 6 7.8 900 850 Top Stitch 8.2 68 5.58 7.25 Making West Elastic 15.8 60 9.48 12.32 260 240 Elastic Join 23.8 61 14.52 18.88 340 321 Elastic Join 21.4 62 13.27 17.25 Close inseam 9.4 64 6 7.8 430 400 Tack at Latch 13.2 63 8.32 10.82 300 277
  • 28. 28 Line Diagramof Capacity,TotalCapacity& Average cycle time Fig. Line Diagram Results: After analysis of sewing section efficiency by time study technique the production per hour 220 pieces. Discussion: After analysis of sewing section efficiency by time study technique the production capacity increase. 0 200 400 600 800 1000 1200 1400 1600 Staystitchatfrontpouch Staystitchatfrontpouch Staystitchatfrontpouch MakingFrontPouch JoinBackRise JoinSideSeam JoinSideSeam AttachFrontPouch JoinGussed AttatchPiping AttatchPiping TopStitch TopStitch MakingWestElastic ElasticJoin ElasticJoin Closeinseam TackatLatch Total Capacity Capacity Avg. Cycle Time
  • 30. 30 Conclusion Industrial engineering is an important and essential part of any Garments Industry. One of the aims of any production system is to make total production time as minimum as possible. This automatically reduces inventory cost to a minimum. Sub-assembly system provides many opportunities to economies on temporary storage and transportation space and time. No definite answer can be given as to which is the best, as it depends on garment style, specifications, machinery and manpower and manufacturing policies. It gives us an opportunity to compare the theoretical knowledge with practical facts and thus develop our knowledge and skills. This project also gives an opportunity to enlarge knowledge of textile administration, production planning, procurement system, production process etc. to adjust with the industrial life.
  • 31. 31 Reference: 1. Data Collected By Liz Fashions ltd. 2. http://www.slideshare.net/lavg1/time-study-41361819 3. http://www.onlineclothingstudy.com/2011/03/how-to-do-time-study-for- garment.html 4. http://www.slideshare.net/TanmoyAntu/presentation-38605832 5. https://www.isixsigma.com/methodology/business-process-management- bpm/preparing-measure-process-work-time-study/ 6. http://www.ijset.net/journal/212.pdf 7. http://www.slideshare.net/sheshir/work-study-line-balancing 8. http://www.slideshare.net/vishakeb/work-study-presentation-650617 9. http://www.slideshare.net/Roni640/application-of-industrial-engineering-in- garments-sewing-floor