General Information
STANDAR
KERJA
General Information
Goal
Mampu membuat Standar
Kerja sebagai Dokumen
Hidup
General Information
Coach’s Background
AJI WIJAYA KUSUMA, ST
Enthusiast & professional on Lean,
Improvement, people development
and motivation.
16 years experience in Apparel
Industry focus on practical lean
implementation, costing & capacity
management
471.wijayakusuma@gmail.com
+62 815 7898 6913
Aji Wijaya Kusuma
Lean Manufacturing
Industrial Engineering
Production Planning
Apparel CMT Costing & CPM
90%
90%
80%
85%
85%
Supplier Capacity Management
https://www.youtube.com/user/471WijayaKusuma/featured
https://www.facebook.com/Lets-LEAN-788239307962079
General Information
Perusahaan yang LEAN dipengaruhi oleh 2 prinsip dasar:
1. TEMPAT KERJA YANG
TRANSPARAN/VISUAL WORKPLACE –
Semua karyawan harus dapat
menjelaskan kondisi lingkungan
pekerjaannya dengan jelas
2. NORMAL VS TIDAK NORMAL –
Sejumlah standar harus dipasang,
sehingga semua karyawan bisa
menilai Normal atau Tidak
Normalnya suatu pekerjaan
TOOLS/ALAT
TOOLS/ALAT
STANDAR
KERJA
General Information
MENGAPA Kerja Perlu Di
STANDARKAN?
Why
Mencegah
VARIASI
Output &
Kualitas
Reduce/Eliminate
COST/WASTE
Konsistensi
PEKERJA &
WAKTU
KERJA
Memudahkan
mengenali
PENYIMPANGAN
General Information
Target per hour : 300 pcs
Takt Time : 3600 sec/300 pcs =
12 sec/1 process 1 operator
Process with
1 operator
Process with
2 operator
Process with
3 operator
Process with
4 operator
TAKT TIME
Mengapa 3 operator
proses sama tapi
waktu pengerjaan
berbeda?
Konsistensi
PEKERJA &
WAKTU KERJA
General Information
POIN PROSES JENIS AKTIVITAS WAKTU KEKURANGAN JENIS AKTIVITAS WAKTU KELEBIHAN
AMBIL JAHITAN KOMPONEN TANGAN 8 AMBIL JAHITAN KOMPONEN TANGAN 0
AMBIL JAHITAN YANG MAU DIOBRAS 4 AMBIL JAHITAN YANG MAU DIOBRAS 4
LETAKAN JAHITAN DI BAWAH SEPATU MESIN
JARUM 1
24 LETAKAN JAHITAN DI BAWAH SEPATU MESIN JARUM 1 0
LETAKKAN JAHITAN DI SEPATU MESIN OBRAS 5 LETAKKAN JAHITAN DI SEPATU MESIN OBRAS 15
JAHIT PASANG TANGAN 33 JAHIT PASANG TANGAN 0
OBRAS PASANG TANGAN 28 OBRAS PASANG TANGAN 50
CEK KUALITAS CEK KUALITAS JAHITAN 9 CEK KUALITAS JAHITAN 4
GUNTING BENANG GUNTING BENANG 7 GUNTING BENANG 4
PELETAKAN LETAKKAN HASIL JAHITAN 6 LETAKKAN HASIL JAHITAN 2
CYCLE TIME GAMBAR SESUDAH CYCLE TIME
IMPROVEMENT OF SEWING METHOD
IMPROVEMENT ACTIVITY : MENGURANGI JUMLAH CYCLE TIME
DENGAN CARA MENGURANGI PROSES PASANG TANGAN
OPERATION : PASANG TANGAN MACHINE : OBRAS
BEFORE AFTER
MayObras pasang
tanganObras pasang
tangan After.3GP
PERSIAPAN
Membutuhkan
cycle time lebih
besar KARENA
ADA PROSES
PASANG TANGAN
JARUM 1
Dapat mengurangi
cycle time hingga 45
detik
PROSES JAHIT
GAMBAR SEBELUM
124 79
PELETAKAN
MayObras
pasang
tanganPasang
MayObras
pasang
tanganObras
Reduce/Eliminate
COST/WASTE
General Information
8
Analisa Elemen Kerja
Level
Tugas
Level
Pekerjaan
Elemen
Kerja
Level
Gerakan
Elemen
Gerakan
Membuat
Jacket
Gabung Badan
Belakang &
Depan
Pasang Tangan
Ke badan
Jahit Badan
Depan
Jahit badan
belakang
Ambil badan
belakang
Jahit badan
belakang
Simpan
Menaruh badan
belakang di atas mesin
Angkat Sepatu
Tekan pedal jahit
Proses Jahit
Umum Khusus/
Rinci
General Information
Konsep Bekerja Pintar
Work Waste
Work
Work
Waste
Waste
Waste
Work
Waste
Work
Waste
Waste
Work Waste
Cara Modern
Work
Work
Bekerja Lebih Pintar Dengan
Mengurangi/Menghilangkan Pemborosan
General Information
MatrixValue Added/Nilai Tambah
VALUE ADDED NON VALUE ADDED
TIDAK
DIPERLUKAN PERTAHANKAN REDUCE
ELIMINATE!
TIDAK
ADA
‘Incidental’
‘Value Add’
‘NON Value Add’
Habis Kontrak
Absen
Mencegah
VARIASI Output
& Kualitas
Memudahkan
mengenali
PENYIMPANGAN
>1 Sty
Pindah Line
Mencegah
VARIASI Output
& Kualitas
Memudahkan
mengenali
PENYIMPANGAN
>1 Sty
Mencegah
VARIASI Output
& Kualitas
Memudahkan
mengenali
PENYIMPANGAN
General Information
Definisi
Standar Kerja adalah:
• Alat untuk membuat produk yang berkualitas.
• Berfokus pada gerakan pekerja,
• Mengkombinasikan elemen kerja dalam urutan kerja yang paling
efektif.
• Cara untuk mencapai tingkat produksi yang paling efisien.
General Information
Standar haruslah :
• Spesifik dan Ilmiah
– Berdasarkan fakta dan analisa bukan berdsarkan kebiasaan, dugaan atau ingatan
• Dilaksanakan
– Tidak bermanfaat kalau tidak digunakan
– Harus konsisten diikuti dan dilaksanakan
• Didokumentasikan & dikomunikasikan
– Sehingga operator tahu standarnya dan mengikutinya
– Supaya standar bisa diaudit
General Information
Standar Kerja harus berisi….
• Cara terbaik yang dipilih dan disetujui untuk melakukan suatu
pekerjaan
• Disiplin untuk melaksanakan standar
• Mekanisme untuk memperbaiki cara kerja yang sebelumnya
sudah didokumentasikan
General Information
18
Standar Kerja Bukanlah….
• Diciptakan oleh manajer atau engineering
– SOP adalah ‘APA’ yang harus dilakukan sedangkan Standar Kerja adalah ‘BAGAIMANA’ melakukannya
– Tetap/tidak Berubah -- Standar adalah sesuatu yang bisa berubah sesuai dengan perkembangan perbaikan yang
dilakukan
• Berserakan di meja kerja --- Standar kerja haruslah ditempatkan didekat stasiun kerja.
• Lembaran Kerja; Standar kerja adalah suatu sistem untk mengecek lebih rinci kinerja aktual proses
produksi.
• Terlalu Rinci – Standar haruslah mudah dipahami
• Sebuah pengawasan -- Standar merupakan fondasi untuk perbaikan
General Information
19
STANDAR KERJA merupakan dokumen hidup
• Dikembangkan oleh tim produksi bukan IE
• Memastikan Konsistensi antar operator
• Standar Kerja Mengalami Perubahan ketika :
– Level skill improve atau proses dirubah/dimodifikasi
– Ketika operator menemukan masalah
– Ketika operator menemukan metode/cara kerja baru yang lebih baik
General Information
20
3 KOMPONEN STANDAR KERJA
Standardized
Work
Work
Quality
Efficiencies &
Resources
TAKT
Time
Urutan
Kerja
Standar WIP
General Information
Takt Time, Cycle Time, Urutan Kerja
A B C D E
Step A1
Step B1
Step A2
Step B2
Step A3
Step B3
Step C1
Step C2
Step C3
Step C4
Step C5
Step E1
Step E2
Step E3
Step E4
Step E5
Step D1
Step D2
Step D3
Step D4
Step D5
Operators
Takt Time ( 60 sec )
A B C D E
Step A1
Step B1
Step A2
Step B2
Step A3
Step B3
Step A4 Step C1
Step C2
Step C3
Step C4
Step C5
Step E1
Step E3
Step E4
Step E5
Step D1
Step D2
Step D3
Step D4
Step D5
Operators
Takt Time ( 60 sec )
Step A4
Step E2
10
20
30
40
50
60
0
10
20
30
40
50
60
0
General Information
Continuous Improvement Model
Neal Creative ©
FINISH
IMPROVEMENTS!
THANK YOU

More Related Content

Similar to STANDARISASI

W2 LA1 Check Component Drawing Development Minggu 2
W2 LA1 Check Component Drawing Development Minggu 2W2 LA1 Check Component Drawing Development Minggu 2
W2 LA1 Check Component Drawing Development Minggu 2Jepree Ibrahim
 
1263 p1-p psp-teknik pemeliharaan mekanik industri
1263 p1-p psp-teknik pemeliharaan mekanik industri1263 p1-p psp-teknik pemeliharaan mekanik industri
1263 p1-p psp-teknik pemeliharaan mekanik industriWinarto Winartoap
 
Materi QCC Awwarness 1.pptx
Materi QCC Awwarness 1.pptxMateri QCC Awwarness 1.pptx
Materi QCC Awwarness 1.pptxRizaldiFakhri
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceIdham Hanafiah
 
Laporan Kerja Praktek - PT. Inti Ganda Perdana
Laporan Kerja Praktek - PT. Inti Ganda PerdanaLaporan Kerja Praktek - PT. Inti Ganda Perdana
Laporan Kerja Praktek - PT. Inti Ganda PerdanaRidwan Arifin
 
04. TRAINING PEMBUATAN PROSEDUR R00 07-2022.pdf
04. TRAINING PEMBUATAN PROSEDUR R00 07-2022.pdf04. TRAINING PEMBUATAN PROSEDUR R00 07-2022.pdf
04. TRAINING PEMBUATAN PROSEDUR R00 07-2022.pdfalfainternusa tritama
 
Model Gugus Kendali Mutu (GKM) 3P
Model Gugus Kendali Mutu (GKM) 3PModel Gugus Kendali Mutu (GKM) 3P
Model Gugus Kendali Mutu (GKM) 3PAa Renovit
 
MATERY KAIZEN GARMNENT.pptx
MATERY KAIZEN GARMNENT.pptxMATERY KAIZEN GARMNENT.pptx
MATERY KAIZEN GARMNENT.pptxMirandaAmbarita
 
837ddc1fdc65970103d029ed7165c46b.pptx
837ddc1fdc65970103d029ed7165c46b.pptx837ddc1fdc65970103d029ed7165c46b.pptx
837ddc1fdc65970103d029ed7165c46b.pptxMuhammadAfifS
 
1796 p3-p psp-teknik dan manajemen pergudangan
1796 p3-p psp-teknik dan manajemen pergudangan1796 p3-p psp-teknik dan manajemen pergudangan
1796 p3-p psp-teknik dan manajemen pergudanganWinarto Winartoap
 
Materi 5 S (Seiri Seiton Seiso Seiketsu Shitsuke)
Materi 5 S (Seiri Seiton Seiso Seiketsu Shitsuke)Materi 5 S (Seiri Seiton Seiso Seiketsu Shitsuke)
Materi 5 S (Seiri Seiton Seiso Seiketsu Shitsuke)Al Marson
 
QMS - bahasa R1.pptx
QMS - bahasa R1.pptxQMS - bahasa R1.pptx
QMS - bahasa R1.pptxMTaufik23
 
CONTOH KAJIAN KES TERBARU DAN TERBAIK 2019
CONTOH KAJIAN KES  TERBARU DAN TERBAIK 2019CONTOH KAJIAN KES  TERBARU DAN TERBAIK 2019
CONTOH KAJIAN KES TERBARU DAN TERBAIK 2019WOWAMANZING
 
Business Process Reengineering Framework and Approach
Business Process Reengineering Framework and ApproachBusiness Process Reengineering Framework and Approach
Business Process Reengineering Framework and Approachdeawemona
 

Similar to STANDARISASI (20)

W2 LA1 Check Component Drawing Development Minggu 2
W2 LA1 Check Component Drawing Development Minggu 2W2 LA1 Check Component Drawing Development Minggu 2
W2 LA1 Check Component Drawing Development Minggu 2
 
1263 p1-p psp-teknik pemeliharaan mekanik industri
1263 p1-p psp-teknik pemeliharaan mekanik industri1263 p1-p psp-teknik pemeliharaan mekanik industri
1263 p1-p psp-teknik pemeliharaan mekanik industri
 
Penerapan Manajemen Sederhana dan 5 R untuk UMK - Studi Kasus Masker Kain
Penerapan Manajemen Sederhana dan 5 R untuk UMK - Studi Kasus Masker KainPenerapan Manajemen Sederhana dan 5 R untuk UMK - Studi Kasus Masker Kain
Penerapan Manajemen Sederhana dan 5 R untuk UMK - Studi Kasus Masker Kain
 
Materi QCC Awwarness 1.pptx
Materi QCC Awwarness 1.pptxMateri QCC Awwarness 1.pptx
Materi QCC Awwarness 1.pptx
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Laporan Kerja Praktek - PT. Inti Ganda Perdana
Laporan Kerja Praktek - PT. Inti Ganda PerdanaLaporan Kerja Praktek - PT. Inti Ganda Perdana
Laporan Kerja Praktek - PT. Inti Ganda Perdana
 
04. TRAINING PEMBUATAN PROSEDUR R00 07-2022.pdf
04. TRAINING PEMBUATAN PROSEDUR R00 07-2022.pdf04. TRAINING PEMBUATAN PROSEDUR R00 07-2022.pdf
04. TRAINING PEMBUATAN PROSEDUR R00 07-2022.pdf
 
Model Gugus Kendali Mutu (GKM) 3P
Model Gugus Kendali Mutu (GKM) 3PModel Gugus Kendali Mutu (GKM) 3P
Model Gugus Kendali Mutu (GKM) 3P
 
MATERY KAIZEN GARMNENT.pptx
MATERY KAIZEN GARMNENT.pptxMATERY KAIZEN GARMNENT.pptx
MATERY KAIZEN GARMNENT.pptx
 
000_Presentasi Automasi
000_Presentasi Automasi000_Presentasi Automasi
000_Presentasi Automasi
 
5R 5S.pptx
5R 5S.pptx5R 5S.pptx
5R 5S.pptx
 
837ddc1fdc65970103d029ed7165c46b.pptx
837ddc1fdc65970103d029ed7165c46b.pptx837ddc1fdc65970103d029ed7165c46b.pptx
837ddc1fdc65970103d029ed7165c46b.pptx
 
1796 p3-p psp-teknik dan manajemen pergudangan
1796 p3-p psp-teknik dan manajemen pergudangan1796 p3-p psp-teknik dan manajemen pergudangan
1796 p3-p psp-teknik dan manajemen pergudangan
 
Materi 5 S (Seiri Seiton Seiso Seiketsu Shitsuke)
Materi 5 S (Seiri Seiton Seiso Seiketsu Shitsuke)Materi 5 S (Seiri Seiton Seiso Seiketsu Shitsuke)
Materi 5 S (Seiri Seiton Seiso Seiketsu Shitsuke)
 
Iso room sop
Iso room sopIso room sop
Iso room sop
 
Business process improvement
Business process improvementBusiness process improvement
Business process improvement
 
QMS - bahasa R1.pptx
QMS - bahasa R1.pptxQMS - bahasa R1.pptx
QMS - bahasa R1.pptx
 
PEKKA SYSTEM
PEKKA SYSTEMPEKKA SYSTEM
PEKKA SYSTEM
 
CONTOH KAJIAN KES TERBARU DAN TERBAIK 2019
CONTOH KAJIAN KES  TERBARU DAN TERBAIK 2019CONTOH KAJIAN KES  TERBARU DAN TERBAIK 2019
CONTOH KAJIAN KES TERBARU DAN TERBAIK 2019
 
Business Process Reengineering Framework and Approach
Business Process Reengineering Framework and ApproachBusiness Process Reengineering Framework and Approach
Business Process Reengineering Framework and Approach
 

More from Aji Wijaya Kusuma

Kaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptxKaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptxAji Wijaya Kusuma
 
4_5S & Visual Management.pdf
4_5S & Visual Management.pdf4_5S & Visual Management.pdf
4_5S & Visual Management.pdfAji Wijaya Kusuma
 
2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdfAji Wijaya Kusuma
 
11_Skill Matrix_Multiskill Development & Training plan.pdf
11_Skill Matrix_Multiskill Development & Training plan.pdf11_Skill Matrix_Multiskill Development & Training plan.pdf
11_Skill Matrix_Multiskill Development & Training plan.pdfAji Wijaya Kusuma
 
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdfAji Wijaya Kusuma
 
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdfAji Wijaya Kusuma
 
Rft real implementation korean fty
Rft real implementation korean ftyRft real implementation korean fty
Rft real implementation korean ftyAji Wijaya Kusuma
 
Rft project real implementation
Rft project real implementationRft project real implementation
Rft project real implementationAji Wijaya Kusuma
 
Greentex indonesia utama lean implementation
Greentex indonesia utama lean implementationGreentex indonesia utama lean implementation
Greentex indonesia utama lean implementationAji Wijaya Kusuma
 
BEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADINGBEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADINGAji Wijaya Kusuma
 
Reducing cleanliness defect_GRB
Reducing cleanliness defect_GRBReducing cleanliness defect_GRB
Reducing cleanliness defect_GRBAji Wijaya Kusuma
 

More from Aji Wijaya Kusuma (17)

Kaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptxKaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptx
 
4_5S & Visual Management.pdf
4_5S & Visual Management.pdf4_5S & Visual Management.pdf
4_5S & Visual Management.pdf
 
14_PULL SYSTEM.pdf
14_PULL SYSTEM.pdf14_PULL SYSTEM.pdf
14_PULL SYSTEM.pdf
 
15_One Piece Flow.pdf
15_One Piece Flow.pdf15_One Piece Flow.pdf
15_One Piece Flow.pdf
 
2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf
 
11_Skill Matrix_Multiskill Development & Training plan.pdf
11_Skill Matrix_Multiskill Development & Training plan.pdf11_Skill Matrix_Multiskill Development & Training plan.pdf
11_Skill Matrix_Multiskill Development & Training plan.pdf
 
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
 
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
 
8_TPM.pdf
8_TPM.pdf8_TPM.pdf
8_TPM.pdf
 
Rft real implementation korean fty
Rft real implementation korean ftyRft real implementation korean fty
Rft real implementation korean fty
 
Rft project real implementation
Rft project real implementationRft project real implementation
Rft project real implementation
 
RFT Workshop
RFT WorkshopRFT Workshop
RFT Workshop
 
Creating speed with 5 s
Creating speed with 5 sCreating speed with 5 s
Creating speed with 5 s
 
New qco project greentex
New qco project greentexNew qco project greentex
New qco project greentex
 
Greentex indonesia utama lean implementation
Greentex indonesia utama lean implementationGreentex indonesia utama lean implementation
Greentex indonesia utama lean implementation
 
BEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADINGBEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADING
 
Reducing cleanliness defect_GRB
Reducing cleanliness defect_GRBReducing cleanliness defect_GRB
Reducing cleanliness defect_GRB
 

Recently uploaded

PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptxPCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptxmuhammadfajri44049
 
Contoh contoh soal dan jawaban persediaan barang
Contoh contoh soal dan jawaban persediaan barangContoh contoh soal dan jawaban persediaan barang
Contoh contoh soal dan jawaban persediaan barangRadhialKautsar
 
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYAPRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYALex PRTOTO
 
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di IndonesiaTajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di IndonesiaHaseebBashir5
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptxTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptxFORTRESS
 
KEAGENAN KAPAL DALAM DUNIA MARITIME INDO
KEAGENAN KAPAL DALAM DUNIA MARITIME INDOKEAGENAN KAPAL DALAM DUNIA MARITIME INDO
KEAGENAN KAPAL DALAM DUNIA MARITIME INDOANNISAUMAYAHS
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptxTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptxFORTRESS
 
PROMOTIF KESEHATAN JIWA TERBARUHGFF.pptx
PROMOTIF KESEHATAN JIWA TERBARUHGFF.pptxPROMOTIF KESEHATAN JIWA TERBARUHGFF.pptx
PROMOTIF KESEHATAN JIWA TERBARUHGFF.pptxMelandaNiuwa
 
RISK BASED INTERNAL AUDIT - AUDITING .pptx
RISK BASED INTERNAL AUDIT - AUDITING .pptxRISK BASED INTERNAL AUDIT - AUDITING .pptx
RISK BASED INTERNAL AUDIT - AUDITING .pptxerlyndakasim2
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aesthetic Pintu Aluminium di Banda Aceh
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aesthetic Pintu Aluminium di Banda AcehTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aesthetic Pintu Aluminium di Banda Aceh
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aesthetic Pintu Aluminium di Banda AcehFORTRESS
 
Tugas unjuk keterampilan_HERI PURWANTO1.pptx
Tugas unjuk keterampilan_HERI PURWANTO1.pptxTugas unjuk keterampilan_HERI PURWANTO1.pptx
Tugas unjuk keterampilan_HERI PURWANTO1.pptxHeripurwanto62
 
Time Value of Money Mata Kuliah Ekonomi 2
Time Value of Money Mata Kuliah Ekonomi 2Time Value of Money Mata Kuliah Ekonomi 2
Time Value of Money Mata Kuliah Ekonomi 2PutriMuaini
 
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar JudiCimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar JudiHaseebBashir5
 
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...HaseebBashir5
 
10. (C) MERGER DAN AKUISISI Presentation.pptx
10. (C) MERGER DAN AKUISISI Presentation.pptx10. (C) MERGER DAN AKUISISI Presentation.pptx
10. (C) MERGER DAN AKUISISI Presentation.pptxerlyndakasim2
 
PPT Presentasimatkul Hukum Komersial.pptx
PPT Presentasimatkul Hukum Komersial.pptxPPT Presentasimatkul Hukum Komersial.pptx
PPT Presentasimatkul Hukum Komersial.pptxYasfinaQurrotaAyun
 
Investment Analysis Chapter 5 and 6 Material
Investment Analysis Chapter 5 and 6 MaterialInvestment Analysis Chapter 5 and 6 Material
Investment Analysis Chapter 5 and 6 MaterialValenciaAnggie
 
"Menjelajahi Keberagaman Permainan di Sumaterabet: Situs Slot Terbesar di Ind...
"Menjelajahi Keberagaman Permainan di Sumaterabet: Situs Slot Terbesar di Ind..."Menjelajahi Keberagaman Permainan di Sumaterabet: Situs Slot Terbesar di Ind...
"Menjelajahi Keberagaman Permainan di Sumaterabet: Situs Slot Terbesar di Ind...HaseebBashir5
 
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs TogelTogel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs TogelHaseebBashir5
 
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di IndonesiaJudul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di IndonesiaHaseebBashir5
 

Recently uploaded (20)

PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptxPCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
 
Contoh contoh soal dan jawaban persediaan barang
Contoh contoh soal dan jawaban persediaan barangContoh contoh soal dan jawaban persediaan barang
Contoh contoh soal dan jawaban persediaan barang
 
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYAPRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
 
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di IndonesiaTajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
Tajuk: SV388: Platform Unggul Taruhan Sabung Ayam Online di Indonesia
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptxTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
 
KEAGENAN KAPAL DALAM DUNIA MARITIME INDO
KEAGENAN KAPAL DALAM DUNIA MARITIME INDOKEAGENAN KAPAL DALAM DUNIA MARITIME INDO
KEAGENAN KAPAL DALAM DUNIA MARITIME INDO
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptxTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
 
PROMOTIF KESEHATAN JIWA TERBARUHGFF.pptx
PROMOTIF KESEHATAN JIWA TERBARUHGFF.pptxPROMOTIF KESEHATAN JIWA TERBARUHGFF.pptx
PROMOTIF KESEHATAN JIWA TERBARUHGFF.pptx
 
RISK BASED INTERNAL AUDIT - AUDITING .pptx
RISK BASED INTERNAL AUDIT - AUDITING .pptxRISK BASED INTERNAL AUDIT - AUDITING .pptx
RISK BASED INTERNAL AUDIT - AUDITING .pptx
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aesthetic Pintu Aluminium di Banda Aceh
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aesthetic Pintu Aluminium di Banda AcehTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aesthetic Pintu Aluminium di Banda Aceh
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aesthetic Pintu Aluminium di Banda Aceh
 
Tugas unjuk keterampilan_HERI PURWANTO1.pptx
Tugas unjuk keterampilan_HERI PURWANTO1.pptxTugas unjuk keterampilan_HERI PURWANTO1.pptx
Tugas unjuk keterampilan_HERI PURWANTO1.pptx
 
Time Value of Money Mata Kuliah Ekonomi 2
Time Value of Money Mata Kuliah Ekonomi 2Time Value of Money Mata Kuliah Ekonomi 2
Time Value of Money Mata Kuliah Ekonomi 2
 
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar JudiCimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
 
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
 
10. (C) MERGER DAN AKUISISI Presentation.pptx
10. (C) MERGER DAN AKUISISI Presentation.pptx10. (C) MERGER DAN AKUISISI Presentation.pptx
10. (C) MERGER DAN AKUISISI Presentation.pptx
 
PPT Presentasimatkul Hukum Komersial.pptx
PPT Presentasimatkul Hukum Komersial.pptxPPT Presentasimatkul Hukum Komersial.pptx
PPT Presentasimatkul Hukum Komersial.pptx
 
Investment Analysis Chapter 5 and 6 Material
Investment Analysis Chapter 5 and 6 MaterialInvestment Analysis Chapter 5 and 6 Material
Investment Analysis Chapter 5 and 6 Material
 
"Menjelajahi Keberagaman Permainan di Sumaterabet: Situs Slot Terbesar di Ind...
"Menjelajahi Keberagaman Permainan di Sumaterabet: Situs Slot Terbesar di Ind..."Menjelajahi Keberagaman Permainan di Sumaterabet: Situs Slot Terbesar di Ind...
"Menjelajahi Keberagaman Permainan di Sumaterabet: Situs Slot Terbesar di Ind...
 
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs TogelTogel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
 
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di IndonesiaJudul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
 

STANDARISASI

  • 2. General Information Goal Mampu membuat Standar Kerja sebagai Dokumen Hidup
  • 3. General Information Coach’s Background AJI WIJAYA KUSUMA, ST Enthusiast & professional on Lean, Improvement, people development and motivation. 16 years experience in Apparel Industry focus on practical lean implementation, costing & capacity management 471.wijayakusuma@gmail.com +62 815 7898 6913 Aji Wijaya Kusuma Lean Manufacturing Industrial Engineering Production Planning Apparel CMT Costing & CPM 90% 90% 80% 85% 85% Supplier Capacity Management https://www.youtube.com/user/471WijayaKusuma/featured https://www.facebook.com/Lets-LEAN-788239307962079
  • 4. General Information Perusahaan yang LEAN dipengaruhi oleh 2 prinsip dasar: 1. TEMPAT KERJA YANG TRANSPARAN/VISUAL WORKPLACE – Semua karyawan harus dapat menjelaskan kondisi lingkungan pekerjaannya dengan jelas 2. NORMAL VS TIDAK NORMAL – Sejumlah standar harus dipasang, sehingga semua karyawan bisa menilai Normal atau Tidak Normalnya suatu pekerjaan TOOLS/ALAT TOOLS/ALAT STANDAR KERJA
  • 5. General Information MENGAPA Kerja Perlu Di STANDARKAN? Why Mencegah VARIASI Output & Kualitas Reduce/Eliminate COST/WASTE Konsistensi PEKERJA & WAKTU KERJA Memudahkan mengenali PENYIMPANGAN
  • 6. General Information Target per hour : 300 pcs Takt Time : 3600 sec/300 pcs = 12 sec/1 process 1 operator Process with 1 operator Process with 2 operator Process with 3 operator Process with 4 operator TAKT TIME Mengapa 3 operator proses sama tapi waktu pengerjaan berbeda? Konsistensi PEKERJA & WAKTU KERJA
  • 7. General Information POIN PROSES JENIS AKTIVITAS WAKTU KEKURANGAN JENIS AKTIVITAS WAKTU KELEBIHAN AMBIL JAHITAN KOMPONEN TANGAN 8 AMBIL JAHITAN KOMPONEN TANGAN 0 AMBIL JAHITAN YANG MAU DIOBRAS 4 AMBIL JAHITAN YANG MAU DIOBRAS 4 LETAKAN JAHITAN DI BAWAH SEPATU MESIN JARUM 1 24 LETAKAN JAHITAN DI BAWAH SEPATU MESIN JARUM 1 0 LETAKKAN JAHITAN DI SEPATU MESIN OBRAS 5 LETAKKAN JAHITAN DI SEPATU MESIN OBRAS 15 JAHIT PASANG TANGAN 33 JAHIT PASANG TANGAN 0 OBRAS PASANG TANGAN 28 OBRAS PASANG TANGAN 50 CEK KUALITAS CEK KUALITAS JAHITAN 9 CEK KUALITAS JAHITAN 4 GUNTING BENANG GUNTING BENANG 7 GUNTING BENANG 4 PELETAKAN LETAKKAN HASIL JAHITAN 6 LETAKKAN HASIL JAHITAN 2 CYCLE TIME GAMBAR SESUDAH CYCLE TIME IMPROVEMENT OF SEWING METHOD IMPROVEMENT ACTIVITY : MENGURANGI JUMLAH CYCLE TIME DENGAN CARA MENGURANGI PROSES PASANG TANGAN OPERATION : PASANG TANGAN MACHINE : OBRAS BEFORE AFTER MayObras pasang tanganObras pasang tangan After.3GP PERSIAPAN Membutuhkan cycle time lebih besar KARENA ADA PROSES PASANG TANGAN JARUM 1 Dapat mengurangi cycle time hingga 45 detik PROSES JAHIT GAMBAR SEBELUM 124 79 PELETAKAN MayObras pasang tanganPasang MayObras pasang tanganObras Reduce/Eliminate COST/WASTE
  • 8. General Information 8 Analisa Elemen Kerja Level Tugas Level Pekerjaan Elemen Kerja Level Gerakan Elemen Gerakan Membuat Jacket Gabung Badan Belakang & Depan Pasang Tangan Ke badan Jahit Badan Depan Jahit badan belakang Ambil badan belakang Jahit badan belakang Simpan Menaruh badan belakang di atas mesin Angkat Sepatu Tekan pedal jahit Proses Jahit Umum Khusus/ Rinci
  • 9. General Information Konsep Bekerja Pintar Work Waste Work Work Waste Waste Waste Work Waste Work Waste Waste Work Waste Cara Modern Work Work Bekerja Lebih Pintar Dengan Mengurangi/Menghilangkan Pemborosan
  • 10. General Information MatrixValue Added/Nilai Tambah VALUE ADDED NON VALUE ADDED TIDAK DIPERLUKAN PERTAHANKAN REDUCE ELIMINATE! TIDAK ADA ‘Incidental’ ‘Value Add’ ‘NON Value Add’
  • 11.
  • 12. Habis Kontrak Absen Mencegah VARIASI Output & Kualitas Memudahkan mengenali PENYIMPANGAN
  • 13. >1 Sty Pindah Line Mencegah VARIASI Output & Kualitas Memudahkan mengenali PENYIMPANGAN
  • 14. >1 Sty Mencegah VARIASI Output & Kualitas Memudahkan mengenali PENYIMPANGAN
  • 15. General Information Definisi Standar Kerja adalah: • Alat untuk membuat produk yang berkualitas. • Berfokus pada gerakan pekerja, • Mengkombinasikan elemen kerja dalam urutan kerja yang paling efektif. • Cara untuk mencapai tingkat produksi yang paling efisien.
  • 16. General Information Standar haruslah : • Spesifik dan Ilmiah – Berdasarkan fakta dan analisa bukan berdsarkan kebiasaan, dugaan atau ingatan • Dilaksanakan – Tidak bermanfaat kalau tidak digunakan – Harus konsisten diikuti dan dilaksanakan • Didokumentasikan & dikomunikasikan – Sehingga operator tahu standarnya dan mengikutinya – Supaya standar bisa diaudit
  • 17. General Information Standar Kerja harus berisi…. • Cara terbaik yang dipilih dan disetujui untuk melakukan suatu pekerjaan • Disiplin untuk melaksanakan standar • Mekanisme untuk memperbaiki cara kerja yang sebelumnya sudah didokumentasikan
  • 18. General Information 18 Standar Kerja Bukanlah…. • Diciptakan oleh manajer atau engineering – SOP adalah ‘APA’ yang harus dilakukan sedangkan Standar Kerja adalah ‘BAGAIMANA’ melakukannya – Tetap/tidak Berubah -- Standar adalah sesuatu yang bisa berubah sesuai dengan perkembangan perbaikan yang dilakukan • Berserakan di meja kerja --- Standar kerja haruslah ditempatkan didekat stasiun kerja. • Lembaran Kerja; Standar kerja adalah suatu sistem untk mengecek lebih rinci kinerja aktual proses produksi. • Terlalu Rinci – Standar haruslah mudah dipahami • Sebuah pengawasan -- Standar merupakan fondasi untuk perbaikan
  • 19. General Information 19 STANDAR KERJA merupakan dokumen hidup • Dikembangkan oleh tim produksi bukan IE • Memastikan Konsistensi antar operator • Standar Kerja Mengalami Perubahan ketika : – Level skill improve atau proses dirubah/dimodifikasi – Ketika operator menemukan masalah – Ketika operator menemukan metode/cara kerja baru yang lebih baik
  • 20. General Information 20 3 KOMPONEN STANDAR KERJA Standardized Work Work Quality Efficiencies & Resources TAKT Time Urutan Kerja Standar WIP
  • 21. General Information Takt Time, Cycle Time, Urutan Kerja A B C D E Step A1 Step B1 Step A2 Step B2 Step A3 Step B3 Step C1 Step C2 Step C3 Step C4 Step C5 Step E1 Step E2 Step E3 Step E4 Step E5 Step D1 Step D2 Step D3 Step D4 Step D5 Operators Takt Time ( 60 sec ) A B C D E Step A1 Step B1 Step A2 Step B2 Step A3 Step B3 Step A4 Step C1 Step C2 Step C3 Step C4 Step C5 Step E1 Step E3 Step E4 Step E5 Step D1 Step D2 Step D3 Step D4 Step D5 Operators Takt Time ( 60 sec ) Step A4 Step E2 10 20 30 40 50 60 0 10 20 30 40 50 60 0