This document discusses portfolio management of multiple building construction projects using Primavera EPPM P6v16.1 software. It analyzes 4 commercial building projects, calculating quantities and scheduling activities. The projects were planned, scheduled and baseline budgets created in Primavera P6. A portfolio of the projects was then prepared to evaluate cash flow, optimize resource use, reduce warehousing and administrative costs. Prior research on using Primavera P6 for project planning, scheduling and monitoring is also reviewed. The objective is to develop the project portfolio and analyze cash flow using the Primavera software.
This document outlines the scope and content of an innovative project management program for working professionals. The program will cover topics such as project concepts and standards, formulation and approval processes, risk analysis, quality assurance, and case studies. It will demonstrate the use of tools like CPM, PERT and Gantt charts for project scheduling. The objectives are to define what constitutes a project, explain the project manager's role, and analyze reasons for cost and time overruns in government projects in India. Successful project management requires experienced people, well-defined processes and organizational structure.
Project Management can save USD 25 Billion per year as per study by NCAER.Examples of Reliance Power,NTPC,Tata Power,Delhi Metro,Tata Motors with live examples and photos!
Activity schedule and affective control of component based projecteSAT Journals
Abstract Abstract The overall performance of any organizations depends on the way the project is managed and scheduled. The successful implementation of one or two big or complex project does not indicate that this organization will perform In the same way in future. Component based implementation of software development projects in the automotive industry have to face the rapid strategies for the use of the latest technologies that would provide the success of this type of projects, namely the frequency of change requirements during the life cycle. The cost and time for software testing was analyzed and to avoid delays in the project and more to cope with disturbances caused by changing requirements in the each phase of the project life cycle. Using of Component Based Software Engineering(CBSE) in software company, the implementation of any software project has become easy but the integration of available component or their use is the not only skill of project manager but the delivery of project in time is a required.. The project manager ensure the success of their project as a competitive advantage and establish such a system which will work with limited resources and available time. The project management tools and techniques i.e. Critical Path Methods(CPM) or Program Evaluation and Review Techniques (PERT) are used in reality as the most valuable and are planned to be used in the component based software testing system. This research result point out that there is a huge difference between planned and unplanned testing project. It also shows that the time of testing can be reduced with increase of cost of failure as a result the company may decide the benefit from that project. Analysis of the results allows to determine dependencies between level of company’s maturity level in project management, used project management tools and techniques, and values gained by the company from project management time to time with measured risk factor. Key Words: K Component Base Software Engineering(CBSE), CPM, PERT, Project life cycle, planned or unplanned project
This document discusses different organizational models for project management: functional, pure project, and matrix.
The functional model involves projects being managed within existing functional departments, allowing flexibility in staffing but risking that projects are not the primary focus.
The pure project model makes projects independent from the main organization, giving full responsibility and authority to project managers but risking duplication of resources across multiple projects.
The matrix model aims to combine advantages of the functional and pure project models by drawing on existing departments' expertise while also giving projects dedicated resources and leadership. It represents a middle ground between the two extremes.
This document provides an overview of project formulation, including its key elements and significance. It discusses the need for project formulation, highlighting issues like technology selection, resource constraints, and legal/policy impacts. The main elements of project formulation are identified as feasibility analysis, techno-economic analysis, project design/network analysis, input analysis, financial analysis, social cost-benefit analysis, and project appraisal. The document also distinguishes project formulation from a detailed project report, and outlines the steps in India's planning commission's project appraisal process.
How to Increase the Value of the PMMMs as a Business-oriented FrameworkYasmin AbdelAziz
An organization’s effectiveness partly depends
on the success of its projects. With this in mind, many
efforts have been spent in recent decades to enhance the
project management culture, but results are still highly
unsatisfactory. Project Management Maturity Models
(PMMMs) are seen by both the academic and the
industrial communities as a solid instrument to achieve
this goal. The point at issue is that surveys and researches
show PMMMs must be better linked to business and
financial performance. The aim of this paper is to explore
the scope for improvement to evolve PMMMs as
business-oriented frameworks.
Opportunity analysis under strategic program management second editionBob Prieto
Strategic Program Management is about meeting the challenges of scale and complexity but also about capturing the opportunities of leverage. Every major program as well as the projects that comprise it is the subject of a detailed and rigorous risk analysis. This is not only appropriate but also necessary. But in order to capture the full value inherent in large programs, the program management consultant or PMC must be seeking out opportunities in a proactive and ongoing manner.
The PMC’s opportunity analysis is best constructed within a framework that ensures a comprehensive view of all aspects of the program. Unlike various risk frameworks and categorizations that exist, there is no comparable opportunity framework for program management in the engineering and construction industry. This paper outlines one possible framework
This document outlines the scope and content of an innovative project management program for working professionals. The program will cover topics such as project concepts and standards, formulation and approval processes, risk analysis, quality assurance, and case studies. It will demonstrate the use of tools like CPM, PERT and Gantt charts for project scheduling. The objectives are to define what constitutes a project, explain the project manager's role, and analyze reasons for cost and time overruns in government projects in India. Successful project management requires experienced people, well-defined processes and organizational structure.
Project Management can save USD 25 Billion per year as per study by NCAER.Examples of Reliance Power,NTPC,Tata Power,Delhi Metro,Tata Motors with live examples and photos!
Activity schedule and affective control of component based projecteSAT Journals
Abstract Abstract The overall performance of any organizations depends on the way the project is managed and scheduled. The successful implementation of one or two big or complex project does not indicate that this organization will perform In the same way in future. Component based implementation of software development projects in the automotive industry have to face the rapid strategies for the use of the latest technologies that would provide the success of this type of projects, namely the frequency of change requirements during the life cycle. The cost and time for software testing was analyzed and to avoid delays in the project and more to cope with disturbances caused by changing requirements in the each phase of the project life cycle. Using of Component Based Software Engineering(CBSE) in software company, the implementation of any software project has become easy but the integration of available component or their use is the not only skill of project manager but the delivery of project in time is a required.. The project manager ensure the success of their project as a competitive advantage and establish such a system which will work with limited resources and available time. The project management tools and techniques i.e. Critical Path Methods(CPM) or Program Evaluation and Review Techniques (PERT) are used in reality as the most valuable and are planned to be used in the component based software testing system. This research result point out that there is a huge difference between planned and unplanned testing project. It also shows that the time of testing can be reduced with increase of cost of failure as a result the company may decide the benefit from that project. Analysis of the results allows to determine dependencies between level of company’s maturity level in project management, used project management tools and techniques, and values gained by the company from project management time to time with measured risk factor. Key Words: K Component Base Software Engineering(CBSE), CPM, PERT, Project life cycle, planned or unplanned project
This document discusses different organizational models for project management: functional, pure project, and matrix.
The functional model involves projects being managed within existing functional departments, allowing flexibility in staffing but risking that projects are not the primary focus.
The pure project model makes projects independent from the main organization, giving full responsibility and authority to project managers but risking duplication of resources across multiple projects.
The matrix model aims to combine advantages of the functional and pure project models by drawing on existing departments' expertise while also giving projects dedicated resources and leadership. It represents a middle ground between the two extremes.
This document provides an overview of project formulation, including its key elements and significance. It discusses the need for project formulation, highlighting issues like technology selection, resource constraints, and legal/policy impacts. The main elements of project formulation are identified as feasibility analysis, techno-economic analysis, project design/network analysis, input analysis, financial analysis, social cost-benefit analysis, and project appraisal. The document also distinguishes project formulation from a detailed project report, and outlines the steps in India's planning commission's project appraisal process.
How to Increase the Value of the PMMMs as a Business-oriented FrameworkYasmin AbdelAziz
An organization’s effectiveness partly depends
on the success of its projects. With this in mind, many
efforts have been spent in recent decades to enhance the
project management culture, but results are still highly
unsatisfactory. Project Management Maturity Models
(PMMMs) are seen by both the academic and the
industrial communities as a solid instrument to achieve
this goal. The point at issue is that surveys and researches
show PMMMs must be better linked to business and
financial performance. The aim of this paper is to explore
the scope for improvement to evolve PMMMs as
business-oriented frameworks.
Opportunity analysis under strategic program management second editionBob Prieto
Strategic Program Management is about meeting the challenges of scale and complexity but also about capturing the opportunities of leverage. Every major program as well as the projects that comprise it is the subject of a detailed and rigorous risk analysis. This is not only appropriate but also necessary. But in order to capture the full value inherent in large programs, the program management consultant or PMC must be seeking out opportunities in a proactive and ongoing manner.
The PMC’s opportunity analysis is best constructed within a framework that ensures a comprehensive view of all aspects of the program. Unlike various risk frameworks and categorizations that exist, there is no comparable opportunity framework for program management in the engineering and construction industry. This paper outlines one possible framework
Concurrent Engineering- for Environment & SustainabilityIRJET Journal
This document discusses concurrent engineering and its benefits for sustainability and the environment. Concurrent engineering involves simultaneous development of products and processes through cross-functional team collaboration. It aims to shorten development timelines while improving quality. The document outlines the key elements and implementation of concurrent engineering. It discusses how concurrent engineering supports sustainability through immediate response to demands, reduced environmental impacts, and improved material efficiency. The document argues concurrent engineering is needed to quickly respond to changing environments through continuous improvement and inclusion of environmental constraints in decision making.
The document discusses management approaches for construction programs in India. It analyzes performance data from over 1,000 infrastructure projects valued at Rs. 14 lakh crores that experienced cost overruns, delays, and failed to meet stakeholder expectations due to a lack of effective program management. The paper proposes a new framework based on the Project Management Institute's Standard for Program Management to improve coordination across related projects and help deliver intended strategic benefits on time and budget. By managing construction initiatives as programs and addressing integration challenges and interdependencies, this approach aims to increase the probability of project success.
Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...Kamran Rahat
-Study of the Practice of Making Risk Breakdown Structure (RBS) and Making Risk Register (RR) by Key Project Players in Construction.
-Finding out the level of integration of Risk Breakdown Structure (RBS) with that of Work Breakdown Structure (WBS).
-Making a RBS and WBS Integration Model in the light of findings.
Value Management (VM) is a systematic process used at Seattle Public Utilities (SPU) to improve capital projects and maximize their functional value. VM involves two studies - Value Planning during project planning to ensure the correct problem is addressed, and Value Engineering during design to improve the project's function and reduce costs. SPU requires VM reviews for projects over $5 million. VM studies are conducted by independent consultant teams and SPU staff. Recommendations from the studies are implemented to improve SPU projects and provide increased value to ratepayers.
In the engineering and construction industry governance needs and requirements exist at
multiple levels. These include:
• Governmental and industry level governance (laws, regulations, codes, standards)
• Enterprise level (encompassing social (stakeholder), political, economic (market,
shareholder, financial institutions), cultural (corporate and national/local),
technological)
• Portfolio and programs
• Project
This paper focuses on the portfolio and program level, collectively referred to as program in
this paper.
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-SlidesRussell Archibald
Presents and explains two recommendations and two conclusions relating to linking the 6 phase project life cycle with the AACEi Total Cost Management Framework.
IRJET- Code Reuse & Reusability of the SoftwareIRJET Journal
This document discusses code reuse and reusability in software development. It defines code reuse as using existing software to create new software. Reuse can reduce costs and improve software quality by reusing code, structures, architectures and other components from one application to another. The document reviews literature on software metrics and reuse programs. It describes an ideal software reuse process with four components: create reusable assets, use assets to develop new products, support the asset library, and manage the overall reuse process and organization.
The Role of the Architect in ERP and PDM System DeploymentGlen Alleman
The architect’s role in the development of an ERP or PDM system is to maintain the integrity of the vision statement produced by the owners, users, and funders of the system.
IRJET- Skills and Competencies Perceived of an Effective Construction Project...IRJET Journal
This document discusses skills and competencies perceived as important for effective construction project managers. A survey was conducted of 58 stakeholders in the construction industry to identify and rank the importance of various skills. The top 3 most important skills according to the survey were:
1. Decision making
2. Communication
3. Leadership
Additional skills identified as important included: health and safety regulations, ethics and responsibility towards society, collaboration, and commitment to goals. The study provides insight into the skills needed for construction project managers to successfully deliver projects on schedule and budget.
This document presents a framework for using benchmarking to evaluate and improve the project management performance of large contractors in Vietnam. The framework involves identifying key performance indicators to measure project management, collecting data from an internal organization and two competitor contractors, analyzing the data to identify best practices, and providing conclusions and recommendations. The goal is to help contractors learn from each other's successes to continuously improve their project management.
This document discusses project success criteria for engineering and refurbishment projects at Eskom, a South African power utility. It conducted a survey of stakeholders to identify key success criteria. The survey found that while time, cost and quality were important, other factors like satisfying business goals, customer satisfaction, and impact on plant were rated as even more important. Different stakeholders had differing views, with clients prioritizing satisfying goals, customer satisfaction and impact, while project managers prioritized quality, time and cost. Most respondents felt that time, cost and quality were not the only important success criteria. The document concludes that multiple factors are important for measuring project success.
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...IRJET Journal
This document discusses project planning and management. It begins by defining a project as a temporary endeavor undertaken to create a unique product or service. Project planning and management are key to successfully completing any project. Planning involves developing appropriate reports and documents to have a clear and complete project. Management involves applying skills, tools, and techniques to project activities to meet requirements. Planning without management is useless - both are needed to develop a successful project. The document then discusses factors that can lead to project success or failure, and the importance of planning activities and adhering to schedules in project management.
This document discusses types of construction projects and project management in the context of construction. It outlines four main types of construction projects: residential, institutional/commercial, specialized industrial, and infrastructure/heavy construction. It then provides details on the construction project life cycle and key aspects of project management for construction, including work breakdown structures, Gantt charts, and the role of the project manager.
1) The document summarizes a seminar presentation on the importance of feasibility studies for hospital planning. It defines feasibility studies and discusses their various types and objectives.
2) The presentation notes that feasibility studies are important for hospital planning as they determine project viability, identify potential obstacles, and assess necessary funding. Feasibility studies also help narrow risks and identify accurate project outcomes.
3) Preparing a feasibility study report has several benefits, including determining if a project is allowed and under what terms, assessing property needs, and giving principals confidence to move a project forward.
Resource Paper of Enterprise-Wide Deployment of EDMGlen Alleman
The acquisition of an Enterprise–wide software system requires careful planning and execution of a multitude of activities unrelated to the actual software systems being deployed.
Agile Importance in Pharmaceutical IndustryVijay Brzee
The document discusses how pharmaceutical companies can adapt to an increasingly agile environment. It faces pressures like expiring patents, fewer drug approvals, and increased generics. Agile practices can help accelerate innovation, design for supply chain needs, and rapidly commercialize products. The document outlines areas where agile works well and describes agile principles, benefits, tools, and knowledge/skills needed. It also discusses PMI agile domains of practice and questions if an organization is ready to adopt agile approaches.
Avinash Patil has over 24 years of experience in project management, including 15+ years specific experience. He is currently the Program Manager for a large transformation project for an Indian government power utility. Previously he has managed projects for clients in various industries, set up PMOs, and has expertise in planning and scheduling tools like Primavera and Microsoft Project.
This document discusses various aspects of project management including defining a project, characteristics of projects, project life cycles, and estimating project time and costs. It defines a project as a complex, non-routine effort with established objectives, a defined life span, and cross-organizational participation. Successful project management requires understanding an organization's strategy and culture. Estimating project time and costs involves both top-down and bottom-up approaches.
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET Journal
This document discusses the application of value engineering to highway projects and programs. It begins with an introduction to value engineering, which aims to provide necessary project functions at the lowest possible cost while maintaining quality. It then outlines the 8 phases of a typical value engineering study: selection of projects, investigation of functions and costs, creative idea generation, evaluation of alternatives, development of recommendations, presentation to decision makers, and implementation. The document provides details on each phase and emphasizes that value engineering can help control expenditures and maximize value for highway agencies working with limited budgets.
This document provides information about an instructor of project management named Mohamed Maged. It outlines his qualifications and experience in construction management, as well as the courses and materials he provides on topics like project planning, claims resolution, and PMP exam preparation. It also briefly describes the Project Management Body of Knowledge and its integration processes, with examples of how expert judgment, facilitation, and change management apply. The document aims to help students and professionals prepare for the PMP exam and improve their project management skills.
Enterprise Project Management using Primavera P6 EPPMIRJET Journal
This document summarizes the use of Primavera P6 Enterprise Project Portfolio Management (EPPM) software for project management. It outlines the key benefits of using Primavera P6, which include reducing errors, optimizing resource allocation, improved visibility, forecasting, tracking, and collaboration capabilities. The document then describes the 20 step process for using Primavera P6, including creating a work breakdown structure, defining activities and durations, assigning relationships between activities, allocating resources, tracking progress, and updating the schedule as needed. The overall purpose is to understand how to plan, schedule and manage projects efficiently using the Primavera P6 project management software.
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...IRJET Journal
This document discusses planning, scheduling, and allocating resources for a multi-storied residential building project using Oracle's Primavera P6 software. It begins with an abstract that outlines the importance of project management tools in the growing construction industry. It then provides background on project management, planning, scheduling, and the benefits of Primavera P6, which include quick scheduling, identifying floats and critical paths, customizable reports, and resource allocation. The document aims to demonstrate the advantages of using Primavera P6 for construction project management.
Concurrent Engineering- for Environment & SustainabilityIRJET Journal
This document discusses concurrent engineering and its benefits for sustainability and the environment. Concurrent engineering involves simultaneous development of products and processes through cross-functional team collaboration. It aims to shorten development timelines while improving quality. The document outlines the key elements and implementation of concurrent engineering. It discusses how concurrent engineering supports sustainability through immediate response to demands, reduced environmental impacts, and improved material efficiency. The document argues concurrent engineering is needed to quickly respond to changing environments through continuous improvement and inclusion of environmental constraints in decision making.
The document discusses management approaches for construction programs in India. It analyzes performance data from over 1,000 infrastructure projects valued at Rs. 14 lakh crores that experienced cost overruns, delays, and failed to meet stakeholder expectations due to a lack of effective program management. The paper proposes a new framework based on the Project Management Institute's Standard for Program Management to improve coordination across related projects and help deliver intended strategic benefits on time and budget. By managing construction initiatives as programs and addressing integration challenges and interdependencies, this approach aims to increase the probability of project success.
Level of Integration of Risk Breakdown Structure (RBS) and Work Breakdown Str...Kamran Rahat
-Study of the Practice of Making Risk Breakdown Structure (RBS) and Making Risk Register (RR) by Key Project Players in Construction.
-Finding out the level of integration of Risk Breakdown Structure (RBS) with that of Work Breakdown Structure (WBS).
-Making a RBS and WBS Integration Model in the light of findings.
Value Management (VM) is a systematic process used at Seattle Public Utilities (SPU) to improve capital projects and maximize their functional value. VM involves two studies - Value Planning during project planning to ensure the correct problem is addressed, and Value Engineering during design to improve the project's function and reduce costs. SPU requires VM reviews for projects over $5 million. VM studies are conducted by independent consultant teams and SPU staff. Recommendations from the studies are implemented to improve SPU projects and provide increased value to ratepayers.
In the engineering and construction industry governance needs and requirements exist at
multiple levels. These include:
• Governmental and industry level governance (laws, regulations, codes, standards)
• Enterprise level (encompassing social (stakeholder), political, economic (market,
shareholder, financial institutions), cultural (corporate and national/local),
technological)
• Portfolio and programs
• Project
This paper focuses on the portfolio and program level, collectively referred to as program in
this paper.
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-SlidesRussell Archibald
Presents and explains two recommendations and two conclusions relating to linking the 6 phase project life cycle with the AACEi Total Cost Management Framework.
IRJET- Code Reuse & Reusability of the SoftwareIRJET Journal
This document discusses code reuse and reusability in software development. It defines code reuse as using existing software to create new software. Reuse can reduce costs and improve software quality by reusing code, structures, architectures and other components from one application to another. The document reviews literature on software metrics and reuse programs. It describes an ideal software reuse process with four components: create reusable assets, use assets to develop new products, support the asset library, and manage the overall reuse process and organization.
The Role of the Architect in ERP and PDM System DeploymentGlen Alleman
The architect’s role in the development of an ERP or PDM system is to maintain the integrity of the vision statement produced by the owners, users, and funders of the system.
IRJET- Skills and Competencies Perceived of an Effective Construction Project...IRJET Journal
This document discusses skills and competencies perceived as important for effective construction project managers. A survey was conducted of 58 stakeholders in the construction industry to identify and rank the importance of various skills. The top 3 most important skills according to the survey were:
1. Decision making
2. Communication
3. Leadership
Additional skills identified as important included: health and safety regulations, ethics and responsibility towards society, collaboration, and commitment to goals. The study provides insight into the skills needed for construction project managers to successfully deliver projects on schedule and budget.
This document presents a framework for using benchmarking to evaluate and improve the project management performance of large contractors in Vietnam. The framework involves identifying key performance indicators to measure project management, collecting data from an internal organization and two competitor contractors, analyzing the data to identify best practices, and providing conclusions and recommendations. The goal is to help contractors learn from each other's successes to continuously improve their project management.
This document discusses project success criteria for engineering and refurbishment projects at Eskom, a South African power utility. It conducted a survey of stakeholders to identify key success criteria. The survey found that while time, cost and quality were important, other factors like satisfying business goals, customer satisfaction, and impact on plant were rated as even more important. Different stakeholders had differing views, with clients prioritizing satisfying goals, customer satisfaction and impact, while project managers prioritized quality, time and cost. Most respondents felt that time, cost and quality were not the only important success criteria. The document concludes that multiple factors are important for measuring project success.
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...IRJET Journal
This document discusses project planning and management. It begins by defining a project as a temporary endeavor undertaken to create a unique product or service. Project planning and management are key to successfully completing any project. Planning involves developing appropriate reports and documents to have a clear and complete project. Management involves applying skills, tools, and techniques to project activities to meet requirements. Planning without management is useless - both are needed to develop a successful project. The document then discusses factors that can lead to project success or failure, and the importance of planning activities and adhering to schedules in project management.
This document discusses types of construction projects and project management in the context of construction. It outlines four main types of construction projects: residential, institutional/commercial, specialized industrial, and infrastructure/heavy construction. It then provides details on the construction project life cycle and key aspects of project management for construction, including work breakdown structures, Gantt charts, and the role of the project manager.
1) The document summarizes a seminar presentation on the importance of feasibility studies for hospital planning. It defines feasibility studies and discusses their various types and objectives.
2) The presentation notes that feasibility studies are important for hospital planning as they determine project viability, identify potential obstacles, and assess necessary funding. Feasibility studies also help narrow risks and identify accurate project outcomes.
3) Preparing a feasibility study report has several benefits, including determining if a project is allowed and under what terms, assessing property needs, and giving principals confidence to move a project forward.
Resource Paper of Enterprise-Wide Deployment of EDMGlen Alleman
The acquisition of an Enterprise–wide software system requires careful planning and execution of a multitude of activities unrelated to the actual software systems being deployed.
Agile Importance in Pharmaceutical IndustryVijay Brzee
The document discusses how pharmaceutical companies can adapt to an increasingly agile environment. It faces pressures like expiring patents, fewer drug approvals, and increased generics. Agile practices can help accelerate innovation, design for supply chain needs, and rapidly commercialize products. The document outlines areas where agile works well and describes agile principles, benefits, tools, and knowledge/skills needed. It also discusses PMI agile domains of practice and questions if an organization is ready to adopt agile approaches.
Avinash Patil has over 24 years of experience in project management, including 15+ years specific experience. He is currently the Program Manager for a large transformation project for an Indian government power utility. Previously he has managed projects for clients in various industries, set up PMOs, and has expertise in planning and scheduling tools like Primavera and Microsoft Project.
This document discusses various aspects of project management including defining a project, characteristics of projects, project life cycles, and estimating project time and costs. It defines a project as a complex, non-routine effort with established objectives, a defined life span, and cross-organizational participation. Successful project management requires understanding an organization's strategy and culture. Estimating project time and costs involves both top-down and bottom-up approaches.
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET Journal
This document discusses the application of value engineering to highway projects and programs. It begins with an introduction to value engineering, which aims to provide necessary project functions at the lowest possible cost while maintaining quality. It then outlines the 8 phases of a typical value engineering study: selection of projects, investigation of functions and costs, creative idea generation, evaluation of alternatives, development of recommendations, presentation to decision makers, and implementation. The document provides details on each phase and emphasizes that value engineering can help control expenditures and maximize value for highway agencies working with limited budgets.
This document provides information about an instructor of project management named Mohamed Maged. It outlines his qualifications and experience in construction management, as well as the courses and materials he provides on topics like project planning, claims resolution, and PMP exam preparation. It also briefly describes the Project Management Body of Knowledge and its integration processes, with examples of how expert judgment, facilitation, and change management apply. The document aims to help students and professionals prepare for the PMP exam and improve their project management skills.
Enterprise Project Management using Primavera P6 EPPMIRJET Journal
This document summarizes the use of Primavera P6 Enterprise Project Portfolio Management (EPPM) software for project management. It outlines the key benefits of using Primavera P6, which include reducing errors, optimizing resource allocation, improved visibility, forecasting, tracking, and collaboration capabilities. The document then describes the 20 step process for using Primavera P6, including creating a work breakdown structure, defining activities and durations, assigning relationships between activities, allocating resources, tracking progress, and updating the schedule as needed. The overall purpose is to understand how to plan, schedule and manage projects efficiently using the Primavera P6 project management software.
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...IRJET Journal
This document discusses planning, scheduling, and allocating resources for a multi-storied residential building project using Oracle's Primavera P6 software. It begins with an abstract that outlines the importance of project management tools in the growing construction industry. It then provides background on project management, planning, scheduling, and the benefits of Primavera P6, which include quick scheduling, identifying floats and critical paths, customizable reports, and resource allocation. The document aims to demonstrate the advantages of using Primavera P6 for construction project management.
The role of time, cost and quality in project managementIRJET Journal
This document discusses the roles of time, cost, and quality in project management. It states that these three factors are interrelated and impact each other, making it difficult for project managers to balance them. The document reviews literature that analyzed how planning, monitoring, and controlling impact the timely completion of construction projects. It also discusses how tools like Microsoft Project and Primavera P6 can help optimize schedules, budgets, and quality. Overall, the document examines the relationships between time, cost, and quality in project management and how effectively managing these key factors is important for project success.
Earned Value Management for Design and Construction Projectijtsrd
This document discusses earned value management (EVM) as an effective tool for tracking and controlling construction project costs and schedules. EVM integrates cost, schedule and technical performance by comparing the planned cost of work scheduled to the actual cost of work performed. The document provides background on EVM, including its history and use in various industries. It then discusses how EVM establishes a cost baseline and calculates variances to analyze project performance and identify potential issues needing corrective action in order to complete projects on time and on budget.
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...IRJET Journal
This document discusses planning, scheduling, and optimizing labor resources for the construction of a residential apartment building using Primavera P6 software. It describes how the software was used to plan and schedule each activity through critical path method. To address potential lack of required labor resources, labor resource leveling, smoothing, and overtime working techniques were used to optimize resource allocation. Using these techniques, the total project duration was changed from 935 days to 1011 days with leveling, remained at 935 days with smoothing, and was reduced to 748 days with overtime working, all while maintaining the total labor units and completing the project on schedule.
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
This document discusses controlling and monitoring construction projects using the earned value method. It begins with an introduction to the importance of controlling and monitoring construction projects. It then discusses the methodology of earned value analysis, including defining earned value, variances, and the five steps to set up an earned value system and four steps to use the information generated. Key aspects of earned value discussed include using it as a uniform measure of project progress, its role in cost performance analysis, and how it is calculated based on planned value, earned value, and actual costs.
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
This document discusses planning and scheduling a residential construction project using Microsoft Project. It summarizes the key steps:
1) The activities of constructing two residential blocks were planned and scheduled in MSP, including allocating resources, determining task relationships, and generating a Gantt chart.
2) The total baseline duration of the project was estimated to be 632 days with a total cost of Rs. 154,394,081.
3) Planning and scheduling the project in MSP allowed determining the critical path and monitoring project progress and costs.
A Comparative Analysis Of Various Methodologies Of Agile Project Management V...Brittany Allen
This document provides a comparative analysis of project management methodologies, specifically comparing the Project Management Body of Knowledge (PMBOK) and various agile project management approaches. It first describes the key processes and knowledge areas of PMBOK. It then outlines some popular agile methodologies like Scrum, Extreme Programming (XP), and Feature Driven Development (FDD). The document aims to identify similarities and differences between the traditional PMBOK framework and more flexible agile approaches.
Material Management Practices of “Foundation Silver Spring” Residential Build...IRJET Journal
This document discusses material management practices for the "Foundation Silver Spring" residential building project using Microsoft Project (MSP) software. It conducted a case study of the project to explore construction material management practices in Mysuru region and identify obstacles. The study found that material management practices are not fully adopted in the construction industry due to lack of support from top management and knowledge about practices. Not implementing necessary practices can lead to wasted materials and increased costs. It recommends improving material management in residential projects through better techniques and practices.
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
This document summarizes a study that planned and scheduled the construction of a multi-story residential building using Microsoft Project software and applied material management techniques. The study categorized building materials using ABC analysis to prioritize those with the greatest cost impact. Scheduling the project in Microsoft Project and analyzing material usage helped optimize costs and duration to increase construction efficiency. Applying material management principles such as inventory control and efficient procurement supported timely material availability and reduced waste.
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET Journal
This document discusses planning and scheduling a multi-storied building construction project using Microsoft Project software. It begins with an abstract that outlines the objectives of studying scheduling methods for multi-story buildings and applying MS Project software to plan and schedule a hypothetical 7-story residential building. The document then provides background on the benefits of effective project planning and scheduling for reducing construction time and costs. It describes the key aspects and features of MS Project for developing schedules, assigning resources to tasks, tracking progress, managing budgets, and analyzing workloads. The methodology section outlines the steps for using MS Project to plan and schedule the hypothetical building project within time and resource constraints to complete it on schedule.
Project cost management a simplified approach white paper - Oracle Primaver...p6academy
Project organizations struggle with predicting long-term project costs, assessing return on investment, and managing cash flow over a project's lifecycle. Integrating financial systems and Oracle Primavera applications can provide cost visibility and control. The document proposes integrating ERP, Primavera Unifier, and Primavera P6 to facilitate sharing accurate, timely data across teams. This would automate processes to improve productivity, empower stakeholders, streamline workflows, and improve task management for executing profitable projects aligned with organizational strategy.
Scheduling and Monitoring of Work Progress at Reach 2B (From Pier No. 573 to ...IRJET Journal
The document discusses scheduling and monitoring of work progress for Reach 2B of the Bangalore Metro Rail Corporation Limited (BMRCL) project from Pier 573 to Pier 735 using Primavera P6 software. It outlines the objectives, literature review, scheduling methodology, and analysis of piling work for some sample piers. The scheduling process in Primavera P6 involves creating activities, assigning durations, updating plans based on progress, and rescheduling delayed activities. The analysis examines activity times for different steps of the piling work and presents data on time taken for individual activities at different project locations.
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
This document discusses project management techniques to avoid project failure. It begins with an introduction to project management and definitions of key terms. The literature review then summarizes several academic papers on topics related to project failure such as identifying common causes of failure, project performance measurement, and techniques for scheduling projects with uncertainty. The conclusion reiterates that project management techniques must be tailored to the specific project and region, and that further research is needed to enhance understanding of avoiding project failure.
Deciding project management methodology for e governance projects in indiaAshish Karan
The document discusses and compares different project management methodologies used for e-governance projects in India. It summarizes the PMBOK, PRINCE2, and SCRUM methodologies. It also presents the results of a survey of 52 Indian project managers that indicated a preference for adaptive, time-efficient, and easy to learn methodologies with limited delegation of authority to project managers. Overall, the document analyzes and evaluates different project management methodologies for their suitability for e-governance projects in India.
12 Terms You Should Know | Project Management Fundamentals
12 key terms that we think everyone should know (from beginners to experts)
12 key project management terms that she thinks everyone involved with projects should know. No longer get confused when confronted with unfamiliar terms
#projectmanagement #terms #tips #Tamdeed
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...ijtsrd
Any development undertaking regardless beginnings with the Layout of the structure or construction followed by Design and Analysis of the construction which is prevailing by cost assessment and making arrangements for the said project. This undertaking includes the format, plan, examination, arranging and cost assessment of a G 4 private structure situated in BicholiMardana, Indore. Primavera P6 has been utilized for arranging the different exercises that encompass the development of a structure. Utilizing primavera we had the option to detail a functioning timetable and furthermore an advancement bar for steady checking of the venture. Utilizing primavera we had the option to allot different assets just as obligations on different individuals identified with the different phases of the venture there by expanding responsibility. The term of the venture utilizing primavera has been determined to be around 374 days which likewise incorporates occasions. The advancement and the connection between different exercises has likewise been appeared as an enlivened Gantt Chart. This graph likewise helps the Project supervisor to disclose to his customers the different perspectives just as progress of the undertaking. The quote for the venture has been determined utilizing Center Line Method in Microsoft Excel. For the Abstract expense CPWD Schedule of rates has been followed and an absolute expense of Rs 5,733,000 has been determined. Nitin Mukesh Bhalla | Mr. Ravindra Raj "Planning, Scheduling and Allocation of Resources for Multi-storeyed Structure using Primevera Software" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-4 , June 2021, URL: https://www.ijtsrd.compapers/ijtsrd42599.pdf Paper URL: https://www.ijtsrd.comengineering/civil-engineering/42599/planning-scheduling-and-allocation-of-resources-for-multistoreyed-structure-using-primevera-software/nitin-mukesh-bhalla
STUDY AND IMPLEMENTATION OF LAST PLANNER SYSTEM (LPS) IN CONSTRUCTION PROJECTSIRJET Journal
This document discusses the implementation of the Last Planner System (LPS) in construction projects. It begins with an introduction to lean construction and LPS. The LPS aims to improve project planning and control through short-term planning. It breaks down work into smaller packages and activities and encourages commitment from foremen. The document then discusses the various components of LPS in detail - master planning, phase scheduling, look-ahead planning, weekly work plans, and percentage plan complete. Various tools used for LPS implementation are also explained, including constraints analysis boards, Pareto charts, and commitment monitoring boards. The objective is to study LPS concepts and apply it on a case study to improve labour productivity, minimize time and cost, and achieve reliable workflow.
This document discusses approaches for organizing and leveraging past experience in project management. It describes how a large software company captures lessons learned from prior projects by systematically recording project data, deriving insights, and making them available to other projects. The key elements discussed for building organizational knowledge are collecting and organizing knowledge, making it available through systems like processes and a process database, and reusing it to improve new project execution.
The document provides guidance on applying an asset management approach to infrastructure projects. It discusses how considering asset management throughout a project's lifecycle can help ensure the project delivers long-term benefits and value. The guidance is structured around three pillars: strategic alignment and outcomes, whole life value, and asset performance and information. Questions are provided under each pillar to help project teams evaluate their asset management approach and identify areas for enhancement. Applying an asset management lens during project initiation and delivery can help optimize outcomes and ensure the benefits of infrastructure projects are realized over the assets' full lifespans.
Similar to IRJET- Portfolio Management of Multiple Building Projects using EPPM (20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
1) The document discusses the Sungal Tunnel project in Jammu and Kashmir, India, which is being constructed using the New Austrian Tunneling Method (NATM).
2) NATM involves continuous monitoring during construction to adapt to changing ground conditions, and makes extensive use of shotcrete for temporary tunnel support.
3) The methodology section outlines the systematic geotechnical design process for tunnels according to Austrian guidelines, and describes the various steps of NATM tunnel construction including initial and secondary tunnel support.
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
This study examines the effect of response reduction factors (R factors) on reinforced concrete (RC) framed structures through nonlinear dynamic analysis. Three RC frame models with varying heights (4, 8, and 12 stories) were analyzed in ETABS software under different R factors ranging from 1 to 5. The results showed that displacement increased as the R factor decreased, indicating less linear behavior for lower R factors. Drift also decreased proportionally with increasing R factors from 1 to 5. Shear forces in the frames decreased with higher R factors. In general, R factors of 3 to 5 produced more satisfactory performance with less displacement and drift. The displacement variations between different building heights were consistent at different R factors. This study evaluated how R factors influence
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
This study compares the use of Stark Steel and TMT Steel as reinforcement materials in a two-way reinforced concrete slab. Mechanical testing is conducted to determine the tensile strength, yield strength, and other properties of each material. A two-way slab design adhering to codes and standards is executed with both materials. The performance is analyzed in terms of deflection, stability under loads, and displacement. Cost analyses accounting for material, durability, maintenance, and life cycle costs are also conducted. The findings provide insights into the economic and structural implications of each material for reinforcement selection and recommendations on the most suitable material based on the analysis.
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
This document discusses a study analyzing the effect of camber, position of camber, and angle of attack on the aerodynamic characteristics of airfoils. Sixteen modified asymmetric NACA airfoils were analyzed using computational fluid dynamics (CFD) by varying the camber, camber position, and angle of attack. The results showed the relationship between these parameters and the lift coefficient, drag coefficient, and lift to drag ratio. This provides insight into how changes in airfoil geometry impact aerodynamic performance.
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
This document reviews the progress and challenges of aluminum-based metal matrix composites (MMCs), focusing on their fabrication processes and applications. It discusses how various aluminum MMCs have been developed using reinforcements like borides, carbides, oxides, and nitrides to improve mechanical and wear properties. These composites have gained prominence for their lightweight, high-strength and corrosion resistance properties. The document also examines recent advancements in fabrication techniques for aluminum MMCs and their growing applications in industries such as aerospace and automotive. However, it notes that challenges remain around issues like improper mixing of reinforcements and reducing reinforcement agglomeration.
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
This document discusses research on using graph neural networks (GNNs) for dynamic optimization of public transportation networks in real-time. GNNs represent transit networks as graphs with nodes as stops and edges as connections. The GNN model aims to optimize networks using real-time data on vehicle locations, arrival times, and passenger loads. This helps increase mobility, decrease traffic, and improve efficiency. The system continuously trains and infers to adapt to changing transit conditions, providing decision support tools. While research has focused on performance, more work is needed on security, socio-economic impacts, contextual generalization of models, continuous learning approaches, and effective real-time visualization.
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
This document summarizes a research project that aims to compare the structural performance of conventional slab and grid slab systems in multi-story buildings using ETABS software. The study will analyze both symmetric and asymmetric building models under various loading conditions. Parameters like deflections, moments, shears, and stresses will be examined to evaluate the structural effectiveness of each slab type. The results will provide insights into the comparative behavior of conventional and grid slabs to help engineers and architects select appropriate slab systems based on building layouts and design requirements.
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
This document summarizes and reviews a research paper on the seismic response of reinforced concrete (RC) structures with plan and vertical irregularities, with and without infill walls. It discusses how infill walls can improve or reduce the seismic performance of RC buildings, depending on factors like wall layout, height distribution, connection to the frame, and relative stiffness of walls and frames. The reviewed research paper analyzes the behavior of infill walls, effects of vertical irregularities, and seismic performance of high-rise structures under linear static and dynamic analysis. It studies response characteristics like story drift, deflection and shear. The document also provides literature on similar research investigating the effects of infill walls, soft stories, plan irregularities, and different
This document provides a review of machine learning techniques used in Advanced Driver Assistance Systems (ADAS). It begins with an abstract that summarizes key applications of machine learning in ADAS, including object detection, recognition, and decision-making. The introduction discusses the integration of machine learning in ADAS and how it is transforming vehicle safety. The literature review then examines several research papers on topics like lightweight deep learning models for object detection and lane detection models using image processing. It concludes by discussing challenges and opportunities in the field, such as improving algorithm robustness and adaptability.
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
The document analyzes temperature and precipitation trends in Asosa District, Benishangul Gumuz Region, Ethiopia from 1993 to 2022 based on data from the local meteorological station. The results show:
1) The average maximum and minimum annual temperatures have generally decreased over time, with maximum temperatures decreasing by a factor of -0.0341 and minimum by -0.0152.
2) Mann-Kendall tests found the decreasing temperature trends to be statistically significant for annual maximum temperatures but not for annual minimum temperatures.
3) Annual precipitation in Asosa District showed a statistically significant increasing trend.
The conclusions recommend development planners account for rising summer precipitation and declining temperatures in
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
This document discusses the design and analysis of pre-engineered building (PEB) framed structures using STAAD Pro software. It provides an overview of PEBs, including that they are designed off-site with building trusses and beams produced in a factory. STAAD Pro is identified as a key tool for modeling, analyzing, and designing PEBs to ensure their performance and safety under various load scenarios. The document outlines modeling structural parts in STAAD Pro, evaluating structural reactions, assigning loads, and following international design codes and standards. In summary, STAAD Pro is used to design and analyze PEB framed structures to ensure safety and code compliance.
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
This document provides a review of research on innovative fiber integration methods for reinforcing concrete structures. It discusses studies that have explored using carbon fiber reinforced polymer (CFRP) composites with recycled plastic aggregates to develop more sustainable strengthening techniques. It also examines using ultra-high performance fiber reinforced concrete to improve shear strength in beams. Additional topics covered include the dynamic responses of FRP-strengthened beams under static and impact loads, and the performance of preloaded CFRP-strengthened fiber reinforced concrete beams. The review highlights the potential of fiber composites to enable more sustainable and resilient construction practices.
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
This document summarizes a survey on securing patient healthcare data in cloud-based systems. It discusses using technologies like facial recognition, smart cards, and cloud computing combined with strong encryption to securely store patient data. The survey found that healthcare professionals believe digitizing patient records and storing them in a centralized cloud system would improve access during emergencies and enable more efficient care compared to paper-based systems. However, ensuring privacy and security of patient data is paramount as healthcare incorporates these digital technologies.
Review on studies and research on widening of existing concrete bridgesIRJET Journal
This document summarizes several studies that have been conducted on widening existing concrete bridges. It describes a study from China that examined load distribution factors for a bridge widened with composite steel-concrete girders. It also outlines challenges and solutions for widening a bridge in the UAE, including replacing bearings and stitching the new and existing structures. Additionally, it discusses two bridge widening projects in New Zealand that involved adding precast beams and stitching to connect structures. Finally, safety measures and challenges for strengthening a historic bridge in Switzerland under live traffic are presented.
React based fullstack edtech web applicationIRJET Journal
The document describes the architecture of an educational technology web application built using the MERN stack. It discusses the frontend developed with ReactJS, backend with NodeJS and ExpressJS, and MongoDB database. The frontend provides dynamic user interfaces, while the backend offers APIs for authentication, course management, and other functions. MongoDB enables flexible data storage. The architecture aims to provide a scalable, responsive platform for online learning.
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
This paper proposes integrating Internet of Things (IoT) and blockchain technologies to help implement objectives of India's National Education Policy (NEP) in the education sector. The paper discusses how blockchain could be used for secure student data management, credential verification, and decentralized learning platforms. IoT devices could create smart classrooms, automate attendance tracking, and enable real-time monitoring. Blockchain would ensure integrity of exam processes and resource allocation, while smart contracts automate agreements. The paper argues this integration has potential to revolutionize education by making it more secure, transparent and efficient, in alignment with NEP goals. However, challenges like infrastructure needs, data privacy, and collaborative efforts are also discussed.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
This document provides a review of research on the performance of coconut fibre reinforced concrete. It summarizes several studies that tested different volume fractions and lengths of coconut fibres in concrete mixtures with varying compressive strengths. The studies found that coconut fibre improved properties like tensile strength, toughness, crack resistance, and spalling resistance compared to plain concrete. Volume fractions of 2-5% and fibre lengths of 20-50mm produced the best results. The document concludes that using a 4-5% volume fraction of coconut fibres 30-40mm in length with M30-M60 grade concrete would provide benefits based on previous research.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
The document discusses optimizing business management processes through automation using Microsoft Power Automate and artificial intelligence. It provides an overview of Power Automate's key components and features for automating workflows across various apps and services. The document then presents several scenarios applying automation solutions to common business processes like data entry, monitoring, HR, finance, customer support, and more. It estimates the potential time and cost savings from implementing automation for each scenario. Finally, the conclusion emphasizes the transformative impact of AI and automation tools on business processes and the need for ongoing optimization.
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
The document describes the seismic design of a G+5 steel building frame located in Roorkee, India according to Indian codes IS 1893-2002 and IS 800. The frame was analyzed using the equivalent static load method and response spectrum method, and its response in terms of displacements and shear forces were compared. Based on the analysis, the frame was designed as a seismic-resistant steel structure according to IS 800:2007. The software STAAD Pro was used for the analysis and design.
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
This research paper explores using plastic waste as a sustainable and cost-effective construction material. The study focuses on manufacturing pavers and bricks using recycled plastic and partially replacing concrete with plastic alternatives. Initial results found that pavers and bricks made from recycled plastic demonstrate comparable strength and durability to traditional materials while providing environmental and cost benefits. Additionally, preliminary research indicates incorporating plastic waste as a partial concrete replacement significantly reduces construction costs without compromising structural integrity. The outcomes suggest adopting plastic waste in construction can address plastic pollution while optimizing costs, promoting more sustainable building practices.
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTjpsjournal1
The rivalry between prominent international actors for dominance over Central Asia's hydrocarbon
reserves and the ancient silk trade route, along with China's diplomatic endeavours in the area, has been
referred to as the "New Great Game." This research centres on the power struggle, considering
geopolitical, geostrategic, and geoeconomic variables. Topics including trade, political hegemony, oil
politics, and conventional and nontraditional security are all explored and explained by the researcher.
Using Mackinder's Heartland, Spykman Rimland, and Hegemonic Stability theories, examines China's role
in Central Asia. This study adheres to the empirical epistemological method and has taken care of
objectivity. This study analyze primary and secondary research documents critically to elaborate role of
china’s geo economic outreach in central Asian countries and its future prospect. China is thriving in trade,
pipeline politics, and winning states, according to this study, thanks to important instruments like the
Shanghai Cooperation Organisation and the Belt and Road Economic Initiative. According to this study,
China is seeing significant success in commerce, pipeline politics, and gaining influence on other
governments. This success may be attributed to the effective utilisation of key tools such as the Shanghai
Cooperation Organisation and the Belt and Road Economic Initiative.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
International Conference on NLP, Artificial Intelligence, Machine Learning an...gerogepatton
International Conference on NLP, Artificial Intelligence, Machine Learning and Applications (NLAIM 2024) offers a premier global platform for exchanging insights and findings in the theory, methodology, and applications of NLP, Artificial Intelligence, Machine Learning, and their applications. The conference seeks substantial contributions across all key domains of NLP, Artificial Intelligence, Machine Learning, and their practical applications, aiming to foster both theoretical advancements and real-world implementations. With a focus on facilitating collaboration between researchers and practitioners from academia and industry, the conference serves as a nexus for sharing the latest developments in the field.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
Literature Review Basics and Understanding Reference Management.pptxDr Ramhari Poudyal
Three-day training on academic research focuses on analytical tools at United Technical College, supported by the University Grant Commission, Nepal. 24-26 May 2024
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Introduction- e - waste – definition - sources of e-waste– hazardous substances in e-waste - effects of e-waste on environment and human health- need for e-waste management– e-waste handling rules - waste minimization techniques for managing e-waste – recycling of e-waste - disposal treatment methods of e- waste – mechanism of extraction of precious metal from leaching solution-global Scenario of E-waste – E-waste in India- case studies.