Scheduling and Monitoring of Work Progress at Reach 2B (From Pier No. 573 to Pier No. 735) BMRCL using Primavera P6
•
0 likes
•
36 views
IRJET Journal
Follow
https://irjet.net/archives/V4/i8/IRJET-V4I8384.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 6
Download now
Download to read offline
Recommended
Avinash_ Resume_
Avinash_ Resume_
Avinash Patil
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET Journal
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET Journal
Resume - Premal J Vashi
Resume - Premal J Vashi
Premal vashi
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
IRJET Journal
SAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactors
Roberto Carlos Roldán
Innovative project management practices for large power sector projects.
Innovative project management practices for large power sector projects.
sanjeeev bahadur, m.tech,mba
Enterprise Project Management using Primavera P6 EPPM
Enterprise Project Management using Primavera P6 EPPM
IRJET Journal
Recommended
Avinash_ Resume_
Avinash_ Resume_
Avinash Patil
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET Journal
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET Journal
Resume - Premal J Vashi
Resume - Premal J Vashi
Premal vashi
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
IRJET Journal
SAP awards 2014 solunion cloud category SuccessFactors
SAP awards 2014 solunion cloud category SuccessFactors
Roberto Carlos Roldán
Innovative project management practices for large power sector projects.
Innovative project management practices for large power sector projects.
sanjeeev bahadur, m.tech,mba
Enterprise Project Management using Primavera P6 EPPM
Enterprise Project Management using Primavera P6 EPPM
IRJET Journal
IRJET- Last Planner System
IRJET- Last Planner System
IRJET Journal
Genrays Project Charter
Genrays Project Charter
April Drake
Presentation by Rajesh Kumar Mudiakal
Presentation by Rajesh Kumar Mudiakal
PMI_IREP_TP
Save USD 25 billion thru new project management practices!
Save USD 25 billion thru new project management practices!
sanjeeev bahadur, m.tech,mba
Yogesh Sharma
Yogesh Sharma
Yogesh Sharma
Resume - Arvind Jha
Resume - Arvind Jha
Arvind Jha
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET Journal
Choudhary Divyang Resume
Choudhary Divyang Resume
Divyang Choudhary
project updated 1
project updated 1
Sushmita Ghosh
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET Journal
A project report on Six sigma for filmmaking process
A project report on Six sigma for filmmaking process
Sachin Pandit
GenRays Project Scope Document
GenRays Project Scope Document
April Drake
Project Management Report for Blue Bag Films (University Assignment)
Project Management Report for Blue Bag Films (University Assignment)
Yordan Dimitrov
Project management
Project management
Arup Ray
Project initiation document
Project initiation document
Lenka Tomsova
GenRays Communications Management
GenRays Communications Management
April Drake
Ce seminar
Ce seminar
Ashutosh Satpathy
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET Journal
Powerpoint created for Holland Management Consultant
Powerpoint created for Holland Management Consultant
Barbara Smith
TRINH_THANHVAN_PERFORMANCE_EVALUATION_PROJECT.pdf
TRINH_THANHVAN_PERFORMANCE_EVALUATION_PROJECT.pdf
Thanh Vân Trịnh
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
IRJET Journal
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
ijtsrd
More Related Content
What's hot
IRJET- Last Planner System
IRJET- Last Planner System
IRJET Journal
Genrays Project Charter
Genrays Project Charter
April Drake
Presentation by Rajesh Kumar Mudiakal
Presentation by Rajesh Kumar Mudiakal
PMI_IREP_TP
Save USD 25 billion thru new project management practices!
Save USD 25 billion thru new project management practices!
sanjeeev bahadur, m.tech,mba
Yogesh Sharma
Yogesh Sharma
Yogesh Sharma
Resume - Arvind Jha
Resume - Arvind Jha
Arvind Jha
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET Journal
Choudhary Divyang Resume
Choudhary Divyang Resume
Divyang Choudhary
project updated 1
project updated 1
Sushmita Ghosh
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET Journal
A project report on Six sigma for filmmaking process
A project report on Six sigma for filmmaking process
Sachin Pandit
GenRays Project Scope Document
GenRays Project Scope Document
April Drake
Project Management Report for Blue Bag Films (University Assignment)
Project Management Report for Blue Bag Films (University Assignment)
Yordan Dimitrov
Project management
Project management
Arup Ray
Project initiation document
Project initiation document
Lenka Tomsova
GenRays Communications Management
GenRays Communications Management
April Drake
Ce seminar
Ce seminar
Ashutosh Satpathy
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET Journal
Powerpoint created for Holland Management Consultant
Powerpoint created for Holland Management Consultant
Barbara Smith
TRINH_THANHVAN_PERFORMANCE_EVALUATION_PROJECT.pdf
TRINH_THANHVAN_PERFORMANCE_EVALUATION_PROJECT.pdf
Thanh Vân Trịnh
What's hot
(20)
IRJET- Last Planner System
IRJET- Last Planner System
Genrays Project Charter
Genrays Project Charter
Presentation by Rajesh Kumar Mudiakal
Presentation by Rajesh Kumar Mudiakal
Save USD 25 billion thru new project management practices!
Save USD 25 billion thru new project management practices!
Yogesh Sharma
Yogesh Sharma
Resume - Arvind Jha
Resume - Arvind Jha
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
Choudhary Divyang Resume
Choudhary Divyang Resume
project updated 1
project updated 1
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
A project report on Six sigma for filmmaking process
A project report on Six sigma for filmmaking process
GenRays Project Scope Document
GenRays Project Scope Document
Project Management Report for Blue Bag Films (University Assignment)
Project Management Report for Blue Bag Films (University Assignment)
Project management
Project management
Project initiation document
Project initiation document
GenRays Communications Management
GenRays Communications Management
Ce seminar
Ce seminar
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
Powerpoint created for Holland Management Consultant
Powerpoint created for Holland Management Consultant
TRINH_THANHVAN_PERFORMANCE_EVALUATION_PROJECT.pdf
TRINH_THANHVAN_PERFORMANCE_EVALUATION_PROJECT.pdf
Similar to Scheduling and Monitoring of Work Progress at Reach 2B (From Pier No. 573 to Pier No. 735) BMRCL using Primavera P6
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
IRJET Journal
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
ijtsrd
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
IRJET Journal
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET Journal
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
IRJET Journal
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IRJET Journal
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET Journal
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...
IRJET Journal
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET Journal
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET Journal
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
IRJET Journal
The role of time, cost and quality in project management
The role of time, cost and quality in project management
IRJET Journal
STUDY AND IMPLEMENTATION OF LAST PLANNER SYSTEM (LPS) IN CONSTRUCTION PROJECTS
STUDY AND IMPLEMENTATION OF LAST PLANNER SYSTEM (LPS) IN CONSTRUCTION PROJECTS
IRJET Journal
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
IRJET Journal
IRJET- An Overview on Project Management
IRJET- An Overview on Project Management
IRJET Journal
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
IRJET Journal
IRJET- Optimization in Construction Management
IRJET- Optimization in Construction Management
IRJET Journal
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET Journal
Activity schedule and affective control of component based project
Activity schedule and affective control of component based project
eSAT Journals
Similar to Scheduling and Monitoring of Work Progress at Reach 2B (From Pier No. 573 to Pier No. 735) BMRCL using Primavera P6
(20)
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
Planning, Scheduling and Allocation of Resources for Multi storeyed Structure...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...
IRJET- Project Management, Planning and its Prospectus in the Context of Proj...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- Scheduling and Labour Management for Residential Building Project usin...
IRJET- Scheduling and Labour Management for Residential Building Project usin...
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
The role of time, cost and quality in project management
The role of time, cost and quality in project management
STUDY AND IMPLEMENTATION OF LAST PLANNER SYSTEM (LPS) IN CONSTRUCTION PROJECTS
STUDY AND IMPLEMENTATION OF LAST PLANNER SYSTEM (LPS) IN CONSTRUCTION PROJECTS
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
IRJET- An Overview on Project Management
IRJET- An Overview on Project Management
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
IRJET- Optimization in Construction Management
IRJET- Optimization in Construction Management
IRJET- Portfolio Management of Multiple Building Projects using EPPM
IRJET- Portfolio Management of Multiple Building Projects using EPPM
Activity schedule and affective control of component based project
Activity schedule and affective control of component based project
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
rehmti665
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Soham Mondal
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
rakeshbaidya232001
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
SIVASHANKAR N
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Anamika Sarkar
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
upamatechverse
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
RajkumarAkumalla
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
Asutosh Ranjan
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
wendy cai
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
hassan khalil
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
upamatechverse
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
RajaP95
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
João Esperancinha
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Recently uploaded
(20)
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Scheduling and Monitoring of Work Progress at Reach 2B (From Pier No. 573 to Pier No. 735) BMRCL using Primavera P6
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2127 SCHEDULING AND MONITORING OF WORK PROGRESS AT REACH 2B (FROM PIER NO. 573 TO PIER NO. 735) BMRCL USING PRIMAVERA P6 ARINDAM DEBNATH 1 , DR SHREENIVAS REDDY SHAHAPUR2 ,MANEETH P.D3 1 M.Tech. Student, Department of Construction Technology, Visvesvaraya Technological University, PG Studies, Regional Office, Kalaburagi-585105 Karnataka, India. 2 Chairman & Professor, Department of Construction Technology, Visvesvaraya Technological University, PG Studies, Regional Office, Kalaburagi-585105 Karnataka, India. 3Assistant Professor, Department of Construction Technology, Visvesvaraya Technological University, PG Studies, Regional Office, Kalaburagi-585105 Karnataka, India. ---------------------------------------------------------------------***--------------------------------------------------------------------- ABSTRACT: A venture is a cooperation to arrange and accomplish a specific point. Extend includes a few errandsto be finished from begin to the last point of venture fulfillment. A timetable of errands is produced in the arranging stage by the venture arranging and booking group that obviously expresses thedifferentventurepoints of reference and exercises in detail from venture begin to venture wrap up. The nature of the calendar created from Primavera P6, one of the for the most part utilized programming for Project arranging, and booking ought to affirm with industry scales as popular in the western countries. Absence of the learning of different parts of timetable advancement regularly brings about a calendar which is not justifiable by the lion's share of individuals required in the venture and henceforth not useable. The obliviousness with respect to scheduler for the most part results in such kind of timetable which is not reasonable by other individuals, customerschipping awayat site. In this way, it is a push to show and ad lib on the calendar improvement by highlighting different fields that are frequently overlooked in the advancement of a decent development plan. Very few complete reviews have been done on the noteworthiness of Activity ID and Description in moderate sized venture plans, in India. A step hasbeentaken to clarify their significance in detail. Booking assumes an imperative part in enhancing the possibilities of fruitful usage of metro ventures. The planning is only one of the apparatuses will be utilized to oversee exercises and term. Work separate structure will be readied length and forerunners for every movement will be dealed out. 1. INTRODUCTION Primavera P6 adaptation has been the least demanding and most utilized programming today. It helps in breaking down the everyday work in the development business. As metro undertakings being a bigger tasks, so the postponement and dangers required in this activities are more. Primavera helps in breaking down the venture by utilizing Critical way technique; it additionally helps in review the venture in Gantt or Pert arrangement. Extend directors, Planning specialists ought to have a full top to bottom learning about this productbeforeuse.P6isbased on Oracle and Microsoft server connection database for big business wide venture administration scalability.P6 fits effortlessly into todays appropriated workplace by keeping all partners and venture colleagues cutting-edge on venture fruition. The following element of primavera p6 enables customers to produce reports and keep up legitimate gauge. It helps in separating the mind boggling ventures into a littler achievable, under stable and in a simple way. It decreases the time and the venture can run easily with proficient ways. Presently a day Metro Rail assumes virtual part in India. As a result of developing movement clog, unprecedented growth of individual vehicles, to stay away from blockage at peak hours, efficient of transporting travellers and fuel utilization. Development industry is a basic segment of a nation's framework and moderndevelopment.Thisindustry is the second biggest industry in India still it's development has been differential the country over. There is a huge distinction of improvement in the rural and urban ranges. Here emerges the requirement for compelling task administration. Numerous issues and issues are being confronted by the development business, major of them are cost invades and time overwhelms due to insufficient venture definition, lack of foresight for implementation and disgraceful administration amid execution. Numerous investigators express that normal cost of extend goes up by 30% as of the planned cost because of uncalledforarranging and booking. Perceptions demonstrate that appropriate skilful administration is fundamental for a venture to finish inside time, assessed spending plan and with apportioned assets. Giving great arranging, legitimate association, adequate stream of assets to venture can consequently accomplish the coveted outcome. Primavera Project Planner is had some expertise in dealing with a wide range of undertakings, little, medium and extensive; all through the world.it has adequate capacities to help the client anticipate the time, assets and cost and then later screen them. It is utilized handle very vast and complex ventures, particularly
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2128 in the designing and development business. Working venture in primavera resembles working in gathering of exercises with a methodical work breakdown structure. 1.1 OBJECTIVES 1) To distinguish whether the customer prerequisites are met. 2) To guarantee that the top request choices are made in view of accessible site information and arranging. 3) To show where enhancements should be made. 4) To decrease the length of the venture by applying appropriate exercises and assets time to time. 5) To examine the venture delay by legitimate followingof the work on regular schedule 2. LITERATURE REVIEW 1] Veena HC et al (2016): In this paper it has been the generaltimetable control methods are valuable in streamlining asset booking and venture length. General strategies, for example, are slamming procedures, lessening the action span, expanding the assets, applying timetable or expanding the working hours of the assets. 2] Umesh Y Polekar et al (2015): In this venture legitimate arranging is made with booking and what are the purposes behind the postponement in the venture is contemplated with appropriate following and refreshing. What, who and Where the work is done today and how much the function is finished on regular schedule is refreshed. 3] T. Siva Nagaraju et al (2016): Proper Planning and booking is critical in Metro Rail development ventures for diminishing and controlling deferrals of the venture. Considerable measure of time, cash, and assets are squandered every year ina developmentindustry becauseof inappropriate arranging and booking. 4] Satinder Chopra et al (2014): Deliberate stream of work is received by utilizing systems called Critical Path Method (CPM) and Program Evaluation and Review procedure (PERT). The state for administration of the venture .and the objective proposed to accomplish extends arranging is to deliver a period table of work with every exercise. The fundamental objective expected from the venture is too finished with legitimate arrangement and timetable inside the gross spending plan apportioned for real venture. 3. SCHEDULING Arranging is the assurance of the planning and gathering of operations in the undertaking and their get together to give the general fruition time. 3.1: STEPSINVOLVEDFOR SCHEDULINGINPROGRESS OF PROJECT BY PRIMAVERA: Creating a New OBS: In an association where best level administration people group’s assignment isdepictedunder their expert experience is keep running into chain of command level. Creating a New EPS: The Enterprise Project Structure is incorporated administration of different undertakingssorts work in the association, a progressive based structure that speaks to how activities are composed. Creating a WBS: The gathering of occasions and undertakings in a venture isolating or recognizing into little work bundles depending up their merits is assigned in project. Creating calendars: Creating another logbook or Modify to alter a current one. Choosing the Calendar that we need to use as a layout for new Projects. Modify the Work Week include work/non-work days. Check the "Default" Box to make the default Calendar for every future venture. Adding Activities: Exercises are the essential work components of venture and they can additionally separate into steps. Exercises are the most reduced level of WBS. Duration: It's the reason for assessing the chose movement's fulfillment time which decides if the timetable, asset accessibility or cost is most imperative when refreshing exercises Reschedule: Distinguishing the postponed movement entering the genuine rate of finish set up of virtual rate to know the effect of deferral to run the real term remains
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2129 ENTIRE PROCESS OF SCHEDULING WITH UPDATE PLAN BENEFITS OF PRIMAVERA SOFTWARE i. Primavera P6 Reduces Risk: Precisely when your timetable has variations from the norm, messes up, or assault issues, meander costs will make. This could mean cutting more fundamental parts of the errand to change for the wealth spending costs. Utilizing P6 sees and mitigates dangers to navigate of orchestrating, directing, and completing an attempt. ii. Forecasting of each activity in the project: As an attempt develops, the meander needs additional assets, activities, and errands which will help in accomplishing demands. Inside Primavera P6, meander chiefs may analyze the figures for assets, works out, and other meander needs. iii. Tracking Activities: The accompanying segments of Primavera P6 empower clients to rapidly make reports, guarantee all expects are done asaskedfor, and keep up example adherence. iv. Organization improvement: Since correspondence is redesigned all through a meander, it's definitely not hard to perceive how improved correspondence changes over into upgraded joint exertion. This is especially basic when activities cross immense zones. For example, meanders in the vitality time business endeavors may require joint exertion between variousvarying gatherings. v. Difficult Projects break down: Level of an endeavor can overwhelm.P6 licensesmeander boss to break immense attempts into tinier, easy attempts, errands, activities. 4. METHODOLOGY AND ANALYSIS: I filled in as understudy in BMRCL ltd. as per the VTU embraced syllabus in third semester. It was an amazing opportunity to working improvement industry people. The worked almost and took after the improvement of Metro works at Bangalore. The season of my impermanent employment was 4 months. I closely watched all the work which was been going out there and the contribution with the all-inclusive community working there give me a compact idea in regards to wearing down my M.Tech expand. The data which I assembled in the midst of my transitory occupation period help metro do the wander. Extend title is "arranging of metro wander of association application using” prophet primavera P6. 4.1 WORK DETAILS Improvement OF above ground level structure of 4.869 km(APROX) from Pattanagere to Challegata for Bangalore Metro Phase2 extend which incorporates 2 station lastly ends at the mouth of the new challegatta terminal. 1) MAILASANDARA STATION (135M) 2) KENGERI STATION (135M) 3) DEPOT STATION (135M) 4.2 EXCLUSIVE STATIONS-: A) Start of Contract to Mailasandra Station PIER 573-PIER 629 (EXCLUSIVE STATION) B) Mailasandra Station to Kengeri Station PIER 630-PIER 686 (EXCLUSIVE STATION) C) Kengeri Station to Start of depot turnout PIER 687-PIER 735 (EXCLUSIVE STATION) 4.3 CONSTRUCTION METHODOLOGY: For the entire Reach 2B Extension line pile foundation has been selected. At Stationsmaximumpilesare end bearing piles, there are two different sizes of pile used (1) 1.2m Diameter Pile (2) 0.6m Diameter Pile. End Bearing Piles: These piles are taken till hard rock strata, and most of the carrying capacity is derived from the base of the pile on to the hard rock strata. Surveying: First step for piling is surveying, to locate the pile. The survey activity at the beginning shall be carried out with a total station of 1” accuracy and from the transverse the stationed engineeratthesiteshall takepoints shown in the approved drawings the levels at each location.
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2130 Fabrication of reinforcement cage: Reinforcement cage is fabricated at the casting yard and transported to site using a trailer. Boring: After the pile point is located, boring is started with a hydraulic rig using a Auger. This initial boring is done till a depth of 4m. Socketing: After a hard rock stratum has been reached, Tripod is erected and Connected with a winch to carry out Chiseling and bailing in the bore. Lowering Reinforcement Cage: The reinforcement cage is Cut as per the depth of the pile. The cage is lifted with the Help of type mounted crane of 15Ton capacity and lowered in to the pile. Concreting: The temporary casing is lifted from the ground level and covered on the sides with the help of bags of sand. Before concreting starts tremie pipes are to be fitted and lowered RELATIONSHIPS: For piling: Augerboring→chiseling→cage lowering→flushing→concreting For pile cap including backfilling: Pile excavation→chipping of pile→levelling with PCC bed→reinforcement ring for pile cap→shuttering→concreting For pier: Pier starter→reinforcement tieing→shuttering→concreting→curing Table No.1 Showing the Activity Summary Of Piling For Pier No. 585 ACTIVITY TIME(HOURS) Auger boring 6.3 Core cutting 0.5 Chiseling 12 Bailing 6.1 Cage lowering 3 Winch erection 2 Tremie pipe lowering 1.8 Flushing 2 Concreting 4 Au ge r bo rin g Co re ba rre l Ch isc llin g Ba ilin g Ca ge lo we rin g Wi nc h er ec tio n Tr e mi e pi pe lo w… Flu shi ng co nc ret in g TIME(HOUR S) 6 1 12 6 3 2 2 2 4 0 2 4 6 8 10 12 14 time ACTIVITY TIME(HOURS) Graph No 1. Activity Time Cycle For Piling Comment: hence here we observe thatthelongest time is consumed during the process of chiselling Table No 2. Showing Summery Of Activity for Piling Of Pier 626 ACTIVITY TIME(HOURS) Survey 1.00 Auger boring 5.42 Casing 1.00 Core cutting 1.00 Chiseling 11.16 Bailing 6.00 Cage lowering 1.75 Winch erection 2.00 Tremie pipe lowering 1.08 Flushing 1.33 Concreting 4.50
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2131 Sur vey Au ger bor ing Cas ing Cor e cull tin g Chi scll ing Bai ling Ca ge low eri ng Wi nc h ere cti on Tre mi e pip e low eri ng Flu shi ng co ncr eti ng TIME(HOURS) 1 5.42 1 1 11.2 6 1.75 2 1.081.33 4.5 0 2 4 6 8 10 12 TIME ACTIVITY TIME(HOURS) Graph No.2 Time Cycle Activity for Piling of Pier 626 Comments: hence from both the time cycle to observe that the maximum time is consumed during the process of chisclling. Table No.3: Showing Activity Time Cycle Of Pier Segment on Pier Segment Mould SL NO. ACTIVITY TIME(HOURS) 1 Clean the bed 0.5 2 Fix the external formwork(outer shutter) including cleaning and oiling done parallel activity 1.5 3 Fix end bulk heads from one side 1.0 4 Lower the rebar cage and place it over casting bed using 20T gantry 1.0 5 Fix the anchorages 2.0 6 Attach the sheathing pipe to the trumpet 1.0 7 Inspection by client 1.0 8 Provide inserts, holes etc. for temporary lifting and pre stressing 1.0 9 Fix bulk heads of span side 1.0 10 Inspection and 1.0 approval from client for concreting 11 Concreting of the segment 3.0 12 Setting time for concrete and waiting period for attaining M25 so that the shutter can be removed 30.0 13 Lifting of segment 1 Total 45 hours Typical cycle time=1.5 days Above cycle time can easily produce 15/16 segments per mould per month Requirement of production for erecting 18 spans per month=18x2=36 segments No. of moulds requires=36/16=2 moulds As far as possible the pier segment shall be cast during day time for proper supervision and monitoring purpose. Table No. 4: Showing Activity Time Cycle Of Normal Segment on Long Line Bed SL NO. ACTIVITY TIME(HOURS) 1 Clean the bed 1.0 2 Fix the external formwork(outer shutter) including cleaning and oiling done parallel activity 2.0 3 Lower the rebar cage and place it over casting bed using 20t gantry 1.O 4 Inspection by client 1.0 5 Attach the sheathing pipe to the match casting segment 1.0 6 Fix end bulk heads from the other side 1.0 7 Provide inserts, holes etc. For lifting &temporary pre stressing 1.0 8 Inspection and approval from client for concreting 1.0 9 Concreting of the segment 4.0 10 Setting time for concrete and waiting period for attaining M25 so that shutter can be removed 24 TOTAL 36 HRS Typical cycle time=2days Above cycle time can easily produce 10 segments per 7 days which means at least 4 spans per month.
6.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2132 Requirement of production for erecting 18 spans per month=18/4=4.5 longline. 5. RESULTS AND DISCUSSION: 1) As the project is ongoing so it is on the progress stage and is going as per the schedule. 2) In stretch 1 from Start of contract to Mailasandra station i.e. from pier 573 to pier 629 all the pier works are completed only the launching of span is not started and the work is going as per schedule. 3) In stretch 2 from Mailasandra to Kengeri station that is from pier 630 to pier 686 only 13 piers have been completed, 9 are ongoing and the rest are not started yet. 4) In stretch 3 from Kengeri station to Start of Depot turnout i.e., from pier 687 to pier735 all the piers, portal piers are completed only the launching work is left Finally the project compares all the schedule techniques and let us knows theactual performance of the project, so as to take quick decision by the planning engineer/project manager in case of schedule parameters CONCLUSION 1] The outcome is inferred that the Activity ID and Activity Description both the most unused part can enormously upgrade the nature of the timetable if utilized legitimately. 2] It is the obligation of the arranging group to precisely choose the Activity ID structure ahead of time in this way, that timetable planning streams easily with no contentions. 3] Thus all the necessary factors with respect to risk management in metro rail projects has been formulated and questionnaire has been designed and the questionnaire will be distributed to the corresponding persons who are working in metro rail projects and by making use of software the response collected from the distributed questionnaire will be analyzed and appropriate suggestion and recommendations are made. 4] Studying activities of the project has been done by using primavera which describe easily each of activity of the project. 5] Analyzing the input data of the project and reporting the output data by which the ability for comparison between the original planoftheproject and the required date of the project can be performed. ACKNOWLEDGEMENT I wish to express my sincere thanks & gratitudetothank my parents, teachers & all people who have helped me directly or indirectly for the completion of this project work. I hereby acknowledge with deep sense of gratitude the valuable guidance, encouragement and suggestions given by my M.Tech project guide Dr. Shreenivas Reddy Shahpur & Prof. Maneeth P.D REFERENCES 1) Veena Hc (2016)‘Schedule control of an apartment building using primavera technique’ 2) Umesh Y Polekar (2015)‘Planning, scheduling and tracking of a residential project’ 3) T. Siva Nagaraju (2016) “Schedule and resources optimization using primavera in metro rail project” 4) Satinder Chopra (2014) “Planning scheduling, tracking and application administration using primavera web logic p6” 5) N. Banuchandar (2014) “Development of management model for the underground corridor construction for metro rail risk” Volume: 1 Issue: 2 08-Mar-2014,ISSN_NO: 2320-723X 6) R.K. Pandey(2013)‘Timeandschedulemanagement by using primavera’
Download now