International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 4073
Enhance the Capacity of Outer Tube Machining Cell
Shubham A. Chavan1, Durgesh A. Patil2, Shubham S. Shukla3, Rohit Khandare4
1, 2, 3, Student B.E., Dept. of Mechanical Engineering, GCOERC, Nashik (M.S), India
4Assistant prof, Dept. of Mechanical Engineering, GCOERC, Nashik (M.S), India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - In today’s fast growing competitive world, it is
important to constantly sustain & improve, be it a
manufacturing or service industry sector. Quality with
quantity is a main characteristic whichhelps aindustrystayin
the competition. Technology has taken leaps of development
lately and this has brought about an increase in the customer
demands. The main aim is to study the current capacity,
analyze it to find areas of improvement and make an
improvement proposal to meet the forecasted increase in
demand. This presents the current performanceofoutputsand
capacity of the plant calculated using continuous data
collected in shop floor. In each workstation the processing
time is different and the longest time consumption
workstation will be identified as a bottleneckworkstation.The
identified bottleneck station will be analyzed to reduce the
processing time which increases production rate.
Key Words: Jig & Fixture, Bottleneck analysis, Enhance
Production
1. INTRODUCTION
In the present period of globalization, enterprises are
receiving new technology and methodsto create productsto
compete and survive in the market. The most discouraging
issue faced by makers today is the manner by which to
convey their componentsor materialsrapidlyrequiringlittle
to no effort and great quality.
With rapid increase in demand of production,manufacturing
industries need to increase their potentials in production &
effectiveness to compete against their competitors. At the
same time, the production process has to be ready with the
ability to have abated costs with higher proficiency. Hence
the route to simplify the problem regardingtheproductionis
of paramount importance.
1.1 Problem Statement
The problem was that the industry was not able to fulfill the
customer requirements. The company’s actual production
was very less as compared to customer requirement. The
company was producing 19575 components per month
while the requirement wasof 27000componentspermonth.
So there was the gap of 7425 components per month. To fill
up this gap the company had to run the production on
Sundays & holidays, yet the requirement of customers was
not meeting.
1.2 Objective
The given objectives are to be predicted while doing this
project work are given below,
 To increase production rate.
 To maximize the use of all of the company’s
resources such as land, equipments etc.
 To meet the customer requirement.
 To increase profit of company.
1.2 Methodology and Process flow
Methodology is the Systematic, Theoretical analysis of the
methodsapplied to a field of study or the theoreticalanalysis
of the body of methods and principles associated with a
branch of study. The below flow chart shows the sequential
operation/steps that will be performed during the project
process.
2. LITERATURE REVIEW
Sandeep Malik, et al, (2015) describedthattimeelementin
manufacturing stretchesfrom the moment the raw material
is separated from the earth to the moment when the final
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 4074
product is delivered to the ultimate customer. Cycle Time
Reduction ((CTR)) is the application of the principles and
practices of total quality management to key business
processes with the added element of speed. It is about
refocusing attention from cost to time and creating the
alignment that enables organizations to run circles around
their slower competitors. It is a process improvement
workshop focused on risk reduction, organizationallearning
and work process improvement with a quick return on the
investment. It is a process improvement methodology.
Prathamesh P. Kulkarni, et al, (2014) described that
methodology for the efficient improvement in productivity
with the help of various Work Study Methods associated
with Lean Manufacturing Principles & Tools. Lean
manufacturing tools are one of the most influential & most
effective methodologies for eliminating scrap
(MUDA),controlling quality, and improving overall
performance of any machine, system or process in any
industry with the complete assurance of large annual profit
margins. This prescriptive paper proposesgenuinesolutions
& concepts for implementing Work Study Methods and
deploying associated lean manufacturing tools in any
enterprise or industry, covering the technical, engineering,
and manufacturing aspects as well as the business etiquette
affairs. Lean Manufacturing together with Work Study
Methods, being the most sophisticated & vast area of studies
has a huge scope for implementation & deployment of their
very own concepts.
Mihir R. Prajapati, et al, (2015) described that In this
economical world, any company has to fulfill its customer
needs to survive in the market. Cycle time reduction plays a
vital role in improving the customer demands. Whenseveral
workplaces are required to process a job, the machiningand
moving of the parts between the workplaces can be very
time consuming unlessit is suitably planned. From thepoint
of view of production planning and control the basic bulldog
blocks in the production system are WIP (work in process),
Takt time and Balancing of line. In this particularstudymore
focuson lean tools and techniqueswith their principles. The
significance of this study is to identify the best possible tools
and tools and techniqueswith respect to the problems.After
this study the decision says that few tools and techniques
can be applied and it is more preferable. It also discussesthe
methodology generally adopted, tools and techniques used
and benefits obtained
Dr. T. Ramesh Babu, et al, described that In today’s
increasingly competitive world, it is important to constantly
improve, be it a manufacturing or service industry. Quality
with quantity is a main characteristic whichhelpsacompany
stay in the competition. Technology has taken leaps of
development lately and this has brought aboutanincreasein
the customer demands. The main aim is to study the current
capacity, analyze it to find areas of improvement and make
an improvement proposal to meet the forecasted increasein
demand. This thesis presents the current performance of
outputs and capacity of the plant calculatedusingcontinuous
data collected in shop floor. In each workstation the
processing time is different and the longest time
consumption workstation will be identified as a bottleneck
workstation. The identified bottleneck station will be
analyzed to reduce the processing time which increases
production rate.
3. METHODOLOGY ASSESSMENT
The first step in any cycle-time reduction program is to
understand the current state. This means completing a
detailed process map to understand the flow of materials
and paperwork through the organization.Duringtheprocess
of generating this map, there is an opportunity to identify
value added vs. non-value-added activities.
3.1 DATA COLLECTION
The purpose of data collection is to provide a basis for
analysis, in other words, to turn data into information thatis
used by, and useful to, decision-makers. However, before
data can be collected, a data collection plan needs to be
developed. The data is collected to identify the bottleneck
station in manufacturing plant and to analyze and eliminate
them. The collected data is of direct observationinshopfloor
using stop watch by continuousassessmentofeachmachine.
Data collected is shown in below.
Total sets produced per month in outer tube cell = Total
sets produced per month in E – cell + Total sets produced
per month in F – cell
= 6825 +12750
= 19575 set/month
Interval = 27000 - 19575
= 7425 set /month
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 4075
4. Possibilities
As per the above possibilities we selected modification in
scrap fixture on the basis of cost savings.
5. Concept drawing
5.1 CATIA Model
In above figure red portion shows spacer plate & portion
above spacer plate (red region) shows scrap fixture plate.
6. Advantages
 Customer requirement is fulfilled.
 Increased in production rate.
 Competitiveness.
 Higher profit gain.
7. Conclusion
By modification in scrap fixture we had improved the
production rate in outer tube machining cell from 21,150
set/month to 26,990 set/ month.
It has given good results, in profit also
ACKNOWLEDGEMENT
The authors are thankful to Guru Gobind Singh College of
Engineering & Research center, Nashik, (GCOERC, Nashik)
and her staff; and also to Prof. Rohit Khandare, Dr
Candrashekhar Mohod, Faculty of Mechanical Engineering
Department, Savitribai University,Pune, for providing the
necessary facilities for the preparation of the paper.
REFERENCES
[1] Sandeep Malik, Nishant Pahwa,Vinod Malik
“Implementation of Cycle Time Reduction Technique in
Industry” international journal of manufacturing
science & engineering Vol. 2,july-dec 2011
[2] Prathamesh P. Kulkarni, Sagar S. Kshire, Kailas V.
Chandratre “Productivity Improvement Through Lean
Deployment & Work Study Methods” Volume: 03 Issue:
02 Feb-2014
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 4076
[3] Jelena R. Jovanovic , Dragan D. Milanovic ,Radisav D.
Djukic1, “Manufacturing Cycle Time Analysis and
Scheduling to Optimize Its Duration” Journal of
Mechanical Engineering, May 2014
[4] Balaji Rathod, Prasad Shinde, Darshan Raut, Govind
Waghmare “ Optimization of Cycle Time by Lean
Manufacturing Techniques-Line Balancing Approah”
Volume 4 Issue V, May 2016
.Megh Patel, Nisarg Patel, Harsh Patel, Yash Patel “A
Review on Concepts of Work-Study for Productivity
Improvement” IJSR Volume 6 Issue 2, February 2017
[5] B. Naveen⃰, Dr. T. Ramesh Babu “Productivity
Improvement in Manufacturing Industry Using
Industrial Engineering Tools” IOSR Journal of
Mechanical and Civil Engineering
BIOGRAPHIES
Mr. Shubham A. Chavan, was born
in India. He is pursuing his
Bachelor’s degree in Mechanical
Engineering from Savitribai Phule
Pune University. His current
interests Product Design &
Development.
Mr. Durgesh A. Patil, was born in
India. He is pursuing his Bachelor’s
degree in Mechanical Engineering
from Savitribai Phule Pune
University. His current interests in
Manufacturing and Industrial
Management.
Mr. Shubham S. Shukla wasbornin
India. He is pursuing his Bachelor’s
degree in Mechanical Engineering
from Savitribai Phule Pune
University. His current interests
Product Design & Development and
Industrial Management.
Mr. Rohit Khandare, was born in
India. He completed Master of
Engineering in Mechanical
Engineering from UniversityofPune,
currently Assistant Professor in
Guru Gobind Singh College of
Engineering and Research Centre,
Nashik.

More Related Content

What's hot

A038301010
A038301010A038301010
A038301010
theijes
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET Journal
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET Journal
 
Just in time
Just in timeJust in time
Just in time
Prashant Barla
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET Journal
 
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
IRJET Journal
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
IRJET Journal
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET Journal
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET Journal
 
Designed Precision Castings-Project Report (1)
Designed Precision Castings-Project Report (1)Designed Precision Castings-Project Report (1)
Designed Precision Castings-Project Report (1)Kushal Gandhi
 
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitImplementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
IRJET Journal
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET Journal
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET Journal
 
Effect of Lean Manufacturing on Operational Performance: An Empirical Study o...
Effect of Lean Manufacturing on Operational Performance: An Empirical Study o...Effect of Lean Manufacturing on Operational Performance: An Empirical Study o...
Effect of Lean Manufacturing on Operational Performance: An Empirical Study o...
IRJET Journal
 
A036501014
A036501014A036501014
A036501014
theijes
 
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
IAEME Publication
 
Modelling Production Performance of Small Scale Production Plant
Modelling Production Performance of Small Scale Production PlantModelling Production Performance of Small Scale Production Plant
Modelling Production Performance of Small Scale Production Plant
IJAEMSJORNAL
 
Productivity improvement through lean deployment &
Productivity improvement through lean deployment &Productivity improvement through lean deployment &
Productivity improvement through lean deployment &
eSAT Publishing House
 
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET Journal
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments production
Md.Abdur Rahim Al Bahar
 

What's hot (20)

A038301010
A038301010A038301010
A038301010
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
Just in time
Just in timeJust in time
Just in time
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
Designed Precision Castings-Project Report (1)
Designed Precision Castings-Project Report (1)Designed Precision Castings-Project Report (1)
Designed Precision Castings-Project Report (1)
 
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitImplementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 
Effect of Lean Manufacturing on Operational Performance: An Empirical Study o...
Effect of Lean Manufacturing on Operational Performance: An Empirical Study o...Effect of Lean Manufacturing on Operational Performance: An Empirical Study o...
Effect of Lean Manufacturing on Operational Performance: An Empirical Study o...
 
A036501014
A036501014A036501014
A036501014
 
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
 
Modelling Production Performance of Small Scale Production Plant
Modelling Production Performance of Small Scale Production PlantModelling Production Performance of Small Scale Production Plant
Modelling Production Performance of Small Scale Production Plant
 
Productivity improvement through lean deployment &
Productivity improvement through lean deployment &Productivity improvement through lean deployment &
Productivity improvement through lean deployment &
 
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments production
 

Similar to IRJET- Enhance the Capacity of Outer Tube Machining Cell

I012536474
I012536474I012536474
I012536474
IOSR Journals
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET Journal
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
IRJET Journal
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET Journal
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
IRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
PERUMALSAMY M
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
IRJET Journal
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET Journal
 
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean PrinciplesLead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
IRJET Journal
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET Journal
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET Journal
 
S3 p2 lee_kong_hui
S3 p2 lee_kong_huiS3 p2 lee_kong_hui
S3 p2 lee_kong_hui
shivamagarwal223
 
Productivity Enhancement Using Method Study
Productivity Enhancement Using Method StudyProductivity Enhancement Using Method Study
Productivity Enhancement Using Method Study
IRJET Journal
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
IRJET Journal
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
IRJET Journal
 
Checking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive IndustryChecking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive Industry
IRJET Journal
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
IRJET Journal
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
IRJET Journal
 
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRYPRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
IRJET Journal
 

Similar to IRJET- Enhance the Capacity of Outer Tube Machining Cell (20)

I012536474
I012536474I012536474
I012536474
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean PrinciplesLead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
Lead Time Reduction in Manufacturing Process of CNC Machines by Lean Principles
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
Iss 9
Iss 9Iss 9
Iss 9
 
S3 p2 lee_kong_hui
S3 p2 lee_kong_huiS3 p2 lee_kong_hui
S3 p2 lee_kong_hui
 
Productivity Enhancement Using Method Study
Productivity Enhancement Using Method StudyProductivity Enhancement Using Method Study
Productivity Enhancement Using Method Study
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
 
Checking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive IndustryChecking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive Industry
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRYPRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 

IRJET- Enhance the Capacity of Outer Tube Machining Cell

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 4073 Enhance the Capacity of Outer Tube Machining Cell Shubham A. Chavan1, Durgesh A. Patil2, Shubham S. Shukla3, Rohit Khandare4 1, 2, 3, Student B.E., Dept. of Mechanical Engineering, GCOERC, Nashik (M.S), India 4Assistant prof, Dept. of Mechanical Engineering, GCOERC, Nashik (M.S), India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - In today’s fast growing competitive world, it is important to constantly sustain & improve, be it a manufacturing or service industry sector. Quality with quantity is a main characteristic whichhelps aindustrystayin the competition. Technology has taken leaps of development lately and this has brought about an increase in the customer demands. The main aim is to study the current capacity, analyze it to find areas of improvement and make an improvement proposal to meet the forecasted increase in demand. This presents the current performanceofoutputsand capacity of the plant calculated using continuous data collected in shop floor. In each workstation the processing time is different and the longest time consumption workstation will be identified as a bottleneckworkstation.The identified bottleneck station will be analyzed to reduce the processing time which increases production rate. Key Words: Jig & Fixture, Bottleneck analysis, Enhance Production 1. INTRODUCTION In the present period of globalization, enterprises are receiving new technology and methodsto create productsto compete and survive in the market. The most discouraging issue faced by makers today is the manner by which to convey their componentsor materialsrapidlyrequiringlittle to no effort and great quality. With rapid increase in demand of production,manufacturing industries need to increase their potentials in production & effectiveness to compete against their competitors. At the same time, the production process has to be ready with the ability to have abated costs with higher proficiency. Hence the route to simplify the problem regardingtheproductionis of paramount importance. 1.1 Problem Statement The problem was that the industry was not able to fulfill the customer requirements. The company’s actual production was very less as compared to customer requirement. The company was producing 19575 components per month while the requirement wasof 27000componentspermonth. So there was the gap of 7425 components per month. To fill up this gap the company had to run the production on Sundays & holidays, yet the requirement of customers was not meeting. 1.2 Objective The given objectives are to be predicted while doing this project work are given below,  To increase production rate.  To maximize the use of all of the company’s resources such as land, equipments etc.  To meet the customer requirement.  To increase profit of company. 1.2 Methodology and Process flow Methodology is the Systematic, Theoretical analysis of the methodsapplied to a field of study or the theoreticalanalysis of the body of methods and principles associated with a branch of study. The below flow chart shows the sequential operation/steps that will be performed during the project process. 2. LITERATURE REVIEW Sandeep Malik, et al, (2015) describedthattimeelementin manufacturing stretchesfrom the moment the raw material is separated from the earth to the moment when the final
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 4074 product is delivered to the ultimate customer. Cycle Time Reduction ((CTR)) is the application of the principles and practices of total quality management to key business processes with the added element of speed. It is about refocusing attention from cost to time and creating the alignment that enables organizations to run circles around their slower competitors. It is a process improvement workshop focused on risk reduction, organizationallearning and work process improvement with a quick return on the investment. It is a process improvement methodology. Prathamesh P. Kulkarni, et al, (2014) described that methodology for the efficient improvement in productivity with the help of various Work Study Methods associated with Lean Manufacturing Principles & Tools. Lean manufacturing tools are one of the most influential & most effective methodologies for eliminating scrap (MUDA),controlling quality, and improving overall performance of any machine, system or process in any industry with the complete assurance of large annual profit margins. This prescriptive paper proposesgenuinesolutions & concepts for implementing Work Study Methods and deploying associated lean manufacturing tools in any enterprise or industry, covering the technical, engineering, and manufacturing aspects as well as the business etiquette affairs. Lean Manufacturing together with Work Study Methods, being the most sophisticated & vast area of studies has a huge scope for implementation & deployment of their very own concepts. Mihir R. Prajapati, et al, (2015) described that In this economical world, any company has to fulfill its customer needs to survive in the market. Cycle time reduction plays a vital role in improving the customer demands. Whenseveral workplaces are required to process a job, the machiningand moving of the parts between the workplaces can be very time consuming unlessit is suitably planned. From thepoint of view of production planning and control the basic bulldog blocks in the production system are WIP (work in process), Takt time and Balancing of line. In this particularstudymore focuson lean tools and techniqueswith their principles. The significance of this study is to identify the best possible tools and tools and techniqueswith respect to the problems.After this study the decision says that few tools and techniques can be applied and it is more preferable. It also discussesthe methodology generally adopted, tools and techniques used and benefits obtained Dr. T. Ramesh Babu, et al, described that In today’s increasingly competitive world, it is important to constantly improve, be it a manufacturing or service industry. Quality with quantity is a main characteristic whichhelpsacompany stay in the competition. Technology has taken leaps of development lately and this has brought aboutanincreasein the customer demands. The main aim is to study the current capacity, analyze it to find areas of improvement and make an improvement proposal to meet the forecasted increasein demand. This thesis presents the current performance of outputs and capacity of the plant calculatedusingcontinuous data collected in shop floor. In each workstation the processing time is different and the longest time consumption workstation will be identified as a bottleneck workstation. The identified bottleneck station will be analyzed to reduce the processing time which increases production rate. 3. METHODOLOGY ASSESSMENT The first step in any cycle-time reduction program is to understand the current state. This means completing a detailed process map to understand the flow of materials and paperwork through the organization.Duringtheprocess of generating this map, there is an opportunity to identify value added vs. non-value-added activities. 3.1 DATA COLLECTION The purpose of data collection is to provide a basis for analysis, in other words, to turn data into information thatis used by, and useful to, decision-makers. However, before data can be collected, a data collection plan needs to be developed. The data is collected to identify the bottleneck station in manufacturing plant and to analyze and eliminate them. The collected data is of direct observationinshopfloor using stop watch by continuousassessmentofeachmachine. Data collected is shown in below. Total sets produced per month in outer tube cell = Total sets produced per month in E – cell + Total sets produced per month in F – cell = 6825 +12750 = 19575 set/month Interval = 27000 - 19575 = 7425 set /month
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 4075 4. Possibilities As per the above possibilities we selected modification in scrap fixture on the basis of cost savings. 5. Concept drawing 5.1 CATIA Model In above figure red portion shows spacer plate & portion above spacer plate (red region) shows scrap fixture plate. 6. Advantages  Customer requirement is fulfilled.  Increased in production rate.  Competitiveness.  Higher profit gain. 7. Conclusion By modification in scrap fixture we had improved the production rate in outer tube machining cell from 21,150 set/month to 26,990 set/ month. It has given good results, in profit also ACKNOWLEDGEMENT The authors are thankful to Guru Gobind Singh College of Engineering & Research center, Nashik, (GCOERC, Nashik) and her staff; and also to Prof. Rohit Khandare, Dr Candrashekhar Mohod, Faculty of Mechanical Engineering Department, Savitribai University,Pune, for providing the necessary facilities for the preparation of the paper. REFERENCES [1] Sandeep Malik, Nishant Pahwa,Vinod Malik “Implementation of Cycle Time Reduction Technique in Industry” international journal of manufacturing science & engineering Vol. 2,july-dec 2011 [2] Prathamesh P. Kulkarni, Sagar S. Kshire, Kailas V. Chandratre “Productivity Improvement Through Lean Deployment & Work Study Methods” Volume: 03 Issue: 02 Feb-2014
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 03 | Mar-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 4076 [3] Jelena R. Jovanovic , Dragan D. Milanovic ,Radisav D. Djukic1, “Manufacturing Cycle Time Analysis and Scheduling to Optimize Its Duration” Journal of Mechanical Engineering, May 2014 [4] Balaji Rathod, Prasad Shinde, Darshan Raut, Govind Waghmare “ Optimization of Cycle Time by Lean Manufacturing Techniques-Line Balancing Approah” Volume 4 Issue V, May 2016 .Megh Patel, Nisarg Patel, Harsh Patel, Yash Patel “A Review on Concepts of Work-Study for Productivity Improvement” IJSR Volume 6 Issue 2, February 2017 [5] B. Naveen⃰, Dr. T. Ramesh Babu “Productivity Improvement in Manufacturing Industry Using Industrial Engineering Tools” IOSR Journal of Mechanical and Civil Engineering BIOGRAPHIES Mr. Shubham A. Chavan, was born in India. He is pursuing his Bachelor’s degree in Mechanical Engineering from Savitribai Phule Pune University. His current interests Product Design & Development. Mr. Durgesh A. Patil, was born in India. He is pursuing his Bachelor’s degree in Mechanical Engineering from Savitribai Phule Pune University. His current interests in Manufacturing and Industrial Management. Mr. Shubham S. Shukla wasbornin India. He is pursuing his Bachelor’s degree in Mechanical Engineering from Savitribai Phule Pune University. His current interests Product Design & Development and Industrial Management. Mr. Rohit Khandare, was born in India. He completed Master of Engineering in Mechanical Engineering from UniversityofPune, currently Assistant Professor in Guru Gobind Singh College of Engineering and Research Centre, Nashik.