SlideShare a Scribd company logo
1 of 4
UDAY PRATAP SINGH
Mobile:-9777445583
E-Mail:-udps.20@gmail.com
CAREER GOALS
Intend to build a career with leading corporate of hi-tech environment withcommitted & dedicated
people, whichwill help me in utilizing my potential. Willing to work as a key player in challenging &
creative environment and set example forothers.
Professional SUMMARY
 A Competent & dynamic professional having 8+ year experience of CNC Machine Operation &
Maintenance, Steel Structure Detailing, Drafting & Fabrication, Sheet Metal Work, and
Procurement.
 Expertise in the Operation & Maintenance of various makes CNC Machine like FICEP, MESSER,
CORIMPEX, AMADA and FINN-POWER.
 Well versed in Heavy & Technological Structural Steel Fabrication of steel plant and power
plant.
 Hands on experience in manufacturing of various rating Acoustics Enclosure and Control Panel
cubicle.
 Ensure frequent Quality improvement, Productivity improvements, setup time reduction,
Multi-Machines balancing and actively responsible for meeting day-to-day production target
through effective production planning and coordination with various departments.
 Monitoring adherence to Quality Management system as well as conducting compliance checks
with respect to quality frameworks document.
 Conversant with different type Welding and NDT process.
 Value Addition of the Team consisting Engineer, Operator and Technician through Monthly
Training Program.
AREA OF EXPERTISE
 ProductionManagement  CNC MachineOperation  Modelling&Detailing
 HeavyFabrication  Sheet Metal Fabrication  Team Management
 Material Management  Procurement&Negotiation  StrategicPlanning
 New ProductDevelopment  Cross-Functional Coordination  VendorDevelopment
Work history
Jindal Steel & PowerLtd, Angul Jul 12-Present AssistantManager
BiopacIndiaCorporationLtd,Silvassa Mar 12-Jul 12 ProductionEngineer
PowericaLimited,Silvassa May08- Mar12 ProductionEngineer
EMPLOYMENT RECITAL
Jindal Steel & Power Ltd, Angul
Tilte: Structural Steel Department, Assistant Manager-CNC Machine Operation & Fabrication.
Responsibilities:-
 Responsible in end to end CNC Machine Productionand Steel Structure Fabrication of daily
processing of Job orders from raw materials to finish product to achieve high quality outcome and
client satisfaction.
 Conceptualizing and implementing process modificationfor optimizing resources utilization and
maximizing productivity and adapts automated systems forstreamlining operations.
 Performing productivity analysis & their financial impact calculationand implementing preventive
measures.
 Process Planning Machining sequence and follow up fordifferent projects.
 Pre ProjectPlanning- Planning the projects and ensuring the materials and timely execution of the
projects.
 Assisting technicians and Fabricator to understand Engineering drawings, instructions, machine
guidelines etc.
 Improving operational efficiency by enhancing capacity utilization, reducing rejections and non-
value added activities.
 Restructuring & developing cost & energy saving techniques/measures and modifications to
achieve substantial reduction in O&M expenditures and workwithin the budget.
 Process/Methods improvements & Introductionof Kaizen.
 Ensuring Good Housekeeping at workshop level and safe workenvironment in workshop by
making team alert about danger of operations by reporting on any unsafe conditions , operations ,
accidents to improve safety.
 Procurement of Spares and Consumables to enhanced production.
 Establish documents for “Standardized Work”
 Demonstrating superior people management skills and facilitate cross-functional team formation
to reduce and solve customer complaints.
Notable Accomplishments:
 Oversaw Commissioning of CNC Plate Processing and CNC Beam Line make FICEP and MESSER.
 Develop the Grizzly manufacturing over machine for RMHS Dept.
 Execute M/s Geodesic Techniques G+11 steel Structure Project (1500 MT) for JSPL Township.
 Develop the MS / SS Screen assembly to overcome the issue of CGP discharge line.
 Re-build the Ash-Brick Mould assembly towards the utilization of remain/waste part of DRI under
the guidance of ED-In charge.
 Develop the departmental Fabrication team to convert the machine semi-finish good to finish good
and save the cost.
 Achieve the one day Max. I-beam (BOF Main Shop) production target is 112 MT.
 Successfully accomplish the Filpkart-Banglore (IT Project) Steel Structure Fabrication-933MT.
Biopac India Corporation Ltd, Silvassa
Company Profile:- Biopac India Corporation Ltd is the largest manufacturer of foam dinnerware in
India, established his business in 1996 .
Responsibilities:-
 Operation of Tandem type Extruder makes MYUNG-IL-FOAMTECH, Korea.
 Operation & Maintenance of Vacuum Forming M/c makes IRWIN RESARCH USA.
 Prepare Product Transfer Note.
Powerica Ltd, Silvassa
Company Profile: It is an ISO 9001-2008 certified company involved in the manufacturing of Silent
Diesel & GAS generator set and Manual & AMF Control panel.
Responsibilities:-
 Planning for day-to-day strategies of man, material & machine utilization for optimum out-put.
 Successfully managed Operation of CNC machine and Fabrication of various rating Acoustic
enclosure as well as Welded/ Bolted section type control panel cubicle
 Identifying and eliminating unnecessary procedures in processes, ensuring uniformity in the
process with focus on achieving client and the organizational requirements.
 Effecting predictive & preventive maintenance schedule of CNC machine to increase machine UP
time and equipment reliability.
 Minimize performance bottlenecks for high productivity with maximization of men, material &
machine, preparing process sheet & estimate sheet for same.
 Prepare CAPA against customer complaints. Monitor the overall function of processes and
implement adequate measures to maximize customer satisfaction levels.
 Undertaking monthly scrap analysis.
 Raise monthly purchase Indent of Manufacturing Department.
 Execute and maintain the shop floor reports and records as per ISO 9001-2008.
 Conducted weekly MOM for standardization and cost reduction of Process & Product.
Notable Accomplishments:
 Effectively planned and executed the projects as per design and user requirement.
 Collecting Quotation of LHP set Robotics fabrication line set up from PARI Pune.
 Actively participated in internal audits, verification of effectiveness of the implemented system.
 Actively participate to introduce LCMS / CSP material.
 Achieved the targets as per TAKT time.
 Holds the merit of introducing:
o Fishtail Tool as a parting tool to save material and reduce process time on TPP machine.
o Cluster Tool on TPP machine for perforation of control panel cubicle.
 Significant contribution in saving around 25% CRCA material through implement 1.2 mm thick
sheet instead of 1.6 mm sheet in Control panel cubicle.
 Played vital role in:
o Modifying 380 kVA new acoustic design for same performance and save around 20%
material and process time.
o Modify-Height reduces of HHP acoustic enclosure set base frame to save 20% material.
 Effectively utilised:
o HRCA scrap for Bolted section control panel base frame instead of ISMC and save 43%
material cost.
o The un-nest sheet part for fabrication purpose.
 Generated Batch number to HHP DG set acoustic enclosure.
Education
Degree / Examination Institute Percentage
B.Tech Mechanical Uttar Pradesh Technical University, Lucknow 74.06%
Intermediate UP Board, from RSMIC Robertsganj, Sonebhadra 53.0%
High School UP Board, from RSMIC Robertsganj, Sonebhadra 51.5%
Technical Capabilities
Tekla , SAP ,AutoCAD, Solid works, CNC CAM software, Microsoft Office, TPM and IMS/ ISO.
PERSONAL DETAILS
Date of Birth: 20th Oct 1983
Languages Known: English, Hindi and Marathi.
Address: 25/163, New Colony, near JHVM School, Robertsganj, Sonebhadra-231216 ( U.P.)
DECLARATION
I hereby declare that the above information is correctand to be best of my knowledge.
Date: - (UDAY PRATAP SINGH)
Place:- Angul,Odisha

More Related Content

What's hot (20)

Resume 3-17-16
Resume 3-17-16Resume 3-17-16
Resume 3-17-16
 
Mali(Cv)
Mali(Cv)Mali(Cv)
Mali(Cv)
 
RahulNavale
RahulNavaleRahulNavale
RahulNavale
 
Krishnan Resume
Krishnan ResumeKrishnan Resume
Krishnan Resume
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
MUKESH G. CHAVAN-FD
MUKESH G. CHAVAN-FDMUKESH G. CHAVAN-FD
MUKESH G. CHAVAN-FD
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
 
Resume to I EC
Resume to I ECResume to I EC
Resume to I EC
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
pradeep~Rsume (1)
pradeep~Rsume (1)pradeep~Rsume (1)
pradeep~Rsume (1)
 
Shahid attar chemical_engr2[1]
Shahid attar chemical_engr2[1]Shahid attar chemical_engr2[1]
Shahid attar chemical_engr2[1]
 
RCG resume 2016 IE (2)
RCG resume 2016 IE (2)RCG resume 2016 IE (2)
RCG resume 2016 IE (2)
 
NEW BIODATA AUG'16
NEW BIODATA AUG'16NEW BIODATA AUG'16
NEW BIODATA AUG'16
 
RahulSrivastava - El
RahulSrivastava - ElRahulSrivastava - El
RahulSrivastava - El
 
MOHAN
MOHANMOHAN
MOHAN
 
Curriculum vitae original
Curriculum vitae originalCurriculum vitae original
Curriculum vitae original
 
Resume.DOC
Resume.DOCResume.DOC
Resume.DOC
 
CV - Ashokan (Operation)
CV - Ashokan (Operation)CV - Ashokan (Operation)
CV - Ashokan (Operation)
 
Ravi Kiran Balabhadruni
Ravi Kiran BalabhadruniRavi Kiran Balabhadruni
Ravi Kiran Balabhadruni
 
vikas goel
vikas goelvikas goel
vikas goel
 

Similar to UDAY Rsm-16 (20)

Resume
ResumeResume
Resume
 
G28 dec8 ASR Resu
G28 dec8 ASR ResuG28 dec8 ASR Resu
G28 dec8 ASR Resu
 
Gauravcv
GauravcvGauravcv
Gauravcv
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 
Aghil Jith
Aghil JithAghil Jith
Aghil Jith
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and Maintenance
 
Sudhir Niphadkar 1007-S
Sudhir Niphadkar 1007-SSudhir Niphadkar 1007-S
Sudhir Niphadkar 1007-S
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
Resume_Dinkar.xls
Resume_Dinkar.xlsResume_Dinkar.xls
Resume_Dinkar.xls
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
Rsume
RsumeRsume
Rsume
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 

UDAY Rsm-16

  • 1. UDAY PRATAP SINGH Mobile:-9777445583 E-Mail:-udps.20@gmail.com CAREER GOALS Intend to build a career with leading corporate of hi-tech environment withcommitted & dedicated people, whichwill help me in utilizing my potential. Willing to work as a key player in challenging & creative environment and set example forothers. Professional SUMMARY  A Competent & dynamic professional having 8+ year experience of CNC Machine Operation & Maintenance, Steel Structure Detailing, Drafting & Fabrication, Sheet Metal Work, and Procurement.  Expertise in the Operation & Maintenance of various makes CNC Machine like FICEP, MESSER, CORIMPEX, AMADA and FINN-POWER.  Well versed in Heavy & Technological Structural Steel Fabrication of steel plant and power plant.  Hands on experience in manufacturing of various rating Acoustics Enclosure and Control Panel cubicle.  Ensure frequent Quality improvement, Productivity improvements, setup time reduction, Multi-Machines balancing and actively responsible for meeting day-to-day production target through effective production planning and coordination with various departments.  Monitoring adherence to Quality Management system as well as conducting compliance checks with respect to quality frameworks document.  Conversant with different type Welding and NDT process.  Value Addition of the Team consisting Engineer, Operator and Technician through Monthly Training Program. AREA OF EXPERTISE  ProductionManagement  CNC MachineOperation  Modelling&Detailing  HeavyFabrication  Sheet Metal Fabrication  Team Management  Material Management  Procurement&Negotiation  StrategicPlanning  New ProductDevelopment  Cross-Functional Coordination  VendorDevelopment Work history Jindal Steel & PowerLtd, Angul Jul 12-Present AssistantManager BiopacIndiaCorporationLtd,Silvassa Mar 12-Jul 12 ProductionEngineer PowericaLimited,Silvassa May08- Mar12 ProductionEngineer
  • 2. EMPLOYMENT RECITAL Jindal Steel & Power Ltd, Angul Tilte: Structural Steel Department, Assistant Manager-CNC Machine Operation & Fabrication. Responsibilities:-  Responsible in end to end CNC Machine Productionand Steel Structure Fabrication of daily processing of Job orders from raw materials to finish product to achieve high quality outcome and client satisfaction.  Conceptualizing and implementing process modificationfor optimizing resources utilization and maximizing productivity and adapts automated systems forstreamlining operations.  Performing productivity analysis & their financial impact calculationand implementing preventive measures.  Process Planning Machining sequence and follow up fordifferent projects.  Pre ProjectPlanning- Planning the projects and ensuring the materials and timely execution of the projects.  Assisting technicians and Fabricator to understand Engineering drawings, instructions, machine guidelines etc.  Improving operational efficiency by enhancing capacity utilization, reducing rejections and non- value added activities.  Restructuring & developing cost & energy saving techniques/measures and modifications to achieve substantial reduction in O&M expenditures and workwithin the budget.  Process/Methods improvements & Introductionof Kaizen.  Ensuring Good Housekeeping at workshop level and safe workenvironment in workshop by making team alert about danger of operations by reporting on any unsafe conditions , operations , accidents to improve safety.  Procurement of Spares and Consumables to enhanced production.  Establish documents for “Standardized Work”  Demonstrating superior people management skills and facilitate cross-functional team formation to reduce and solve customer complaints. Notable Accomplishments:  Oversaw Commissioning of CNC Plate Processing and CNC Beam Line make FICEP and MESSER.  Develop the Grizzly manufacturing over machine for RMHS Dept.  Execute M/s Geodesic Techniques G+11 steel Structure Project (1500 MT) for JSPL Township.  Develop the MS / SS Screen assembly to overcome the issue of CGP discharge line.  Re-build the Ash-Brick Mould assembly towards the utilization of remain/waste part of DRI under the guidance of ED-In charge.  Develop the departmental Fabrication team to convert the machine semi-finish good to finish good and save the cost.  Achieve the one day Max. I-beam (BOF Main Shop) production target is 112 MT.  Successfully accomplish the Filpkart-Banglore (IT Project) Steel Structure Fabrication-933MT. Biopac India Corporation Ltd, Silvassa Company Profile:- Biopac India Corporation Ltd is the largest manufacturer of foam dinnerware in India, established his business in 1996 . Responsibilities:-  Operation of Tandem type Extruder makes MYUNG-IL-FOAMTECH, Korea.
  • 3.  Operation & Maintenance of Vacuum Forming M/c makes IRWIN RESARCH USA.  Prepare Product Transfer Note. Powerica Ltd, Silvassa Company Profile: It is an ISO 9001-2008 certified company involved in the manufacturing of Silent Diesel & GAS generator set and Manual & AMF Control panel. Responsibilities:-  Planning for day-to-day strategies of man, material & machine utilization for optimum out-put.  Successfully managed Operation of CNC machine and Fabrication of various rating Acoustic enclosure as well as Welded/ Bolted section type control panel cubicle  Identifying and eliminating unnecessary procedures in processes, ensuring uniformity in the process with focus on achieving client and the organizational requirements.  Effecting predictive & preventive maintenance schedule of CNC machine to increase machine UP time and equipment reliability.  Minimize performance bottlenecks for high productivity with maximization of men, material & machine, preparing process sheet & estimate sheet for same.  Prepare CAPA against customer complaints. Monitor the overall function of processes and implement adequate measures to maximize customer satisfaction levels.  Undertaking monthly scrap analysis.  Raise monthly purchase Indent of Manufacturing Department.  Execute and maintain the shop floor reports and records as per ISO 9001-2008.  Conducted weekly MOM for standardization and cost reduction of Process & Product. Notable Accomplishments:  Effectively planned and executed the projects as per design and user requirement.  Collecting Quotation of LHP set Robotics fabrication line set up from PARI Pune.  Actively participated in internal audits, verification of effectiveness of the implemented system.  Actively participate to introduce LCMS / CSP material.  Achieved the targets as per TAKT time.  Holds the merit of introducing: o Fishtail Tool as a parting tool to save material and reduce process time on TPP machine. o Cluster Tool on TPP machine for perforation of control panel cubicle.  Significant contribution in saving around 25% CRCA material through implement 1.2 mm thick sheet instead of 1.6 mm sheet in Control panel cubicle.  Played vital role in: o Modifying 380 kVA new acoustic design for same performance and save around 20% material and process time. o Modify-Height reduces of HHP acoustic enclosure set base frame to save 20% material.  Effectively utilised: o HRCA scrap for Bolted section control panel base frame instead of ISMC and save 43% material cost. o The un-nest sheet part for fabrication purpose.  Generated Batch number to HHP DG set acoustic enclosure. Education Degree / Examination Institute Percentage B.Tech Mechanical Uttar Pradesh Technical University, Lucknow 74.06% Intermediate UP Board, from RSMIC Robertsganj, Sonebhadra 53.0%
  • 4. High School UP Board, from RSMIC Robertsganj, Sonebhadra 51.5% Technical Capabilities Tekla , SAP ,AutoCAD, Solid works, CNC CAM software, Microsoft Office, TPM and IMS/ ISO. PERSONAL DETAILS Date of Birth: 20th Oct 1983 Languages Known: English, Hindi and Marathi. Address: 25/163, New Colony, near JHVM School, Robertsganj, Sonebhadra-231216 ( U.P.) DECLARATION I hereby declare that the above information is correctand to be best of my knowledge. Date: - (UDAY PRATAP SINGH) Place:- Angul,Odisha