Improvement of Overall Equipment Effectiveness of Valve Stem
Seal Finishing Machine
Mallikarjunagouda S Patil1, Mr. P Prasad2
1M.Tech Student, Dept. of Mechanical Engineering, JSS S&TU, Mysuru, Karnataka, India
2Associate Professor, Dept. of Mechanical Engineering, JSS S&TU, Mysuru, Karnataka, India
------------------------------------------------------------------------***-------------------------------------------------------------------------
Abstract - Most over the top of present day creation lines is central as it sees an improved age and utilization ofopenassets. Parts
adding to age line ampleness are work use and machine limit. There are different structures where we can applycomputerization
for better and precise outcomes. Computerization is no delicacy the best perspective enemy cost cutting by endsquanderasscrap,
lessening work, decreasing time, controlling quality and improving everything examined execution of any, machine, structure or
system in any industry. The association should have the choice to channel for fitting age information and to altogether expel up
these information to see the different needs at creation level and to rapidly see how to improve advantage. A careful and online
information the authorities structure can guarantee that these issues are drive forward. As a last resort Equipment Feasibility
(OEE) of a machine expect a first improvement where execution and nature of the thingareofkeycentralitytotheconnection. The
age rate can be improved by decreasing the individual time of the machine. This paper discusses thought of robotization, in which
the pick slicing viewpoint is utilized to trim the dazzling piece of a Valve stem seals [VSS]. The motivation drivingthisevaluationis
to locate the basic drivers of veritable age loss of the machine and to propose counter measures by which these issues can be
reduced. This framework is utilized for improving reasonableness, methodology for executionofcomputerizationand inageneral
sense sufficiency of the structure.
Key words: Overall Equipment Effectiveness (OEE), Valve stem seals (VSS), Automation, Pick trimming.
1. INTRODUCTION
In the present Global Scenario fabricating Efficiency and Agility isn't an alternative, however it is a key necessity. The
creation cost is expanding quickly and the work cost, crude material cost, control cost, and so forth are notin our control
of maker. Modernization of enterprises acquainted new advances with straightforwardness humanon the creation lines.
Ventures have introduced hardware to help laborers. This is known as semi-robotized procedure lines. A completely
computerized procedure line is intended to full-fill large scale manufacturing yield and is in a perfect world fit to serve
enormous. The idea of a creation line relies upon the multifaceted nature of the assembling parts, the generation volume,
the affectability of the item and cost. Industries‟ the board plan and format their generation lines asindicated by explicit
creation necessities. Automation plays a very important role in the automotive industries. Automation has leads to the
increase in the production, reduction in the man power and at the same time provides the growth of the company by
satisfying customer demands. The VSS finishing machine is used in the production of VSS seals which are used in the
automobiles. The machine having many problems in the production which causes the loss of production and as a result
OEE of the machine is lower than the industry standards.
Trimming and inspection unit: The downtime of the machine is considerably high compared to the other
machines in the plant, downtime is mostly due to the unscheduled stoppages, and idling in the process. The improper
trimming of the seals are the most important factors contributing to the low OEE of the machine, it is important to
decrease the personal time of the machine which will help in eliminating the cause of major downtime to improve the
OEE. Springing unit: The damage of the spring in the seals are the most important factors contributing to the low OEE of
the machine, it is important to decrease the personal time of the machine which associates in getting out purpose for
huge departure to improve the OEE. The system which colleagues in discarding explanation behind genuine individual
time to improve the OEE. The structure targets heightening the Overall Equipment Effectiveness, to lessen the gadget
individual time while improving quality and execution. S R Vijayakumar, et al., [1] have proposed a work wherein OEE of
an imbuement upgrade procedure was extended from 61% to 81% utilizing openness, better use of favorable
circumstances, awesome things what's increasinglyraised master soul and affirmation. T Rautio, et al., [2]have made and
tried a system that displays the use of contraptions application to check Overall Equipment Efficiency. K C Ng, et al., [3]
have separated a DMAIC approach, which served to apparent and delineates obviously the issue at the portrayed stage.It
gives a systematic structure by giving all around referenced assessment in to progressively modest scale levels in order
to get the genuine key driver and later offer sensible response for insistence the issue until the completion of time. T
Kamaryt, et al., [5] have proposed a reliable gadget for considering the advantage of overseeing rigging andjoinsupkeep
approaches and structures. OHEE offers a ricochet forward response for investigating supply structures where thereason
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 679
for intermixing of interest is the mechanical assembly. G R Esmaeilian, et al., [6] have comfortable a model with reduce
RPN by improving everything thought about mechanical gathering limit (OEE) by using of heuristic mathematic model
subject to Total Productive Maintenance record, this framework is used to decrease the degree of risk need number. W
Amer, et al., [7] have executed and attempted a system in the district Liquefied Petroleum Gas (LPG)industry toimprove
Overall Equipment Effectiveness (OEE) achieving connected standard talking structure productivity. Z Q Bai, et al., [8]
have shown a structure, which targets giving an OEE improvement system reliant on TOC. Regardless, the OEE
improvement model containing OEE estimation model and OEE the directors module is gathered subject to the DBR
speculation in TOC. D Daniel Sheu, et al., [9] have developed a thought of if all else fails data gear reasonableness(OIE) to
complete the full state of the equipment profitability. The augmentation of the OIE and OEE along these lines builds up
the certified everything considered equipment capacity which the maker names firm mechanical gathering advantage
(TEE) all together not to confuse with the current OEE. Andrea Chiarini, et al., [10] have tended to the use and
undertaking the heads of Six Sigma instruments and Lean Production by looking novel smart evaluation dedicated to the
improvement of everything considered apparatus good judgment (OEE). The methodology joined into the system to
develop a machine with another sub-unit which is a pick slicing procedure to extend the general proficiency of the
structure showed up contrastingly in association with the past structure.
2. METHODOLOGY
[1] Existing System
A) Trimming and Inspection module
The Existing inspection system consists of blade trimming method for the trimming of the seals. The loading unit the existing
system consists of rotary cylinders which increase the cycle time of the machine. The trimming and inspection unit of the
existing system is shown in the Fig 1.1.
Fig 1.1: Trimming and Inspection unit machine layout
B) Springing Unit
The existing springing unit includes feeding of seals into the loading station horizontally from the conveyor. The existing
springing unit machine layout is shown in the Fig 1.2.
Fig 1.2: Springing unit machine layout
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 680
[2] IMPLEMENTED SYSTEM
The system is implemented with the automated trimming machine for trimming an unwanted portion of Valve StemSeals
(VSS) using a „seal pick trimming‟ method. The input for this machine would be seals with rubber flashes. The rubber
flashes on the seals are molded and formed on the seal during the molding process may be due to variations in amount of
rubber added to the process. The scope of this machine is to remove the flash on the ID of the seal. The flash presentin the
ID will be removed by the pick trimming process. The pure cycle time of the machine is 1.5s. This means that the machine
should give out 1 seals every 1.5s. The system consists oftwo indexer unitsIU1 [Indexer Unit 1] and IU2 [Indexer Unit 2].
Boththe indexer units consist of several stations. IU1 is implemented with new units: in loadingstationrotary movement
is replaced by forward/reverse movement pick and place unit, blade trimming is replaced by picktrimmingunit,andseal
butting unit is introduced for proper alignment of seals which helped for camera inspection.
(A)PICK AND PLACE ARRANGEMENT:
To place the seals from conveyor to the indexer unit pick and place arrangement was used. Previously cylinders with
rotary movement were used to pick and place the seals to indexer unit. More cycle time was consumed due to rotary
movement of the cylinder. In order to reduce the cycle time ofthat action cylinders with forward/reverse movement are
used to pick and place the seals in required position. Pick and place arrangement with forward/reverse cylinders are as
shown in Fig.1.3.
(a) (b)
[1] Top cylinder (up/down)
[2] Horizontal cylinder (forward/reverse)
[3] Grippers
[4] Base plate
Fig. 1.3: (a) Pick and place unit front view and (b) Isometric view
ID TRIMMING STATION:
The ID trimming station will remove the Flash in the ID by pick trimmingprocess. The ID trimming station will have a
cylinder unit with sufficient forceto pushthe spring loaded pin present in the spindle upwards to strip the ID flashaway.
The trimming should not damage the seal’s main lip.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 681
(B)PICK TRIMMING:
Blade trimming method was in use previously to remove the flash in the seals after molding process. Blade trimming
method was not working effectively, defects were noticed. To overcome this trimming defects found in seals a pick
trimming method is installed. The mechanical design of pick trimming unit is as shownin fig. 1.4. The pick trimming unit
consists of two sections. Each section has top cylinder, bottom cylinder, mandrel to place seal, seal holding tool and seal
pushing pin. When seals are not present in the mandrel cylinders will be in home position. When seal is placed on the
mandrel bottom cylinder will move upwards which in turn will lifts seal pushing pin upwardsandtopcylinder willmove
downwards whichin turn will lifts seal holding tool downwards. Now the seal will be placed in between seal holding tool
and seal pushing pin. When the pin is pushed with high pressure flash on the seal will be removed. After the flash
removal both top and bottom cylinders will reach the homepositions.Thisis how the flashes on the seals will beremoved
properly without any defects.
(a) (b)
[1] Top cylinder + Seal holder
[2] Seal
[3] Mandrel
[4] Pin
[5] Bottom cylinder
Fig 1.4: (a) Mechanical design of seal pick trimming unit front view and (b) Side view
(C) SPRINGING UNIT:
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 682
[1] Vibro bowl feeder
[2] Spring chute
[3] Chute holder
[4] Stopper
[5] Springing tool
Fig 1.5: Springing unit
[1] Vibro bowl feeder
[2] Spring unit
[3] Indexer plate
[4] Linear feeder
[5] Base table
Fig 1.6: Spring assembly unit
Springs are fed through a cylindrical bowl. The springs are fedthroughan elbowchutetoa stationary end piece
in front of the spring loading tool. A mechanicalspring loadingtool mountedon ahorizontal-verticalPickand Place
picks the spring from the stationary end piece and load the spring onto the seal. The springing unit is as shown in
Fig 1.5.The seal from the input conveyor is placed on the rotatingindexerplateforspringassemblyprocess.Spring
assembly unit is as shown in Fig 1.6. The rotation of the indexerplateisstoppedfor thespringassemblytohappen.
A photo sensor will check the presence of the seal at the spring assembly stopper.
3. RESULTS AND DISCUSSION
The system was using rotary cylinders to keep the seals from linear feeder to the indexer unit using pick and place
arrangement. This was time consuming, so to reduce the cycle time pick and place arrangement is replaced with
forward/reverse motion cylinder. The system is validated by taking series of trials. Table 1.1 contains the validation
result of new pick and place arrangement.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 683
Table 1.1: Pick and place unit report
The proper trimming of the seals after replacing the blade trimming unit by pick trimming unit is validated by
visual inspection system. Trimming defects was the main reasons for decrease in efficiency of the system. Table 1.2
contains the visual inspection data on the pick trimming unit.
Table 1.2: Visual inspection report
OEE data after implementation of new method
Table 1.3 contains the OEE data of the existing system, week wise data is collected. It is observed from the data that the
OEE is less than the world class values, which means low machine performance due to the pick and place arrangement
with more cycle time, trimming defects, frequent stoppages and idle time. The performance is also affected by the low
feed rate. The quality is slightly less than the world class value and it can be improved. It is necessity to improve the
machine performance and quality along with the availability.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 684
Table 1.3: OEE data after the system improvisation
To improve the efficiency of the system OEE of the machine is studied. Week wise data. If OEE before the
implementation of new methods are collected. The OEE data after implementation of new methods are calculated. Both
the data’s are compared and checked for the OEE improvement. Fig 1.7 shows the comparison of OEE of the machine
before and after implementation of new methods. From the graph it can be clearly seen that the OEE is improved after
implementation of new methods. The system is successful in providing good efficiency by increase in OEE. The OEE
values are taken in average before and after implementation and represented in graph. By viewing this, the exact
percentage of OEE improvement can be noted.
Fig 1.7: Comparison of OEE week wise data
Fig 1.8: OEE data before and after implementation of new system
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 685
From the graph we can say that the OEE of the system is increased by 20.83% after implementation. Fig 1.8
shows the graph of OEE improvement in average. From the above results calculated after implementations and
modifications it can be observed that there are considerable improvements in all factors of OEE and also mainly in the
performance, availability and quality by which the objective of the study is fulfilled.
4. CONCLUSIONS
It is fundamental for an association to improve the age rate and nature of the things. In order to achieve this, the Overall
Equipment Effectiveness was improved with low machine breakdown, less sitting and minor stops time, less quality
defects, diminished disaster in plants, extended the productivityrate, streamlined system parameters, worker affiliation,
improved advantages through cost saving procedure, extended buyer reliability and growing arrangements. The
conventional root causes identified provide some structure to the process of human event problem solving. This study of
root cause identification provided idea to prevent the problem from recurring. Thus,it is the process which allows all the
participants to have a clear idea and the reality to promote its effective solution all the time. Theroot cause identification
method could be utilized according to prevalent conditions and situations of Man, Material, machines, Process and
system.
The Overall Equipment Effectiveness of the Valve Stem Seal completing machine was expanded from 62.86% to
83.69% through the usage of accessibility, better use of assets, excellent items and furthermore raised representative
assurance and certainty.
REFERENCES
[1]R Vijayakumar, SGajendran, “Improvement ofOverall EquipmentEffectiveness(OEE) in Injection MouldingProcess
Industry”, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 2014.
[2] T Rautio, K Kutuniva, JMakikangas, KMantyjarvi, “Simpleand CostEffective System for Overall Equipment Efficiency
Measurement”, Proceedings of the 2018 IEEE IEEM.
[3] K C Ng, K E Chong, G G G Goh, “Improving Overall Equipment Effectiveness (OEE) through the Six Sigma Methodology
in a Semiconductor firm: A Case Study”, Proceedings of the 2014 IEEE IEEM.
[4] Michael Romanenko, Marcel Baybus,“Implementation of Overall Equipment Efficiency Methodology in the
Semiconductor Test Facility”, 2017,IEEE.
[5] T Kamaryt, J Kleinová, “Overall Handling Equipment Efficiency and Maintenance Systems”, Proceedings of the 2015
IEEEIEEM.
[6] G R Esmaeilian, M M H MegatAhmad, N Ismail, S Sulaiman, M Hamedi, “Particular Model for Improving Failure Mode
and Effect Analysis (FMEA) by Using of Overall Equipment Efficiency (OEE)”, 2008, IEEE.
[7] W Amer, U Ansari, Abdul Ghafoor, “Industrial Automation usingEmbedded Systems and Machine-to-Machine, Man-to-
Machine (M2M) Connectivity for Improved Overall Equipment Effectiveness (OEE)”, Proceedings of the 2009 IEEE
International Conference on Systems, Man, and Cybernetics.
[8] Z Q Bai, Q Y Wei, M Dai, Z S Zhang, “An OEE Improvement Method Based on TOC”, 2018 25
th
InternationalConference
on Mechatronics and Machine Vision in Practice (M2VIP).
[9] D Daniel Sheu, “Overall Input Efficiency and Total Equipment Efficiency”, IEEE Transactions On Semiconductor
Manufacturing, Vol. 19, No. 4, November 2006.
[10] Andrea Chiarini,“Improvement ofOEE performanceusinga LeanSix Sigmaapproach: An Italian manufacturing case
study”, Article in International Journal of Productivity and Quality Management, January 2015.

More Related Content

What's hot

Condition Monitoring and Maintenance Management for Precision Component Manuf...
Condition Monitoring and Maintenance Management for Precision Component Manuf...Condition Monitoring and Maintenance Management for Precision Component Manuf...
Condition Monitoring and Maintenance Management for Precision Component Manuf...IRJET Journal
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET Journal
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET Journal
 
IRJET- Automatic Load Classification for Suspension Spring, Monitoring an...
IRJET-  	  Automatic Load Classification for Suspension Spring, Monitoring an...IRJET-  	  Automatic Load Classification for Suspension Spring, Monitoring an...
IRJET- Automatic Load Classification for Suspension Spring, Monitoring an...IRJET Journal
 
Overall equipment effectiveness
Overall equipment effectivenessOverall equipment effectiveness
Overall equipment effectivenessRachit Laharia
 
IRJET- Risks Prioritization using AHP Method -A Case Study
IRJET- Risks Prioritization using AHP Method -A Case StudyIRJET- Risks Prioritization using AHP Method -A Case Study
IRJET- Risks Prioritization using AHP Method -A Case StudyIRJET Journal
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
Trend in Maintenance Management
Trend in Maintenance ManagementTrend in Maintenance Management
Trend in Maintenance ManagementUtkarsh Amaravat
 
Root Causes Analysis for Lean Maintenance Using Six Sigma Approach
Root Causes Analysis for Lean Maintenance Using Six Sigma ApproachRoot Causes Analysis for Lean Maintenance Using Six Sigma Approach
Root Causes Analysis for Lean Maintenance Using Six Sigma Approachtheijes
 
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryOverall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryInfoStream Solutions
 
Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareWintriss Controls Group, LLC
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overviewWebseology
 
Research Article - Analysis and Scheduling of Maintenance Operations for a Ch...
Research Article - Analysis and Scheduling of Maintenance Operations for a Ch...Research Article - Analysis and Scheduling of Maintenance Operations for a Ch...
Research Article - Analysis and Scheduling of Maintenance Operations for a Ch...Cyrus Sorab
 
Integrating OEE and Process Improvement
Integrating OEE  and Process ImprovementIntegrating OEE  and Process Improvement
Integrating OEE and Process ImprovementEdward Brown
 
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...IRJET Journal
 
A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)OEEsystems International
 

What's hot (20)

Condition Monitoring and Maintenance Management for Precision Component Manuf...
Condition Monitoring and Maintenance Management for Precision Component Manuf...Condition Monitoring and Maintenance Management for Precision Component Manuf...
Condition Monitoring and Maintenance Management for Precision Component Manuf...
 
OEE
OEEOEE
OEE
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel Equipment
 
Unit 5
Unit 5Unit 5
Unit 5
 
IRJET- Automatic Load Classification for Suspension Spring, Monitoring an...
IRJET-  	  Automatic Load Classification for Suspension Spring, Monitoring an...IRJET-  	  Automatic Load Classification for Suspension Spring, Monitoring an...
IRJET- Automatic Load Classification for Suspension Spring, Monitoring an...
 
Overall equipment effectiveness
Overall equipment effectivenessOverall equipment effectiveness
Overall equipment effectiveness
 
Mm 1 pendahuluan
Mm 1 pendahuluanMm 1 pendahuluan
Mm 1 pendahuluan
 
IRJET- Risks Prioritization using AHP Method -A Case Study
IRJET- Risks Prioritization using AHP Method -A Case StudyIRJET- Risks Prioritization using AHP Method -A Case Study
IRJET- Risks Prioritization using AHP Method -A Case Study
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Trend in Maintenance Management
Trend in Maintenance ManagementTrend in Maintenance Management
Trend in Maintenance Management
 
Root Causes Analysis for Lean Maintenance Using Six Sigma Approach
Root Causes Analysis for Lean Maintenance Using Six Sigma ApproachRoot Causes Analysis for Lean Maintenance Using Six Sigma Approach
Root Causes Analysis for Lean Maintenance Using Six Sigma Approach
 
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryOverall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
 
Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking Software
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
Research Article - Analysis and Scheduling of Maintenance Operations for a Ch...
Research Article - Analysis and Scheduling of Maintenance Operations for a Ch...Research Article - Analysis and Scheduling of Maintenance Operations for a Ch...
Research Article - Analysis and Scheduling of Maintenance Operations for a Ch...
 
Integrating OEE and Process Improvement
Integrating OEE  and Process ImprovementIntegrating OEE  and Process Improvement
Integrating OEE and Process Improvement
 
Machinery maintenance audit by winsys smc
Machinery maintenance audit by winsys smcMachinery maintenance audit by winsys smc
Machinery maintenance audit by winsys smc
 
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
 
A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)A Manager's Guide to OEE (Overall Equipment Effectiveness)
A Manager's Guide to OEE (Overall Equipment Effectiveness)
 

Similar to Improving OEE of Valve Stem Seal Finishing Machine

Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitImplementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitIRJET Journal
 
A038301010
A038301010A038301010
A038301010theijes
 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEijsrd.com
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...IRJET Journal
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET Journal
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining TimeIRJET Journal
 
IRJET- A General Framework of Computerized Maintenance Management System ...
IRJET-  	  A General Framework of Computerized Maintenance Management System ...IRJET-  	  A General Framework of Computerized Maintenance Management System ...
IRJET- A General Framework of Computerized Maintenance Management System ...IRJET Journal
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsIRJET Journal
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET Journal
 
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...IRJET Journal
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...IRJET Journal
 
Criticality Analysis and Quality Appraisal of Innoson Injection Mould System
Criticality Analysis and Quality Appraisal of Innoson Injection Mould SystemCriticality Analysis and Quality Appraisal of Innoson Injection Mould System
Criticality Analysis and Quality Appraisal of Innoson Injection Mould SystemIRJET Journal
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...IRJET Journal
 
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET-  	  Six Axis Pneumatic Materials Handling Robotic ArmIRJET-  	  Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic ArmIRJET Journal
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentationguest03d3e3
 
IRJET-Automation of Boring Machine using PLC and HMI
IRJET-Automation of Boring Machine using PLC and HMIIRJET-Automation of Boring Machine using PLC and HMI
IRJET-Automation of Boring Machine using PLC and HMIIRJET Journal
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEEijsrd.com
 
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...IAEME Publication
 
IRJET- A Research Paper on Spray-Painting Robot for Painting Irregular Workpi...
IRJET- A Research Paper on Spray-Painting Robot for Painting Irregular Workpi...IRJET- A Research Paper on Spray-Painting Robot for Painting Irregular Workpi...
IRJET- A Research Paper on Spray-Painting Robot for Painting Irregular Workpi...IRJET Journal
 

Similar to Improving OEE of Valve Stem Seal Finishing Machine (20)

Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitImplementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
 
A038301010
A038301010A038301010
A038301010
 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEE
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...
 
I012536474
I012536474I012536474
I012536474
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
IRJET- A General Framework of Computerized Maintenance Management System ...
IRJET-  	  A General Framework of Computerized Maintenance Management System ...IRJET-  	  A General Framework of Computerized Maintenance Management System ...
IRJET- A General Framework of Computerized Maintenance Management System ...
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction Equipments
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
 
Criticality Analysis and Quality Appraisal of Innoson Injection Mould System
Criticality Analysis and Quality Appraisal of Innoson Injection Mould SystemCriticality Analysis and Quality Appraisal of Innoson Injection Mould System
Criticality Analysis and Quality Appraisal of Innoson Injection Mould System
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
 
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET-  	  Six Axis Pneumatic Materials Handling Robotic ArmIRJET-  	  Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentation
 
IRJET-Automation of Boring Machine using PLC and HMI
IRJET-Automation of Boring Machine using PLC and HMIIRJET-Automation of Boring Machine using PLC and HMI
IRJET-Automation of Boring Machine using PLC and HMI
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
 
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
 
IRJET- A Research Paper on Spray-Painting Robot for Painting Irregular Workpi...
IRJET- A Research Paper on Spray-Painting Robot for Painting Irregular Workpi...IRJET- A Research Paper on Spray-Painting Robot for Painting Irregular Workpi...
IRJET- A Research Paper on Spray-Painting Robot for Painting Irregular Workpi...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

Improving OEE of Valve Stem Seal Finishing Machine

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 678 Improvement of Overall Equipment Effectiveness of Valve Stem Seal Finishing Machine Mallikarjunagouda S Patil1, Mr. P Prasad2 1M.Tech Student, Dept. of Mechanical Engineering, JSS S&TU, Mysuru, Karnataka, India 2Associate Professor, Dept. of Mechanical Engineering, JSS S&TU, Mysuru, Karnataka, India ------------------------------------------------------------------------***------------------------------------------------------------------------- Abstract - Most over the top of present day creation lines is central as it sees an improved age and utilization ofopenassets. Parts adding to age line ampleness are work use and machine limit. There are different structures where we can applycomputerization for better and precise outcomes. Computerization is no delicacy the best perspective enemy cost cutting by endsquanderasscrap, lessening work, decreasing time, controlling quality and improving everything examined execution of any, machine, structure or system in any industry. The association should have the choice to channel for fitting age information and to altogether expel up these information to see the different needs at creation level and to rapidly see how to improve advantage. A careful and online information the authorities structure can guarantee that these issues are drive forward. As a last resort Equipment Feasibility (OEE) of a machine expect a first improvement where execution and nature of the thingareofkeycentralitytotheconnection. The age rate can be improved by decreasing the individual time of the machine. This paper discusses thought of robotization, in which the pick slicing viewpoint is utilized to trim the dazzling piece of a Valve stem seals [VSS]. The motivation drivingthisevaluationis to locate the basic drivers of veritable age loss of the machine and to propose counter measures by which these issues can be reduced. This framework is utilized for improving reasonableness, methodology for executionofcomputerizationand inageneral sense sufficiency of the structure. Key words: Overall Equipment Effectiveness (OEE), Valve stem seals (VSS), Automation, Pick trimming. 1. INTRODUCTION In the present Global Scenario fabricating Efficiency and Agility isn't an alternative, however it is a key necessity. The creation cost is expanding quickly and the work cost, crude material cost, control cost, and so forth are notin our control of maker. Modernization of enterprises acquainted new advances with straightforwardness humanon the creation lines. Ventures have introduced hardware to help laborers. This is known as semi-robotized procedure lines. A completely computerized procedure line is intended to full-fill large scale manufacturing yield and is in a perfect world fit to serve enormous. The idea of a creation line relies upon the multifaceted nature of the assembling parts, the generation volume, the affectability of the item and cost. Industries‟ the board plan and format their generation lines asindicated by explicit creation necessities. Automation plays a very important role in the automotive industries. Automation has leads to the increase in the production, reduction in the man power and at the same time provides the growth of the company by satisfying customer demands. The VSS finishing machine is used in the production of VSS seals which are used in the automobiles. The machine having many problems in the production which causes the loss of production and as a result OEE of the machine is lower than the industry standards. Trimming and inspection unit: The downtime of the machine is considerably high compared to the other machines in the plant, downtime is mostly due to the unscheduled stoppages, and idling in the process. The improper trimming of the seals are the most important factors contributing to the low OEE of the machine, it is important to decrease the personal time of the machine which will help in eliminating the cause of major downtime to improve the OEE. Springing unit: The damage of the spring in the seals are the most important factors contributing to the low OEE of the machine, it is important to decrease the personal time of the machine which associates in getting out purpose for huge departure to improve the OEE. The system which colleagues in discarding explanation behind genuine individual time to improve the OEE. The structure targets heightening the Overall Equipment Effectiveness, to lessen the gadget individual time while improving quality and execution. S R Vijayakumar, et al., [1] have proposed a work wherein OEE of an imbuement upgrade procedure was extended from 61% to 81% utilizing openness, better use of favorable circumstances, awesome things what's increasinglyraised master soul and affirmation. T Rautio, et al., [2]have made and tried a system that displays the use of contraptions application to check Overall Equipment Efficiency. K C Ng, et al., [3] have separated a DMAIC approach, which served to apparent and delineates obviously the issue at the portrayed stage.It gives a systematic structure by giving all around referenced assessment in to progressively modest scale levels in order to get the genuine key driver and later offer sensible response for insistence the issue until the completion of time. T Kamaryt, et al., [5] have proposed a reliable gadget for considering the advantage of overseeing rigging andjoinsupkeep approaches and structures. OHEE offers a ricochet forward response for investigating supply structures where thereason
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 679 for intermixing of interest is the mechanical assembly. G R Esmaeilian, et al., [6] have comfortable a model with reduce RPN by improving everything thought about mechanical gathering limit (OEE) by using of heuristic mathematic model subject to Total Productive Maintenance record, this framework is used to decrease the degree of risk need number. W Amer, et al., [7] have executed and attempted a system in the district Liquefied Petroleum Gas (LPG)industry toimprove Overall Equipment Effectiveness (OEE) achieving connected standard talking structure productivity. Z Q Bai, et al., [8] have shown a structure, which targets giving an OEE improvement system reliant on TOC. Regardless, the OEE improvement model containing OEE estimation model and OEE the directors module is gathered subject to the DBR speculation in TOC. D Daniel Sheu, et al., [9] have developed a thought of if all else fails data gear reasonableness(OIE) to complete the full state of the equipment profitability. The augmentation of the OIE and OEE along these lines builds up the certified everything considered equipment capacity which the maker names firm mechanical gathering advantage (TEE) all together not to confuse with the current OEE. Andrea Chiarini, et al., [10] have tended to the use and undertaking the heads of Six Sigma instruments and Lean Production by looking novel smart evaluation dedicated to the improvement of everything considered apparatus good judgment (OEE). The methodology joined into the system to develop a machine with another sub-unit which is a pick slicing procedure to extend the general proficiency of the structure showed up contrastingly in association with the past structure. 2. METHODOLOGY [1] Existing System A) Trimming and Inspection module The Existing inspection system consists of blade trimming method for the trimming of the seals. The loading unit the existing system consists of rotary cylinders which increase the cycle time of the machine. The trimming and inspection unit of the existing system is shown in the Fig 1.1. Fig 1.1: Trimming and Inspection unit machine layout B) Springing Unit The existing springing unit includes feeding of seals into the loading station horizontally from the conveyor. The existing springing unit machine layout is shown in the Fig 1.2. Fig 1.2: Springing unit machine layout
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 680 [2] IMPLEMENTED SYSTEM The system is implemented with the automated trimming machine for trimming an unwanted portion of Valve StemSeals (VSS) using a „seal pick trimming‟ method. The input for this machine would be seals with rubber flashes. The rubber flashes on the seals are molded and formed on the seal during the molding process may be due to variations in amount of rubber added to the process. The scope of this machine is to remove the flash on the ID of the seal. The flash presentin the ID will be removed by the pick trimming process. The pure cycle time of the machine is 1.5s. This means that the machine should give out 1 seals every 1.5s. The system consists oftwo indexer unitsIU1 [Indexer Unit 1] and IU2 [Indexer Unit 2]. Boththe indexer units consist of several stations. IU1 is implemented with new units: in loadingstationrotary movement is replaced by forward/reverse movement pick and place unit, blade trimming is replaced by picktrimmingunit,andseal butting unit is introduced for proper alignment of seals which helped for camera inspection. (A)PICK AND PLACE ARRANGEMENT: To place the seals from conveyor to the indexer unit pick and place arrangement was used. Previously cylinders with rotary movement were used to pick and place the seals to indexer unit. More cycle time was consumed due to rotary movement of the cylinder. In order to reduce the cycle time ofthat action cylinders with forward/reverse movement are used to pick and place the seals in required position. Pick and place arrangement with forward/reverse cylinders are as shown in Fig.1.3. (a) (b) [1] Top cylinder (up/down) [2] Horizontal cylinder (forward/reverse) [3] Grippers [4] Base plate Fig. 1.3: (a) Pick and place unit front view and (b) Isometric view ID TRIMMING STATION: The ID trimming station will remove the Flash in the ID by pick trimmingprocess. The ID trimming station will have a cylinder unit with sufficient forceto pushthe spring loaded pin present in the spindle upwards to strip the ID flashaway. The trimming should not damage the seal’s main lip.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 681 (B)PICK TRIMMING: Blade trimming method was in use previously to remove the flash in the seals after molding process. Blade trimming method was not working effectively, defects were noticed. To overcome this trimming defects found in seals a pick trimming method is installed. The mechanical design of pick trimming unit is as shownin fig. 1.4. The pick trimming unit consists of two sections. Each section has top cylinder, bottom cylinder, mandrel to place seal, seal holding tool and seal pushing pin. When seals are not present in the mandrel cylinders will be in home position. When seal is placed on the mandrel bottom cylinder will move upwards which in turn will lifts seal pushing pin upwardsandtopcylinder willmove downwards whichin turn will lifts seal holding tool downwards. Now the seal will be placed in between seal holding tool and seal pushing pin. When the pin is pushed with high pressure flash on the seal will be removed. After the flash removal both top and bottom cylinders will reach the homepositions.Thisis how the flashes on the seals will beremoved properly without any defects. (a) (b) [1] Top cylinder + Seal holder [2] Seal [3] Mandrel [4] Pin [5] Bottom cylinder Fig 1.4: (a) Mechanical design of seal pick trimming unit front view and (b) Side view (C) SPRINGING UNIT:
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 682 [1] Vibro bowl feeder [2] Spring chute [3] Chute holder [4] Stopper [5] Springing tool Fig 1.5: Springing unit [1] Vibro bowl feeder [2] Spring unit [3] Indexer plate [4] Linear feeder [5] Base table Fig 1.6: Spring assembly unit Springs are fed through a cylindrical bowl. The springs are fedthroughan elbowchutetoa stationary end piece in front of the spring loading tool. A mechanicalspring loadingtool mountedon ahorizontal-verticalPickand Place picks the spring from the stationary end piece and load the spring onto the seal. The springing unit is as shown in Fig 1.5.The seal from the input conveyor is placed on the rotatingindexerplateforspringassemblyprocess.Spring assembly unit is as shown in Fig 1.6. The rotation of the indexerplateisstoppedfor thespringassemblytohappen. A photo sensor will check the presence of the seal at the spring assembly stopper. 3. RESULTS AND DISCUSSION The system was using rotary cylinders to keep the seals from linear feeder to the indexer unit using pick and place arrangement. This was time consuming, so to reduce the cycle time pick and place arrangement is replaced with forward/reverse motion cylinder. The system is validated by taking series of trials. Table 1.1 contains the validation result of new pick and place arrangement.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 683 Table 1.1: Pick and place unit report The proper trimming of the seals after replacing the blade trimming unit by pick trimming unit is validated by visual inspection system. Trimming defects was the main reasons for decrease in efficiency of the system. Table 1.2 contains the visual inspection data on the pick trimming unit. Table 1.2: Visual inspection report OEE data after implementation of new method Table 1.3 contains the OEE data of the existing system, week wise data is collected. It is observed from the data that the OEE is less than the world class values, which means low machine performance due to the pick and place arrangement with more cycle time, trimming defects, frequent stoppages and idle time. The performance is also affected by the low feed rate. The quality is slightly less than the world class value and it can be improved. It is necessity to improve the machine performance and quality along with the availability.
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 684 Table 1.3: OEE data after the system improvisation To improve the efficiency of the system OEE of the machine is studied. Week wise data. If OEE before the implementation of new methods are collected. The OEE data after implementation of new methods are calculated. Both the data’s are compared and checked for the OEE improvement. Fig 1.7 shows the comparison of OEE of the machine before and after implementation of new methods. From the graph it can be clearly seen that the OEE is improved after implementation of new methods. The system is successful in providing good efficiency by increase in OEE. The OEE values are taken in average before and after implementation and represented in graph. By viewing this, the exact percentage of OEE improvement can be noted. Fig 1.7: Comparison of OEE week wise data Fig 1.8: OEE data before and after implementation of new system
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 685 From the graph we can say that the OEE of the system is increased by 20.83% after implementation. Fig 1.8 shows the graph of OEE improvement in average. From the above results calculated after implementations and modifications it can be observed that there are considerable improvements in all factors of OEE and also mainly in the performance, availability and quality by which the objective of the study is fulfilled. 4. CONCLUSIONS It is fundamental for an association to improve the age rate and nature of the things. In order to achieve this, the Overall Equipment Effectiveness was improved with low machine breakdown, less sitting and minor stops time, less quality defects, diminished disaster in plants, extended the productivityrate, streamlined system parameters, worker affiliation, improved advantages through cost saving procedure, extended buyer reliability and growing arrangements. The conventional root causes identified provide some structure to the process of human event problem solving. This study of root cause identification provided idea to prevent the problem from recurring. Thus,it is the process which allows all the participants to have a clear idea and the reality to promote its effective solution all the time. Theroot cause identification method could be utilized according to prevalent conditions and situations of Man, Material, machines, Process and system. The Overall Equipment Effectiveness of the Valve Stem Seal completing machine was expanded from 62.86% to 83.69% through the usage of accessibility, better use of assets, excellent items and furthermore raised representative assurance and certainty. REFERENCES [1]R Vijayakumar, SGajendran, “Improvement ofOverall EquipmentEffectiveness(OEE) in Injection MouldingProcess Industry”, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 2014. [2] T Rautio, K Kutuniva, JMakikangas, KMantyjarvi, “Simpleand CostEffective System for Overall Equipment Efficiency Measurement”, Proceedings of the 2018 IEEE IEEM. [3] K C Ng, K E Chong, G G G Goh, “Improving Overall Equipment Effectiveness (OEE) through the Six Sigma Methodology in a Semiconductor firm: A Case Study”, Proceedings of the 2014 IEEE IEEM. [4] Michael Romanenko, Marcel Baybus,“Implementation of Overall Equipment Efficiency Methodology in the Semiconductor Test Facility”, 2017,IEEE. [5] T Kamaryt, J Kleinová, “Overall Handling Equipment Efficiency and Maintenance Systems”, Proceedings of the 2015 IEEEIEEM. [6] G R Esmaeilian, M M H MegatAhmad, N Ismail, S Sulaiman, M Hamedi, “Particular Model for Improving Failure Mode and Effect Analysis (FMEA) by Using of Overall Equipment Efficiency (OEE)”, 2008, IEEE. [7] W Amer, U Ansari, Abdul Ghafoor, “Industrial Automation usingEmbedded Systems and Machine-to-Machine, Man-to- Machine (M2M) Connectivity for Improved Overall Equipment Effectiveness (OEE)”, Proceedings of the 2009 IEEE International Conference on Systems, Man, and Cybernetics. [8] Z Q Bai, Q Y Wei, M Dai, Z S Zhang, “An OEE Improvement Method Based on TOC”, 2018 25 th InternationalConference on Mechatronics and Machine Vision in Practice (M2VIP). [9] D Daniel Sheu, “Overall Input Efficiency and Total Equipment Efficiency”, IEEE Transactions On Semiconductor Manufacturing, Vol. 19, No. 4, November 2006. [10] Andrea Chiarini,“Improvement ofOEE performanceusinga LeanSix Sigmaapproach: An Italian manufacturing case study”, Article in International Journal of Productivity and Quality Management, January 2015.