Project Documents
Dr. Haitham El Sharnouby
 The most important phase in project
management is the second phase which is
divided into main three processes
Project’s Study
Site Investigation
Design & Drawing’s Preparation.
Tender’s Documents
Tendering, Awarding & Contracting
Initiatin
g
Preparing
Dr. Haitham El Sharnouby
 The most important submitted tender’s
documents
 Contract Agreement (not signed)
 Contract Conditions
 General Conditions
 Particular/Specific Conditions
 Technical Specifications
 Bill of Quantities
 Executive Drawings & Soil Report
 Preliminary Time Schedule
 Primary/Temporary Insurance/Bond (Fixed value or % value)
Dr. Haitham El Sharnouby
 Bills Of Quantities (BOQ)
Dr. Haitham El Sharnouby
 Preliminary Time Schedule
Dr. Haitham El Sharnouby
Submission of
the Tender
Technical Envelope/Package
Contract Agreement
Contract Conditions
General Conditions
Particular Conditions
Technical Specifications
Executive Drawings & Soil Report
Preliminary Time Schedule
Fixed Value Primary Insurance
Financial Envelope/Package
Bill Of Quantities
% Value Primary Insurance
Dr. Haitham El Sharnouby
 The most important contract documents
 Contract Agreement (signed)
 Contract Conditions
 General Conditions
 Particular Conditions
 Technical Specifications
 Bill of Quantities
 Executive Drawings & Soil Report
 Detailed Time Schedule
 Final Insurance/Bond (5% of Contract Value)
Dr. Haitham El Sharnouby
 Detailed Time Schedule
Dr. Haitham El Sharnouby
The most important contents are:
1. Contract Participants detailed data
2. Project’s Scope
3. Project’s Budget (Contract Value)
4. Project’s Duration (Start Date – Finish Date)
5. List of Contract Documents (Documents’ Priority)
6. Down Payment (if any)
7. Final Insurance (5% of Contract Value)
8. Performance Insurance (5% sub of each invoice)

More Related Content

What's hot

Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts finalFitBlar Mit
 
Progress billing definition
Progress billing definitionProgress billing definition
Progress billing definition
Akosichelle
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Asia Master Training آسيا ماسترز للتدريب والتطوير
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
Melvin Lim
 
Construction Claims Explained
Construction Claims ExplainedConstruction Claims Explained
Construction Claims Explained
claimsconsultancy
 
Site Instruction Provision
Site Instruction ProvisionSite Instruction Provision
Site Instruction ProvisionRichard Retita
 
claims management framework
 claims management framework claims management framework
claims management framework
Mohammad Salama,PMP,PgMP,PMI-SP,PMI-RMP, PMOC
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGC
Cordell Parvin
 
Professional Practice 1 Tutorial 7
Professional Practice 1 Tutorial 7Professional Practice 1 Tutorial 7
Professional Practice 1 Tutorial 7
ashleyyeap
 
Prolongation cost calculation
Prolongation cost  calculation Prolongation cost  calculation
Prolongation cost calculation
R.R.G.S Bandara
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Asia Master Training آسيا ماسترز للتدريب والتطوير
 
Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...
Bhalindra Bath - projects & M&A law
 
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceClaim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceFrancis Ho
 
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
Asia Master Training آسيا ماسترز للتدريب والتطوير
 
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Fakhar-un -Nisa
 
Public Meeting - Contract Close-Out - Ground Rules
Public Meeting - Contract Close-Out - Ground RulesPublic Meeting - Contract Close-Out - Ground Rules
Public Meeting - Contract Close-Out - Ground Rules
Asia Master Training آسيا ماسترز للتدريب والتطوير
 
Contract mgt stc
Contract mgt stcContract mgt stc
Contract mgt stc
Nageswara Rao M
 
Prolongation and HOOH Costs
Prolongation and HOOH CostsProlongation and HOOH Costs
Prolongation and HOOH Costs
Loay Ghazaleh MBA, BSc Civil Eng.
 
Site possession
Site possessionSite possession
Site possession
Amir Ibrahim
 

What's hot (20)

Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Progress billing definition
Progress billing definitionProgress billing definition
Progress billing definition
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
Construction Claims Explained
Construction Claims ExplainedConstruction Claims Explained
Construction Claims Explained
 
Site Instruction Provision
Site Instruction ProvisionSite Instruction Provision
Site Instruction Provision
 
claims management framework
 claims management framework claims management framework
claims management framework
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGC
 
Professional Practice 1 Tutorial 7
Professional Practice 1 Tutorial 7Professional Practice 1 Tutorial 7
Professional Practice 1 Tutorial 7
 
Prolongation cost calculation
Prolongation cost  calculation Prolongation cost  calculation
Prolongation cost calculation
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
 
Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...
 
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceClaim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
 
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
 
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)
 
Public Meeting - Contract Close-Out - Ground Rules
Public Meeting - Contract Close-Out - Ground RulesPublic Meeting - Contract Close-Out - Ground Rules
Public Meeting - Contract Close-Out - Ground Rules
 
Fidic law1
Fidic law1Fidic law1
Fidic law1
 
Contract mgt stc
Contract mgt stcContract mgt stc
Contract mgt stc
 
Prolongation and HOOH Costs
Prolongation and HOOH CostsProlongation and HOOH Costs
Prolongation and HOOH Costs
 
Site possession
Site possessionSite possession
Site possession
 

Similar to Intro. to management lecture 03

Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Project Controls Expo
 
A Recommended Process for M&A
A Recommended Process for M&A A Recommended Process for M&A
A Recommended Process for M&A
S. W. Leung
 
Sunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract ClosureSunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract Closuresunnycmui
 
Tenders.ppt
 Tenders.ppt Tenders.ppt
Tenders.ppt
Sampath Sredharran
 
Indian Construction Contracts & Covid19 : Way Forward
Indian Construction Contracts & Covid19 : Way ForwardIndian Construction Contracts & Covid19 : Way Forward
Indian Construction Contracts & Covid19 : Way Forward
Badrinath Srinivasan
 
Tendering.pdf
Tendering.pdfTendering.pdf
Tendering.pdf
LalindaKalansooriya
 
HW - Preconstruction phase
HW - Preconstruction phaseHW - Preconstruction phase
HW - Preconstruction phaseHARLAND MIMS
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Tahir B Mirza
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of time
Joseph Sangpang
 
Project insurance claims
Project insurance claimsProject insurance claims
Project insurance claims
goyalvimal
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
Lenson Mhango
 
Bidding and awards.pptx2
Bidding and awards.pptx2Bidding and awards.pptx2
Bidding and awards.pptx2
peredplatypus
 
Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017Frances Vessell
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
ssuser32da691
 
Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016Thomas Frank.
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
ArchDuty
 
Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
Sukhdarshan Singh
 

Similar to Intro. to management lecture 03 (20)

Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014
 
Project Lifecycle and PM processes
Project Lifecycle and PM processesProject Lifecycle and PM processes
Project Lifecycle and PM processes
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
 
A Recommended Process for M&A
A Recommended Process for M&A A Recommended Process for M&A
A Recommended Process for M&A
 
Sunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract ClosureSunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract Closure
 
Tenders.ppt
 Tenders.ppt Tenders.ppt
Tenders.ppt
 
Indian Construction Contracts & Covid19 : Way Forward
Indian Construction Contracts & Covid19 : Way ForwardIndian Construction Contracts & Covid19 : Way Forward
Indian Construction Contracts & Covid19 : Way Forward
 
Tendering.pdf
Tendering.pdfTendering.pdf
Tendering.pdf
 
HW - Preconstruction phase
HW - Preconstruction phaseHW - Preconstruction phase
HW - Preconstruction phase
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of time
 
Project insurance claims
Project insurance claimsProject insurance claims
Project insurance claims
 
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTSFINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
FINAL ACCOUNT CONCLUSION OF BUILDING PROJECTS
 
Bidding and awards.pptx2
Bidding and awards.pptx2Bidding and awards.pptx2
Bidding and awards.pptx2
 
Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
 
Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
 

More from Haitham Sharnouby

Intro. to management lecture 09
Intro. to management lecture 09Intro. to management lecture 09
Intro. to management lecture 09
Haitham Sharnouby
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08
Haitham Sharnouby
 
Intro. to management lecture 06
Intro. to management lecture 06Intro. to management lecture 06
Intro. to management lecture 06
Haitham Sharnouby
 
Intro. to management lecture 05
Intro. to management lecture 05Intro. to management lecture 05
Intro. to management lecture 05
Haitham Sharnouby
 
Intro. to management lecture 04
Intro. to management lecture 04Intro. to management lecture 04
Intro. to management lecture 04
Haitham Sharnouby
 
Intro. to management lecture 02
Intro. to management lecture 02Intro. to management lecture 02
Intro. to management lecture 02
Haitham Sharnouby
 
Intro. to management lecture 01
Intro. to management lecture 01Intro. to management lecture 01
Intro. to management lecture 01
Haitham Sharnouby
 
Gis lecture #01
Gis lecture #01Gis lecture #01
Gis lecture #01
Haitham Sharnouby
 

More from Haitham Sharnouby (8)

Intro. to management lecture 09
Intro. to management lecture 09Intro. to management lecture 09
Intro. to management lecture 09
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08
 
Intro. to management lecture 06
Intro. to management lecture 06Intro. to management lecture 06
Intro. to management lecture 06
 
Intro. to management lecture 05
Intro. to management lecture 05Intro. to management lecture 05
Intro. to management lecture 05
 
Intro. to management lecture 04
Intro. to management lecture 04Intro. to management lecture 04
Intro. to management lecture 04
 
Intro. to management lecture 02
Intro. to management lecture 02Intro. to management lecture 02
Intro. to management lecture 02
 
Intro. to management lecture 01
Intro. to management lecture 01Intro. to management lecture 01
Intro. to management lecture 01
 
Gis lecture #01
Gis lecture #01Gis lecture #01
Gis lecture #01
 

Recently uploaded

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 

Recently uploaded (20)

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 

Intro. to management lecture 03

  • 1. Dr. Haitham El Sharnouby Project Documents
  • 2. Dr. Haitham El Sharnouby  The most important phase in project management is the second phase which is divided into main three processes Project’s Study Site Investigation Design & Drawing’s Preparation. Tender’s Documents Tendering, Awarding & Contracting Initiatin g Preparing
  • 3. Dr. Haitham El Sharnouby  The most important submitted tender’s documents  Contract Agreement (not signed)  Contract Conditions  General Conditions  Particular/Specific Conditions  Technical Specifications  Bill of Quantities  Executive Drawings & Soil Report  Preliminary Time Schedule  Primary/Temporary Insurance/Bond (Fixed value or % value)
  • 4. Dr. Haitham El Sharnouby  Bills Of Quantities (BOQ)
  • 5. Dr. Haitham El Sharnouby  Preliminary Time Schedule
  • 6. Dr. Haitham El Sharnouby Submission of the Tender Technical Envelope/Package Contract Agreement Contract Conditions General Conditions Particular Conditions Technical Specifications Executive Drawings & Soil Report Preliminary Time Schedule Fixed Value Primary Insurance Financial Envelope/Package Bill Of Quantities % Value Primary Insurance
  • 7. Dr. Haitham El Sharnouby  The most important contract documents  Contract Agreement (signed)  Contract Conditions  General Conditions  Particular Conditions  Technical Specifications  Bill of Quantities  Executive Drawings & Soil Report  Detailed Time Schedule  Final Insurance/Bond (5% of Contract Value)
  • 8. Dr. Haitham El Sharnouby  Detailed Time Schedule
  • 9. Dr. Haitham El Sharnouby The most important contents are: 1. Contract Participants detailed data 2. Project’s Scope 3. Project’s Budget (Contract Value) 4. Project’s Duration (Start Date – Finish Date) 5. List of Contract Documents (Documents’ Priority) 6. Down Payment (if any) 7. Final Insurance (5% of Contract Value) 8. Performance Insurance (5% sub of each invoice)