Training Slides of An Overview of the FIDIC FORMS OF CONTRACTand Contracts Committee Activities .
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
#FIDIC Understanding Basics# By SN Panigrahi
Essenpee Business Solutions
FIDIC Golden Principles
FIDIC essential characteristics of its general conditions of contract
Essenpee Knowledge Series
- Having a brief of FIDIC
- Understand the steps and stages of Contract Management Using FIDIC.
- Understand the Role of PM during construction project to protect the organization Business case.
#FIDIC Understanding Basics# By SN Panigrahi
Essenpee Business Solutions
FIDIC Golden Principles
FIDIC essential characteristics of its general conditions of contract
Essenpee Knowledge Series
- Having a brief of FIDIC
- Understand the steps and stages of Contract Management Using FIDIC.
- Understand the Role of PM during construction project to protect the organization Business case.
The Second Edition of the Rainbow Suite is considerably longer, more detailed. The update addresses issues raised by users over the past 18 years and reflects current international best practice. The presentation analysis changes in Yellow & Silver Books as they apply to EPC & PPP Contracts from the perspectives of Public Entities, Contractors and Lenders.
A thorough analysis of FIDIC and it implication on COnstruction industry explained in this presentation for the beginners. It has been broken down to simplified version
مقارنة بين ثلاثة من الصيغ النموذجية البريطانية والدولية مع فكرة عن نموذج رابع أمريكي
FIDIC - JCT - NEC - AIA
محاضرة الشرح: https://www.youtube.com/watch?v=fVpeut_-9-0
Construction Contracts: Basics of Contracts and Contract AdministrationGerald R. (Jerry) Genge
The CCDC 2 Stipulated Price Contract is the "go to" document for construction contracts. Learn the basic components and roles of eth parties to the contract.
Presentation is trying to define the intent , content, methods and scope of arbitration and tendering and its implications for the architectural practice.
Presentation tries to give an overview and brief about tendering used in the building works for the benefit of students of architecture. Additions and alterations can be made to make it a better one. It is based on the book of Professional practice by Krishnamurthy and Ravindra
تصنيف أنواع العقود في مجال الانشاءات
دورة مجانية في: https://www.udemy.com/contracts-arabic/
الدورة الكاملة: prof.planner.teachable.com/p/contract-management/
The Second Edition of the Rainbow Suite is considerably longer, more detailed. The update addresses issues raised by users over the past 18 years and reflects current international best practice. The presentation analysis changes in Yellow & Silver Books as they apply to EPC & PPP Contracts from the perspectives of Public Entities, Contractors and Lenders.
A thorough analysis of FIDIC and it implication on COnstruction industry explained in this presentation for the beginners. It has been broken down to simplified version
مقارنة بين ثلاثة من الصيغ النموذجية البريطانية والدولية مع فكرة عن نموذج رابع أمريكي
FIDIC - JCT - NEC - AIA
محاضرة الشرح: https://www.youtube.com/watch?v=fVpeut_-9-0
Construction Contracts: Basics of Contracts and Contract AdministrationGerald R. (Jerry) Genge
The CCDC 2 Stipulated Price Contract is the "go to" document for construction contracts. Learn the basic components and roles of eth parties to the contract.
Presentation is trying to define the intent , content, methods and scope of arbitration and tendering and its implications for the architectural practice.
Presentation tries to give an overview and brief about tendering used in the building works for the benefit of students of architecture. Additions and alterations can be made to make it a better one. It is based on the book of Professional practice by Krishnamurthy and Ravindra
تصنيف أنواع العقود في مجال الانشاءات
دورة مجانية في: https://www.udemy.com/contracts-arabic/
الدورة الكاملة: prof.planner.teachable.com/p/contract-management/
Contradictory enforcement of terms in FIDIC presents risks to contractors who are told to proceed as directed on change orders which never get approved till the end of the job, and are then renegotiated favorably to the Owner. .
إدارة القيمة المكتسبة مفيدة ومخادعة في التحكم في المشروعات
فيديو دورة الأساسيات: http://prof.planner.teachable.com/p/evm-basics/
دورة المستوى المتقدم: http://www.slideshare.net/MohamedMaged8/contracts-classification
للمزيد: https://www.facebook.com/groups/prof.cost.engineers/
Determination of compensation due to a grant of EOT under FIDIC Conditions creates certain issues and the Society of Construction Law has set up a Protocol to overcome most of these issues with a well laid out procedure.
Construction Delay Analysis, SimplifiedMichael Pink
Learn how to perform a delay analysis in the construction industry. Capture and study your impacts to determine why a project was late. Use this proven method to ensure that you get paid for delays caused by others.
A simple example of Earned Value Management (EVM) in actionPlanisware
A simple example of Earned Value Management (EVM) calculations to illustrate the EVM article on Planisware's online Project Portfolio Management glossary.
This was a presentation delivered by Robert Langley, partner and head of the construction and engineering team at Muckle LLP, on Tuesday 7th October. The event was organised and hosted by the APM North East branch and was entitled 'Project contracts and how they support collaborative working'. It was held at the Radisson Blu hotel in Durham.
Contract management is the systematic process of creating, administering, and enforcing contracts between two or more parties. It ensures both parties fulfill their obligations as outlined in the agreement and minimizes potential risks.
NEC4 overview: key changes and impacts - London, September 2017Browne Jacobson LLP
This seminar looked at the changes to the NEC structrure, changes in approach following the change to the structure, and the introduction of two new contracts to the suite.
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...César del Riego y Fuentes
Case study: ARBITRATION DISPUTE CROSS ARGUMENTS- PROJECTS that EPC CONTRACTS ARE NOT INTENDED TO- case study: Central Asia Natural Gas Pipeline megaproject Claimant/Respondant Argumentation. Study of the Substance of the EPC contract and main features preventing them from being used in certain projects. The huge assumptions of the Contractor (including site ground and unforeseeable events) makes EPC contracts not (supposedly) intended for variations and should be scope closed. Unfortunatelly the usual think is that the Contractors do engage in EPC contracts that will certainly lead to huge liquidated damages and eventIually trigger the bid/performance bonds with no/very limit resource to the contractor. Intensive ground/Underground. Flagship projects not previous experience. Drawings approval by the employer. No/uneffective procedure to Interim Payments upon milestones completion. Foreseeable intensive variations.
Early contractor involvement (eci) procurement approach spm talk 2016teohwooisin
ECI is a project procurement approach whereby contractors are engaged early to effectively tap on their expertise especially in the aspects buildability, constructability, construction schedule and planning, designs and alternative proposals, value engineering, and latest construction technologies. The presentation will cover the scope of ECI, how ECI could fit into different procurement methods such as Design & Build and traditional procurement, the ECI process and the important considerations in implementing ECI, and the drivers and benefits of ECI. In addition, the ECI models for public sector projects and lessons learned from past ECI cases will also be covered.
Similar to An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activities (20)
Training Slides of Human Resource Management : The Importance of Effective Strategy and Planning, discussing the importance of Human Resource Management.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Purpose of Contract CloseOuts - Overview Landscape.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Public Meeting - Contract Close-Out - Ground Rules.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of NATIONAL AUDIT – FIDIC CONTRACTS: BASIS OF FAIR CONTRACT, discussing the importance of Contract.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of OPTICAL INDUSTRY - Design Engineering Fabrication Testing, discussing the importance of Optics.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Microsoft word 2010 - Technical Skills Training, discussing the importance of Microsoft Word.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Microsoft® Office Word 2007 Skills & Compentencies Training .
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Competency Modeling v. Job Analysis discussing the importance of Job Analysis.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Competency gaps for Professional Development discussing the importance of Performance.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Competency Approach to Human Resource Management, discussing the importance of Human Resource Management.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Developing a University-Wide Integrated Employee Core Competency Framework.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Organizational Change and Development, discussing the importance of Change.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Competency-based Management for the DoD-wide Contracting Community, discussing the importance of Competency Management.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of COMPETENCY-BASED CURRICULUM DEVELOPMENT, discussing the importance of Coaching.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of The Counseling Interview - Principles & Practices, discussing the importance of Interview.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Behavioral Interview - Selecting Quality Employees for a Quality Organization, discussing the importance of Interview.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Effective Hiring Practices, discussing the importance of Hiring.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Coaching and Industrial & Organisational Psychology Selecting Employees, discussing the importance of recruiting.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
Training Slides of Structuring the Interview - Hiring Skills, discussing the importance of Interview.
For further information regarding the course, please contact:
info@asia-masters.com
www.asia-masters.com
More from Asia Master Training آسيا ماسترز للتدريب والتطوير (20)
How to Obtain Permanent Residency in the NetherlandsBridgeWest.eu
You can rely on our assistance if you are ready to apply for permanent residency. Find out more at: https://immigration-netherlands.com/obtain-a-permanent-residence-permit-in-the-netherlands/.
ASHWINI KUMAR UPADHYAY v/s Union of India.pptxshweeta209
transfer of the P.I.L filed by lawyer Ashwini Kumar Upadhyay in Delhi High Court to Supreme Court.
on the issue of UNIFORM MARRIAGE AGE of men and women.
WINDING UP of COMPANY, Modes of DissolutionKHURRAMWALI
Winding up, also known as liquidation, refers to the legal and financial process of dissolving a company. It involves ceasing operations, selling assets, settling debts, and ultimately removing the company from the official business registry.
Here's a breakdown of the key aspects of winding up:
Reasons for Winding Up:
Insolvency: This is the most common reason, where the company cannot pay its debts. Creditors may initiate a compulsory winding up to recover their dues.
Voluntary Closure: The owners may decide to close the company due to reasons like reaching business goals, facing losses, or merging with another company.
Deadlock: If shareholders or directors cannot agree on how to run the company, a court may order a winding up.
Types of Winding Up:
Voluntary Winding Up: This is initiated by the company's shareholders through a resolution passed by a majority vote. There are two main types:
Members' Voluntary Winding Up: The company is solvent (has enough assets to pay off its debts) and shareholders will receive any remaining assets after debts are settled.
Creditors' Voluntary Winding Up: The company is insolvent and creditors will be prioritized in receiving payment from the sale of assets.
Compulsory Winding Up: This is initiated by a court order, typically at the request of creditors, government agencies, or even by the company itself if it's insolvent.
Process of Winding Up:
Appointment of Liquidator: A qualified professional is appointed to oversee the winding-up process. They are responsible for selling assets, paying off debts, and distributing any remaining funds.
Cease Trading: The company stops its regular business operations.
Notification of Creditors: Creditors are informed about the winding up and invited to submit their claims.
Sale of Assets: The company's assets are sold to generate cash to pay off creditors.
Payment of Debts: Creditors are paid according to a set order of priority, with secured creditors receiving payment before unsecured creditors.
Distribution to Shareholders: If there are any remaining funds after all debts are settled, they are distributed to shareholders according to their ownership stake.
Dissolution: Once all claims are settled and distributions made, the company is officially dissolved and removed from the business register.
Impact of Winding Up:
Employees: Employees will likely lose their jobs during the winding-up process.
Creditors: Creditors may not recover their debts in full, especially if the company is insolvent.
Shareholders: Shareholders may not receive any payout if the company's debts exceed its assets.
Winding up is a complex legal and financial process that can have significant consequences for all parties involved. It's important to seek professional legal and financial advice when considering winding up a company.
Responsibilities of the office bearers while registering multi-state cooperat...Finlaw Consultancy Pvt Ltd
Introduction-
The process of register multi-state cooperative society in India is governed by the Multi-State Co-operative Societies Act, 2002. This process requires the office bearers to undertake several crucial responsibilities to ensure compliance with legal and regulatory frameworks. The key office bearers typically include the President, Secretary, and Treasurer, along with other elected members of the managing committee. Their responsibilities encompass administrative, legal, and financial duties essential for the successful registration and operation of the society.
RIGHTS OF VICTIM EDITED PRESENTATION(SAIF JAVED).pptxOmGod1
Victims of crime have a range of rights designed to ensure their protection, support, and participation in the justice system. These rights include the right to be treated with dignity and respect, the right to be informed about the progress of their case, and the right to be heard during legal proceedings. Victims are entitled to protection from intimidation and harm, access to support services such as counseling and medical care, and the right to restitution from the offender. Additionally, many jurisdictions provide victims with the right to participate in parole hearings and the right to privacy to protect their personal information from public disclosure. These rights aim to acknowledge the impact of crime on victims and to provide them with the necessary resources and involvement in the judicial process.
ALL EYES ON RAFAH BUT WHY Explain more.pdf46adnanshahzad
All eyes on Rafah: But why?. The Rafah border crossing, a crucial point between Egypt and the Gaza Strip, often finds itself at the center of global attention. As we explore the significance of Rafah, we’ll uncover why all eyes are on Rafah and the complexities surrounding this pivotal region.
INTRODUCTION
What makes Rafah so significant that it captures global attention? The phrase ‘All eyes are on Rafah’ resonates not just with those in the region but with people worldwide who recognize its strategic, humanitarian, and political importance. In this guide, we will delve into the factors that make Rafah a focal point for international interest, examining its historical context, humanitarian challenges, and political dimensions.
Introducing New Government Regulation on Toll Road.pdfAHRP Law Firm
For nearly two decades, Government Regulation Number 15 of 2005 on Toll Roads ("GR No. 15/2005") has served as the cornerstone of toll road legislation. However, with the emergence of various new developments and legal requirements, the Government has enacted Government Regulation Number 23 of 2024 on Toll Roads to replace GR No. 15/2005. This new regulation introduces several provisions impacting toll business entities and toll road users. Find out more out insights about this topic in our Legal Brief publication.
DNA Testing in Civil and Criminal Matters.pptxpatrons legal
Get insights into DNA testing and its application in civil and criminal matters. Find out how it contributes to fair and accurate legal proceedings. For more information: https://www.patronslegal.com/criminal-litigation.html
In 2020, the Ministry of Home Affairs established a committee led by Prof. (Dr.) Ranbir Singh, former Vice Chancellor of National Law University (NLU), Delhi. This committee was tasked with reviewing the three codes of criminal law. The primary objective of the committee was to propose comprehensive reforms to the country’s criminal laws in a manner that is both principled and effective.
The committee’s focus was on ensuring the safety and security of individuals, communities, and the nation as a whole. Throughout its deliberations, the committee aimed to uphold constitutional values such as justice, dignity, and the intrinsic value of each individual. Their goal was to recommend amendments to the criminal laws that align with these values and priorities.
Subsequently, in February, the committee successfully submitted its recommendations regarding amendments to the criminal law. These recommendations are intended to serve as a foundation for enhancing the current legal framework, promoting safety and security, and upholding the constitutional principles of justice, dignity, and the inherent worth of every individual.
8. 8
The 1999 Suite of Standard
Conditions of Contract
• Conditions of Contract for Construction - design
by Employer: The Construction Contract (The
New Red Book)
• Conditions of Contract for Plant and Design-Build
- design by Contractor: The Plant and
Design/Build Contract (The New Yellow Book)
• Conditions of Contract for EPC Turnkey Projects:
The EPC/Turnkey Contract (The Silver Book)
• Short Form of Contract: The Short Form (The
Green Book)
• The FIDIC Contracts Guide (2000)
10. 10
Principles (continued)
• Traditional role of ‘the Engineer’ to
make impartial determinations modified
to reflect current practice (Red and
Yellow Books)
• ‘Employer’s Representative’ introduced:
must be fair and reasonable (Silver and
Green Books)
15. 15
The 1999 Red and Yellow Books
• Emphasis changed to party responsible for
design
• 1999 Yellow Book replaced both 1987 Yellow
Book and Orange Book
• Traditional competitive tendering procedures
• Risk sharing is balanced
• All claims, from either Party, have to follow a
strict procedure
• Engineer is no longer stated to be ‘impartial’:
he ‘shall be deemed to act for the Employer’,
except when fair determinations are required
22. 22
Special Features of the
Silver Book
• Responsibility for design lies with Contractor
• Employer’s Requirements usually a
‘performance specification’ (functional basis)
• Contractor carries out all engineering,
procurement, construction, ready for
operation at the ‘turn of a key’
• No Engineer - instead the Employer
• Lump Sum Contract Price (but adjustments in
limited specified cases)
23. 23
Special Features (continued)
• Testing procedures to demonstrate
achievement of specified end result
• Contractor carries majority of risks, so
Employer pays more
• Final price and time should be more certain
• Small number of tenderers with negotiation
• Contractor given freedom to use own
methods
• Has to prove reliability and performance