Dr. Haitham El Sharnouby
Pricing & BOQ
Dr. Haitham El Sharnouby
 Cost Analyses
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors
m2 20 Res.
Category
Resource Description Amount Price Rate Losses
Pct. /
Multi.
Direct
Cost
E010 M Floor Ceramic Tiles 1.000 90 1 1.07 1 96.30
E010 M Sand 1.000 40 1 1.12 0.07 3.14
E010 M Sand 1.000 40 1 1.12 0.02 0.90
E010 M Cement 0.300 1420 1 1.07 0.02 9.12
E010 M Water 0.225 1 1 1.12 0.07 0.02
E010 M White Mortar Filling / m2 1.000 3 1 1.07 1 3.21
Direct Cost of Material 112.68
E010 L Ceramic Fixer 1 180 30 1 1 6.00
E010 L Ceramic F. Ass. 1 120 30 1 1 4.00
E010 Mortar Fill L Ceramic Fixer 1 180 150 1 1 1.20
E010 Mortar Fill L Ceramic F. Ass. 1 120 150 1 1 0.80
Direct Cost of Labor 12.00
E010 Q Ceramic Fixing Equipment 1 5 1 1 1 5.00
Direct Cost of Equipment 5.00
Total Direct Cost for Each Item Unit 129.68
E020
Supply and Erect Ceramic for
Walls
m2 60 Res.
Category
Resource Description Amount Price Rate Losses
Pct. /
Multi.
Direct
Cost
E020 M Wall Ceramic Tiles 1.000 80 1 1.07 1 85.60
E020 M Lime 0.400 35 1 1.12 0.04 0.63
E020 M Sand 0.600 40 1 1.12 0.04 1.08
E020 M Cement 0.300 1420 1 1.07 0.04 18.23
E020 M Water 0.175 1 1 1.12 0.04 0.01
E020 M White Mortar Filling / m2 1.000 3 1 1.07 1 3.21
Direct Cost of Material 108.75
E020 L Ceramic Fixer 1 180 15 1 1 12.00
E020 L Ceramic F. Ass. 1 120 15 1 1 8.00
E020 Mortar Fill L Ceramic Fixer 1 180 150 1 1 1.20
E020 L Ceramic F. Ass. 1 120 150 1 1 0.80
Direct Cost of Labor 22.00
E020 Q Ceramic Fixing Equipment 1 5 1 1 1 5.00
Direct Cost of Equipment 5.00
Total Direct Cost for Each Item Unit 135.75
Dr. Haitham El Sharnouby
 Cost Analyses
F000 Plastering Works
F010
Supply and Apply Internal
Plaster Works
m2 390 Res.
Category
Resource Description Amount Price Rate Losses
Pct. /
Multi.
Direct
Cost
F010 Tartasha M Sand 1.000 40 1 1.25 0.005 0.25
F010 M Cement 0.450 1420 1 1.25 0.005 3.99
F010 M Water 0.225 1 1 1.25 0.005 0.00
F010 Plaster M Lime 0.400 35 1 1.12 0.02 0.31
F010 M Sand 0.600 40 1 1.12 0.02 0.54
F010 M Cement 0.300 1420 1 1.07 0.02 9.12
F010 M Water 0.175 1 1 1.12 0.02 0.00
Direct Cost of Material 14.22
F010 Tartasha L Plasterer 1 180 50 1 1 3.60
F010 L Plasterer Helper 1 120 50 1 1 2.40
F010 Plaster L Plasterer 1 180 20 1 1 9.00
F010 L Plasterer Helper 1 120 20 1 1 6.00
Direct Cost of Labor 21.00
F010 Q Scaffolding / m2 1 1 1 1 1 1.00
F010 Q Plastering Equipment 1 2 1 1 1 2.00
Direct Cost of Equipment 3.00
Total Direct Cost for Each Item Unit 38.22
Dr. Haitham El Sharnouby
 BOQ Item
No.
Item Description Unit Qty.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 47.58 18556.11
Grand Total of BOQ 432669.4
Dr. Haitham El Sharnouby
 BOQ
Item
No.
Item Description Unit Qty.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 47.58 18556.11
Grand Total of BOQ 432669.4
Dr. Haitham El Sharnouby
 BOQ
Item
No.
Item Description Unit Qty. D. Cost Total D. C.
Mark
Up Pct.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 2812.40 224992.24 1.25 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3026.53 60530.56 1.25 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 63.42 9512.33 1.25 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 536.95 26847.28 1.25 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 129.68 2593.52 1.25 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 135.75 8145.18 1.25 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 38.22 14904.50 1.25 47.58 18556.11
Grand Total of BOQ 347526 432669.4
Dr. Haitham El Sharnouby
 Converting Margin to Markup
 𝑴𝒂𝒓𝒌𝒖𝒑 =
1
1−𝑴𝒂𝒓𝒈𝒊𝒏
− 1
 Converting Markup to Margin
 𝑴𝒂𝒓𝒈𝒊𝒏 = 1 −
1
1+𝑴𝒂𝒓𝒌𝒖𝒑
Dr. Haitham El Sharnouby
 BOQ
Item
No.
Item Description Unit Qty. D. Cost Total D. C.
Mark
Up Pct.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 2812.40 224992.24 1.25 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3026.53 60530.56 1.25 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 63.42 9512.33 1.25 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 536.95 26847.28 1.25 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 129.68 2593.52 1.25 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 135.75 8145.18 1.25 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 38.22 14904.50 1.25 47.58 18556.11
Grand Total of BOQ 347526 432669.4

More Related Content

What's hot

45010341 planning-estimate
45010341 planning-estimate45010341 planning-estimate
45010341 planning-estimate
imaduddin91
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS
Reza Bassawon
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION
Reza Bassawon
 
Howto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer filmHowto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer film
CNC Glass Interlayer(China)
 

What's hot (18)

45010341 planning-estimate
45010341 planning-estimate45010341 planning-estimate
45010341 planning-estimate
 
Kabaddi
KabaddiKabaddi
Kabaddi
 
Setting time test
Setting time testSetting time test
Setting time test
 
Apron feeder pans
Apron feeder pansApron feeder pans
Apron feeder pans
 
Fresh concrete tests
Fresh concrete testsFresh concrete tests
Fresh concrete tests
 
Esite Norton T100
Esite Norton T100Esite Norton T100
Esite Norton T100
 
Fineness test of Cement
Fineness test of CementFineness test of Cement
Fineness test of Cement
 
Normal consistency test
Normal consistency testNormal consistency test
Normal consistency test
 
Aggregate impact value Calculation And uses
Aggregate impact value Calculation And usesAggregate impact value Calculation And uses
Aggregate impact value Calculation And uses
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Fineness test on cement
Fineness test on cementFineness test on cement
Fineness test on cement
 
What is Tungsten Carbide?
What is Tungsten Carbide?What is Tungsten Carbide?
What is Tungsten Carbide?
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION
 
How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...
 
checking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimenchecking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimen
 
Howto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer filmHowto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer film
 
Rz catalogue cn AIKOH 推拉力计
Rz catalogue cn AIKOH 推拉力计Rz catalogue cn AIKOH 推拉力计
Rz catalogue cn AIKOH 推拉力计
 

Similar to Intro. to management lecture 09

SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary Report
Natalie Reid
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation
imaduddin91
 
23262483 unit-cost-derivation
23262483 unit-cost-derivation23262483 unit-cost-derivation
23262483 unit-cost-derivation
imaduddin91
 
Builder Sample
Builder SampleBuilder Sample
Builder Sample
Hai Nguyen
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimation
krkantamneni
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimation
krkantamneni
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
ashleyyeap
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary Report
Natalie Reid
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
Natalie Reid
 

Similar to Intro. to management lecture 09 (20)

Intro. to management lecture 06
Intro. to management lecture 06Intro. to management lecture 06
Intro. to management lecture 06
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary Report
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
RR Nagar
RR NagarRR Nagar
RR Nagar
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation
 
Single storied house
Single storied houseSingle storied house
Single storied house
 
StoneCraft Floors
StoneCraft FloorsStoneCraft Floors
StoneCraft Floors
 
E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15
 
23262483 unit-cost-derivation
23262483 unit-cost-derivation23262483 unit-cost-derivation
23262483 unit-cost-derivation
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
Builder Sample
Builder SampleBuilder Sample
Builder Sample
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimation
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimation
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary Report
 
Stilt house
Stilt houseStilt house
Stilt house
 
GBI: Role of BS
GBI: Role of BSGBI: Role of BS
GBI: Role of BS
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 

More from Haitham Sharnouby (6)

Intro. to management lecture 05
Intro. to management lecture 05Intro. to management lecture 05
Intro. to management lecture 05
 
Intro. to management lecture 03
Intro. to management lecture 03Intro. to management lecture 03
Intro. to management lecture 03
 
Intro. to management lecture 04
Intro. to management lecture 04Intro. to management lecture 04
Intro. to management lecture 04
 
Intro. to management lecture 02
Intro. to management lecture 02Intro. to management lecture 02
Intro. to management lecture 02
 
Intro. to management lecture 01
Intro. to management lecture 01Intro. to management lecture 01
Intro. to management lecture 01
 
Gis lecture #01
Gis lecture #01Gis lecture #01
Gis lecture #01
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Intro. to management lecture 09

  • 1. Dr. Haitham El Sharnouby Pricing & BOQ
  • 2. Dr. Haitham El Sharnouby  Cost Analyses E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 Res. Category Resource Description Amount Price Rate Losses Pct. / Multi. Direct Cost E010 M Floor Ceramic Tiles 1.000 90 1 1.07 1 96.30 E010 M Sand 1.000 40 1 1.12 0.07 3.14 E010 M Sand 1.000 40 1 1.12 0.02 0.90 E010 M Cement 0.300 1420 1 1.07 0.02 9.12 E010 M Water 0.225 1 1 1.12 0.07 0.02 E010 M White Mortar Filling / m2 1.000 3 1 1.07 1 3.21 Direct Cost of Material 112.68 E010 L Ceramic Fixer 1 180 30 1 1 6.00 E010 L Ceramic F. Ass. 1 120 30 1 1 4.00 E010 Mortar Fill L Ceramic Fixer 1 180 150 1 1 1.20 E010 Mortar Fill L Ceramic F. Ass. 1 120 150 1 1 0.80 Direct Cost of Labor 12.00 E010 Q Ceramic Fixing Equipment 1 5 1 1 1 5.00 Direct Cost of Equipment 5.00 Total Direct Cost for Each Item Unit 129.68 E020 Supply and Erect Ceramic for Walls m2 60 Res. Category Resource Description Amount Price Rate Losses Pct. / Multi. Direct Cost E020 M Wall Ceramic Tiles 1.000 80 1 1.07 1 85.60 E020 M Lime 0.400 35 1 1.12 0.04 0.63 E020 M Sand 0.600 40 1 1.12 0.04 1.08 E020 M Cement 0.300 1420 1 1.07 0.04 18.23 E020 M Water 0.175 1 1 1.12 0.04 0.01 E020 M White Mortar Filling / m2 1.000 3 1 1.07 1 3.21 Direct Cost of Material 108.75 E020 L Ceramic Fixer 1 180 15 1 1 12.00 E020 L Ceramic F. Ass. 1 120 15 1 1 8.00 E020 Mortar Fill L Ceramic Fixer 1 180 150 1 1 1.20 E020 L Ceramic F. Ass. 1 120 150 1 1 0.80 Direct Cost of Labor 22.00 E020 Q Ceramic Fixing Equipment 1 5 1 1 1 5.00 Direct Cost of Equipment 5.00 Total Direct Cost for Each Item Unit 135.75
  • 3. Dr. Haitham El Sharnouby  Cost Analyses F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 Res. Category Resource Description Amount Price Rate Losses Pct. / Multi. Direct Cost F010 Tartasha M Sand 1.000 40 1 1.25 0.005 0.25 F010 M Cement 0.450 1420 1 1.25 0.005 3.99 F010 M Water 0.225 1 1 1.25 0.005 0.00 F010 Plaster M Lime 0.400 35 1 1.12 0.02 0.31 F010 M Sand 0.600 40 1 1.12 0.02 0.54 F010 M Cement 0.300 1420 1 1.07 0.02 9.12 F010 M Water 0.175 1 1 1.12 0.02 0.00 Direct Cost of Material 14.22 F010 Tartasha L Plasterer 1 180 50 1 1 3.60 F010 L Plasterer Helper 1 120 50 1 1 2.40 F010 Plaster L Plasterer 1 180 20 1 1 9.00 F010 L Plasterer Helper 1 120 20 1 1 6.00 Direct Cost of Labor 21.00 F010 Q Scaffolding / m2 1 1 1 1 1 1.00 F010 Q Plastering Equipment 1 2 1 1 1 2.00 Direct Cost of Equipment 3.00 Total Direct Cost for Each Item Unit 38.22
  • 4. Dr. Haitham El Sharnouby  BOQ Item No. Item Description Unit Qty. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 47.58 18556.11 Grand Total of BOQ 432669.4
  • 5. Dr. Haitham El Sharnouby  BOQ Item No. Item Description Unit Qty. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 47.58 18556.11 Grand Total of BOQ 432669.4
  • 6. Dr. Haitham El Sharnouby  BOQ Item No. Item Description Unit Qty. D. Cost Total D. C. Mark Up Pct. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 2812.40 224992.24 1.25 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3026.53 60530.56 1.25 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 63.42 9512.33 1.25 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 536.95 26847.28 1.25 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 129.68 2593.52 1.25 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 135.75 8145.18 1.25 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 38.22 14904.50 1.25 47.58 18556.11 Grand Total of BOQ 347526 432669.4
  • 7. Dr. Haitham El Sharnouby  Converting Margin to Markup  𝑴𝒂𝒓𝒌𝒖𝒑 = 1 1−𝑴𝒂𝒓𝒈𝒊𝒏 − 1  Converting Markup to Margin  𝑴𝒂𝒓𝒈𝒊𝒏 = 1 − 1 1+𝑴𝒂𝒓𝒌𝒖𝒑
  • 8. Dr. Haitham El Sharnouby  BOQ Item No. Item Description Unit Qty. D. Cost Total D. C. Mark Up Pct. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 2812.40 224992.24 1.25 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3026.53 60530.56 1.25 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 63.42 9512.33 1.25 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 536.95 26847.28 1.25 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 129.68 2593.52 1.25 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 135.75 8145.18 1.25 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 38.22 14904.50 1.25 47.58 18556.11 Grand Total of BOQ 347526 432669.4