Cost Estimate I
Dr. Haitham El Sharnouby
 Bill Of Quantities Item
No.
Item Description Unit Qty.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 47.58 18556.11
Grand Total of BOQ 432669.4
Dr. Haitham El Sharnouby
 Bill Of Quantities Item
No.
Item Description Unit Qty.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 47.58 18556.11
Grand Total of BOQ 432669.4
Dr. Haitham El Sharnouby
 Price Breakdown
Item
No.
Item Description Unit Qty. D. Cost Total D. C.
Mark
Up Pct.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 2812.40 224992.24 1.25 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3026.53 60530.56 1.25 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 63.42 9512.33 1.25 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 536.95 26847.28 1.25 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 129.68 2593.52 1.25 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 135.75 8145.18 1.25 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 38.22 14904.50 1.25 47.58 18556.11
Grand Total of BOQ 347526 432669.4
Dr. Haitham El Sharnouby
 Res. Dictionary
ID Description Unit Price Notes
M Gravel m3 80
M Sand m3 40
M Cement ton 1420
M Water m3 1
M Rein. Steel ton 14000
M Brick 1000 600
M Floor Ceramic Tiles m2 90
M Wall Ceramic Tiles m2 80
M White Mortar Filling / m2 m2 3
M Lime m3 35
L R. C. Pouring Crew day 1200
L Steel Fixer day 180
L Steel Fixer Ass. day 120
L Steel O. Labor day 90
L Formwork Carpentry day 180
L Formwork Carpentry Ass. day 120
L Brick Laying Lab. day 180
L Brick Laying Ass. day 120
L Brick Laying O. Lab. day 90
L Ceramic Fixer day 180
L Ceramic F. Ass. day 120
L Plasterer day 180
L Plasterer Helper day 120
Q Mixer & Vibrator m3 25
Q Fuel & Electric m3 15
Q Small Tools / m3 RC m3 7
Q Formwork Timber m3 80
Q Scaffolding / m2 m2 1
Q Scaffolding / m3 m3 6
Q Small Tools / m2 Brick m2 1
Q Small Tools / m3 Brick m3 5
Q Ceramic Fixing Equipment m2 5
Q Plastering Equipment m2 2
Dr. Haitham El Sharnouby
 Direct Cost Estimate ‫كل‬3‫مساعد‬ ‫ومعهم‬ ‫حدادبن‬
‫أيام‬ ‫تسعة‬ ‫يحتاجون‬ ‫وعامل‬
‫ليثبتوا‬10‫وهذا‬ ‫حديد‬ ‫طن‬
‫قسمة‬ ‫حاصل‬10‫كمية‬ ‫على‬
‫م‬ ‫في‬ ‫الحديد‬3
‫كل‬4‫مساعدي‬ ‫وثالثة‬ ‫نجارين‬‫ن‬
‫عمل‬ ‫أيام‬ ‫عشرة‬ ‫يحتاجون‬
‫لصب‬ ‫نجارة‬ ‫ليثبتوا‬40‫متر‬
‫خرسانة‬ ‫مكعب‬
C010
Supply and Pouring Reinforced
Concrete for Columns
m3 80 Res.
Category
Resource Description Amount Price Rate Losses
Pct. /
Multi.
Direct
Cost
C010 M Gravel 0.800 80 1 1.12 1 71.68
C010 M Sand 0.400 40 1 1.12 1 17.92
C010 M Cement 0.400 1420 1 1.07 1 607.76
C010 M Water 0.150 1 1 1.12 1 0.17
C010 M Rein. Steel 0.105 14000 1 1.1 1 1617.00
Direct Cost of Material 2314.53
C010 L R. C. Pouring Crew 1 1200 40 1 1 30.00
C010 L Steel Fixer 3 180 95.2381 1 9 51.03
C010 L Steel Fixer Ass. 1 120 95.2381 1 9 11.34
C010 L Steel O. Labor 1 90 95.2381 1 9 8.51
C010 (El Bakkary p. 243) L Formwork Carpentry 4 180 40 1 10 180.00
C010 (El Bakkary p. 243) L Formwork Carpentry Ass. 3 120 40 1 10 90.00
Direct Cost of Labor 370.88
C010 Q Mixer & Vibrator 1 25 1 1 1 25.00
C010 Q Fuel & Electric 1 15 1 1 1 15.00
C010 Q Small Tools / m3 RC 1 7 1 1 1 7.00
C010 Q Formwork Timber 1 80 1 1 1 80.00
Direct Cost of Equipment 127.00
Total Direct Cost for Each Item Unit 2812.40

More Related Content

What's hot

45010341 planning-estimate
45010341 planning-estimate45010341 planning-estimate
45010341 planning-estimateimaduddin91
 
Fineness test of Cement
Fineness test of CementFineness test of Cement
Fineness test of CementPTUT Lahore
 
Aggregate impact value Calculation And uses
Aggregate impact value Calculation And usesAggregate impact value Calculation And uses
Aggregate impact value Calculation And usesShahryar Amin
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineeringKailash Chander
 
What is Tungsten Carbide?
What is Tungsten Carbide?What is Tungsten Carbide?
What is Tungsten Carbide?The FBA Broker
 
Fineness test on cement
Fineness test on cementFineness test on cement
Fineness test on cementHARISH B A
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILSReza Bassawon
 
How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...CNC Glass Interlayer(China)
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTIONReza Bassawon
 
Howto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer filmHowto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer filmCNC Glass Interlayer(China)
 
checking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimenchecking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimenzeeshan hafeez
 

What's hot (18)

45010341 planning-estimate
45010341 planning-estimate45010341 planning-estimate
45010341 planning-estimate
 
Kabaddi
KabaddiKabaddi
Kabaddi
 
Setting time test
Setting time testSetting time test
Setting time test
 
Apron feeder pans
Apron feeder pansApron feeder pans
Apron feeder pans
 
Fresh concrete tests
Fresh concrete testsFresh concrete tests
Fresh concrete tests
 
Esite Norton T100
Esite Norton T100Esite Norton T100
Esite Norton T100
 
Fineness test of Cement
Fineness test of CementFineness test of Cement
Fineness test of Cement
 
Normal consistency test
Normal consistency testNormal consistency test
Normal consistency test
 
Aggregate impact value Calculation And uses
Aggregate impact value Calculation And usesAggregate impact value Calculation And uses
Aggregate impact value Calculation And uses
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
What is Tungsten Carbide?
What is Tungsten Carbide?What is Tungsten Carbide?
What is Tungsten Carbide?
 
Fineness test on cement
Fineness test on cementFineness test on cement
Fineness test on cement
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS
 
Rz catalogue cn AIKOH 推拉力计
Rz catalogue cn AIKOH 推拉力计Rz catalogue cn AIKOH 推拉力计
Rz catalogue cn AIKOH 推拉力计
 
How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION
 
Howto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer filmHowto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer film
 
checking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimenchecking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimen
 

Similar to Intro. to management lecture 06

Intro. to management lecture 09
Intro. to management lecture 09Intro. to management lecture 09
Intro. to management lecture 09Haitham Sharnouby
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08Haitham Sharnouby
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimationimaduddin91
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary ReportNatalie Reid
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxQAQCGCC
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farmOmar Faruque
 
Builder Sample
Builder SampleBuilder Sample
Builder SampleHai Nguyen
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimationkrkantamneni
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimationkrkantamneni
 
Civil standard notes
Civil standard notesCivil standard notes
Civil standard notesmanu287448
 

Similar to Intro. to management lecture 06 (20)

Intro. to management lecture 09
Intro. to management lecture 09Intro. to management lecture 09
Intro. to management lecture 09
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08
 
E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Single storied house
Single storied houseSingle storied house
Single storied house
 
RR Nagar
RR NagarRR Nagar
RR Nagar
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary Report
 
Stilt house
Stilt houseStilt house
Stilt house
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
SOR DWS 2010
SOR DWS 2010SOR DWS 2010
SOR DWS 2010
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Builder Sample
Builder SampleBuilder Sample
Builder Sample
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimation
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimation
 
RMC 34 KUMILY - POOPPARA ROAD
RMC 34 KUMILY - POOPPARA ROADRMC 34 KUMILY - POOPPARA ROAD
RMC 34 KUMILY - POOPPARA ROAD
 
Civil standard notes
Civil standard notesCivil standard notes
Civil standard notes
 
Civil book
Civil bookCivil book
Civil book
 

More from Haitham Sharnouby

Intro. to management lecture 05
Intro. to management lecture 05Intro. to management lecture 05
Intro. to management lecture 05Haitham Sharnouby
 
Intro. to management lecture 03
Intro. to management lecture 03Intro. to management lecture 03
Intro. to management lecture 03Haitham Sharnouby
 
Intro. to management lecture 04
Intro. to management lecture 04Intro. to management lecture 04
Intro. to management lecture 04Haitham Sharnouby
 
Intro. to management lecture 02
Intro. to management lecture 02Intro. to management lecture 02
Intro. to management lecture 02Haitham Sharnouby
 
Intro. to management lecture 01
Intro. to management lecture 01Intro. to management lecture 01
Intro. to management lecture 01Haitham Sharnouby
 

More from Haitham Sharnouby (6)

Intro. to management lecture 05
Intro. to management lecture 05Intro. to management lecture 05
Intro. to management lecture 05
 
Intro. to management lecture 03
Intro. to management lecture 03Intro. to management lecture 03
Intro. to management lecture 03
 
Intro. to management lecture 04
Intro. to management lecture 04Intro. to management lecture 04
Intro. to management lecture 04
 
Intro. to management lecture 02
Intro. to management lecture 02Intro. to management lecture 02
Intro. to management lecture 02
 
Intro. to management lecture 01
Intro. to management lecture 01Intro. to management lecture 01
Intro. to management lecture 01
 
Gis lecture #01
Gis lecture #01Gis lecture #01
Gis lecture #01
 

Recently uploaded

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...gragchanchal546
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 

Recently uploaded (20)

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 

Intro. to management lecture 06

  • 1. Dr. Haitham El Sharnouby Cost Estimate I
  • 2. Dr. Haitham El Sharnouby  Bill Of Quantities Item No. Item Description Unit Qty. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 47.58 18556.11 Grand Total of BOQ 432669.4
  • 3. Dr. Haitham El Sharnouby  Bill Of Quantities Item No. Item Description Unit Qty. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 47.58 18556.11 Grand Total of BOQ 432669.4
  • 4. Dr. Haitham El Sharnouby  Price Breakdown Item No. Item Description Unit Qty. D. Cost Total D. C. Mark Up Pct. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 2812.40 224992.24 1.25 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3026.53 60530.56 1.25 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 63.42 9512.33 1.25 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 536.95 26847.28 1.25 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 129.68 2593.52 1.25 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 135.75 8145.18 1.25 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 38.22 14904.50 1.25 47.58 18556.11 Grand Total of BOQ 347526 432669.4
  • 5. Dr. Haitham El Sharnouby  Res. Dictionary ID Description Unit Price Notes M Gravel m3 80 M Sand m3 40 M Cement ton 1420 M Water m3 1 M Rein. Steel ton 14000 M Brick 1000 600 M Floor Ceramic Tiles m2 90 M Wall Ceramic Tiles m2 80 M White Mortar Filling / m2 m2 3 M Lime m3 35 L R. C. Pouring Crew day 1200 L Steel Fixer day 180 L Steel Fixer Ass. day 120 L Steel O. Labor day 90 L Formwork Carpentry day 180 L Formwork Carpentry Ass. day 120 L Brick Laying Lab. day 180 L Brick Laying Ass. day 120 L Brick Laying O. Lab. day 90 L Ceramic Fixer day 180 L Ceramic F. Ass. day 120 L Plasterer day 180 L Plasterer Helper day 120 Q Mixer & Vibrator m3 25 Q Fuel & Electric m3 15 Q Small Tools / m3 RC m3 7 Q Formwork Timber m3 80 Q Scaffolding / m2 m2 1 Q Scaffolding / m3 m3 6 Q Small Tools / m2 Brick m2 1 Q Small Tools / m3 Brick m3 5 Q Ceramic Fixing Equipment m2 5 Q Plastering Equipment m2 2
  • 6. Dr. Haitham El Sharnouby  Direct Cost Estimate ‫كل‬3‫مساعد‬ ‫ومعهم‬ ‫حدادبن‬ ‫أيام‬ ‫تسعة‬ ‫يحتاجون‬ ‫وعامل‬ ‫ليثبتوا‬10‫وهذا‬ ‫حديد‬ ‫طن‬ ‫قسمة‬ ‫حاصل‬10‫كمية‬ ‫على‬ ‫م‬ ‫في‬ ‫الحديد‬3 ‫كل‬4‫مساعدي‬ ‫وثالثة‬ ‫نجارين‬‫ن‬ ‫عمل‬ ‫أيام‬ ‫عشرة‬ ‫يحتاجون‬ ‫لصب‬ ‫نجارة‬ ‫ليثبتوا‬40‫متر‬ ‫خرسانة‬ ‫مكعب‬ C010 Supply and Pouring Reinforced Concrete for Columns m3 80 Res. Category Resource Description Amount Price Rate Losses Pct. / Multi. Direct Cost C010 M Gravel 0.800 80 1 1.12 1 71.68 C010 M Sand 0.400 40 1 1.12 1 17.92 C010 M Cement 0.400 1420 1 1.07 1 607.76 C010 M Water 0.150 1 1 1.12 1 0.17 C010 M Rein. Steel 0.105 14000 1 1.1 1 1617.00 Direct Cost of Material 2314.53 C010 L R. C. Pouring Crew 1 1200 40 1 1 30.00 C010 L Steel Fixer 3 180 95.2381 1 9 51.03 C010 L Steel Fixer Ass. 1 120 95.2381 1 9 11.34 C010 L Steel O. Labor 1 90 95.2381 1 9 8.51 C010 (El Bakkary p. 243) L Formwork Carpentry 4 180 40 1 10 180.00 C010 (El Bakkary p. 243) L Formwork Carpentry Ass. 3 120 40 1 10 90.00 Direct Cost of Labor 370.88 C010 Q Mixer & Vibrator 1 25 1 1 1 25.00 C010 Q Fuel & Electric 1 15 1 1 1 15.00 C010 Q Small Tools / m3 RC 1 7 1 1 1 7.00 C010 Q Formwork Timber 1 80 1 1 1 80.00 Direct Cost of Equipment 127.00 Total Direct Cost for Each Item Unit 2812.40