INTRODUCTION TO DRAWING ❃ INTRODUCTION TO CONSTRUCTION INDUSTRY ❃ ENGLISH MODULE 1
CHA YUN XIAN
EE HUI TENG
CHLOE SIM TIING ERN
ANGELA WEE KAH MAN
FIONA CHIMWEMWE CHIUDZU
CHIA KEH CHIAN
HONG SEO TAEK
WHO ARE THE PROFESSIONALS
WE NEED IN A CONSTRUCTION
SITE?
INTERIOR DESIGNER
ARCHITECT
ENGINEER
QUANTITY
SURVEYOR
RESPONSIBILIITIES OF A QUANTITY SURVEYOR
COST PLANNING
⍢ Budget estimating
⍢ Cost planning
⍢ Make sure project is kept
within budget
COMMERCIAL MANAGEMENT
⍢ responsible for
overseeing many
different aspects of a
company
⍢ managing risks,
overseeing employee
performance,
negotiating contracts
& planning individual
projects
PROCUREMENT ADVICE
⍢ process includes
preparation and
processing of a demand
⍢ able to advise clients
⍢ determine if
operations will continue
VALUE ENGINEERING
⍢ minimise the cost of a
project
⍢ enhance value for money
while still achieving the
required standard and quality
⍢ promotes substitution of
materials & methods with
less expensive alternatives
PREPARE BILL OF
QUANTITIES
⍢ make cost feasibility
studies, establish
construction budget
⍢ objective of bill of
quantities :
- To provide sufficient info
on the quantities of
works to be done to allow
bids to be prepared
accurately
ALLOCATE WORK
TO SUBCONTRACTORS
⍢ interact with the site
employees and
employees from
subcontract organisations
⍢ value completed work
⍢ arrange payment
⍢ approve payments
made once the works are
done
SCOPE OF WORK & TASKS AT
DIFFERENT STAGES OF
CONSTRUCTION
PRE -
CONSTRUCTION
STAGE 1 :
ESTIMATING & COST ADVICE
Receiving instruction
from the employer,
advising on various
courses of action and
procedures to suit the
particular requirements
of the Project.
Financial design
criteria advice
Preliminary and
comprehensive
estimates of
construction
cost
Other cost advice
STAGE 2:
DOCUMENTATION AND
PROCUREMENT
• Preparing documents for procurement of
construction contracts
• Soliciting tender offers
• Financially evaluating and reporting on tender offers
• Examining and verifying priced documents
STAGE 3 :
CONTRACT ADMINISTRATION
Preparing the
procurement
documentation for
subcontracts
Examining and reporting
on tender offers for
subcontracts, including
financial comparisons
with budget.
Preparing
schedules of
predicted cash
flows.
Attending progress
meetings on site at
reasonable intervals to
suit the nature and size
of the Project in order
Attending other
meetings at reasonable
intervals to suit the
nature and size of the
Project
Preparing valuations
for the issue of
payment certificates
Preparing cost
estimates for
proposed variations
for Employer
decision-making.
Maintaining a running
financial management
statement and
monitoring against the
financial budget.
Proceeding with
preparing the
final account.
Adjudicating and
resolving the financial
and contractual aspects
of claims between the
Employer and the
contractor,
STAGE 4 :
FINAL ACCOUNT
Determining and
agreeing all
variations and
adjustments for
incorporation
into the final
account.
Agreeing and
finalizing all
subcontracts
and adjusting
against
provisional
sums.
Concluding
the final
account,
including
fluctuations in
costs (if
applicable).
Preparing and
presenting the final
account to the
Employer,
including any
necessary
reconciliations and
explanations
against the financial
budget.
DRAWINGS THAT A QS REFERS TO
 Project drawings provided by the architect, typically showing the floor plan ;elevations;
finish schedules; and details of moldings, cabinetry, doors, and other such matters
necessary for the builder to order the proper materials for construction.
 Drawings, usually prepared by a
structural engineers, of the design and
working drawings of a building’s
 An itemized list of materials, parts,
and labor (with
their costs) required to construct, maintain,
or repair a specific structure.
Bill of quantity is to:
 Assist with the agreement of the contract
sum with the successful tenderer.
 Provide a schedule of rates assisting with
the valuation of variations.
 Provide a basis for the valuation
of interim payments.
 Provide a basis for the preparation of
the final account.
Cartlidge, D. (2012). Quantity Surveyors Pocket Book 2nd Edition. Routledge.
SMM7: Standard method of measurement of building works : Authorised by agreement
between the Royal Institution of Chartered Surveyors and the Building Employers
Confederation. (7th ed.). (1988). London: Royal Institution of Chartered Surveyors.
http://www.rics.org/uk/shop/SMM7-Standard-Method-of-Measurement-for-Building-
Works.aspx
SAMPLE GENERIC SCOPE OF WORK FOR PROFESSIONAL SERVICES. (2003, April).
from
http://www.google.com.my/url?sa=t&rct=j&q=&esrc=s&source=web&cd=2&cad=rja&uact
=8&ved=0CCUQFjAB&url=http://www.cidb.org.za/toolkit06/toolkitpages/module4/20Sup
plementaryInformation/4S04%20Quantity%20surveyor%20v4-0.doc&ei=3Gz2VLedHs-l
REFERENCE

More Related Content

What's hot

Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Mital Damani
 
Construction project management
Construction project managementConstruction project management
Construction project managementsaif hasan
 
Slab site report
Slab site reportSlab site report
Slab site reportskmunazzar
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-IKishor Ade
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
Note on tunnel form construction
Note on tunnel form constructionNote on tunnel form construction
Note on tunnel form constructionRohanBuildersIndia
 
Low cost building materials
Low cost building materials Low cost building materials
Low cost building materials Soumitra Smart
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkAshwiniChaudhari13
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Architectural Design Process - In brief
Architectural Design Process - In briefArchitectural Design Process - In brief
Architectural Design Process - In briefSharaniSomasundaram
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Bhishma Bhatti
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures ConstructionDavid H Moloney
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methodsgayu pandian
 

What's hot (20)

Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)Construction quality control inspection program (qcip)
Construction quality control inspection program (qcip)
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Slab site report
Slab site reportSlab site report
Slab site report
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
Note on tunnel form construction
Note on tunnel form constructionNote on tunnel form construction
Note on tunnel form construction
 
Low cost building materials
Low cost building materials Low cost building materials
Low cost building materials
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickwork
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Formwork
FormworkFormwork
Formwork
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Architectural Design Process - In brief
Architectural Design Process - In briefArchitectural Design Process - In brief
Architectural Design Process - In brief
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
 

Similar to Integration Project 1 - Quantity Surveyor

PMC Proposal.docx
PMC Proposal.docxPMC Proposal.docx
PMC Proposal.docxManuSood11
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi tttDhana Lakshmi
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
Acotech Overview of cost consulting
Acotech Overview of cost consultingAcotech Overview of cost consulting
Acotech Overview of cost consultingnit4646
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi tttDhana Lakshmi
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiMd Mehadi Hasan
 
Duties and job roles of QS.pptx
Duties and job roles of QS.pptxDuties and job roles of QS.pptx
Duties and job roles of QS.pptxSagarKatole1
 

Similar to Integration Project 1 - Quantity Surveyor (20)

Ici qs
Ici qsIci qs
Ici qs
 
COMPANY PORTFOLIO
COMPANY PORTFOLIOCOMPANY PORTFOLIO
COMPANY PORTFOLIO
 
PMC .docx
PMC .docxPMC .docx
PMC .docx
 
PMC Proposal.docx
PMC Proposal.docxPMC Proposal.docx
PMC Proposal.docx
 
Construction process
Construction processConstruction process
Construction process
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Anand resume scm
Anand resume scmAnand resume scm
Anand resume scm
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
Acotech Overview of cost consulting
Acotech Overview of cost consultingAcotech Overview of cost consulting
Acotech Overview of cost consulting
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
CJM Construction Consulting Presentation
CJM Construction Consulting PresentationCJM Construction Consulting Presentation
CJM Construction Consulting Presentation
 
Donald Buchanan CV
Donald Buchanan CVDonald Buchanan CV
Donald Buchanan CV
 
Aziz updated cv
Aziz updated  cvAziz updated  cv
Aziz updated cv
 
Aziz updated cv
Aziz updated  cvAziz updated  cv
Aziz updated cv
 
Total-Project-Cost.pptx
Total-Project-Cost.pptxTotal-Project-Cost.pptx
Total-Project-Cost.pptx
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Duties and job roles of QS.pptx
Duties and job roles of QS.pptxDuties and job roles of QS.pptx
Duties and job roles of QS.pptx
 

More from Natalie Yunxian

Theories of Architecture and Urbanism Project 3
Theories of Architecture and Urbanism Project 3Theories of Architecture and Urbanism Project 3
Theories of Architecture and Urbanism Project 3Natalie Yunxian
 
Theories of Architecture and Urbanism Project 2
Theories of Architecture and Urbanism Project 2Theories of Architecture and Urbanism Project 2
Theories of Architecture and Urbanism Project 2Natalie Yunxian
 
Building Science II Project 2
Building Science II Project 2Building Science II Project 2
Building Science II Project 2Natalie Yunxian
 
Building Science ll Project 1 Report
Building Science ll Project 1 ReportBuilding Science ll Project 1 Report
Building Science ll Project 1 ReportNatalie Yunxian
 
Building Science II KLPAC
Building Science II KLPAC Building Science II KLPAC
Building Science II KLPAC Natalie Yunxian
 
Food and Culture Photobook
Food and Culture PhotobookFood and Culture Photobook
Food and Culture PhotobookNatalie Yunxian
 
Food and Culture Research Proposal
Food and Culture Research ProposalFood and Culture Research Proposal
Food and Culture Research ProposalNatalie Yunxian
 
Architecture Conservation Essay
Architecture Conservation EssayArchitecture Conservation Essay
Architecture Conservation EssayNatalie Yunxian
 
Architecture Conservation Project 2 Report
Architecture Conservation Project 2 ReportArchitecture Conservation Project 2 Report
Architecture Conservation Project 2 ReportNatalie Yunxian
 
Architecture Conservation Project 2 Presentation Slides
Architecture Conservation Project 2 Presentation SlidesArchitecture Conservation Project 2 Presentation Slides
Architecture Conservation Project 2 Presentation SlidesNatalie Yunxian
 
Architecture Conservation Project 1 Presentation Slides
Architecture Conservation Project 1 Presentation SlidesArchitecture Conservation Project 1 Presentation Slides
Architecture Conservation Project 1 Presentation SlidesNatalie Yunxian
 
Methods of Documentation RSC Final Report
Methods of Documentation RSC Final ReportMethods of Documentation RSC Final Report
Methods of Documentation RSC Final ReportNatalie Yunxian
 
Building Construction I Project 1 Compilation
Building Construction I Project 1 CompilationBuilding Construction I Project 1 Compilation
Building Construction I Project 1 CompilationNatalie Yunxian
 
Shah Alam Botanical Garden Site Analysia Group A
Shah Alam Botanical Garden Site Analysia Group AShah Alam Botanical Garden Site Analysia Group A
Shah Alam Botanical Garden Site Analysia Group ANatalie Yunxian
 
Design Communication Module Outline
Design Communication Module OutlineDesign Communication Module Outline
Design Communication Module OutlineNatalie Yunxian
 
Introduction to Design Final Project
Introduction to Design Final ProjectIntroduction to Design Final Project
Introduction to Design Final ProjectNatalie Yunxian
 
Introduction to Design Project 2 Brief
Introduction to Design Project 2 BriefIntroduction to Design Project 2 Brief
Introduction to Design Project 2 BriefNatalie Yunxian
 

More from Natalie Yunxian (20)

Theories of Architecture and Urbanism Project 3
Theories of Architecture and Urbanism Project 3Theories of Architecture and Urbanism Project 3
Theories of Architecture and Urbanism Project 3
 
Theories of Architecture and Urbanism Project 2
Theories of Architecture and Urbanism Project 2Theories of Architecture and Urbanism Project 2
Theories of Architecture and Urbanism Project 2
 
Building Science II Project 2
Building Science II Project 2Building Science II Project 2
Building Science II Project 2
 
Building Science ll Project 1 Report
Building Science ll Project 1 ReportBuilding Science ll Project 1 Report
Building Science ll Project 1 Report
 
Building Science II KLPAC
Building Science II KLPAC Building Science II KLPAC
Building Science II KLPAC
 
Food and Culture Photobook
Food and Culture PhotobookFood and Culture Photobook
Food and Culture Photobook
 
Food and Culture Research Proposal
Food and Culture Research ProposalFood and Culture Research Proposal
Food and Culture Research Proposal
 
Architecture Conservation Essay
Architecture Conservation EssayArchitecture Conservation Essay
Architecture Conservation Essay
 
Architecture Conservation Project 2 Report
Architecture Conservation Project 2 ReportArchitecture Conservation Project 2 Report
Architecture Conservation Project 2 Report
 
Architecture Conservation Project 2 Presentation Slides
Architecture Conservation Project 2 Presentation SlidesArchitecture Conservation Project 2 Presentation Slides
Architecture Conservation Project 2 Presentation Slides
 
Architecture Conservation Project 1 Presentation Slides
Architecture Conservation Project 1 Presentation SlidesArchitecture Conservation Project 1 Presentation Slides
Architecture Conservation Project 1 Presentation Slides
 
RSC Photobook
RSC PhotobookRSC Photobook
RSC Photobook
 
Complete Drawings
Complete DrawingsComplete Drawings
Complete Drawings
 
Methods of Documentation RSC Final Report
Methods of Documentation RSC Final ReportMethods of Documentation RSC Final Report
Methods of Documentation RSC Final Report
 
Dewan Tunku Canselor
Dewan Tunku CanselorDewan Tunku Canselor
Dewan Tunku Canselor
 
Building Construction I Project 1 Compilation
Building Construction I Project 1 CompilationBuilding Construction I Project 1 Compilation
Building Construction I Project 1 Compilation
 
Shah Alam Botanical Garden Site Analysia Group A
Shah Alam Botanical Garden Site Analysia Group AShah Alam Botanical Garden Site Analysia Group A
Shah Alam Botanical Garden Site Analysia Group A
 
Design Communication Module Outline
Design Communication Module OutlineDesign Communication Module Outline
Design Communication Module Outline
 
Introduction to Design Final Project
Introduction to Design Final ProjectIntroduction to Design Final Project
Introduction to Design Final Project
 
Introduction to Design Project 2 Brief
Introduction to Design Project 2 BriefIntroduction to Design Project 2 Brief
Introduction to Design Project 2 Brief
 

Recently uploaded

How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPCeline George
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxEduSkills OECD
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxJisc
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXMIRIAMSALINAS13
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleCeline George
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfjoachimlavalley1
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismDeeptiGupta154
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonSteve Thomason
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfVivekanand Anglo Vedic Academy
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationDelapenabediema
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfkaushalkr1407
 
plant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated cropsplant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated cropsparmarsneha2
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativePeter Windle
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chipsGeoBlogs
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxakshayaramakrishnan21
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportAvinash Rai
 

Recently uploaded (20)

How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
plant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated cropsplant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated crops
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptx
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
NCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdfNCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdf
 

Integration Project 1 - Quantity Surveyor

  • 1. INTRODUCTION TO DRAWING ❃ INTRODUCTION TO CONSTRUCTION INDUSTRY ❃ ENGLISH MODULE 1 CHA YUN XIAN EE HUI TENG CHLOE SIM TIING ERN ANGELA WEE KAH MAN FIONA CHIMWEMWE CHIUDZU CHIA KEH CHIAN HONG SEO TAEK
  • 2. WHO ARE THE PROFESSIONALS WE NEED IN A CONSTRUCTION SITE?
  • 4.
  • 5. RESPONSIBILIITIES OF A QUANTITY SURVEYOR
  • 6. COST PLANNING ⍢ Budget estimating ⍢ Cost planning ⍢ Make sure project is kept within budget
  • 7. COMMERCIAL MANAGEMENT ⍢ responsible for overseeing many different aspects of a company ⍢ managing risks, overseeing employee performance, negotiating contracts & planning individual projects
  • 8. PROCUREMENT ADVICE ⍢ process includes preparation and processing of a demand ⍢ able to advise clients ⍢ determine if operations will continue
  • 9. VALUE ENGINEERING ⍢ minimise the cost of a project ⍢ enhance value for money while still achieving the required standard and quality ⍢ promotes substitution of materials & methods with less expensive alternatives
  • 10. PREPARE BILL OF QUANTITIES ⍢ make cost feasibility studies, establish construction budget ⍢ objective of bill of quantities : - To provide sufficient info on the quantities of works to be done to allow bids to be prepared accurately
  • 11. ALLOCATE WORK TO SUBCONTRACTORS ⍢ interact with the site employees and employees from subcontract organisations ⍢ value completed work ⍢ arrange payment ⍢ approve payments made once the works are done
  • 12. SCOPE OF WORK & TASKS AT DIFFERENT STAGES OF CONSTRUCTION
  • 14. STAGE 1 : ESTIMATING & COST ADVICE Receiving instruction from the employer, advising on various courses of action and procedures to suit the particular requirements of the Project. Financial design criteria advice Preliminary and comprehensive estimates of construction cost Other cost advice
  • 15. STAGE 2: DOCUMENTATION AND PROCUREMENT • Preparing documents for procurement of construction contracts • Soliciting tender offers • Financially evaluating and reporting on tender offers • Examining and verifying priced documents
  • 16. STAGE 3 : CONTRACT ADMINISTRATION
  • 17. Preparing the procurement documentation for subcontracts Examining and reporting on tender offers for subcontracts, including financial comparisons with budget. Preparing schedules of predicted cash flows. Attending progress meetings on site at reasonable intervals to suit the nature and size of the Project in order Attending other meetings at reasonable intervals to suit the nature and size of the Project Preparing valuations for the issue of payment certificates Preparing cost estimates for proposed variations for Employer decision-making. Maintaining a running financial management statement and monitoring against the financial budget. Proceeding with preparing the final account. Adjudicating and resolving the financial and contractual aspects of claims between the Employer and the contractor,
  • 18. STAGE 4 : FINAL ACCOUNT Determining and agreeing all variations and adjustments for incorporation into the final account. Agreeing and finalizing all subcontracts and adjusting against provisional sums. Concluding the final account, including fluctuations in costs (if applicable). Preparing and presenting the final account to the Employer, including any necessary reconciliations and explanations against the financial budget.
  • 19. DRAWINGS THAT A QS REFERS TO
  • 20.  Project drawings provided by the architect, typically showing the floor plan ;elevations; finish schedules; and details of moldings, cabinetry, doors, and other such matters necessary for the builder to order the proper materials for construction.
  • 21.  Drawings, usually prepared by a structural engineers, of the design and working drawings of a building’s
  • 22.  An itemized list of materials, parts, and labor (with their costs) required to construct, maintain, or repair a specific structure. Bill of quantity is to:  Assist with the agreement of the contract sum with the successful tenderer.  Provide a schedule of rates assisting with the valuation of variations.  Provide a basis for the valuation of interim payments.  Provide a basis for the preparation of the final account.
  • 23.
  • 24.
  • 25. Cartlidge, D. (2012). Quantity Surveyors Pocket Book 2nd Edition. Routledge. SMM7: Standard method of measurement of building works : Authorised by agreement between the Royal Institution of Chartered Surveyors and the Building Employers Confederation. (7th ed.). (1988). London: Royal Institution of Chartered Surveyors. http://www.rics.org/uk/shop/SMM7-Standard-Method-of-Measurement-for-Building- Works.aspx SAMPLE GENERIC SCOPE OF WORK FOR PROFESSIONAL SERVICES. (2003, April). from http://www.google.com.my/url?sa=t&rct=j&q=&esrc=s&source=web&cd=2&cad=rja&uact =8&ved=0CCUQFjAB&url=http://www.cidb.org.za/toolkit06/toolkitpages/module4/20Sup plementaryInformation/4S04%20Quantity%20surveyor%20v4-0.doc&ei=3Gz2VLedHs-l REFERENCE