Eng. Kishor K. Ade
UNIT-I
Eng. Kishor K. Ade
UNIT-I SPECIFICATION
1.4 Definition, need & importance of Specification
writing
1.5 Relation with working drawing, bill of
quantities, schedule of rates
1.6 Specification as a integral part of contract
document
Syllabus
Eng. Kishor K. Ade
What is Specification?
 Introduction
 A Specification is a specific description of a particular subject. An
engineering specification contains detailed description of all
workmanship and materials which are required to complete an
engineering project in accordance with its drawings and details.
 The technical drawings of a structure will show the proportion and
relative positions of the various components of the structure.
 Many a time it is not possible to furnish the information on the
drawings, regarding the quality of materials to be used and the quality
of workmanship to be achieved during construction, due to Shortage of
space.
 This data regarding the materials and workmanship is conveyed in a
separate contract document which is known as the “Specification” for
the work.
 Thus the drawing with the specification “will completely define the
structure.” The “Specification” is furnished separately along with
drawing and is an essential part of all engineering contracts.
Eng. Kishor K. Ade
Necessity of Specifications
The cost of an unit quantity of work is governed by its
specification.
Specification is an essential contract document and is
required for Arbitration or court cases.
The necessity of specification is to verity and check the
strength of materials for a work involved in a project.
Specification is necessary to specify the equipments,
tools and plants to be engaged for a work and thus
enable to procure them beforehand.
A work is carried out according to its specification and
the contractor is paid for the same, Any change in
specification changes the tendered rate.
Eng. Kishor K. Ade
Cont…..
 This also specifies the workmanship and the method of doing
the work. Thus specification of work serves as a guide to the
supervising staff of the contractor as well as to the owner to
execute the work to their satisfaction.
 As the rate of work is based on specification a contractor can
calculate the rates of various items of works in a tender with his
procurement rates of materials and labour. Thus tender paper
without specifications of works is baseless, incomplete and
invalid.
 Specifications of work are required to describe the quality and
quantity of different materials required for a construction work
and is one of the essential contract documents. Thus a
contractor can make a programme to procure the materials
required for a project and the owner can check the quality of
materials conforming to the specification avoiding dispute with
contractor.
Eng. Kishor K. Ade
How to write specification?
Description of materials:
The quality and size of materials required to do an item of work shall
be fully described for checking up at site according to the bindings
provided in the specification. The proportion of mixing or treatment
of materials if required before use shall be clearly described.
 Workmanship:
Complete description of workmanship, the method of mixing to the
proportion, the method of laying, preparation of base or surface,
compaction, finishing and curing etc. specifically applicable to the
item of work shall be clearly stated in different clauses.
 Tools and plants (T.&P.):
The tools and plants to be engaged to carry out a work shall be
described. The method of operation and by whom to be supplied
shall be stated.
Eng. Kishor K. Ade
Cont….
Protection of new work:
The method of protection of new works against damage or the method
of curing if required, the test of completed work if necessary shall be
described in separate clauses.
 Expression:
While writing a specification Endeavour shall be made to express the
requirements of the specification clearly and in concise from
avoiding repetition and unusual works. The style of tense shall
remain same throughout. The sentences shall be short, simple and
concise. As the specifications are the legal documents, terms such as
suitable, proper used and works having more than one meaning
shall be avoided.
 Clause of the specification:
The clauses shall be arranged in the order in which work shall be
carried out.
Eng. Kishor K. Ade
Types Of Specifications
 General specification
i. In general specifications, nature and class of works names of
materials and proportion that should be used in the various items
of works are described.
ii. Only a brief description of each and every item is given. It is
useful for estimating the project.
iii. Without going through the lengthy detailed specifications,
general information for the quantities of materials, nature and
class of work can be known from the general specifications, but
they do not form part of the contract document.
Eng. Kishor K. Ade
Cont….
 Detailed specification
i. The detailed specifications form a part of the contract document.
Detailed specification for a particular items specify the qualities,
quantities and proportions of materials, and the method of
preparation and execution for that particular item of work in a
project.
ii. The detailed specifications of the different items of works are
prepared separately and they describe what the works should be
and how they shall be executed and constructed physical, chemical
and electrical tests if any requires for the finished work to ensure
the desired strength or quality are specified in the detailed
specification.
iii. They of machinery, equipments and special tools and plant their
methods of operation when involved during execution are
described in the detailed specification.
Eng. Kishor K. Ade
Cont….
iv. The method and duration of protection of finished works as
required are specified in the detailed specification.
v. This also specify the involvements and responsibility for
auxiliary works, incidental damage etc.
vi. During execution of the original work. While writing the
detailed specifications the same order of sequence as the
work is to be carried out, is maintained.
vii. Engineering departments maintain detail specifications for
different items of work those are followed to carry out work.
Eng. Kishor K. Ade
What is working Drawing?
Eng. Kishor K. Ade
Relation with working drawing with Specification
writing…
Eng. Kishor K. Ade
Cont..
Eng. Kishor K. Ade
Bill of Quantity (BOQ)
Bill of Quantities or Schedule of Quantities-
• This is a complete list of all items of work involved in connection
with the estimate for a project with the description, quantity and
unit of rate against each item of work.
• These are filled up in a tabular form similar to the abstract of
estimated cost but the rate and amount column remain blank.
• The bill of quantities when multiplied by the corresponding rates
of the items and totalled, gives the estimated cost of the project.
Such a bill of quantities is provided in a tender form for item rate
tenders.
• Contractors put up their own competitive rates and calculate the
totals to offer their estimated amount to complete the whole work.
• The bill of quantities is also required to calculate the quantities of
different materials required for the project.
Eng. Kishor K. Ade
Schedule of Rates
Schedule of Rates-
• To facilitate the preparation of estimates, and also to serve as
a guide in setting rates in construction with contract
agreements, a schedule of rates for each kind of work
commonly executed (viz. works, materials, wages of labour,
transport etc.) should be maintained by different engineering
departments or authorised organization and kept up to date.
• This is prepared on the basis of the rates prevailing in each
locality including the cost of transport and profit. All rates
should be inclusive of labour, materials and unless specifically
mentioned otherwise should include all charges like tool, ferry
charge, local charges, income tax, sales tax, Royalties etc.
• As many have to be incurred by the contractor for getting the
respective items of works executed to proper
Eng. Kishor K. Ade
Cont….
Order and complete and finish.
• Unless specifically mentioned otherwise in the description of
the item itself, no extra charges should be paid for scaffolding
(including stage scaffolding), centering shuttering, curing etc.
• and the rates are to be deemed to be inclusive of the same. In
the schedule necessary analysis of the rates for the varying
conditions should be provided.
Eng. Kishor K. Ade
Contract Documents
Contract Documents-
• When a work , other than a petty work which is to be executed
under the work order system, is proposed to be given out on
contract, the Engineer-in-Charge (on behalf of the owner)
prepares ‘contract documents.’
• Both the parties entering into a contract must put their signatures
on each page of the contract documents and, in the case of sealed
contract, their seals under each signature.
• Special care shall be taken to see that all corrections, additions,
alteration, omissions, over- writings or slips attached to the
agreements are duly signed or initialled by the contractor and the
accepting authority.
• In case the contractor fails to sign the above particular it may
result in disputes and disregarding claims of the Department.
Eng. Kishor K. Ade
Eng. Kishor K. Ade
Eng. Kishor K. Ade
Thank You
REFERENCE-
ESTIMATING,COSTING,SPECIFICATION &VALUATION IN CIVIL ENGINEERING, BY M. CHAKRABORTI

More Related Content

What's hot

Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
Kailash Chander
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
Simarpreet Singh
 
Unit-4_Specification
Unit-4_SpecificationUnit-4_Specification
Unit-4_Specification
Akash Bharti
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
Simarpreet Singh
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
srinivas2036
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
Ganesh Tatikonda
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
anbukkarasi dhuraisamy
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
Simarpreet Singh
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
Construction Tech. and Mgmt., VNIT Nagpur
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
gayu pandian
 
Tender
TenderTender
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
Rajat Nainwal
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
Prabhat chhirolya
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.Satyaki Sikdar
 
Defects in construction
Defects in constructionDefects in construction
Defects in construction
Shivangi Saini
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
Ravi Savani
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
Ar.Vijay Kumar
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
Namrata Agnihotri
 

What's hot (20)

Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Unit-4_Specification
Unit-4_SpecificationUnit-4_Specification
Unit-4_Specification
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
 
Tender
TenderTender
Tender
 
Introduction To Building Services
Introduction To Building ServicesIntroduction To Building Services
Introduction To Building Services
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.
 
Defects in construction
Defects in constructionDefects in construction
Defects in construction
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 

Similar to Specification writing-I

15CV81-Module-3.pdf
15CV81-Module-3.pdf15CV81-Module-3.pdf
15CV81-Module-3.pdf
ReenaraniMalik
 
estimating and costing specification ppt -.pptx
estimating and costing  specification ppt -.pptxestimating and costing  specification ppt -.pptx
estimating and costing specification ppt -.pptx
AshishJadhav655553
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
Saqib Imran
 
Specification Handout for 4th year civil engineering students
Specification Handout for 4th year civil engineering studentsSpecification Handout for 4th year civil engineering students
Specification Handout for 4th year civil engineering students
abrahaam21astu
 
Specification of Work in Estimation and Accounts (EA)
Specification of Work in Estimation and Accounts (EA)Specification of Work in Estimation and Accounts (EA)
Specification of Work in Estimation and Accounts (EA)
Vasu Goel
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
LAKSHITHA RAJAPAKSHA
 
Specifications
SpecificationsSpecifications
Specifications
fenta dejene
 
Specification- Contracts, Accounts and Tenders.pptx
Specification- Contracts, Accounts and Tenders.pptxSpecification- Contracts, Accounts and Tenders.pptx
Specification- Contracts, Accounts and Tenders.pptx
Vinod Nejkar
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
AprilRosal1
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Lec - 2.ppt ganbella university quantity estimta
Lec - 2.ppt ganbella university quantity estimtaLec - 2.ppt ganbella university quantity estimta
Lec - 2.ppt ganbella university quantity estimta
2cd
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
Nikhil Kumar
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
Vj NiroSh
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
R.R.G.S Bandara
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 
Spec
SpecSpec
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdfUAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
josephiigo
 
1.Cost Estimation of Civil Structures Orientation.pptx
1.Cost Estimation of Civil Structures Orientation.pptx1.Cost Estimation of Civil Structures Orientation.pptx
1.Cost Estimation of Civil Structures Orientation.pptx
VenkataRamana602302
 
contracts-unit 3.ppt
contracts-unit 3.pptcontracts-unit 3.ppt
contracts-unit 3.ppt
mayuray
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
Himani762003
 

Similar to Specification writing-I (20)

15CV81-Module-3.pdf
15CV81-Module-3.pdf15CV81-Module-3.pdf
15CV81-Module-3.pdf
 
estimating and costing specification ppt -.pptx
estimating and costing  specification ppt -.pptxestimating and costing  specification ppt -.pptx
estimating and costing specification ppt -.pptx
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
 
Specification Handout for 4th year civil engineering students
Specification Handout for 4th year civil engineering studentsSpecification Handout for 4th year civil engineering students
Specification Handout for 4th year civil engineering students
 
Specification of Work in Estimation and Accounts (EA)
Specification of Work in Estimation and Accounts (EA)Specification of Work in Estimation and Accounts (EA)
Specification of Work in Estimation and Accounts (EA)
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
Specifications
SpecificationsSpecifications
Specifications
 
Specification- Contracts, Accounts and Tenders.pptx
Specification- Contracts, Accounts and Tenders.pptxSpecification- Contracts, Accounts and Tenders.pptx
Specification- Contracts, Accounts and Tenders.pptx
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Lec - 2.ppt ganbella university quantity estimta
Lec - 2.ppt ganbella university quantity estimtaLec - 2.ppt ganbella university quantity estimta
Lec - 2.ppt ganbella university quantity estimta
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
Spec
SpecSpec
Spec
 
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdfUAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
UAP Doc. 301BBBBBBBBBBBBBBBBBBBBBBBBB.pdf
 
1.Cost Estimation of Civil Structures Orientation.pptx
1.Cost Estimation of Civil Structures Orientation.pptx1.Cost Estimation of Civil Structures Orientation.pptx
1.Cost Estimation of Civil Structures Orientation.pptx
 
contracts-unit 3.ppt
contracts-unit 3.pptcontracts-unit 3.ppt
contracts-unit 3.ppt
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
 

More from Kishor Ade

Motivation
MotivationMotivation
Motivation
Kishor Ade
 
Contouring
ContouringContouring
Contouring
Kishor Ade
 
Balbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavitaBalbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavita
Kishor Ade
 
THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]
Kishor Ade
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
Kishor Ade
 
First lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college PuneFirst lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college Pune
Kishor Ade
 
Demolition work of existing building
Demolition work of existing buildingDemolition work of existing building
Demolition work of existing building
Kishor Ade
 
Levelling
LevellingLevelling
Levelling
Kishor Ade
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
Kishor Ade
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
Kishor Ade
 
Compass surveying
Compass surveying Compass surveying
Compass surveying
Kishor Ade
 
Natural Beauty of India...............!
Natural Beauty of India...............!Natural Beauty of India...............!
Natural Beauty of India...............!
Kishor Ade
 
Life will be never ending..........!
Life will be never ending..........!Life will be never ending..........!
Life will be never ending..........!
Kishor Ade
 
Structures-V
Structures-VStructures-V
Structures-V
Kishor Ade
 
Specification Writing-I
Specification Writing-I Specification Writing-I
Specification Writing-I
Kishor Ade
 
Research Methodology Module-08
Research Methodology Module-08Research Methodology Module-08
Research Methodology Module-08
Kishor Ade
 
Research Methodology Module-07
Research Methodology Module-07Research Methodology Module-07
Research Methodology Module-07
Kishor Ade
 
Research Methodology Module-06
Research Methodology Module-06Research Methodology Module-06
Research Methodology Module-06
Kishor Ade
 
Research Methodology Module-05
Research Methodology Module-05Research Methodology Module-05
Research Methodology Module-05
Kishor Ade
 
Research Methodology Module-04
Research Methodology Module-04Research Methodology Module-04
Research Methodology Module-04
Kishor Ade
 

More from Kishor Ade (20)

Motivation
MotivationMotivation
Motivation
 
Contouring
ContouringContouring
Contouring
 
Balbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavitaBalbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavita
 
THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
First lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college PuneFirst lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college Pune
 
Demolition work of existing building
Demolition work of existing buildingDemolition work of existing building
Demolition work of existing building
 
Levelling
LevellingLevelling
Levelling
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Compass surveying
Compass surveying Compass surveying
Compass surveying
 
Natural Beauty of India...............!
Natural Beauty of India...............!Natural Beauty of India...............!
Natural Beauty of India...............!
 
Life will be never ending..........!
Life will be never ending..........!Life will be never ending..........!
Life will be never ending..........!
 
Structures-V
Structures-VStructures-V
Structures-V
 
Specification Writing-I
Specification Writing-I Specification Writing-I
Specification Writing-I
 
Research Methodology Module-08
Research Methodology Module-08Research Methodology Module-08
Research Methodology Module-08
 
Research Methodology Module-07
Research Methodology Module-07Research Methodology Module-07
Research Methodology Module-07
 
Research Methodology Module-06
Research Methodology Module-06Research Methodology Module-06
Research Methodology Module-06
 
Research Methodology Module-05
Research Methodology Module-05Research Methodology Module-05
Research Methodology Module-05
 
Research Methodology Module-04
Research Methodology Module-04Research Methodology Module-04
Research Methodology Module-04
 

Recently uploaded

Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
AzmatAli747758
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
GeoBlogs
 

Recently uploaded (20)

Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 

Specification writing-I

  • 1. Eng. Kishor K. Ade UNIT-I
  • 2. Eng. Kishor K. Ade UNIT-I SPECIFICATION 1.4 Definition, need & importance of Specification writing 1.5 Relation with working drawing, bill of quantities, schedule of rates 1.6 Specification as a integral part of contract document Syllabus
  • 3. Eng. Kishor K. Ade What is Specification?  Introduction  A Specification is a specific description of a particular subject. An engineering specification contains detailed description of all workmanship and materials which are required to complete an engineering project in accordance with its drawings and details.  The technical drawings of a structure will show the proportion and relative positions of the various components of the structure.  Many a time it is not possible to furnish the information on the drawings, regarding the quality of materials to be used and the quality of workmanship to be achieved during construction, due to Shortage of space.  This data regarding the materials and workmanship is conveyed in a separate contract document which is known as the “Specification” for the work.  Thus the drawing with the specification “will completely define the structure.” The “Specification” is furnished separately along with drawing and is an essential part of all engineering contracts.
  • 4. Eng. Kishor K. Ade Necessity of Specifications The cost of an unit quantity of work is governed by its specification. Specification is an essential contract document and is required for Arbitration or court cases. The necessity of specification is to verity and check the strength of materials for a work involved in a project. Specification is necessary to specify the equipments, tools and plants to be engaged for a work and thus enable to procure them beforehand. A work is carried out according to its specification and the contractor is paid for the same, Any change in specification changes the tendered rate.
  • 5. Eng. Kishor K. Ade Cont…..  This also specifies the workmanship and the method of doing the work. Thus specification of work serves as a guide to the supervising staff of the contractor as well as to the owner to execute the work to their satisfaction.  As the rate of work is based on specification a contractor can calculate the rates of various items of works in a tender with his procurement rates of materials and labour. Thus tender paper without specifications of works is baseless, incomplete and invalid.  Specifications of work are required to describe the quality and quantity of different materials required for a construction work and is one of the essential contract documents. Thus a contractor can make a programme to procure the materials required for a project and the owner can check the quality of materials conforming to the specification avoiding dispute with contractor.
  • 6. Eng. Kishor K. Ade How to write specification? Description of materials: The quality and size of materials required to do an item of work shall be fully described for checking up at site according to the bindings provided in the specification. The proportion of mixing or treatment of materials if required before use shall be clearly described.  Workmanship: Complete description of workmanship, the method of mixing to the proportion, the method of laying, preparation of base or surface, compaction, finishing and curing etc. specifically applicable to the item of work shall be clearly stated in different clauses.  Tools and plants (T.&P.): The tools and plants to be engaged to carry out a work shall be described. The method of operation and by whom to be supplied shall be stated.
  • 7. Eng. Kishor K. Ade Cont…. Protection of new work: The method of protection of new works against damage or the method of curing if required, the test of completed work if necessary shall be described in separate clauses.  Expression: While writing a specification Endeavour shall be made to express the requirements of the specification clearly and in concise from avoiding repetition and unusual works. The style of tense shall remain same throughout. The sentences shall be short, simple and concise. As the specifications are the legal documents, terms such as suitable, proper used and works having more than one meaning shall be avoided.  Clause of the specification: The clauses shall be arranged in the order in which work shall be carried out.
  • 8. Eng. Kishor K. Ade Types Of Specifications  General specification i. In general specifications, nature and class of works names of materials and proportion that should be used in the various items of works are described. ii. Only a brief description of each and every item is given. It is useful for estimating the project. iii. Without going through the lengthy detailed specifications, general information for the quantities of materials, nature and class of work can be known from the general specifications, but they do not form part of the contract document.
  • 9. Eng. Kishor K. Ade Cont….  Detailed specification i. The detailed specifications form a part of the contract document. Detailed specification for a particular items specify the qualities, quantities and proportions of materials, and the method of preparation and execution for that particular item of work in a project. ii. The detailed specifications of the different items of works are prepared separately and they describe what the works should be and how they shall be executed and constructed physical, chemical and electrical tests if any requires for the finished work to ensure the desired strength or quality are specified in the detailed specification. iii. They of machinery, equipments and special tools and plant their methods of operation when involved during execution are described in the detailed specification.
  • 10. Eng. Kishor K. Ade Cont…. iv. The method and duration of protection of finished works as required are specified in the detailed specification. v. This also specify the involvements and responsibility for auxiliary works, incidental damage etc. vi. During execution of the original work. While writing the detailed specifications the same order of sequence as the work is to be carried out, is maintained. vii. Engineering departments maintain detail specifications for different items of work those are followed to carry out work.
  • 11. Eng. Kishor K. Ade What is working Drawing?
  • 12. Eng. Kishor K. Ade Relation with working drawing with Specification writing…
  • 13. Eng. Kishor K. Ade Cont..
  • 14. Eng. Kishor K. Ade Bill of Quantity (BOQ) Bill of Quantities or Schedule of Quantities- • This is a complete list of all items of work involved in connection with the estimate for a project with the description, quantity and unit of rate against each item of work. • These are filled up in a tabular form similar to the abstract of estimated cost but the rate and amount column remain blank. • The bill of quantities when multiplied by the corresponding rates of the items and totalled, gives the estimated cost of the project. Such a bill of quantities is provided in a tender form for item rate tenders. • Contractors put up their own competitive rates and calculate the totals to offer their estimated amount to complete the whole work. • The bill of quantities is also required to calculate the quantities of different materials required for the project.
  • 15. Eng. Kishor K. Ade Schedule of Rates Schedule of Rates- • To facilitate the preparation of estimates, and also to serve as a guide in setting rates in construction with contract agreements, a schedule of rates for each kind of work commonly executed (viz. works, materials, wages of labour, transport etc.) should be maintained by different engineering departments or authorised organization and kept up to date. • This is prepared on the basis of the rates prevailing in each locality including the cost of transport and profit. All rates should be inclusive of labour, materials and unless specifically mentioned otherwise should include all charges like tool, ferry charge, local charges, income tax, sales tax, Royalties etc. • As many have to be incurred by the contractor for getting the respective items of works executed to proper
  • 16. Eng. Kishor K. Ade Cont…. Order and complete and finish. • Unless specifically mentioned otherwise in the description of the item itself, no extra charges should be paid for scaffolding (including stage scaffolding), centering shuttering, curing etc. • and the rates are to be deemed to be inclusive of the same. In the schedule necessary analysis of the rates for the varying conditions should be provided.
  • 17. Eng. Kishor K. Ade Contract Documents Contract Documents- • When a work , other than a petty work which is to be executed under the work order system, is proposed to be given out on contract, the Engineer-in-Charge (on behalf of the owner) prepares ‘contract documents.’ • Both the parties entering into a contract must put their signatures on each page of the contract documents and, in the case of sealed contract, their seals under each signature. • Special care shall be taken to see that all corrections, additions, alteration, omissions, over- writings or slips attached to the agreements are duly signed or initialled by the contractor and the accepting authority. • In case the contractor fails to sign the above particular it may result in disputes and disregarding claims of the Department.
  • 20. Eng. Kishor K. Ade Thank You REFERENCE- ESTIMATING,COSTING,SPECIFICATION &VALUATION IN CIVIL ENGINEERING, BY M. CHAKRABORTI