Measurement 1 [QSB 60104]- Sr. Ang Fuey Lin
Building Materials [BLD 62003]- Puan Hasmanira Mokhtar
Construction Technology [BLD 60104]- Mr. Leong Boon Tik
Assignment: Site Visit Report
Name: Tan Chuu Yee
Student ID: 0315097
2
Table of Content
Cover page---------------------------------------------------------------------------------------------- 1
Table of content-----------------------------------------------------------------------------------------2
Introduction--------------------------------------------------------------------------------------------- 3
Content-------------------------------------------------------------------------------------------------- 4
Objective--------------------------------------------------------------------------------------------------5
Project summary----------------------------------------------------------------------------------------6
Photos and descriptions--------------------------------------------------------------------------7-16
Conclusion---------------------------------------------------------------------------------------------17
3
Introduction
On 20 th of June 2014, along with my course mates, we went for a construction site
which organized by our lecture (Ms.Ang) to visit the actual working environment on
site that located at Jalan Klang Lama, Mukim Petaling. It is somewhere nearby the
Pearl International Hotel Kuala Lumpur prides. The main contractor of this project is
Encorp Construct Sdn. Bhd. On 26 th December 2013, Encorp secured a contract
from Aik Bee Sdn Bhd on the construction and completion of main contract works for
a 25-storey mixed- use development construction project. Construction is expected
to be completed by November 2015.
The size of the land is roughly 1 acres and the only one block that come with 25
level. It was a two years contract and the cost for this project is 101.6 million. As
research, we knew there are level 3 to 6 for car basement and for the business area
is ground first floor to second floor. Morever, the residential area is from level 7 to 24
and we authorized there are one bridge that build and combined to others building
which is pearl point.
We step into the ground floor level and then we went up to the car park on the third,
fourth and fifth floor which are meant to be the carpark for the residents.
4
Content
Firstly, we saw a continuous row of cylindrical-shaped concreteat the basement for
the carpark of this building. Mr. Chong the guy who guide us walk around the
construction building breifly explained to us that bore piilling is commonly used for
high-rise buildings especially in the Kuala Lumpur state, switching the conventional
reinforced concrete pile (RC pile). The bore piles act as a retentive wall for the
building.
In addition, when we walk around the site and there are actually plastic pipes lying
around the site and some of the pipe were installed upright and the upper suspended
slab. Mr. Chong told us those that were a pipe to transfer the concrete from the
ground floor to upper floors for convinience. The pipe able to transfer a whopping
30m cube per hour. Once raining, the concreting works are enforced to be stop as
the rainwater will insipid the concrete.
Accidently, one of my classmate has fall down on the site that near the bar benders.
That’s why we found that the bars benders bending the bars. They told me that the
bar benders had their own ways in calculating the amount of steel bars needed.
At the end we walking through the site, we went back to the ground floor of the site.
There are a cluster of concrete pieces cutting by the workers. They cut the big
pieces of concrete to small pieces and each of pieces are divided to 25mm or 50mm
thick.
Above had shown the informations of site and what we have explore on site.
5
Objective
 To help us get more thoughtful on the basics of construction process while
paying a visit to the site.
 To understand the practical aspect of construction techniques in comparison
to the theory aspect in books and its application on site.
 To let us experience the actual working environment as a quantity surveyor on
site dealing with the uncertain circumstance such as the weather condition
and the risks that may take place on the site.
 Awareness the importance of personal safety on site, and the safety
precautions that we need to take in order to avoid get injured or accidents
from happening. For instance, we are required to wear safety helmet when
visit the site.
 Explore and identify the various type of building materials and type of
technology used in construction while constructing a building.
 Upsurge our knowledge on the basic construction process by observing the
building team and gathering information on the actual practise that carried on
the site.
 Observe the usage of machinery at the construction site such as mechanical
plants, concrete mixer, bar bending machine and excavator.
 Recognize the construction drawings and details given based on the items
measurable for sub-structure and reinforced concrete frame works.
6
Project summary
The summary of the project is written below:
Project Title: Cadangan membina 1 blok bangunan bercampur 25 tingkat
mengandungi tempat letak kereta di tingkat basemen 1 dan 2. Ruang perdagangan
di tingkat bawah 1 dan 2.Tempat letak kereta di tingkat 3 hingga 6. Unit pagsapuri
(403 unit) di tingkat 7 hingga 24. Binaan jejantas di tingkat satu bersambungan
dengan bangunan Pearl Point sedia ada di jalan sepadu. Di atas lot 8354 (Lot asal
7517) & 9757,Batu 5, Jalan Klang Lama, Mukim Petaling, Kuala Lumpur.
For Pearl Suria.
Contract value: 101.6 million
Commencement date: 26th december 2013
Audit date: November 2015
Client: Aikbee timbers
Architecture: Lt Leong Sekudu
Main contractor: Encorp construct sdn bhd
7
Photos and descriptions
Various types of links, hooks and stirrups
Workers making fillings for the formwork of staircase
8
Pipes structure on the roof beam
The first step to steel building assembly is slab of concrete
9
Two types of scaffoldings (Putlog and Independent)
Independent scaffold
Putlog scaffold
10
Pipe for transfer the concrete to each level
Picture shown the plan of the building construction
11
Timber are used as formwork in construction of staircase
Bar cutting machine is used to cut down the 12m high tensile steel rods into certain
length
12
Temporary building built for contractors, engineers & quantity surveyors to make
discussions. It also acts as safety workshop to remind the visitors or clients to take
safety precautions
Date and work done during the construction process are recorded for referencing
13
Importance of safety on site (Sign Boards)
Steel bar come out from the column
14
Bore pile under construction building
Bend bar from the floor
15
Various types of building materials
Steel Pipe
Fittings and Pipes (For hot and cold water piping systems)
16
‘DHI’ hubless cast iron drainage pipes and fittings
High impact uPVC conduit
17
Conclusion
After visiting the construction site, I fully understand the practical aspect of
construction techniques in comparison to the theory aspect in books and its
application. It is a lot more tougher than I thought. There is the different between
woking on site, its helps me to gain more knowledge and the real experience that we
will never learn in the class. At site, I had learnt about to be patient as we have to
work under an uncertainly circumstances, especially the weather. However, I had
learnt also how to communicate with the constructionteam members on site to see
how importance of teamwork in the building team and also try to overcome the
problems faced during the construction process.
In the lifestyle of university, we only learn the new knowledge by memorizing the
important points or doing tutorial questions to improve ourself for getting a good
result for the next test or examination but as I knew that the real exam we will face is
during our actual working in a company. That’s why we don’t really know how does it
feel like when we starts to work outside and experience the actual working
environmant.
Last but not least, I had gained knowledge and understood about the basic of
construction process, the communication of team work between members,
experienced the actual working environment, the usage of machinery equipment,
able to know what type of construction technology is adopted, able to differenciate
the varius type of building materials used in the constructions and others.
Honestly, the site visits strictly brought lot of benefits to me as it preparing me to
overcome more troubles which may occur in the future of my life. I wish I could have
more practical knowledge as it will prepare a better me during my work time in the
future.

More Related Content

What's hot

Site visit report
Site visit report Site visit report
Site visit report
Liming Hiew
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
Shao Xun Sean Thun
 
Construction site
Construction siteConstruction site
Construction site
Timun Loh
 
Building Construction 1: Project 1
Building Construction 1: Project 1Building Construction 1: Project 1
Building Construction 1: Project 1
KohSungJie
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
w ss
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
mohdasrimohdhasim
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
Nabeel Rajpoot
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
KhangWei Chin
 
BUILDING CONSTRUCTION
BUILDING CONSTRUCTIONBUILDING CONSTRUCTION
BUILDING CONSTRUCTION
Yen Min Khor
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
I'mMiss Lily
 
Apartment building construction project report
Apartment building construction project reportApartment building construction project report
Apartment building construction project report
Hiska Chishi
 
Site visit report
Site visit reportSite visit report
Site visit report
foongmei yap
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology I
kaiwenyeo
 

What's hot (20)

Site visit report
Site visit report Site visit report
Site visit report
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
Objective of site visit
Objective of site visitObjective of site visit
Objective of site visit
 
Construction site
Construction siteConstruction site
Construction site
 
Building Construction 1: Project 1
Building Construction 1: Project 1Building Construction 1: Project 1
Building Construction 1: Project 1
 
Site report
Site reportSite report
Site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
BS course bldg diagnostic
BS course bldg diagnosticBS course bldg diagnostic
BS course bldg diagnostic
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
BUILDING CONSTRUCTION
BUILDING CONSTRUCTIONBUILDING CONSTRUCTION
BUILDING CONSTRUCTION
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Apartment building construction project report
Apartment building construction project reportApartment building construction project report
Apartment building construction project report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology I
 

Similar to Site Visit Report

Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
Pui San
 
Site report
Site reportSite report
Site report
vaylu
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
Yung Kai
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
w ss
 
Site report
Site reportSite report
Site report
yongseenyee
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
Momo Poyi
 
Site visit report
Site visit reportSite visit report
Site visit report
Jordon Wong
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Site report algel
Site report algelSite report algel
Site report algelAlgel Yee
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Arthur Wilson
 
Site visit report
Site visit reportSite visit report
Site visit report
shensin1015
 
Final Report
Final Report Final Report
Final Report
Jack Ng
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
Hasif Alias
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
Lucas ChinSheng
 
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
YONG WEN TING
 
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoSite Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Chin Kian Hon
 
Ez
EzEz

Similar to Site Visit Report (20)

Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
Site report
Site reportSite report
Site report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site report
Site reportSite report
Site report
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 
Site report
Site reportSite report
Site report
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Site report algel
Site report algelSite report algel
Site report algel
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Final Report
Final Report Final Report
Final Report
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
 
Site report
Site reportSite report
Site report
 
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoSite Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia Xao
 
Ez
EzEz
Ez
 

More from ZIyeeTan

Estimating letters
Estimating lettersEstimating letters
Estimating letters
ZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Building services-report
Building services-reportBuilding services-report
Building services-report
ZIyeeTan
 
Reflective Journal about the module of Rights in Malaysia
Reflective Journal about the module of Rights in Malaysia Reflective Journal about the module of Rights in Malaysia
Reflective Journal about the module of Rights in Malaysia
ZIyeeTan
 
Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)ZIyeeTan
 
Sustainable wastewater treatment
Sustainable wastewater treatmentSustainable wastewater treatment
Sustainable wastewater treatment
ZIyeeTan
 
construction drawings
construction drawingsconstruction drawings
construction drawings
ZIyeeTan
 
Bm final assignment cgc
Bm final assignment   cgcBm final assignment   cgc
Bm final assignment cgcZIyeeTan
 
Paint info
Paint infoPaint info
Paint infoZIyeeTan
 
Type of concrete
Type of concreteType of concrete
Type of concreteZIyeeTan
 
Latest psycho final r (2)
Latest psycho final r (2)Latest psycho final r (2)
Latest psycho final r (2)ZIyeeTan
 
Personal reflection one
Personal reflection onePersonal reflection one
Personal reflection oneZIyeeTan
 
Math Report
Math ReportMath Report
Math ReportZIyeeTan
 
Account project
Account projectAccount project
Account projectZIyeeTan
 
Research proposal psy 1
Research proposal  psy 1Research proposal  psy 1
Research proposal psy 1ZIyeeTan
 
Psycho Report. Tittle: First Impression on appearance
Psycho Report. Tittle: First Impression on appearance Psycho Report. Tittle: First Impression on appearance
Psycho Report. Tittle: First Impression on appearance ZIyeeTan
 

More from ZIyeeTan (20)

Estimating letters
Estimating lettersEstimating letters
Estimating letters
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Building services-report
Building services-reportBuilding services-report
Building services-report
 
Reflective Journal about the module of Rights in Malaysia
Reflective Journal about the module of Rights in Malaysia Reflective Journal about the module of Rights in Malaysia
Reflective Journal about the module of Rights in Malaysia
 
Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)
 
Sustainable wastewater treatment
Sustainable wastewater treatmentSustainable wastewater treatment
Sustainable wastewater treatment
 
construction drawings
construction drawingsconstruction drawings
construction drawings
 
Bm final assignment cgc
Bm final assignment   cgcBm final assignment   cgc
Bm final assignment cgc
 
Paints
PaintsPaints
Paints
 
Paint info
Paint infoPaint info
Paint info
 
Type of concrete
Type of concreteType of concrete
Type of concrete
 
Latest psycho final r (2)
Latest psycho final r (2)Latest psycho final r (2)
Latest psycho final r (2)
 
Journal 2
Journal 2Journal 2
Journal 2
 
Personal reflection one
Personal reflection onePersonal reflection one
Personal reflection one
 
Math Report
Math ReportMath Report
Math Report
 
Account project
Account projectAccount project
Account project
 
Research proposal psy 1
Research proposal  psy 1Research proposal  psy 1
Research proposal psy 1
 
Psycho Report. Tittle: First Impression on appearance
Psycho Report. Tittle: First Impression on appearance Psycho Report. Tittle: First Impression on appearance
Psycho Report. Tittle: First Impression on appearance
 

Recently uploaded

The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
Celine George
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 

Recently uploaded (20)

The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 

Site Visit Report

  • 1. 1 Measurement 1 [QSB 60104]- Sr. Ang Fuey Lin Building Materials [BLD 62003]- Puan Hasmanira Mokhtar Construction Technology [BLD 60104]- Mr. Leong Boon Tik Assignment: Site Visit Report Name: Tan Chuu Yee Student ID: 0315097
  • 2. 2 Table of Content Cover page---------------------------------------------------------------------------------------------- 1 Table of content-----------------------------------------------------------------------------------------2 Introduction--------------------------------------------------------------------------------------------- 3 Content-------------------------------------------------------------------------------------------------- 4 Objective--------------------------------------------------------------------------------------------------5 Project summary----------------------------------------------------------------------------------------6 Photos and descriptions--------------------------------------------------------------------------7-16 Conclusion---------------------------------------------------------------------------------------------17
  • 3. 3 Introduction On 20 th of June 2014, along with my course mates, we went for a construction site which organized by our lecture (Ms.Ang) to visit the actual working environment on site that located at Jalan Klang Lama, Mukim Petaling. It is somewhere nearby the Pearl International Hotel Kuala Lumpur prides. The main contractor of this project is Encorp Construct Sdn. Bhd. On 26 th December 2013, Encorp secured a contract from Aik Bee Sdn Bhd on the construction and completion of main contract works for a 25-storey mixed- use development construction project. Construction is expected to be completed by November 2015. The size of the land is roughly 1 acres and the only one block that come with 25 level. It was a two years contract and the cost for this project is 101.6 million. As research, we knew there are level 3 to 6 for car basement and for the business area is ground first floor to second floor. Morever, the residential area is from level 7 to 24 and we authorized there are one bridge that build and combined to others building which is pearl point. We step into the ground floor level and then we went up to the car park on the third, fourth and fifth floor which are meant to be the carpark for the residents.
  • 4. 4 Content Firstly, we saw a continuous row of cylindrical-shaped concreteat the basement for the carpark of this building. Mr. Chong the guy who guide us walk around the construction building breifly explained to us that bore piilling is commonly used for high-rise buildings especially in the Kuala Lumpur state, switching the conventional reinforced concrete pile (RC pile). The bore piles act as a retentive wall for the building. In addition, when we walk around the site and there are actually plastic pipes lying around the site and some of the pipe were installed upright and the upper suspended slab. Mr. Chong told us those that were a pipe to transfer the concrete from the ground floor to upper floors for convinience. The pipe able to transfer a whopping 30m cube per hour. Once raining, the concreting works are enforced to be stop as the rainwater will insipid the concrete. Accidently, one of my classmate has fall down on the site that near the bar benders. That’s why we found that the bars benders bending the bars. They told me that the bar benders had their own ways in calculating the amount of steel bars needed. At the end we walking through the site, we went back to the ground floor of the site. There are a cluster of concrete pieces cutting by the workers. They cut the big pieces of concrete to small pieces and each of pieces are divided to 25mm or 50mm thick. Above had shown the informations of site and what we have explore on site.
  • 5. 5 Objective  To help us get more thoughtful on the basics of construction process while paying a visit to the site.  To understand the practical aspect of construction techniques in comparison to the theory aspect in books and its application on site.  To let us experience the actual working environment as a quantity surveyor on site dealing with the uncertain circumstance such as the weather condition and the risks that may take place on the site.  Awareness the importance of personal safety on site, and the safety precautions that we need to take in order to avoid get injured or accidents from happening. For instance, we are required to wear safety helmet when visit the site.  Explore and identify the various type of building materials and type of technology used in construction while constructing a building.  Upsurge our knowledge on the basic construction process by observing the building team and gathering information on the actual practise that carried on the site.  Observe the usage of machinery at the construction site such as mechanical plants, concrete mixer, bar bending machine and excavator.  Recognize the construction drawings and details given based on the items measurable for sub-structure and reinforced concrete frame works.
  • 6. 6 Project summary The summary of the project is written below: Project Title: Cadangan membina 1 blok bangunan bercampur 25 tingkat mengandungi tempat letak kereta di tingkat basemen 1 dan 2. Ruang perdagangan di tingkat bawah 1 dan 2.Tempat letak kereta di tingkat 3 hingga 6. Unit pagsapuri (403 unit) di tingkat 7 hingga 24. Binaan jejantas di tingkat satu bersambungan dengan bangunan Pearl Point sedia ada di jalan sepadu. Di atas lot 8354 (Lot asal 7517) & 9757,Batu 5, Jalan Klang Lama, Mukim Petaling, Kuala Lumpur. For Pearl Suria. Contract value: 101.6 million Commencement date: 26th december 2013 Audit date: November 2015 Client: Aikbee timbers Architecture: Lt Leong Sekudu Main contractor: Encorp construct sdn bhd
  • 7. 7 Photos and descriptions Various types of links, hooks and stirrups Workers making fillings for the formwork of staircase
  • 8. 8 Pipes structure on the roof beam The first step to steel building assembly is slab of concrete
  • 9. 9 Two types of scaffoldings (Putlog and Independent) Independent scaffold Putlog scaffold
  • 10. 10 Pipe for transfer the concrete to each level Picture shown the plan of the building construction
  • 11. 11 Timber are used as formwork in construction of staircase Bar cutting machine is used to cut down the 12m high tensile steel rods into certain length
  • 12. 12 Temporary building built for contractors, engineers & quantity surveyors to make discussions. It also acts as safety workshop to remind the visitors or clients to take safety precautions Date and work done during the construction process are recorded for referencing
  • 13. 13 Importance of safety on site (Sign Boards) Steel bar come out from the column
  • 14. 14 Bore pile under construction building Bend bar from the floor
  • 15. 15 Various types of building materials Steel Pipe Fittings and Pipes (For hot and cold water piping systems)
  • 16. 16 ‘DHI’ hubless cast iron drainage pipes and fittings High impact uPVC conduit
  • 17. 17 Conclusion After visiting the construction site, I fully understand the practical aspect of construction techniques in comparison to the theory aspect in books and its application. It is a lot more tougher than I thought. There is the different between woking on site, its helps me to gain more knowledge and the real experience that we will never learn in the class. At site, I had learnt about to be patient as we have to work under an uncertainly circumstances, especially the weather. However, I had learnt also how to communicate with the constructionteam members on site to see how importance of teamwork in the building team and also try to overcome the problems faced during the construction process. In the lifestyle of university, we only learn the new knowledge by memorizing the important points or doing tutorial questions to improve ourself for getting a good result for the next test or examination but as I knew that the real exam we will face is during our actual working in a company. That’s why we don’t really know how does it feel like when we starts to work outside and experience the actual working environmant. Last but not least, I had gained knowledge and understood about the basic of construction process, the communication of team work between members, experienced the actual working environment, the usage of machinery equipment, able to know what type of construction technology is adopted, able to differenciate the varius type of building materials used in the constructions and others. Honestly, the site visits strictly brought lot of benefits to me as it preparing me to overcome more troubles which may occur in the future of my life. I wish I could have more practical knowledge as it will prepare a better me during my work time in the future.